Wolverine Coal Mine

Type:Typical EA Process (Active and Complete)Status:Certificate Issued
Category:MiningPre-application

Start Date:

2001/12/31
 

Under Review >> Application and Supporting Studies



Folder:

Volume 4. Additional Information Report - Appendices Part 2. Submitted by Western Canadian Coal (prop) to Bob Hart (EAO) on May 12/04.

Date Posted:

2004/05/12


Document File

File Size

Format

Appendix B - Terrain and Surficial Materials 471 KBPDF
Appendix C-1 Part 1 Phase 1 ARD Characterization Study 4,073 KBPDF
Appendix C-1 Part 2 Phase 1 ARD Characterization Study 3,326 KBPDF
Appendix C-2 to C-6 ARD Metal ABA Data 1,539 KBPDF
Appendix C-7 Part 1 - Mineralogy of Sedimentary Rocks and Tailings Sample 3,898 KBPDF
Appendix C-7 Part 2 - Mineralogy of Sedimentary Rocks and Tailings Sample 2,319 KBPDF
Appendix C-8 Soil Test Pit Logs 149 KBPDF
Appendix C-9 - ARD ML Qa and QC Reports 4,937 KBPDF
Appendix D - Soils and Vegetation 165 KBPDF
Appendix E - Wildlife 531 KBPDF
Appendix F - Climate 397 KBPDF
Appendix G - Air Quality 1,085 KBPDF
Appendix H - Surface Water (Hydrology) 4,553 KBPDF
Appendix I - Surface Water Quality 1,191 KBPDF
Appendix J - Hydrogeology / Groundwater 432 KBPDF
Appendix K - Aquatic Resources 3,474 KBPDF
Appendix L - Reclamation 855 KBPDF
Appendix M - Water and Sediment Quality Objectives 257 KBPDF
Appendix N - Traditional Use Assembly 1,000 KBPDF
Appendix O - Geotechnical Design Pit Slope and Perry Creek 2,444 KBPDF
Appendix P - Emergency Response Plan 347 KBPDF
Appendix Q - Consultation Record 157 KBPDF
Appendix R - Material Safety Data Sheets 3,030 KBPDF
Last Updated: Last Updated: 2010-03-20
Copyright.Disclaimer.Privacy.Accessibility.