Highland Valley Centre for Sustainable Waste Management

Type:Typical EA Process (Active and Complete)Status:Completed / Certified
Category:Waste DisposalPre-application

Start Date:

2005/08/02
 

Under Review >> Application and Supporting Studies



Folder:

Vol 1. Main Document - Application for an Environmental Assessment Certificate for the Highland Valley Centre for Sustainable Waste Management submitted by Highland Valley Copper to Archie Riddell (EAO) Sept 2007.

Date Posted:

2007/09/05


Document File

File Size

Format

Volume 1 - Table of Contents 204 KBPDF
Volume 1 - Application - Main Document 1,769 KBPDF
Volume 1 - Figure 1-1 - Site Location Regional Setting 3,606 KBPDF
Volume 1 - Figure 1-2 - Key Landfill Infrastructure and Facilities 1,854 KBPDF
Volume 1 - Figure 3-1 - Site Location Air Photo 3,519 KBPDF
Volume 1 - Figure 3-2 - Operational Cover and Construction Material Stockpiles 2,596 KBPDF
Volume 1 - Figure 3-3 - Regional Transportation Route Options 1,335 KBPDF
Volume 1 - Figure 3-4 - Future Landfill Final Contours on 2019 Waste Rock Dump Design 1,823 KBPDF
Volume 1 - Figure 3-5 - Drainage Liner and Leachate Collector Header 695 KBPDF
Volume 1 - Figure 3-6 - Projected Production of LFG by the Landfill Bioreactor for three Organic Diversion Scenarios 291 KBPDF
Volume 1 - Figure 3-7 - Phasing of the Power Generator Installations for Landfill Bioreactor (75% LFG Capture) 268 KBPDF
Volume 1 - Figure 3-8 - Surface Water Ditching and Downchutes 1,625 KBPDF
Volume 1 - Figure 3-9 - Landfill Final Cover Design Concept 388 KBPDF
Volume 1 - Figure 3-10 - Overview of Progressive Closure Areas 1,799 KBPDF
Volume 1 - Figure 4-1 - Drainage Patterns in the Vicinity of the Project 796 KBPDF
Volume 1 - Figure 5-1 - Vertical Surficial Geologic Sections Through Highland Valley 409 KBPDF
Volume 1 - Figure 5-2 - Existing Aquatic and Terrestrial Conditions 1,366 KBPDF
Last Updated: Last Updated: 2009-11-21
Copyright.Disclaimer.Privacy.Accessibility.