Highland Valley Centre for Sustainable Waste Management

Type:Typical EA Process (Active and Complete)Status:Completed / Certified
Category:Waste DisposalPre-application

Start Date:

2005/08/02
 

Under Review >> Application and Supporting Studies



Folder:

Vol 2. Appendix A - Application for an Environmental Assessment Certificate for the Highland Valley Centre for Sustainable Waste Management submitted by Highland Valley Copper to Archie Riddell (EAO) Sept 2007

Date Posted:

2007/09/05


Document File

File Size

Format

Volume 2 - Table of Contents 219 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Main Document 5,005 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 2 - Figure 2-1 - British Columbia Site Location Map 459 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 2 - Figure 2-2 - Site Location Regional Setting 883 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 2 - Figure 2-3 - Site Location Highland Valley Setting 4,015 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 2 - Figure 2-4 - Site Topography Surveyed in March 2007 3,096 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 3 - Figure 3-1 - Facility Siting Constraints in the TNRD 2,879 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 3 - Figure 3-2 - Highland Valley Site Location Air Photo 3,907 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 3 - Figure 3-3 - Key Landfill Infrastructure and Facilities 932 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 3 - Figure 3-4 - Operational Cover and Construction Material Stockpiles 3,365 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 4 - Figure 4-1 - Regional Transportation Route Options 4,382 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 5 - Figure 5-1 - Future Landfill Final Contours on 2019 Waste Rock Dump Design 885 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 5 - Figure 5-2 - 2019 Waste Rock Dump Contours 828 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 5 - Figure 5-3 - Future Landfill Base Contours for 2019 Dump Design 890 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 5 - Figure 5-4 - Cut & Fill Landfill Base to March 2007 Contours 3,574 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 5 - Figure 5-5 - Cut & Fill Landfill Base Minus 2019 Rock Dump 3,081 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 5 - Figure 5-6 - Total Landfill Capacity Cut & Fill Final Contours Minus Base Contours 2,274 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 5 - Figure 5-7 - Phase 1 Contours 893 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 5 - Figure 5-8 - Phase 1 Cut & Fill Contours/Capacity 1,405 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 5 - Figure 5-9 - Phase 2 Contours 898 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 5 - Figure 5-10 - Phase 2 Cut & Fill Contours/Capacity 1,373 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 5 - Figure 5-11 - Phase 3 Contours 894 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 5 - Figure 5-12 - Phase 3 Cut & Fill Contours/Capacity 1,261 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 5 - Figure 5-13 - Phase 4 Contours 898 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 5 - Figure 5-14 - Phase 4 Cut & Fill Contours/Capacity 1,344 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 5 - Figure 5-15 Phase 5 Contours 899 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 5 - Figure 5-16 - Phase 5 Cut & Fill Contours/Capacity 1,510 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 5 - Figure 5-17 - Design Cross-Sections for Stability Analysis 259 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 6 - Figure 6-1 - Landfill Entrance Infrastructure and Facilities 294 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 8 - Figure 8-1 - Water Consumption for Producing LFG 216 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 8 - Figure 8-2 - Phasewise Projected Generation of Leachate 206 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 8 - Figure 8-3 - Leachate Collection System 927 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 8 - Figure 8-4 - Chloride Migration Pattern Through the Geo-Membrane/GCL Barrier 207 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 8 - Figure 8-5 - Chloride Mitigation Pattern Through the 10B Silt Soil 209 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 8 - Figure 8-6 - Migration Pattern of Chloride Through 10B Absorptive Silt 207 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 8 - Figure 8-7 - Drainage Liner and Leachate Collector Header 282 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 8 - Figure 8-8 - Leachate Collector Tower 377 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 8 - Figure 8-9 - Ponds Section and Detail 236 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 8 - Figure 8-10 - Leachate Recirculation System In Section 296 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 8 - Figure 8-11 - Ground Water Monitoring Locations During Phasing Development 1,005 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 9 - Figure 9-1 - Projected Production of LFG by a Conventional Landfill for three Organic Diversion Scenarios 215 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 9 - Figure 9-2 - Projected Production of LFG by a Bioreactor Landfill for three Organic Diversion Scenarios 215 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 9 - Figure 9-3 - Projected Production of LFG by a Conventional Landfill for 0%, 50%, 90% Organic Diversion and No Replacement of Tonnage Lost 216 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 9 - Figure 9-4 - Projected Production of LFG by a Bioreactor Landfill for 0%, 50%, 90% Organic Diversion and No Replacement of Tonnage Lost 216 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 9 - Figure 9-5 - Projected Generation of NMOC by the Landfill Bioreactor 219 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 9 - Figure 9-6 - Emmissions from the Power Generating Engines 216 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 9 - Figure 9-7 - Phase 1 Single Layer Horizontal Gas Collection Network Layout Typical for Bottem Fift 1,726 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 9 - Figure 9-8 - Phase 2 Single Layer Horizontal Gas Collection Network Layout Typical for Bottem Fift 1,782 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 9 - Figure 9-9 - Phase 3 Single Layer Horizontal Gas Collection Network Layout Typical for Bottem Fift 1,734 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 9 - Figure 9-10 - Phase 4 Single Layer Horizontal Gas Collection Network Layout Typical for Bottem Fift 1,736 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 9 - Figure 9-11 - Phase 5 Single Layer Horizontal Gas Collection Network Layout Typical for Bottem Fift 1,727 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 9 - Figure 9-12 - Horizontal Gas Trench Detail 204 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 9 - Figure 9-13 - Gas Monitoring Locations 910 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 10 - Figure 10-1 - Projected Power Production of Bioreactor with 75% LFG Capture Efficiency 215 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 10 - Figure 10-2 - Phasing of the Power Generator Installations for Landfill Bioreactor (75% LFG Capture Efficiency) 206 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 10 - Figure 10-3 - Power Production Potential with Landfill Age 47 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 10 - Figure 10-4 - Projected GHG Emissions Reduction Due to LFG Utilization (75% LFG Capture) 218 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 10 - Figure 10-5 - Comparitive GHG Emissions for HVCSWM, Incinerator, and Incinerator plus Small Landfills 218 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 10 - Figure 10-6 - Comparitive GHG Emissions (non Biogenic) for HVL, Incinerator, and Incinerator plus Small Landfills 216 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 10 - Figure 10-7 - Comparitive Emissions for Sumas-E2, Incinerator, and HVC Incinerator Landfills 207 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 11 - Figure 11-1 - IDF Curve for Kamloops Airport 1965 - 1990 285 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 11 - Figure 11-2 - Surface Water Ditching and Downchutes 578 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 11 - Figure 11-3 - Typical Ditch Detail 76 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 11 - Figure 11-4 - Downchute Detail 98 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 12 - Figure 12-1 - Landfill Final Cover Design Concept 218 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 12 - Figure 12-2 - Help Modeling Options 167 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 12 - Figure 12-3 - Overview of Progressive Closure Areas 904 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 12 - Figure 12-4 - Phase 1 Closure Area 889 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 12 - Figure 12-5 - Phase 2 Closure Area 888 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 12 - Figure 12-6 - Phase 3 Closure Area 884 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 12 - Figure 12-7 - Phase 4 Closure Area 882 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 12 - Figure 12-8 - Phase 5 Closure Area 884 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 13 - Figure 13-1 - Lift Construction Concept Using Strip Method 205 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 13 - Figure 13-2 - Lift Edge Development 189 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Figures - Chapter 13 - Figure 13-3 - Post Closure Monitoring Locations 995 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-1 307 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-2 488 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-3 140 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-4 713 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-5 464 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-6-1 to A-6-24 3,587 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-6-25 - A-6-36 2,058 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-6-37 - A-6-48 1,979 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-6-49 - A-6-72 3,288 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-6-73 - A-6-84 1,866 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-7 - Table of Contents 69 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-7 - Text 606 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-7 - Figure 2-1 407 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-7 - Figure 2-2 103 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-7 - Figure 2-3 97 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-7 - Figure 2-4 3,377 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-7 - Figure 4-1 112 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-7 - Figure 4-2 1,950 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-7 - Figure 4-3 81 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-7 - Table 4-3 59 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-7 - Figure 4-4 861 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-7 - Table 4-4 58 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-7 - Figure 4-5 842 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-7 - Figure 4-6 714 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-7 - Figure 4-7 691 KBPDF
Volume 2 - Appendix A - Design and Operation Plan - Annex A-7 - Figure 4-8 803 KBPDF
Last Updated: Last Updated: 2009-11-21
Copyright.Disclaimer.Privacy.Accessibility.