KSL Pipeline Looping Project

Type:Typical EA Process (Active and Complete)Status:Completed / Certified
Category:EnergyPre-application

Start Date:

2005/11/23
 

Under Review >> Application and Supporting Studies



Folder:

Volume 2 Baseline Studies - Application for an Environmental Assessment Certificate for the KSL Pipline Looping Project submitted by Pacific Trails Piplines LP to Graeme McLaren (EAO) Oct. 2007.

Date Posted:

2007/10/12


Document File

File Size

Format

Volume II - Baseline Studies - Acoustic Environmental Assessment 368 KBPDF
Volume II - Baseline Studies - Air Quality Assessment 6,943 KBPDF
Volume II - Baseline Studies - Archaeological Overview Study 4,856 KBPDF
Volume II - Baseline Studies - Acid Rock Drainage and Metal Leaching Assessment 770 KBPDF
Volume II - Baseline Studies - Acid Rock Drainage and Metal Leaching Assessment - Appendix I - Location Plan Map 2 805 KBPDF
Volume II - Baseline Studies - Acid Rock Drainage and Metal Leaching Assessment - Appendix I - Minfile, Aris Locations and 1:250K BCGS Geology Plan - Maps 3 - 10 3,298 KBPDF
Volume II - Baseline Studies - Acid Rock Drainage and Metal Leaching Assessment - Appendix I - BC Regional Geochemistry Survey Maps 11 - 14 7,509 KBPDF
Volume II - Baseline Studies - Acid Rock Drainage and Metal Leaching Assessment - Appendix I - Acid Rock Drainage/Metal Leaching Ranking Map 15 934 KBPDF
Volume II - Baseline Studies - Contaminated Sites Inventory 673 KBPDF
Volume II - Baseline Studies - Fish and Fish Habitat Investigations 780 KBPDF
Volume II - Baseline Studies - Fish and Fish Habitat Investigations - Appendix A Watercourse Crossing Summary Table 156 KBPDF
Volume II - Baseline Studies - Forestry Technical Report 887 KBPDF
Volume II - Baseline Studies - Paleontological Resources Assessment 485 KBPDF
Volume II - Baseline Studies - Physiography and Geological Processes 901 KBPDF
Volume II - Baseline Studies - Socio-Economic Technical Report 4,633 KBPDF
Volume II - Baseline Studies - Socio-Economic Technical Report - Figure 3 - 9 Registered Trapping Territories Crossed by the Project Route 8,750 KBPDF
Volume II - Baseline Studies - Socio-Economic Technical Report - Figure 3 - 10 Guide Outfitter Territories Crossed by the Project Route 8,763 KBPDF
Volume II - Baseline Studies - Soil Assessment 1,662 KBPDF
Volume II - Baseline Studies - Terrestrial Ecosystem Inventory Compilation and Mapping 1,065 KBPDF
Volume II - Baseline Studies - Vegetation Technical Report 5,742 KBPDF
Volume II - Baseline Studies - Wildlife and Wildlife Habitat Technical Report 3,649 KBPDF
Volume II - Baseline Studies - Wildlife and Wildlife Habitat Technical Report - Mountain Goat Habitat Areas in the LSA Maps 2,341 KBPDF
Volume II - Baseline Studies - Wildlife and Wildlife Habitat Technical Report - Wildlife Series Legend 21 KBPDF
Volume II - Baseline Studies - Wildlife and Wildlife Habitat Technical Report - Wildlife Index Map 828 KBPDF
Volume II - Baseline Studies - Wildlife and Wildlife Habitat Technical Report - Wildlife Series Map 1 of 7 1,954 KBPDF
Volume II - Baseline Studies - Wildlife and Wildlife Habitat Technical Report - Wildlife Series Map 2 of 7 1,626 KBPDF
Volume II - Baseline Studies - Wildlife and Wildlife Habitat Technical Report - Wildlife Series Map 3 of 7 1,684 KBPDF
Volume II - Baseline Studies - Wildlife and Wildlife Habitat Technical Report - Wildlife Series Map 4 of 7 1,311 KBPDF
Volume II - Baseline Studies - Wildlife and Wildlife Habitat Technical Report - Wildlife Series Map 5 of 7 1,324 KBPDF
Volume II - Baseline Studies - Wildlife and Wildlife Habitat Technical Report - Wildlife Series Map 6 of 7 1,349 KBPDF
Volume II - Baseline Studies - Wildlife and Wildlife Habitat Technical Report - Wildlife Series Map 7 of 7 1,469 KBPDF
Last Updated: Last Updated: 2009-11-21
Copyright.Disclaimer.Privacy.Accessibility.