Kokish River Hydroelectric Project

Type:Typical EA Process (Active and Complete)Status:Pre-Application
Category:EnergyPre-application

Start Date:

2008/07/11
 

Pre-Application >> EAO Generated Documents



Folder:

Letter dated Dec 3/08 from Robin Junger (EAO) to Chris Oakley (Brookfield Renewable Power Inc.) re: Application for the proposed Kokish Hydroelectric Power Project to be designated as reviewable

Date Posted:

2008/12/05


Document File

File Size

Format

Letter dated Dec 3/08 from Robin Junger (EAO) to Chris Oakley (Brookfield Renewable Power Inc.) re: Application for the proposed Kokish Hydroelectric Power Project to be designated as reviewable 320 KBPDF