Kwoiek Creek Hydroelectric Project

Type:Typical EA Process (Active and Complete)Status:Completed / Certified
Category:EnergyPre-application

Start Date:

2001/03/20
 

Document Index

Under Review

Application and Supporting Studies

Title

Author

Posted Date

Amended Application and Appendices for an Environmental Assessment Certificate submitted to Joe Truscott (EAO) Sep 05/08  2008/09/11
Letter of Transmittal for an Amended Application dated Sep 05/08Joe Truscott, Environmental Assessment Office2008/09/11
Project Approval Certificate Application - Volume 1  2001/03/20
Project Approval Certificate Application - Volume 2  2001/03/20

Aboriginal Comments/Submissions

Title

Author

Posted Date

Letter/fax dated Jan 22/09 from Chief Robert Pasco (NNTC) to Nicole Vinette (EAO) regarding the Kwoiek Creek Hydroelectric ProjectRobert Pasco, Nlaka'pamux Nation Tribal Council2009/03/24
Letter/fax dated Jan 9/09 from Ken Hughes-Adams (Madrone Environmental Services Ltd.) to Chief Sampson, Chief Aljam and Chief Walkem regarding the Amended ApplicationKen Hughes-Adams, Madrone Environmental Services Ltd.2009/03/24
Report dated Feb 19/09 submitted by Ken Hughes-Adams (Madrone Environmental Services Ltd.) to the Siska, Cook's Ferry and Coldwater Indian Bands regarding the Kwoiek Creek Hydroelectric Project Amended Application Ken Hughes-Adams, Madrone Environmental Services Ltd.2009/03/24
Letter/fax dated Oct 24/08 from Chief Robert Pasco (NNTC) to Joe Truscott (EAO) regarding the Amended ApplicationChief Bob Pasco, Nlaka'pamux Nation Tribal Council2009/01/29
Document titled Kanaka Bar Indian Band Proposed Designation and Recovation Vote Whyeek Indian Reserve No. 4 received Jan 16/09 from Patrick Michell (Kanaka Bar Indian Band) Patrick Michell, Kanaka Bar Indian Band2009/01/26
Comments dated Dec 12/08 from Patrick Michell (Kanaka Bar Indian Band) to Joe Truscott (EAO) regarding the Amended Application Patrick Michell, Kanaka Bar Indian Band2008/12/19
Letter dated Dec 12/08 from Les Leibbrandt (Nicola Tribal Association) to Joe Truscott (EAO) regarding the Amended Application Les Leibbrandt, Nicola Tribal Association2008/12/16
Email and letter dated Dec 12/08 from Tracy Sampson and Tania Lazorko (Nicola Tribal Association) to Joe Truscott (EAO) regarding the Amended Application Tracy Sampson, Nicola Tribal Association2008/12/16
Letter from Nathan Spinks (Lytton First Nation) to Alan Calder (EAO) regarding the impact the Kwoiek Creek Hydro Electric Project will have on the reserve.Nathan Spinks, Lytton First Nation2001/08/20
Letter from Chief Bob Pasco (Nlaka'pamux Nation Tribal Council) to Derek Griffin (EAO) regarding his participating in the project review.Chief Bob Pasco, Oregon Jack Creek Band2001/05/30

EAO Generated Documents

Title

Author

Posted Date

Kwoiek Creek Hydroelectric Project Working Group Final Meeting Summary dated Dec 17/08 Nicole Vinette, Environmental Assessment Office2009/02/09
Kwoiek Creek Hydroelectric Project Technical Fisheries Working Group Final Meeting Summary dated Dec 18/08 Rachel Shaw, Environmental Assessment Office2009/02/09
Kwoiek Creek Hydroelectric Project Technical Terrestrial Working Group Final Meeting Summary dated Nov 18/08 Nicole Vinette, Environmental Assessment Office2008/12/09
Kwoiek Creek Hydroelectric Project Technical Terrestrial Working Group Final Meeting Summary dated Nov 6/08 Nicole Vinette, Environmental Assessment Office2008/12/05
Kwoiek Creek Hydroelectric Project Technical Fisheries Working Group Final Meeting Summary dated Nov 6/08 Nicole Vinette, Environmental Assessment Office2008/12/05
Proposed Kwoiek Creek Hydroelectric Project Working Group Final Meeting Summary dated Oct 8/08Rachel Shaw, Environmental Assessment Office2008/12/03
Letter from Joe Truscott (EAO) accepting the Amended Application Sep 11/08  2008/09/11
Letter From Joe Truscott (EAO) assessing the First Nations and Public Consultation Plans Sep 11/08Joe Truscott, Environmental Assessment Office2008/09/11
Order Under Section 11 dated October 5, 2007 signed by Joe Truscott (EAO)Joe Truscott, Environmental Assessment Office2007/10/05
Kwoiek Creek Hydroelectric Project, Fisheries Working Group Meeting Minutes - Kamloops Ramada Inn - April 3, 2007 1:00 - 4:00pm Joe Truscott, Environmental Assessment Office2007/09/13
Kwoiek Creek Hydroelectric Project, Terrestrial Working Group Meeting Minutes - Thompson Hotel & Conference Centre - April 18, 2007 9:00am to NoonJoe Truscott, Environmental Assessment Office2007/09/13
Letter dated Sept 12/07 from Derek Griffin (EAO) to Richard Blanchet (KCRLP) regarding a one-year time extension. Time Limit Extension Order #2 dated Sept 12/07 attachedDerek Griffin, Environmental Assessment Office2007/09/12
Letter dated Sept 5/06 from Joan Hesketh (EAO) to Richard Blanchet (Proponent) regarding a one-year extension. Time Limit Extension Order dated Sept 6/06 attachedJoan Hesketh, Environmental Assessment Office2006/09/13
Transition Order 02-11 for the Kwoiek Creek Hydroelectric Project Deputy Minister Sheila Wynn, Environmental Assessment Office2002/12/31
Letter from Derek Griffin (EAO) to Waldemar (Wally) Braul (Faskan Martineau DuMoulin LLP) confirming the acceptance of Kwoiek Creek Resources Inc as the formal proponent for the Kwoiek Creek Hydroelectric Project.Derek Griffin, Environmental Assessment Office2002/08/09
Email from Alan Calder (EAO) to Kwoiek Creek Committee members with attached Kwoiek PC Meeting final minutes from September 6, 2001.Alan Calder, Environmental Assessment Office2001/10/09
Letter from Derek Griffin (EAO) to Nathan Spinks (Lytton First Nation) in response to his comments submitted August 15, 2001.Derek Griffin, Environmental Assessment Office2001/10/02
Kwoiek Creek Hydroelectric Project Committee Meeting Minutes - EAO Meeting Room, 4th Floor, 836 Yates St, Victoria, BC - September 6, 2001 - 9:30am - 11:30amDerek Griffin, Environmental Assessment Office2001/10/02
E-mail with attachment from Alan Calder (EAO) to Bill Harland (Prop) regarding proposed addendum to section 2.3.1.2Alan Calder, Environmental Assessment Office2001/09/20
Memo from Sheila Wynn (EAO) to Derek Griffin (EAO) regarding the assignment of the project from Norm Ringstad to Derek GriffinDeputy Minister Sheila Wynn, Environmental Assessment Office2001/09/20
Letter from Derek Griffin (EAO) to Scot Bourgiois (Lytton BC) regarding the Draft Report Specifications for this projectDerek Griffin, Environmental Assessment Office2001/09/19
E-mail with attachment from Derek Griffin (EAO) to Bill Harland (Prop) regarding Canada Coast Guards suggested changesDerek Griffin, Environmental Assessment Office2001/09/19
Letter from Sheila Wynn (DM, EAO) to Derek Griffin (EAO) regarding assignment of the Kwoiek Creek Hydroelectric Project.Deputy Minister Sheila Wynn, Environmental Assessment Office2001/09/17
Letter from Derek Griffin (EAO) to Project Committee Members regarding the completion of the Project Report Specifications.Derek Griffin, Environmental Assessment Office2001/09/17
Letter from Derek Griffin (EAO) to Chief James Frank (Kanaka Bar Band) enclosing the Final Project Report Specifiations for the Kwoiek Creek Hydroelectric Project.Derek Griffin, Environmental Assessment Office2001/09/17
Project Report Specifications for the Kwoiek Creek Hydroelectric Project (September 13, 2001).Derek Griffin, Environmental Assessment Office2001/09/17
Email from Alan Calder (EAO) to Kwoiek Creek Active Committee members forwarding additional Meeting material for the September 6, 2001 meeting.Alan Calder, Environmental Assessment Office2001/09/06
Letter from Derek Griffin (EAO) to Cheif James Frank (Kanaka Bar Band) regarding the acknowledgement of the Chief's comments on the Draft Project Report Specifications.Derek Griffin, Environmental Assessment Office2001/08/29
Letter from Derek Griffin (EAO) to Kwoiek Creek Hydroelectric Project Committee regarding the next meeting of the committee to be held Sept. 6 2001 at 836 Yates St (EAO) with attached distribution list and agenda.Derek Griffin, Environmental Assessment Office2001/08/29
Kwoiek Project Committee Meeting Minutes - Rm 2290, West Fraser Timber, Simon Fraser University, Downtown Campus - July 18, 2001 9:30am - 4:30pmDerek Griffin, Environmental Assessment Office2001/08/21
Letter from Sheila Wynn (Deputy Minister, EAO) to Betty Hinton (MP, Kamloops-Thompson-Highland Valley) regarding an invitation to comment on the draft project specifications.Deputy Minister Sheila Wynn, Environmental Assessment Office2001/08/16
Letter from Derek Griffin (EAO) to Government Agents regarding public notification of an EA project review.Derek Griffin, Environmental Assessment Office2001/08/02
Letter from Derek Griffin (EAO) to EA advisory committee members & First Nation observers regarding public notification of an EA project review.Derek Griffin, Environmental Assessment Office2001/08/02
Letter from Sheila Wynn (DM, EAO) to Dave Chutter (Liberal MLA, Yale-Lillooet) regarding an invitation to comment on the draft project report specifications.Deputy Minister Sheila Wynn, Environmental Assessment Office2001/08/02
Letter from Sheila Wynn (DM, EAO) to Mayors in the Kwoiek Creek area regarding an invitation to comment on the draft project report specifications.Deputy Minister Sheila Wynn, Environmental Assessment Office2001/08/02
Draft Project Report Specifications for Kwoiek (July 24, 2001)Derek Griffin, Environmental Assessment Office2001/07/25
Memo from Derek Griffin (EAO) to Kwoiek Creek Hydroelectric Project Committee Members regarding the completion of the Draft Project Report Specifications.Derek Griffin, Environmental Assessment Office2001/07/25
Follow up letter from Derek Griffin (EAO) to Chief James Frank (Proponent) regarding the Draft Project Report specifications.Derek Griffin, Environmental Assessment Office2001/07/25
Recommendation of the Kwoiek Creek Project Committee - July 4, 2001 Kanaka Bar Band is ordered to prepare a project report The project is ordered to undergo further reviewDerek Griffin, Environmental Assessment Office2001/07/13
Letter from Derek Griffin (EAO) to Chief James Frank (proponent) regarding the completion of the stage 1 review of the project and the preparation of the draft project report specifications.Derek Griffin, Environmental Assessment Office2001/07/13
Kwoiek Creek Hydroelectric Project Final Meeting Minutes, Fraser Canyon Tribal Hall, 988 McIntyre Rd, Lytton BC, May 30,2001, 9:30 am to 12:30 pm.Derek Griffin, Environmental Assessment Office2001/06/28
Response letter from Derek Griffin (EAO) to Bill Harland ( Powerhouse Energy Corp.) regarding the receipt of the Kwoiek Creek Hydroelectric Project Public and First Nations Consultation Stage 1 Summary Report.Derek Griffin, Environmental Assessment Office2001/06/12
Memo from Derek Griffin (EAO) to Kwoiek Creek Hydroelectric Project Committee (see distribution list) regarding attached agenda for the next committee meeting on May 30, 2001.Derek Griffin, Environmental Assessment Office2001/05/30
Letter from Derek Griffin (EAO) to Bill Harland (PHE) regarding comments from government agencies.Derek Griffin, Environmental Assessment Office2001/05/30
Letter from Derek Griffin (EAO ) to Paul Scott (CEAA) regarding participating in project review.Derek Griffin, Environmental Assessment Office2001/05/29
Letter from Derek Griffin (EAO) to Mayors (see distribution list) regarding participating in project review.Derek Griffin, Environmental Assessment Office2001/05/29
Letter from Derek Griffin (EAO) to Janice Aull (MCF) and distribution list regarding participating in the project review.Derek Griffin, Environmental Assessment Office2001/05/29
Letter from Derek Griffin (EAO) to Garry Alexander (MELP) and distribution list regarding participating in project review.Derek Griffin, Environmental Assessment Office2001/05/29
Letter from Martyn Glassman (EAO) to George Saddleman (Chairperson, Nicola Tribal Association) regarding participating in the project review.Martyn Glassman, Environmental Assessment Office2001/05/29
Letter from Martyn Glassman (EAO) to Chief Doug McIntyre (Fraser Canyon Tribal Administration) regarding participating in the project review.Martyn Glassman, Environmental Assessment Office2001/05/29
Letter from Martyn Glassman (EAO) to Chief Bob Pasco (Nlaka'pamux Nation Tribal Council) regarding participating in the project review.Martyn Glassman, Environmental Assessment Office2001/05/29
Letter from Martyn Glassman (EAO) to Chief Janet Webster (Lytton First Nation) regarding participating in the project review.Martyn Glassman, Environmental Assessment Office2001/05/29
Kwoiek Creek Project Committee Final Meeting Minutes (April 10, 2001)Alan Calder, Environmental Assessment Office2001/05/28
Kwoiek Project Committee Meeting Minutes - Fraser Canyon Tribal Hall, April 10, 2001, 10:00am to 4:00pmDerek Griffin, Environmental Assessment Office2001/05/11
Letter from Derek Griffin (EAO) to Chief James Frank (proponent) regarding measures needed by proponent before the issuance of a project approval certificate.Derek Griffin, Environmental Assessment Office2001/05/02
Letter from Derek Griffin (EAO) to Chief Fred Sampson (Siska Band) regarding providing information on current traditional activities practiced within the proposed area and where have they taken place and technical information Derek Griffin, Environmental Assessment Office2001/05/02
Letter from Derek Griffin (EAO) to Chief James Frank (proponent) regarding providing information on current traditional activities practiced within the proposed area and where have they taken place and technical information Derek Griffin, Environmental Assessment Office2001/05/02
Form letter from Derek Griffin (EAO) to Chiefs (see distribution list) regarding providing information on current traditional activities practiced within the proposed area and where have they taken place and technical informationDerek Griffin, Environmental Assessment Office2001/05/02
Letter from Derek Griffin (EAO) to (distribution list) regarding a mineral tenure that may be affected by the Kwoiek project.Derek Griffin, Environmental Assessment Office2001/05/02
Letter from Norm Ringstad (EAO) to Chiefs (see attached distribution list) regarding the first project committee meeting, review schedule and tasks.Norm Ringstad, Environmental Assessment Office2001/04/09
Letter from Norm Ringstad (EAO) to Environmental Assessment Advisory Committee Members and First Nations Observers (attached distribution list) re. public comment periodNorm Ringstad, Environmental Assessment Office2001/03/29
Letter from Norm Ringstad (EAO) to Environmental and Industry Groups (attached distribution lists) re. public comment periodNorm Ringstad, Environmental Assessment Office2001/03/29
Memo from Norm Ringstad (EAO) to Government Agents (attached distribution list) re. public comment periodNorm Ringstad, Environmental Assessment Office2001/03/29
Memo from Sheila Wynn (EAO) to Mayors (attached distribution list) re. public comment periodDeputy Minister Sheila Wynn, Environmental Assessment Office2001/03/29
Letter from Sheila Wynn (EAO) to Betty Hinton (MP, Canadian Alliance Party) and cc. to Paul Scott (Environmental Assessment Agency) re. public comment periodDeputy Minister Sheila Wynn, Environmental Assessment Office2001/03/29
Memo from Sheila Wynn (EAO) to Harry Lali (MLA, Yale - Lilooet) re. public comment periodDeputy Minister Sheila Wynn, Environmental Assessment Office2001/03/29
Memo from Norm Ringstad (EAO) to Active and Technical Committee members (attached distribution lists) re. public comment periodNorm Ringstad, Environmental Assessment Office2001/03/29
Memo from Norm Ringstad (EAO) to Review Committee members (attached distribution lists) re. public comment periodNorm Ringstad, Environmental Assessment Office2001/03/29
Letter from Sheila Wynn (EAO) to Chief James Frank of Kanaka Bar Indian Band (proponent) regarding assignment of Norm Ringstad as chair of the project committee.Deputy Minister Sheila Wynn, Environmental Assessment Office2001/03/21
Letter from Derek Griffin (EAO) to Chief James Frank of Kanaka Bar Band (proponent) regarding acceptance of Application for a Project Approval Certificate for the Kwoiek Creek Hydroelectric Project.Derek Griffin, Environmental Assessment Office2001/03/20
Public Notice and Invitation to Comment on An Application for Kwoiek Creek Hydroelectric ProjectNorm Ringstad, Environmental Assessment Office2001/03/20
Memo from Sheila Wynn (EAO) to Derek Griffin (EAO) re. assignment of Kwoiek Creek Project.Deputy Minister Sheila Wynn, Environmental Assessment Office2001/03/20

Federal Comments/Submissions

Title

Author

Posted Date

Letter dated Dec 3/08 from Jo-Anne McDonald (TC) to Joe Truscott (EAO) regarding the Amended Application Jo-Anne McDonald, Transport Canada2008/12/08
Email dated Dec 5/08 and letter dated Dec 3/08 from Amanda Chisholm (DFO) to Joe Truscott (EAO) regarding the Amended ApplicationAmanda Chisholm, Canadian Environmental Assessment Agency2008/12/08
Letter dated Nov 21/08 from Rebecca Stranberg (HC) to Amanda Chisholm (EC) regarding the Amended Application Rebecca Stranberg, Health Canada2008/11/24
E-mail with attachment from Debra Hughes (Fed) to Derek Griffin (EAO regarding proposed changes to Specification 13Debra Hughes, Department of Fisheries and Oceans2001/09/19
Letter from Berni Claus (Environment Canada) to Derek Griffin (EAO) regarding the Canadian Environmental Assessment Act.Berni Claus, Environment Canada2001/09/10
Letter from Iannick Lamirande (Environmental Assessment Officer, Natural Resources Canada)to Derek Griffin (EAO) regarding NRC's proposed modifications to the Draft Project Report Specifications.Iannick Lamirande, Natural Resources Canada2001/08/03
Faxed letter from Martin Mullan (INAC) to Derek Griffin (EAO) regarding Transport Canada's response to the CEAA referral.Martin Mullan, Indian and Northern Affairs Canada2001/06/28
Letter from Martin Mullan (INAC) to Bob Sisler (Transport Canada), Adrian Duncan (Environment Canada), and Dr. Marty Magne (Heritage Canada) regarding CEAA review of Kwoiek.Martin Mullan, Indian and Northern Affairs Canada2001/06/06
Fax from Martin Mullan (Indian and Northern Affairs Canada) to William P. Harland (Powerhouse Energy Corp.) regarding a forwarded letter from Iannick Lamirande (NRC) with questions on explosives.Martin Mullan, Indian and Northern Affairs Canada2001/06/06
Letter from D.A. Hughes (Fisheries and Oceans) to Derek Griffin (EAO) regarding comments on the application.Debra Hughes, Department of Fisheries and Oceans2001/06/01
Letter from Berni Claus (Environment Canada) to Martin Mullan (DIAND) and Derek Griffin (EAO) regarding his comments on the application under the CEAA Act and the BCEAA Act.Berni Claus, Environment Canada2001/05/28
Letter from Martin Mullan (INAC) to Derek Griffin (EAO) regarding his comments on the Application.Martin Mullan, Indian and Northern Affairs Canada2001/05/15
Letter from Martin Magne (Parks Canada) to Norm Ringstad (EAO) regarding comments on heritage and archaeological matters.Martin Magne, Department of Canadian Heritage2001/04/12

Local Government Comments/Submissions

Title

Author

Posted Date

Letter from Bob Finley (Thompson-Nicola Regional District) to Alan Calder (EAO) regarding comments on the application.Bob Finley, Thompson-Nicola Regional District2001/06/29
Letter from Terry Raymond (Fraser Valley Regional District) to Alan Calder (EAO) regarding FVRD Electoral Area Services Committee's comments respecting the project.Terry Raymond, Fraser Valley Regional District2001/05/28

Notices - News Releases

Title

Author

Posted Date

Public Comment Period Open Houses ad received Sep11/08  2008/09/11
Public notice from Derek Griffin (EAO) inviting comments on the draft project report specifications.Derek Griffin, Environmental Assessment Office2001/08/02
Registry Notice inviting Public Comment on the Kwoiek Project (July 24, 2001).Derek Griffin, Environmental Assessment Office2001/07/25
Notice of the Public Information Meeting of Tuesday, May 15 from 6:30 to 8:30 pm at the Days Inn - Amber's Room at 3350 Voght Street, Merritt BCCraig Aspinall, Craig Aspinall & Associates Ltd.2001/05/28
Notice of the Public Information Meetings on Monday, April 30, Tuesday, May 1, and Wednesday May 2.W.P. Harland, International Powerhouse Energy Corp.2001/05/25

Provincial Govt Comments/Submissions

Title

Author

Posted Date

Email dated Jan 13/09 from Christine Galliazzo (MOFR) to Joe Truscott (EAO) regarding Timber Analysis for the Kwoiek IPP Transmission LineChristine Galliazzo, Ministry of Forests2009/03/24
Email dated Jan 12/09 from Donna Romain (MOE) to Joe Truscott (EAO) regarding the Amended Application Donna Romain, Ministry of Environment2009/01/12
Email dated Dec 18/08 from Tim Singer (MOFR) to Joe Truscott and Nicole Vinette (EAO) regarding the Amended Application Tim Singer, Ministry of Forests and Range - Cascades District (Lillooet)2008/12/19
Email dated Dec 5/08 from Edward Abels (TCA) to Nicole Vinette (EAO) regarding the Amended Application Edward Abels, Ministry of Tourism, Sport and the Arts2008/12/19
Email and map dated Sept 17/08 from Stephanie McQueen (EMPR) to Joe Truscott and Nicole Vinette (EAO) regarding the Amended ApplicationStephanie McQueen, Ministry of Energy, Mines and Petroleum Resources2008/12/16
Email dated Oct 17/08 from Edward Abels (TCA) to Joe Truscott (EAO) regarding the Amended Application Edward Abels, Ministry of Tourism, Sport and the Arts2008/12/16
Email dated Dec 2/08 from Tim Singer (MOFR) to Nicole Vinette and Joe Truscott (EAO) regarding the Amended Application Tim Singer, Ministry of Forests and Range - Cascades District (Lillooet)2008/12/10
Email dated Dec 5/08 from Pamela Laron Amanse (IHA) to Joe Truscott (EAO) regarding the Amended Application Pamela Laron Amanse, Interior Health Authority2008/12/10
Email dated Oct 17/08 from Graham Strachan (MAL) to Nicole Vinette (EAO) regarding the Amended Application Graham Strachan, Ministry of Agriculture and Lands2008/12/08
Email dated Dec 5/08 and letter dated Nov 24/08 from Alan Caverly and Donna Romain (MOE) to Joe Truscott (EAO) regarding the Amended Application Al Caverly, Ministry of Environment (ESD)2008/12/08
Comments dated Dec 5/08 from Mike Edwards (MOE) to Joe Truscott (EAO) regarding the Amended Application Mike Edwards, Ministry of Environment (WSD)2008/12/08
Email dated Nov 13/08 from Matt Simons (ILMB) to Nicole Vinette (EAO) regarding the Amended Application Matthew P. Simons, Ministry of Agriculture and Lands (ILMB)2008/11/24
Letter dated Nov 20/08 from Christine Galliazzo (MOFR) to Joe Truscott (EAO) regarding the Amended Application Christine Galliazzo, Ministry of Forests2008/11/21
Email dated Nov 14/08 from Barry Eastman (MOT) to Nicole Vinette (EAO) regarding the Amended Application Barry Eastman, Ministry of Transportation2008/11/21
Email from Rick Adams (Ministry of Energy & Mines) to Alan Calder (EAO) regarding Specification #49 of the Draft Project Report Specifications.Rick Adams, Ministry of Energy and Mines2001/08/29
E-mail from Barbara Archer (Project Review Manager, MELP) to Derek Griffin (EAO) regarding monitoring procedures.Barbara Archer, Environmental Assessment Office2001/08/03
Letter from KB Miller (Land Reserve Commission) to Powerhouse Energy Corp. regarding 18km of Option 1 and 3km of Options 2 & 3 being located within the Agricultural Land Reserve (ALR).K B Miller, Land Reserve Commission2001/07/10
Letter from Barbara Archer (MWLAP) to Derek Griffin (EAO) regarding grizzly bear assessment requirements.Barbara Archer, Environmental Assessment Office2001/06/28
Letter from Barbara Archer (MELP) to Derek Griffin (EAO) regarding comments on the application.Barbara Archer, Environmental Assessment Office2001/06/01
Email from Jon Jensen (MOTH) to Alan Calder (EAO) regarding his comments on the application.Jon Jensen, Ministry of Transportation2001/05/30
Email from Dawna Harden (Ministry of Forests) to Alan Calder (EAO) regarding her comments on the application.Dawna Harden, Ministry of Forests2001/05/28
Letter from John Rucki (MEI) to EAO regarding his comments on the application.John Rucki, Ministry of Energy and Mines2001/05/18
Letter from Rick Adams (MEM) to Derek Griffin (EAO) regarding his comments on the application.Rick Adams, Ministry of Energy and Mines2001/05/18
Letter from Steve Acheson (SBTC, Archaeology Branch) to Derek Griffin (EAO) regarding his comments on the application.Steve Acheson, Ministry of Sustainable Resource Management2001/05/18
Letter from Jerry Johnson (BCAL) to Derek Griffin (EAO) regarding comments on the Application.Jerry Johnson, Land and Water British Columbia2001/05/10

Proponent Comments/Correspondence

Title

Author

Posted Date

Letter dated Feb 11/09 from Adam Lewis (Ecofish Research Ltd.) to Ryan Hanson (Proponent) regarding the Review of the Habitat Modelling Method and Approach for the Kwoiek Creek IPPAdam Lewis, Ecofish Research Ltd2009/03/11
Letter dated Jan 8/09 from Paul McElligott and Gary Lawrence (Golder Associates) to Ryan Hanson (Proponent) regarding the Proposed Workplan for Mapping Grizzly Bear Critical Habitat along the Transmission Line Route Paul McElligott, Golder and Associates2009/03/04
Memo dated Feb 25/09 from Bill Graham (Focus Environmental) to Donna Romain (MOE) regarding Kwoiek Creek Hydroelectric Project Transmission Line Species at RiskBill Johnson, Focus Environmental Inc - Sidney BC2009/03/02
Kwoiek Creek Hydroelectric Project Terrestrial Technical Working Group Meeting Presentation dated Nov 6/08 Ryan Hanson, Innergex2008/12/05
Kwoiek Creek Hydroelectric Project Technical Fisheries Working Group Meeting Presentation dated Nov 6/08 Ryan Hanson, Innergex2008/12/05
Kwoiek Creek Hydoelectric Project Working Group Meeting Presentation dated Oct 8/08Bill Johnson, Focus Environmental Inc - Sidney BC2008/12/03
Letter dated August 27, 2007 from (KCRLP) to Derek Griffin (EAO) regarding a one year extension of time for the Kwoiek Creek Hydroelectric ProjectRichard Blanchet, Innergex II Inc.2007/09/12
Letter dated Aug 22/06 from Richard Blanchet (KCRLP) to Joan Hesketh (EAO) re: Updated Project DescriptonRichard Blanchet, Innergex II Inc.2006/09/01
Letter dated Aug 14/06 from Michael McDonald (McDonald & Company Barristers & Solicitors) to Derek Griffin (EAO) requesting an amendment to the EA Application for the ProjectMichael J McDonald, McDonald & Company2006/08/16
Letter from Chief James Frank (Prop) to Derek Griffin (EAO) regarding the name change  2002/06/12
Powerpoint presentation regarding the Kwoiek Creek Hydroelectric Project presented by Powerhouse Energy Corporation.  2001/12/05
Faxed Memo from Paul Bamson (Prop) to Derek Griffin (EAO) regarding Specification #13  2001/09/19
Email (with attachment) from Bill Harland (Proponent) to Derek Griffin (EAO) submitting comments provided on the draft Project Specifications for the project.  2001/09/05
Fax letter from W.P. Harland (V.P., Powerhouse Development Inc.) to Derek Griffin (EAO) regarding their comments on the Draft Project Report Specifications.W.P. Harland, International Powerhouse Energy Corp.2001/08/10
E-mail from Jennifer Jeffrey (Integrated Resource Consultants) to Barbara Archer (Project Review Manager, MELP) regarding test samples for fecal coliform, metals etc.Jennifer Jeffrey, Integrated Resource Consultants Inc.2001/08/03
Copy from W.P. Harland (Powerhouse Energy Corp.) to Alan Calder (EAO) of a letter to Ralph Zucker (Manager, Generation Interconnections, BC Hydro) regarding Kwoiek Creek Hydroelectric project's interconnection to BC Hydro Transmission Facilities.W.P. Harland, International Powerhouse Energy Corp.2001/08/02
Fax letter from Bill Harland (Powerhouse Energy Corp.) to Derek Griffin (EAO) regarding BC Hydro's reply to Powerhouse's letter requesting confirmation that Powerhouse can deliver power to BC Hydro at the Spatsum Substation.W.P. Harland, International Powerhouse Energy Corp.2001/07/25
Stage 2 Studies Power Point Presentation - summarizing the environmental, archaeological, and technical studies conducted with respect to the application.Craig Aspinall, Craig Aspinall & Associates Ltd.2001/06/19
Faxed letter from W.P. Harland ( Powerhouse Energy Corp.) to Derek Griffin (EAO) regarding project components, water quality & related issues,and fish distribution, abundance & habitat.W.P. Harland, International Powerhouse Energy Corp.2001/06/15
Response letter from W.P. Harland (Powerhouse Energy Corp.) to Iannick Lamirande (NRC) regarding options under consideration for the connecting water conduit and excavation.W.P. Harland, International Powerhouse Energy Corp.2001/06/06
Letter from Craig Aspinall (on behalf of PHE) to Derek Griffin (EAO) regarding attached Stage 1 Public and First Nations Consultation: Summary Report.Craig Aspinall, Craig Aspinall & Associates Ltd.2001/05/30
Letter from Patrick Michell (Kanaka Bar Band) to Derek Griffin (EAO) regarding attached meeting agenda for Kanaka Bar Indian Band General Meeting - held May 22, 2001 FCTA HallPatrick Michell, Kanaka Bar Indian Band2001/05/30
Public and First Nations Consultation Stage 1 Summary Report - summarizing the consultation activities conducted with the general public and with First Nations over the period March 12 - May 15, 2001.Craig Aspinall, Craig Aspinall & Associates Ltd.2001/05/28
Email from Craig Aspinall (Craig Aspinall & Associates Ltd.) to Bill Harland (PHE) and ccd. to Derek Griffin (EAO) regarding attached Minutes from the Merritt public meeting of May 15.Craig Aspinall, Craig Aspinall & Associates Ltd.2001/05/28
Email from Craig Aspinall (Craig Aspinall & Associates Ltd.) to Derek Griffin (EAO) regarding notice ads, Canada Post Admail, and poster distribution.Craig Aspinall, Craig Aspinall & Associates Ltd.2001/05/25
Memo from Craig Aspinall (Craig Aspinall & Associates) to Norma Hall (Nicola Tribal Administration) ccd. to Derek Griffin (EAO) regarding attached meeting notice, and copy of the Application.Craig Aspinall, Craig Aspinall & Associates Ltd.2001/05/25
Email from Craig Aspinall (Craig Aspinall & Associates Ltd.) to Bill Harland (Powerhouse Energy Corp.) ccd. to Derek Griffin (EAO) regarding revised Merritt meeting notice that will be published in teh Nicola Native Lodge Newsletter.Craig Aspinall, Craig Aspinall & Associates Ltd.2001/05/25
Letter from Jennifer Jeffrey (Integrated Resource Consultants Inc.) to Derek Griffin (EAO) regarding the enclosed Kwoiek Creek Hydroelectric Project Power Point Presentation prepared on behalf of the proponent for the April-May 2001 Public Meetings.Jennifer Jeffrey, Integrated Resource Consultants Inc.2001/05/18
Letter from Patrick Michell (Project Manager, Kanaka Bar Band) to Derek Griffin (EAO) regarding 1. April 26, 2001 meeting, 2. Public Information Meetings, 3. Meeting with the other Chiefs and 4. Meeting in Merritt. With attachments.Patrick Michell, Kanaka Bar Indian Band2001/05/10
Letter from Patrick Michell (Project Manager, Kanaka Bar Band) to Chiefs (and ccd. to EAO) regarding notice of the Public Information Meeting of May 15, 2001. Attached advertising posterPatrick Michell, Kanaka Bar Indian Band2001/05/10
Letter from Chief James Frank (Kanaka Bar Band) to Chief Phillip Campbell (Boothroyd Indian Band) ccd. to EAO regarding copy of Application and request for preliminary comments. List of Application (binders #49-72) recipients enclosed.  2001/04/19
Letter from W.P. Harland (proponent) to Norm Ringstad (EAO) regarding copies of the application.W.P. Harland, International Powerhouse Energy Corp.2001/04/12

Public Comments/Submissions

Title

Author

Posted Date

Email dated Oct 21/08 from Bryan Fogelman (REO Rafting) to (EAOINFO) regarding the Amended ApplicationBrian Fogelman2008/10/22
Public Comments from Sharon Spike (Lillooet BC) regarding the Project Application - Sept. 23/08 Open House, LyttonSharon Spike2008/10/01
Email from Scott Bourgeois (Lytton) to Derek Griffin (EAO) regarding his opposition to the project.Scott Bourgeois2001/08/22
Letter from Brian Taylor (J.S. Jones Timber Ltd.) to Norm Ringstad (EAO) regarding his support of the project.Brian Taylor, J. S. Jones Timber Ltd.2001/05/30
Letter from J.M. Ashton (Vancouver) to Derek Griffin (EAO) regarding his opposition to the project due to construction of the powerlines taking place over their mineral claims which are potential economic interests.J.M. Ashton2001/05/18
Letter from Ester DeKiewit to Norm Ringstad (EAO) regarding her opposition to the project.  2001/05/18
Email from Chris Connolly to EAOINFO (forwarded to Derek Griffin) regarding the general public having access to Upper Kwoiek Creek.  2001/05/10

Completed / Certified

Notices - News Releases

Title

Author

Posted Date

Information Bulletin - Kwoiek Creek Run-of-River Project Approved Kate Thompson, Public Affairs Bureau2009/03/18

EA Certificate Documentation

Title

Author

Posted Date

Information Bulletin - Kwoiek Creek Run-of-River Project ApprovedKate Thompson, Public Affairs Bureau2009/03/18
Kwoiek Creek Hydroelectric Project Environmental Assessment Certificate # E09-01 issued March 12, 2009 Honourable Barry Penner, BC Ministry of Environment2009/03/18
Kwoiek Creek Hydroelectric Project Assessment Report and Screening Report dated March 10, 2009 with Appendices A - EJoe Truscott, Environmental Assessment Office2009/03/18
Kwoiek Creek Hydroelectric Project Recommendations of the Executive Director dated March 10, 2009Assoc. Deputy Minister Robin Junger, Environmental Assessment Office2009/03/18