Pre-Application |
Application Terms of Reference/Information Requirements |
Title | Author | Posted Date |
| Email from Jan Hagen (EAO) to Tim Bekhuys and David Walker (Proponent) and Environmental Assessment Certificate Application Terms of Reference dated July 14/03 for the Vancouver Convention Centre Expansion Project | Jan Hagen, Environmental Assessment Office | 2003/07/15 |
EAO Generated Documents |
Title | Author | Posted Date |
| Letter dated Jan. 19/04 from Jan Hagen (EAO) to Russell Anthony (VCCEP Ltd.) acknowledging receipt of the (2nd) Application for an Environmental Assessment Certificate for the Vancouver Convention Centre Expansion Project | Jan Hagen, Environmental Assessment Office | 2004/01/19 |
| Letter dated Nov. 26/03 from Jan Hagen (EAO) to Russell Anthony (VCCEP Ltd.) regarding withdrawal of the Nov. 7/03 submission of the Application for an Environmental Assessment Certificate | Jan Hagen, Environmental Assessment Office | 2003/11/27 |
| Letter dated Nov. 7/03 from Jan Hagen (EAO) to Russell Anthony (VCCEP Ltd.) acknowledging receipt of the Application for an Environmental Assessment Certificate for the Vancouver Convention Centre Expansion Project | Jan Hagen, Environmental Assessment Office | 2003/11/07 |
| Final Minutes dated Oct. 16/03 from the Fifth Pre-application Meeting for the proposed Vancouver Convention Centre Expansion Project | Karie Hardie, Environmental Assessment Office | 2003/11/04 |
| Final Minutes dated Sept. 8/03 from the Fourth Pre-application Meeting for the proposed Vancouver Convention Centre Expansion Project | Karie Hardie, Environmental Assessment Office | 2003/09/30 |
| Letter dated Sept. 23/03 from Jan Hagen (EAO) to Tim Bekhuys (EBA) regarding the Vancouver Convention Centre Expansion Project Public Consultation and Communications Plan | Jan Hagen, Environmental Assessment Office | 2003/09/23 |
| Advisory Review Team Membership List dated Sept. 15/03 for the Vancouver Convention Centre Expansion Project | Karie Hardie, Environmental Assessment Office | 2003/09/15 |
| Letter dated September 4/03 from Jan Hagen (EAO) to Tim Bekhuys (Proponent) regarding the Public Consultation and Communications Plan for the Vancouver Convention Centre Expansion Project | Jan Hagen, Environmental Assessment Office | 2003/09/04 |
| Email dated August 14/03 from Jan Hagen (EAO) to Adam La Rusic (Environment Canada) regarding the Federal/Provincial Work Plan and Final Terms of Reference for the Vancouver Convention Centre Expansion Project | Jan Hagen, Environmental Assessment Office | 2003/08/22 |
| Final Minutes dated June 25/03 from the Third Pre-application Meeting for the proposed Vancouver Convention Centre Expansion Project | Karie Hardie, Environmental Assessment Office | 2003/08/08 |
| Email dated July 4/03 from Jan Hagen (EAO) to the Vancouver Convention Centre Project Review Team regarding the Proponent's Final Terms of Reference for Application for Environmental Assessment Certificate | Jan Hagen, Environmental Assessment Office | 2003/07/17 |
| Letter dated July 03/03 from Jan Hagen (EAO) to Tim Bekhuys (Proponent) regarding the submission of Final Application Terms of Reference for the Vancouver Convention Centre Expansion Project | Jan Hagen, Environmental Assessment Office | 2003/07/03 |
| Final Minutes dated May 23/03 from the Second Pre-application Meeting for the proposed Vancouver Convention Centre Expansion Project | Karie Hardie, Environmental Assessment Office | 2003/06/25 |
| Letter dated June 5/03 to Barbara Ritchie (Washington State Department of Ecology) from Jan Hagen (EAO) regarding notification of Environmental Assessment Project Reviews in British Columbia | Jan Hagen, Environmental Assessment Office | 2003/06/06 |
| Final Minutes dated May 6/03 from the First Pre-application Meeting for the proposed Vancouver Convention Centre Expansion Project | Karie Hardie, Environmental Assessment Office | 2003/06/06 |
| Letter dated June 5/03 from Jan Hagen (EAO) to Clive Rock (Greater Vancouver Transportation Authority) inviting participation in the EA review of the proposed project | Jan Hagen, Environmental Assessment Office | 2003/06/05 |
| Order Under Section 11 of the Environmental Assessment Act signed by Jan E. Hagen (EAO)and dated May 20/03 | Jan Hagen, Environmental Assessment Office | 2003/06/02 |
| Letter dated May 15/03 from Jan Hagen (EAO) to Tim Bekhuys (Proponent) regarding the Project Footprint for the Vancouver Convention Centre Expansion Project (VCCEP) | Tim Bekhuys, EBA Engineering Consultants Ltd. | 2003/05/15 |
| Letter dated Apr 15/03 from Jan Hagen (EAO) to Daryl Hargitt - Musqueam Indian Band inviting their participation in the review of the Vancouver Convention Centre Expansion Project | Jan Hagen, Environmental Assessment Office | 2003/05/07 |
| Letter dated Apr 15/ 03 from Jan Hagen (EAO) to Chief Gibby Jacobs - Squamish Nation inviting their participation in the review of the Vancouver Convention Centre Expansion Project | Jan Hagen, Environmental Assessment Office | 2003/05/07 |
| Letter dated Apr 15/ 03 from Jan Hagen (EAO) to Bob Hall - Sto:lo Nation inviting their participation in the review of the Vancouver Convention Centre Expansion Project | Jan Hagen, Environmental Assessment Office | 2003/05/07 |
| Letter dated Apr 15/ 03 from Jan Hagen (EAO) to Chief Leah George-Wilson - Tsleil-Waututh First Nation inviting their participation in the review of the Vancouver Convention Centre Expansion Project | Jan Hagen, Environmental Assessment Office | 2003/05/07 |
| E-mail dated Apr 11/ 03 from Jan Hagen (EAO) to Judy Rogers - City of Vancouver inviting their participation in the review of the Vancouver Convention Centre Expansion Project | Jan Hagen, Environmental Assessment Office | 2003/05/07 |
| Letter dated Apr 30/03 from Jan Hagen (EAO) to Richard Hoos (EBA) regarding the review of the Vancouver Convention Centre Expansion Project | Jan Hagen, Environmental Assessment Office | 2003/04/30 |
| Letter dated Apr 25/03 from Jan Hagen(EAO) to Richard Hoos(EBA) regarding the review of the Vancouver Convention and Exhibition Centre (VCEC) Expansion Project | Jan Hagen, Environmental Assessment Office | 2003/04/29 |
| Letter dated Feb. 18/03 from Sheila Wynn (EAO) to Shelley O'Callaghan (proponent) granting their request to have the project reviewable under section 7(1) of the British Columbia Environmental Assessment Act | Deputy Minister Sheila Wynn, Environmental Assessment Office | 2003/02/27 |
| Letter dated Feb 26/03 from Raymond Crook (EAO) to Shelley O'Callaghan (proponent) regarding the issuing of an order under section 10(1)(c) of the Environmental Assessment Act | Raymond L Crook, Environmental Assessment Office | 2003/02/27 |
| Order under section 10(1)(c) of the Environmental Assessment Act issued Feb 26/03 | Raymond L Crook, Environmental Assessment Office | 2003/02/27 |
Federal Comments/Submissions |
Title | Author | Posted Date |
| Letter dated August 13/03 from Adam La Rusic (Environment Canada) to Jan Hagen (EAO) providing comments on the Terms of Reference for the Vancouver Convention Centre Expansion Project | Adam La Rusic, Environment Canada | 2003/08/21 |
Notices - News Releases |
Title | Author | Posted Date |
| Vancouver Convention Centre Expansion Project, Notice of Public Open House Oct. 27-28/03 | Jan Hagen, Environmental Assessment Office | 2003/10/20 |
Proponent Comments/Correspondence |
Title | Author | Posted Date |
| Letter dated Jan. 19/04 from Russell Anthony (VCCEP Ltd.) to Jan Hagen (EAO) transmitting the (2nd) Application for an Environmental Assessment Certificate for the Vancouver Convention Centre Expansion Project | Russell J. Anthony, Vancouver Convention Centre Expansion Project Ltd. | 2004/01/19 |
| Letter dated Nov. 24/03 from Russell Anthony (VCCEP Ltd.) to Jan Hagen (EAO) advising that the Nov. 7/03 submission of the Application for an Environmental Assessment Certificate is being withdrawn and will be resubmitted in Jan./04 | Russell J. Anthony, Vancouver Convention Centre Expansion Project Ltd. | 2003/11/27 |
| Letter dated Nov. 5/03 from Russell Anthony (VCCEP Ltd.) to Jan Hagen (EAO) transmitting the Application for an Environmental Assessment Certificate for the Vancouver Convention Centre Expansion Project | Jan Hagen, Environmental Assessment Office | 2003/11/07 |
| Email dated Sept. 18/03 from Rick Hoos (EBA) to Jan Hagen (EAO) and a letter from Jean Bussey (Points West Heritage Consulting) regarding the archaeological potential at the proposed Vancouver Convention Centre Expansion Project site | Rick Hoos, EBA Engineering Consultants Ltd. | 2003/09/22 |
| Letter dated Sept. 11/03 from Tim Bekhuys (Proponent) to Jan Hagen (EAO) regarding a Public Open House for the Vancouver Convention Centre Expansion Project | Tim Bekhuys, EBA Engineering Consultants Ltd. | 2003/09/11 |
| Public Consultation and Communications Plan dated August 15/03 for the Vancouver Convention Centre Expansion Project | Tim Bekhuys, EBA Engineering Consultants Ltd. | 2003/08/21 |
| Final Terms of Reference Application for an Environmental Assessment Certificate dated July/03 for the Vancouver Convention Centre Expansion Project | Tim Bekhuys, EBA Engineering Consultants Ltd. | 2003/07/15 |
| Email from Jan Hagen (EAO) to Tim Bekhuys (Proponent) with Consolidated Comments dated June 30/03 regarding the Proponent's revised draft Terms of Reference for Application for Environmental Assessment Certificate | Jan Hagen, Environmental Assessment Office | 2003/07/02 |
| Revised Draft Terms of Reference for Application for Environmental Assessment Certificate dated June/03 for the Vancouver Convention Centre Expansion Project | Tim Bekhuys, EBA Engineering Consultants Ltd. | 2003/06/16 |
| Letter dated May 16/03 from Tim Bekhuys (Proponent) to Jan Hagen (EAO) regarding background on the current marina/float plane operation | Tim Bekhuys, EBA Engineering Consultants Ltd. | 2003/06/03 |
| Letter dated May 08/03 from Tim Bekhuys (Proponent) to Jan Hagen (EAO) regarding Project Footprint for the Vancouver Convention Center Expansion Project (VCCEP) | Tim Bekhuys, EBA Engineering Consultants Ltd. | 2003/05/13 |
| E-mail dated May 07/03 from Tim Bekhuys (Proponent) to Jan Hagen (EAO) regarding the May 06/03 Pre-Application Meeting presentation. Presentation is attached in section 1 | Tim Bekhuys, EBA Engineering Consultants Ltd. | 2003/05/13 |
| Documentation submitted on May 07/03 from Shelley O'Callaghan (on behalf of the Proponent) to Jack Smith (EC) regarding contaminated sites certification | Shelley O'Callaghan, Bull, Housser and Tupper | 2003/05/08 |
| Project Description and photographs of Site 1 and Site 2 - submitted Apr 17/03 by Rick Hoos (EBA) to Jan Hagen (EAO) | Rick Hoos, EBA Engineering Consultants Ltd. | 2003/04/24 |
| Letter dated Apr 14/03 from Shelley O'Callaghan (Proponent) to Jan Hagen (EAO) regarding two land title plans which show the legal parcels relevant to the proposed project site. | Shelley O'Callaghan, Bull, Housser and Tupper | 2003/04/23 |
| Letter dated Feb 4/03 from Shelley O'Callaghan (proponent) to Sheila Wynn (EAO) regarding asking for the project to be designated as reviewable under section 7(1) of the British Columbia Environmental Assessment Act | Shelley O'Callaghan, Bull, Housser and Tupper | 2003/02/27 |
Public Comments/Submissions |
Title | Author | Posted Date |
| Letter dated Sept. 11/03 from Daria Hasselmann (Burrard Environmental Review Committee) to Juergen Baumann (Vancouver Port Authority) regarding Geotechnical Investigations at the Burrard Landing Site in Coal Harbour | Daria Hasselmann, Burrard Environmental Review Committee | 2003/09/15 |
Under Review |
Application and Supporting Studies |
Title | Author | Posted Date |
| Volume 1: Application for an Environmental Assessment Certificate for the Vancouver Convention Centre Expansion Project January 2004 | Russell J. Anthony, Vancouver Convention Centre Expansion Project Ltd. | 2004/02/02 |
| Volume 2: Appendicies to the Application for an Environmental Assessment Certificate for the Vancouver Convention Centre Expansion Project January 2004 | Russell J. Anthony, Vancouver Convention Centre Expansion Project Ltd. | 2004/02/02 |
EAO Generated Documents |
Title | Author | Posted Date |
| Final Minutes dated May 19/04 from the Fourth Application Review Meeting for the Vancouver Convention Centre Expansion Project | Karie Hardie, Environmental Assessment Office | 2004/06/09 |
| Final Minutes dated April 22/04 from the Third Application Review Meeting for the Vancouver Convention Centre Expansion Project | Karie Hardie, Environmental Assessment Office | 2004/05/14 |
| Final Minutes dated March 23/04 from the Second Application Review Meeting for the Vancouver Convention Centre Expansion Project | Karie Hardie, Environmental Assessment Office | 2004/04/13 |
| Final Minutes dated Feb. 26/04 from the First Application Review Meeting for the Vancouver Convention Centre Expansion Project | Karie Hardie, Environmental Assessment Office | 2004/03/09 |
| Letter dated March 5/04 from Jan Hagen (EAO) to Loretta Sieben (Public) in response to her Feb. 24/04 letter and comments regarding the Vancouver Convention Centre Expansion Project | Jan Hagen, Environmental Assessment Office | 2004/03/08 |
| Letter and attachments dated Jan. 29/04 from Jan Hagen (EAO) to Russell Anthony (VCCEP Ltd.) acknowledging that the VCCEP Application for an Environmental Assessment Certificate has been accepted for formal review | Jan Hagen, Environmental Assessment Office | 2004/01/30 |
| Letter dated Jan. 29/04 from Jan Hagen (EAO) to Russell Anthony (VCCEP Ltd.) regarding the Application for an Environmental Assessment Certificate for the VCCEP and Public Consultation and First Nations Consultation Assessments | Jan Hagen, Environmental Assessment Office | 2004/01/30 |
Federal Comments/Submissions |
Title | Author | Posted Date |
| Comments from Federal Agencies dated March 25/04 forwarded by Georgina Naismith (CEAA) to Jan Hagen (EAO) regarding the Vancouver Convention Centre Expansion Project Application | Georgina Naismith, Canadian Environmental Assessment Agency | 2004/03/29 |
General Technical Documents |
Title | Author | Posted Date |
| Email dated April 1/04 from Richard Sims (EBA) to Karie Hardie (EAO), Minutes of March 8/04 Meeting, and four attachments concerning noise and vibration issues related to the Vancouver Convention Centre Expansion Project | Richard A. Sims, EBA Engineering Consultants Ltd. | 2004/04/08 |
| Report dated April 2003: 2010 Winter Games Labour Demand Analysis prepared by Roslyn Kunin & Associates Inc. and presented to the 2010 Winter Games Human Resources Planning Committee | Roslyn Kunin, Roslyn Kunin & Associates, Inc. (RKA, Inc.) | 2004/03/01 |
Local Government Comments/Submissions |
Title | Author | Posted Date |
| Final Commentary dated March 26/04 from Larry Beasley on behalf of the (COV) to Jan Hagen (EAO) regarding the Vancouver Convention Centre Expansion Project Application | Larry Beasley, City of Vancouver | 2004/04/07 |
| Letter/comments dated March 31/04 from Domenic Losito on behalf of (VCH) to Karie Hardie (EAO) regarding the Vancouver Convention Centre Expansion Project Application | Domenic Losito, Vancouver Coastal Health Authority | 2004/04/07 |
Notices - News Releases |
Title | Author | Posted Date |
| Notice - Public Comment Invited on an Application for the Vancouver Convention Centre Expansion Project | Jan Hagen, Environmental Assessment Office | 2004/02/03 |
Provincial Govt Comments/Submissions |
Title | Author | Posted Date |
| Email comments dated March 1/04 from Andrew Taylor on behalf of the (SBED) Ministry to Karie Hardie (EAO) regarding the Vancouver Convention Centre Expansion Project Application | Andrew Taylor, Ministry of Small Business and Economic Development | 2004/04/08 |
| Email comments dated March 17/04 from Paul Georgison on behalf of (LWBC) to Karie Hardie (EAO) regarding the Vancouver Convention Centre Expansion Project Application | Paul Georgison, Land and Water British Columbia Inc. | 2004/04/07 |
Proponent Comments/Correspondence |
Title | Author | Posted Date |
| Letter dated April 20/04 from David Walker (VCCEP Ltd.) to Gerald Sieben (Public) - response to March 17/04 comments regarding the Vancouver Convention Centre Expansion Project | David Walker, Vancouver Convention Centre Expansion Project Ltd. | 2004/04/21 |
| Letter dated April 13/04 from David Walker (VCCEP Ltd.) to Loretta Sieben (Public) - response to Feb. 24/04 comments regarding the Vancouver Convention Centre Expansion Project | David Walker, Vancouver Convention Centre Expansion Project Ltd. | 2004/04/20 |
| Letter dated April 13/04 from David Walker (VCCEP Ltd.) to Afshin Parsamanesh - response to March 23/04 comments regarding the Vancouver Convention Centre Expansion Project | David Walker, Vancouver Convention Centre Expansion Project Ltd. | 2004/04/20 |
| Letter dated April 13/04 from David Walker (VCCEP Ltd.) to Christopher Macmillan (Public) - response to March 25/04 comments regarding the Vancouver Convention Centre Expansion Project | David Walker, Vancouver Convention Centre Expansion Project Ltd. | 2004/04/20 |
| Letter dated April 13/04 from David Walker (VCCEP Ltd.) to Matt Hammond (Public) - response to March 23/04 comments regarding the Vancouver Convention Centre Expansion Project | David Walker, Vancouver Convention Centre Expansion Project Ltd. | 2004/04/20 |
| Letter dated April 13/04 from David Walker (VCCEP Ltd.) to Julie Frischke (Public) - response to March 25/04 comments regarding the Vancouver Convention Centre Expansion Project | David Walker, Vancouver Convention Centre Expansion Project Ltd. | 2004/04/20 |
| Letter dated April 13/04 from David Walker (VCCEP Ltd.) to Daniel Wensauer (Public) - response to March 24/04 comments regarding the Vancouver Convention Centre Expansion Project | David Walker, Vancouver Convention Centre Expansion Project Ltd. | 2004/04/20 |
| Letter dated April 13/04 from David Walker (VCCEP Ltd.) to Erin Koga (Public) - response to March 21/04 comments regarding the Vancouver Convention Centre Expansion Project | David Walker, Vancouver Convention Centre Expansion Project Ltd. | 2004/04/20 |
| Letter dated April 13/04 from David Walker (VCCEP Ltd.) to Linda Prang (Public) - response to March 24/04 comments regarding the Vancouver Convention Centre Expansion Project | David Walker, Vancouver Convention Centre Expansion Project Ltd. | 2004/04/20 |
| Letter dated April 13/04 from David Walker (VCCEP Ltd.) to Linda Takahashi (Public) - response to March 25/04 comments regarding the Vancouver Convention Centre Expansion Project | David Walker, Vancouver Convention Centre Expansion Project Ltd. | 2004/04/20 |
| Letter dated April 13/04 from David Walker (VCCEP Ltd.) to Khalilur Bhuiyan (Public) - response to March 25/04 comments regarding the Vancouver Convention Centre Expansion Project | David Walker, Vancouver Convention Centre Expansion Project Ltd. | 2004/04/20 |
| Letter dated April 13/04 from David Walker (VCCEP Ltd.) to Betty Rumpel (Public) - response to March 23/04 comments regarding the Vancouver Convention Centre Expansion Project | David Walker, Vancouver Convention Centre Expansion Project Ltd. | 2004/04/20 |
| Letter dated April 13/04 from David Walker (VCCEP Ltd.) to Frederic Richard (Public) - response to March 24/04 comments regarding the Vancouver Convention Centre Expansion Project | David Walker, Vancouver Convention Centre Expansion Project Ltd. | 2004/04/20 |
| Letter dated April 13/04 from David Walker (VCCEP Ltd.) to Kelsey Cramer (Public) - response to March 23/04 comments regarding the Vancouver Convention Centre Expansion Project | David Walker, Vancouver Convention Centre Expansion Project Ltd. | 2004/04/20 |
| Responses from (VCCEP Ltd.) dated April 13/04 to comments from (Federal Agencies) dated March 25/04 regarding the Vancouver Convention Centre Expansion Project Application | Richard A. Sims, EBA Engineering Consultants Ltd. | 2004/04/16 |
| Responses from (VCCEP Ltd.) dated April 13/04 to comments from the (VCHA) dated March 31/04 regarding the Vancouver Convention Centre Expansion Project Application | Richard A. Sims, EBA Engineering Consultants Ltd. | 2004/04/16 |
| Responses from (VCCEP Ltd.) dated April 13/04 to comments from the (COV) dated March 26/04 regarding the Vancouver Convention Centre Expansion Project Application | Richard A. Sims, EBA Engineering Consultants Ltd. | 2004/04/16 |
| Letter dated March 19/04 from David Walker (VCCEP Ltd.) to Jan Hagen (EAO) in response to queries raised by Andrew Taylor on March 1/04 on behalf of the (SBED) Ministry regarding the Vancouver Convention Centre Expansion Project Application | David Walker, Vancouver Convention Centre Expansion Project Ltd. | 2004/04/08 |
Public Comments/Submissions |
Title | Author | Posted Date |
| Letter dated March 23/04 from Kelsey Cramer (Public) to Jan Hagen (EAO) - comments regarding the Vancouver Convention Centre Expansion Project | Kelsey Cramer | 2004/03/29 |
| Letter dated March 24/04 from Frederic Richard (Public) to Jan Hagen (EAO) - comments regarding the Vancouver Convention Centre Expansion Project | Frederic Richard | 2004/03/29 |
| Letter dated March 23/04 from Betty Rumpel (Public) to Jan Hagen (EAO) - comments regarding the Vancouver Convention Centre Expansion project | Betty Rumpel | 2004/03/29 |
| Letter dated March 25/04 from Khalilur Bhuiyan (Public) to Jan Hagen (EAO) - comments regarding the Vancouver Convention Centre Expansion Project | Khalilur Bhuiyan | 2004/03/29 |
| Letter dated March 25/04 from Linda Takahashi (Public) to Jan Hagen (EAO) - comments regarding the Vancouver Convention Centre Expansion Project | Linda Takahashi | 2004/03/29 |
| Letter dated March 24/04 from Linda Prang (Public) to Jan Hagen (EAO) - comments regarding the Vancouver Convention Centre Expansion Project | Linda Prang | 2004/03/29 |
| Letter dated March 21/04 from Erin Koga (Public) to Jan Hagen (EAO) - comments regarding the Vancouver Convention Centre Expansion Project | Erin Koga | 2004/03/29 |
| Letter dated March 24/04 from Danielle Wensauer (Public) to Jan Hagen (EAO) - comments regarding the Vancouver Convention Centre Expansion Project | Danielle Wensauer, Post-Graduate Environmental Science & Mangement Program | 2004/03/29 |
| Letter dated March 25/04 from Julie Frischke (Public) to Jan Hagen (EAO) - comments regarding the Vancouver Convention Centre Expansion Project | Julie Frischke | 2004/03/29 |
| Letter dated March 23/04 from Matt Hammond (Public) to Jan Hagen (EAO) - comments regarding the Vancouver Convention Centre Expansion Project | Matt Hammond | 2004/03/29 |
| Letter (received March 25/04) from Christopher Macmillan (Public) to Jan Hagen (EAO) - comments regarding the Vancouver Convention Centre Expansion Project | Christopher Macmillan | 2004/03/29 |
| Letter dated March 23/04 from Afshin Parsamanesh (Public) to Jan Hagen (EAO) - comments regarding the Vancouver Convention Centre Expansion Project | Afshin Parsamanesh | 2004/03/29 |
| Letter dated March 17/04 from Gerald Sieben (Public) to Jan Hagen (EAO) - comments regarding the Vancouver Convention Centre Expansion Project | Gerald Sieben | 2004/03/23 |
| Letter dated Feb. 24/04 from Loretta Sieben (Public) to Jan Hagen (EAO) - comments regarding the Vancouver Convention Centre Expansion Project | Loretta Sieben | 2004/03/02 |
| Email dated Feb. 5/04 from Derek Ralphs (Public) to Jan Hagen (EAO) - comments regarding the Vancouver Convention Centre Expansion Project | Derek Ralphs | 2004/02/10 |
| Email dated Feb. 5/04 from Rob Sollanych (Public) to (EAO) - comments regarding the Vancouver Convention Centre Expansion Project | Rob Sollanych | 2004/02/10 |
| Email dated Feb. 6/04 from David Northgraves (Public) to (EAO) - comments regarding the Vancouver Convention Centre Expansion Project | David Northgraves | 2004/02/10 |
| Email dated Feb. 5/04 from Dylan Carter (Public) to Jan Hagen (EAO) - comments regarding the Vancouver Convention Centre Expansion Project | Dylan Carter | 2004/02/10 |
Completed / Certified |
Notices - News Releases |
Title | Author | Posted Date |
| News Release - $565 Million Project Gets Green Light | Jan Hagen, Environmental Assessment Office | 2004/07/29 |
EA Certificate Documentation |
Title | Author | Posted Date |
| Vancouver Convention Centre Expansion Project Recommendations of the Executive Director and Reasons for Recommendations | Deputy Minister Joan Hesketh, Environmental Assessment Office | 2004/07/29 |
| Environmental Assessment Certificate W04-04 for the Vancouver Convention Centre Expansion Project | Jan Hagen, Environmental Assessment Office | 2004/07/29 |
| Vancouver Convention Centre Expansion Project Assessment Report | Jan Hagen, Environmental Assessment Office | 2004/07/29 |
| Letter dated July 28/04 from Jan Hagen (EAO) to Russell Anthony (VCCEP Ltd.) regarding the Ministers' decision on the Environmental Assessment Certificate for the Vancouver Convention Centre Expansion Project | Jan Hagen, Environmental Assessment Office | 2004/07/29 |
| News Release - $565 Million Project Gets Green Light | Jan Hagen, Environmental Assessment Office | 2004/07/29 |
Amendment Certificate |
Title | Author | Posted Date |
| Amendment to Environmental Assessment Certificate W04-04 for the Vancouver Convention Centre Expansion Project dated June 12/06 and signed by Russell Anthony (VCCEP Ltd.) and Joan Hesketh, Deputy Minister (EAO) | Jan Hagen, Environmental Assessment Office | 2006/06/13 |
Amendment to Certificate Documentation |
Title | Author | Posted Date |
| Amendment #2 to Environmental Assessment Certificate W04-04 for the Vancouver Convention Centre Expansion Project dated Dec 17/08 and signed by Warren Buckley (VCCEP Ltd.) and Robin Junger, Deputy Minister (EAO) |
| 2008/12/18 |
Post Certificate Documentation |
Title | Author | Posted Date |
| Letter dated Oct. 5/04 from Richard Sims (EBA) to Jan Hagen (EAO) regarding Environmental Assessment Certificate (EAC) W04-04, Pre-Construction Reporting as Per Condition 5(a) of the EAC | Richard A. Sims, EBA Engineering Consultants Ltd. | 2004/10/20 |
| Vancouver Convention Centre Expansion Project Pre-Construction Report dated October, 2004 | Richard A. Sims, EBA Engineering Consultants Ltd. | 2004/10/20 |
|