Deltaport Third Berth Project

Type:Typical EA Process (Active and Complete)Status:Completed / Certified
Category:TransportationPre-application

Start Date:

2003/03/18
 

Document Index

Pre-Application

Application Terms of Reference/Information Requirements

Title

Author

Posted Date

Final Application Terms of Reference dated Oct. 8/04 for the Deltaport Third Berth ProjectJan Hagen, Environmental Assessment Office2004/10/14

Aboriginal Comments/Submissions

Title

Author

Posted Date

Letter dated Oct. 29/03 from Andrew Bak (Tsawwassen First Nation) to Jan Hagen (EAO) regarding the draft Work Plans and environmental assessment process for the proposed container port expansion at Roberts BankAndrew Bak, Tsawwassen First Nation2003/11/06
Letter dated Sept. 22/03 from Laura Cassidy (Tsawwassen First Nation) to Joan Hesketh (EAO) regarding the environmental assessment process for the proposed container port expansion at Roberts Bank Laura Cassidy, Tsawwassen First Nation2003/09/30
Letter dated Aug. 6/03 from Chief Kim Baird (Tsawwassen First Nation) to Joan Hesketh (EAO) regarding the environmental assessment process for the proposed container port expansion at Roberts BankKim Baird, Tsawwassen First Nation2003/09/08
Letter dated June 09/03 from Chief Kim Baird (Tsawwassen First Nation) to Sheila Wynn (EAO) regarding the Vancouver Port Authority - Roberts Bank ExpansionKim Baird, Tsawwassen First Nation2003/06/13

EAO Generated Documents

Title

Author

Posted Date

Final Minutes from the Sept. 9/04 Pre-application Meeting for the Deltaport Third Berth Project at Roberts BankKarie Hardie, Environmental Assessment Office2004/10/05
Order Under Section 11 of the Environmental Assessment Act signed by Jan E. Hagen (EAO) and dated Sept. 17/04 Jan Hagen, Environmental Assessment Office2004/09/20
Final Minutes from the June 10/04 4th Pre-application Meeting for the Two Container Port Expansion Projects at Roberts Bank Karie Hardie, Environmental Assessment Office2004/07/06
Letter dated June 22/04 from Jan Hagen (EAO) to Darrell Desjardin (Proponent) regarding the Roberts Bank Container Port Expansion ProgramJan Hagen, Environmental Assessment Office2004/06/22
Final notes from the Jan. 8/04 3rd Pre-application Meeting for the Two Container Port Expansion Projects at Roberts Bank Karie Hardie, Environmental Assessment Office2004/01/30
Letter dated Dec. 8/03 from Jan Hagen (EAO) to Katharine Steig (Vancouver Natural History Society) regarding the proposed Roberts Bank Container Port Expansion ProjectsJan Hagen, Environmental Assessment Office2003/12/08
Final notes from the Oct. 29/03 Pre-application Meeting for the Two Container Port Expansion Projects at Roberts BankKarie Hardie, Environmental Assessment Office2003/11/28
Letter dated Nov. 6/03 from Jan Hagen (EAO) to Andrew Bak (Tsawwassen First Nation) regarding the draft Work Plans and environmental assessment process for the proposed container port expansion at Roberts BankJan Hagen, Environmental Assessment Office2003/11/06
Letter dated Oct. 1/03 from Joan Hesketh (EAO) to Laura Cassidy (Tsawwassen First Nation) regarding the environmental assessment process for the proposed container port expansion at Roberts BankDeputy Minister Joan Hesketh, Environmental Assessment Office2003/10/06
Letter dated Sept. 2/03 from Joan Hesketh (EAO) to Chief Kim Baird (Tsawwassen First Nation) regarding the environmental assessment process for the proposed container port expansion at Roberts BankDeputy Minister Joan Hesketh, Environmental Assessment Office2003/09/05
Letter dated July 23/03 from Derek Griffin (EAO) to June Binkert (Save our Parkland Association) regarding the Vancouver Port Authority's proposal to expand operations at Roberts BankDeputy Minister Joan Hesketh, Environmental Assessment Office2003/07/24
Letter dated July 3/03 from Joan Hesketh (EAO) to Chief Kim Baird (Tsawwassen First Nation) regarding the proposed container port expansion projects at Roberts BankDeputy Minister Joan Hesketh, Environmental Assessment Office2003/07/15
Letter dated June 23/03 from Jan Hagen (EAO) to Mary J. Taitt (Boundary Bay Conservation Committee) regarding the Vancouver Port Authority Proposed Roberts Bank Container Expansion Project: Deltaport Expansion and Container Terminal 2Jan Hagen, Environmental Assessment Office2003/06/25
Letter dated June 5/03 to Barbara Ritchie (Washington State Department of Ecology) from Jan Hagen (EAO) regarding notification of Environmental Assessment Project Reviews in British ColumbiaJan Hagen, Environmental Assessment Office2003/06/06
Letter dated June 2/03 from Jan Hagen (EAO) to Clive Rock (Greater Vancouver Transportation Authority) inviting participation in the EA reviews of the proposed projectsJan Hagen, Environmental Assessment Office2003/06/05
Final Minutes from the May 5/03 Pre-application Meeting for the Two Container Port Expansion Projects, Roberts Bank (Deltaport Third Berth Project and Container Terminal 2 Project)Karie Hardie, Environmental Assessment Office2003/06/03
Letter dated Apr. 08/03 from Jan Hagen (EAO) to Chief and Council Musqueam Indian Band inviting their participation in the review Deltaport Third Berth and Container Terminal 2 expansion projectsJan Hagen, Environmental Assessment Office2003/05/07
Letter dated Apr. 08/03 from Jan Hagen (EAO) to Chief and Council Semiahmoo First Nation inviting their participation in the review of the Deltaport Third Berth and Container Terminal 2 expansion projectsJan Hagen, Environmental Assessment Office2003/05/07
Letter dated Apr. 08/03 from Jan Hagen (EAO) to Chief and Council Sto:lo Nation inviting their participation in the review of the Deltaport Third Berth and Container Terminal 2 expansion projectsJan Hagen, Environmental Assessment Office2003/05/07
Letter dated Apr. 08/03 from Jan Hagen (EAO) to Chief and Council Tsawwassen First Nation inviting their participation in the review of the Deltaport Third Berth and Container Terminal 2 projectsJan Hagen, Environmental Assessment Office2003/05/07
Letter dated Apr. 07/03 from Jan Hagen (EAO) to George V. Harvie (The Corporation of Delta) inviting their participation in the review of the Deltaport Third Berth and Container Terminal 2 projectsJan Hagen, Environmental Assessment Office2003/05/07
Letter dated Apr. 07/03 from Jan Hagen (EAO) to Ken Cameron (Greater Vancouver Regional District) inviting their participation in the review of the Deltaport Third Berth and Container Terminal 2 projectsJan Hagen, Environmental Assessment Office2003/05/07
Final Minutes from Mar. 11/03 Pre-application meetingKarie Hardie, Environmental Assessment Office2003/04/24
Order Under Section 10(1)(c) of the Environmental Assessment Act for the Deltaport Third Berth Project signed by Ray Crook (EAO) on Mar. 18/03Raymond L Crook, Environmental Assessment Office2003/03/18

Federal Comments/Submissions

Title

Author

Posted Date

Letter dated Apr. 1/03 from Jeff Johansen (DFO) to Pat McLaughlin and Darrell Desjardin (Proponent) regarding the Proposed Container Terminal Expansion at Roberts BankJeff Johansen, Fisheries & Oceans Canada2003/04/11

Proponent Comments/Correspondence

Title

Author

Posted Date

Letter dated June 14/04 from Darrell Desjardin (VPA) to Jan Hagen (EAO) with the Preliminary Project Description dated June 8/04 for the Roberts Bank Deltaport Third Berth Project Darrell Desjardin, Vancouver Port Authority2004/06/21
Letter dated Aug. 1/03 from Mark Griggs (Proponent) to Jan Hagen (EAO) regarding the Vancouver Port Authority First Nations Consultation ProgramMark Griggs, Vancouver Port Authority2003/08/11
Email Letter dated June 9/03 from Darrell Desjardin (Proponent) to Jeff Johansen (DFO) regarding clarification of the two proposed projects encompassed by the Roberts Bank Container Expansion ProgramDarrell Desjardin, Vancouver Port Authority2003/06/16
Report dated June/03 from Darrell Desjardin (Proponent) to Jan Hagen (EAO) entitled "Consultation and Communications Plan" for the Roberts Bank Container Expansion ProjectDarrell Desjardin, Vancouver Port Authority2003/06/05
News Release Flyer dated May 2003 from the Proponent regarding the Roberts Bank Container Expansion Project and upcoming Public Open Houses on May 21 and 22, 2003Darrell Desjardin, Vancouver Port Authority2003/05/15
Letter dated Apr. 24/03 from Darrell Desjardin (Proponent) to Jeff Johansen (DFO) regarding the Study Process for Proposed Container Terminal Expansion Projects at Roberts BankDarrell Desjardin, Vancouver Port Authority2003/05/08
Presentation dated Mar. 11/03 from the Vancouver Port Authority given at the Pre-application meeting on Mar. 11/03Darrell Desjardin, Vancouver Port Authority2003/03/20
Letter dated Feb. 24/03 from D.J Desjardins to Ray Crook (EAO) regarding a description of the proposed projectDarrell Desjardin, Vancouver Port Authority2003/03/18
Conceptual Layout of the proposed Deltaport Third Berth ProjectDarrell Desjardin, Vancouver Port Authority2003/03/18

Public Comments/Submissions

Title

Author

Posted Date

Email dated March 10/04 from William Liaskas (Public) to Jan Hagen (EAO) regarding the proposed container port expansion at Roberts BankRobert Liaskas2004/03/15
Letter dated Nov. 17/03 from Katharine Steig (Vancouver Natural History Society) to Jan Hagen (EAO) expressing concerns about the proposed container port expansion projects and their impact on the environment/ecology of Roberts BankKatharine Steig, Vancouver Natural History Society2003/12/03
Letter dated July 4/03 from June Binkert (Save our Parkland Association) to Joan Hesketh (EAO) regarding the Vancouver Port Authority's proposal to expand operations at Roberts BankJune Binkert, Save Our Parkland Association2003/07/24
Letter with attachments dated June 5/03 from Mary Taitt (Boundary Bay Conservation Committee) to Ray Crook (EAO) regarding Vancouver Port Authority Proposed Roberts Bank Container Expansion Project - Deltaport Expansion and Terminal 2Mary Taitt, Boundary Bay Conservation Committee2003/06/16

Under Review

Application and Supporting Studies

Title

Author

Posted Date

Application and Appendices for an Environmental Assessment Certificate for the Deltaport Third Berth Project submitted by the proponent (Vancouver Port Authority) to Jan Hagen (EAO) on February 14 2005Mark Griggs, Vancouver Port Authority2005/02/14

Aboriginal Comments/Submissions

Title

Author

Posted Date

Submission of the Sencot'en Alliance to Deltaport Third Berth Project Review dated March 24/06 (3 parts).Eric Pelkey, Sencot'en Alliance Steering Committee2006/05/25
Faxed letter dated July 5/05 from Chief Kim Baird (Tsawwassen First Nation) to Jan Hagen (EAO) re: Canadian Environmental Assessment Act/BC Environmenta Assessment Act. Comments also contained in Compendium A.Kim Baird, Tsawwassen First Nation2005/08/26
Status of Review Submission #1 dated May 19, 2005 from the Sencot'en Alliance to EAO.Sencot'en Alliance2005/08/26
Status of Review Submission #2 dated June 13, 2005 from the Sencot'en Alliance to EAO.Sencot'en Alliance2005/08/26
Letter dated July 28/05 from Robert Morales (Hul'qumi'num Treaty Group) to Jan Hagen (EAO) and various others regarding DP3 and the Hul'qumi'num Treaty Groups consultation requirements.Robert Morales, Hul'qumi'num Treaty Group2005/08/25
Report dated May 30-July 21/05 from Kathleen Johnnie (Hul'qumi'num Treaty Group) with preliminary comments on DP3Kathleen Johnnie, Hul'qumi'num Treaty Group2005/08/25

EAO Generated Documents

Title

Author

Posted Date

Time Limit Extension Order signed by Minister Penner dated July 26/06.Barry Penner, Ministry of Environment2006/08/01
Letter from Jan Hagen (EAO) to Eric Pelkey (Sencot'en Alliance) dated May 31/06 regarding Sencot'en Allicance Final Report on the Environmental Assessment of Delta Port Third Berth.Jan Hagen, Environmental Assessment Office2006/06/06
Time Limit Extension Order Amendment #1 signed by J. Hesketh dated May 30/06.Joan Hesketh, Environmental Assessment Office2006/05/30
Letter from Joan Hesketh to Mayor Lois Jackson, The Corporation of Delta, dated March 29/06 regarding an inaccuracy in draft Minutes of the Delta Municipal Council Regular Meeting of March 6/06.Joan Hesketh, Environmental Assessment Office2006/03/31
Time Limit Extension Order dated March 29/06 - Deltaport Third Berth Project.Joan Hesketh, Environmental Assessment Office2006/03/29
Letter from J. Hagen to G. Harvie (Corp. of Delta) dated Mar 16/06 regarding municipal concerns and attachment of table with EAO comments.Jan Hagen, Environmental Assessment Office2006/03/17
Final Meeting Summary Notes from the Feb. 16/06 WG meeting.Karie Hardie, Environmental Assessment Office2006/03/08
Final Meeting Summary Notes from the Feb. 23/06 WG meeting.Karie Hardie, Environmental Assessment Office2006/03/08
Letter from J. Hagen (EAO) to G. Harvie (Corp. of Delta) dated March 6/06 regarding Appendix # - Owner's Table of Commitments and Assurances.Jan Hagen, Environmental Assessment Office2006/03/07
Deltaport Third Berth Project (DP3) Eighth Application Review Meeting - Final Meeting Summary Notes - January 26, 2006Jan Hagen, Environmental Assessment Office2006/02/17
Response letter dated Jan 20/06 from Jan Hagen (EAO) to Mayor Kurt Alberts (Township of Langley) with regards to DP3.Jan Hagen, Environmental Assessment Office2006/02/02
Response letter dated Jan 12/06 from Jan Hagen (EAO) to Paul Ham (City of Surrey) with regards to DP3.Jan Hagen, Environmental Assessment Office2006/02/02
Response letter dated Jan 20/06 from Jan Hagen (EAO) to George Harvie (Corporation of Delta) with regards to DP3.Jan Hagen, Environmental Assessment Office2006/02/02
Letter dated Jan 17/06 from Jan Hagen (EAO) to Patrick McLaughlin (Proponent) with regards to the temporary suspension of the time limit for the completion of the review of DP3Jan Hagen, Environmental Assessment Office2006/02/02
Letter dated Feb 1/06 from Jan Hagen (EAO) to Patrick McLaughlin (Proponent) with regards to the public comment period for the specific four documents and the resumption date of the review timeline.Jan Hagen, Environmental Assessment Office2006/02/02
Deltaport Third Berth Project (DP3) - Seventh Application Review Meeting - Dec 14/05Jan Hagen, Environmental Assessment Office2006/01/12
DP3 Sixth Application Review Meeting - Final Meeting Summary Notes - Nov 24/05Jan Hagen, Environmental Assessment Office2005/12/21
Letter dated December 20/05 from Jan Hagen (EAO) to Susan Jones (Boundary Bay Conservation Committee) with regards to minutes and notes from DP3 meetings.Jan Hagen, Environmental Assessment Office2005/12/21
Letter dated December 20/05 from Jan Hagen (EAO) to Mary Taitt (Delta BC) with regards to public review of additional studies and DP3 proposal.Jan Hagen, Environmental Assessment Office2005/12/21
DP3 Fifth Application Review Meeting - Final Meeting Summary Notes - Sept 22/05Karie Hardie, Environmental Assessment Office2005/12/16
Amendment issued on December 12/05 by Jan Hagen (EAO) to the Section 13 Order issued on December 1/05 for Deltaport Third Berth ProjectJan Hagen, Environmental Assessment Office2005/12/12
Order Under Section 13 issued on December 1/05 by Jan Hagen (EAO) for the Deltaport Third Berth ProjectJan Hagen, Environmental Assessment Office2005/12/01
Information Note: Environmental Assessment of the Deltaport Third Berth Project. Progress Report.Jan Hagen, Environmental Assessment Office2005/11/19
Letter dated Oct 27/05 from Jan Hagen (EAO) to George Harvie (The Corporation of Delta) regarding Deltaport Third Berth.Jan Hagen, Environmental Assessment Office2005/10/28
Deltaport Third Berth Project - Fourth Application Review Meeting - July 28, 2005Jan Hagen, Environmental Assessment Office2005/09/23
Letter dated Aug 31/05 from Jan Hagen (EAO) to Robert Morales (Hul'qumi'num Treaty Group) regarding the DP3 project.Jan Hagen, Environmental Assessment Office2005/09/15
Letter dated Aug 25/05 from Jan Hagen (EAO) to Mayor Jackson (The Corporation of Delta) regarding two council resolutions pertaining to the Deltaport Third Berth Project.Jan Hagen, Environmental Assessment Office2005/09/01
Letter dated Aug 25/05 from Jan Hagen (EAO) to Verne Kucy (The Corporation of Delta) re: Deltaport Third Berth Environmental Assessment Public consultation Review ProcessJan Hagen, Environmental Assessment Office2005/09/01
Response letter dated Aug 18/05 from Jan Hagen (EAO) to Robert Morales (Hul'qumi'num Treaty Group) regarding comments received from Hul'qumi'num Treaty Group. Jan Hagen, Environmental Assessment Office2005/08/25
DP3 Second Application Review Meeting - Final Meeting Summary Notes - April 12/05Jan Hagen, Environmental Assessment Office2005/08/23
DP3 Third Application Review Meeting - Final Meeting Summary Notes - May 19/05Jan Hagen, Environmental Assessment Office2005/08/23
Letter dated June 29/05 from Jan Hagen (EAO) to Interested Parties with regards to VPA's responses to comments issued by Working Group/review agencies, compiled in Compendium A and Compendium B on EAO's website.Jan Hagen, Environmental Assessment Office2005/06/29
Letter dated June 27/05 from Jan Hagen (EAO) to Patrick McLaughlin (Proponent) regarding the Proponent's request to temporarily supsend the time limit for Deltaport Third Berth Project.Jan Hagen, Environmental Assessment Office2005/06/27
Letter dated June 20/05 from Jan Hagen (EAO) to Francis Cheung (Regional Engineers Advisory Committee) in response to letter dated May 26/05. Jan Hagen, Environmental Assessment Office2005/06/23
Email dated May 26/05 from Jan Hagen (EAO) to Verne Kucy (Corporation of Delta) with regards to VPA acquisition of land and water lot.Jan Hagen, Environmental Assessment Office2005/06/17
Order Under Section 13 issued on May 4/05 by Jan Hagen (EAO) for Deltaport Third Berth ProjectJan Hagen, Environmental Assessment Office2005/05/04
Letter dated April 20/05 from Jan Hagen (EAO) to Colin Wright (Township of Langley) with regards to issues of the project and assessment scoping for an environmental assessment.Jan Hagen, Environmental Assessment Office2005/04/26
Letter dated April 6/05 to Mary Taitt (Boundary Bay Conservation Committee) from Jan Hagen (EAO) in response to comments regarding the public review process for the projectJan Hagen, Environmental Assessment Office2005/04/20
Meeting Summary Notes dated Mar. 9/05 from the First Application Review Meeting for the Deltaport Third Berth ProjectKarie Hardie, Environmental Assessment Office2005/03/30
Letter dated Feb. 21/05 from Jan Hagen (EAO) to Jeremy McCall (Federation of BC Naturalists) regarding the Deltaport Container Port Expansion - Environmental AssessmentJan Hagen, Environmental Assessment Office2005/02/28
Letter dated Feb. 28/05 from Jan Hagen (EAO) to Darrell Desjardin (VPA) regarding an Environmental Assessment Certificate Application and Public and First Nations Consultation Assessments for the Deltaport Third Berth ProjectJan Hagen, Environmental Assessment Office2005/02/28
Letter dated Feb. 9/05 from Jan Hagen (EAO) to D.J. Desjardin (VPA) regarding the Application for an EA Certificate for the Deltaport Third Berth Project pursuant to the EA Act. Results of Application Screening Darrell Desjardin, Vancouver Port Authority2005/02/14

Federal Comments/Submissions

Title

Author

Posted Date

Letter from Vivian Au (EC) to Darrell Desjardin (VPA) dated March 9/06 regarding Air Quality, DP3.Vivian Au, Environment Canada2006/03/13
Email dated Sept 6/05 from Brad Fanos (DFO) to Darrell Desjardin (VPA) with second set of comments regarding the proposed project.Brad Fanos, Fisheries & Oceans Canada2005/09/19
Email dated Sept 14/05 from Brad Fanos (DFO) to Darrell Desjardin (VPA) with clarification for the Sept 6 email from DFO to the VPA.Brad Fanos, Fisheries & Oceans Canada2005/09/19
Letter dated July 26/05 from Paul Kluckner (EC) to Dave Carter (CEAA) with regards to DP3 addendum to Environment Canada's wildlife comments.Paul Kluckner, Environment Canada2005/08/02
Letter dated July 22/05 from M D Nassichuk (Environemnt Canada) to Dave Carter (CEAA) with confirmation of EC's expectations regarding the scope and approach for the cumulative air quality effects assessment for the project.Mike D Nassichuk, Environment Canada2005/07/28
Letter dated April 19/05 from Mark Warawa (MP, Langley) to Jan Hagen (EAO) with comments regarding the project.Mark Warawa, Langley2005/05/12

Local Government Comments/Submissions

Title

Author

Posted Date

Letter from P. Ham (City of Surrey) regarding VPA's willingness to create a noise management committee.Paul Ham, City of Surrey2006/03/03
Letter from George V. Harvie dated Feb 23/06 to Jan Hagen regarding Appendix E Owner's Table of Commitments and Assurances.George V. Harvie, The Corporation of Delta2006/02/28
Letter dated Jan 6/06 from Mayor Kurt Alberts (Township of Langley) to Jan Hagen (EAO) with comments regarding DP3.Kurt Alberts, District of Langley2006/02/02
Letter dated Jan 10/06 from Paul Ham (City of Surrey) to Jan Hagen (EAO) with comments regarding DP3.Paul Ham, City of Surrey2006/02/02
Letter dated Jan 11/06 from George Harvie (Corporation of Delta) to Jan Hagen (EAO) with regards to DP3 and municipal concerns.George V. Harvie, The Corporation of Delta2006/02/02
Letter dated October 14/05 from George Harvie (The Corporation of Delta) with regards to Deltaport Third Berth Environmental Assessment Municipal Concerns.George Harvie, The Corporation of Delta2005/10/28
Letter dated June 30/05 from Mayor Jackson (The Corporation of Delta) to Jan Hagen (EAO) regarding the Delta Council passing resolutions.Lois E Jackson, Corporation of Delta2005/08/25
Letter dated July 18/05 from Hugh Kellas (GVRD) to Jan Hagen (EAO) regarding GVRD's authority for managing air quality on port lands and studies on air quality impacts associated with rail and truck traffic.Hugh Kellas, Greater Vancouver Regional District2005/08/25
Email dated June 8/05 from Verne Kucy (Corporation of Delta) to Jan Hagen (EAO) with concerns regarding VPA acquisition of land and water lot.Verne Kucy, Corporation of Delta2005/06/17
(2nd Public Comment Period) Letter dated May 17/05 from Eric Britton (Township of Langley) to Jan Hagen (EAO) with the resolutions from the May 16/05 Township of Langley Special Council meeting.Eric Britton, Township of Langley2005/05/20
(2nd Public Comment Period) Emailed submission dated May 13/05 from Colin Wright (Township of Langley) with comments made and questions asked at EAO Public Information Meeting held in Langley on May 11/05Colin S Wright, Township of Langley2005/05/17
(2nd Public Comment Period) Letter dated May 11/05 from Gary MacKinnon (Township of Langley) with comments regarding rail traffic.Gary MacKinnon, Township of Langley2005/05/17
Letter dated May 3/05 from Lois Jackson (Mayor, Corporation of Delta) to Jan Hagen (EAO) with comments regarding the project.Lois Jackson, Corporation of Delta2005/05/17
(2nd Public Comment Period) Letter dated May 6/05 from Pat Jacobsen (Translink) to Jan Hagen (EAO) with comments regarding the project.Pat Jacobsen, Translink2005/05/16
(2nd Public Comment Period) Letter dated May 12/05 from Brian E Taylor (Bull, Housser & Tupper) on behalf of the Township of Langley with the Township's submission.Brian Taylor, Bull, Housser & Tupper2005/05/16
(2nd Public Comment Period) Submission dated May 9/05 from Colin Wright (Township of Langley) to Jan Hagen (EAO) with comments regarding the project.Colin S Wright, Township of Langley2005/05/13
Letter dated May 6/05 from Marlene Grinnell (Mayor, City of Langley), on behalf of City of Langley Council to Jan Hagen (EAO) expressing the City's concerns.Mayor Marlene Grinnell, City of Langley2005/05/10
Email dated May 4/05 from Ann Coffin (City of Surrey) with attached corporate report containing recommendations that council accepted on May 2/05.Ann M. Coffin, City of Surrey2005/05/09

Notices - News Releases

Title

Author

Posted Date

Public comment invited on four specific documents for the Deltaport Third Berth Project. A formal public comment period begins on December 16, 2005 and closes on January 16, 2006.Jan Hagen, Environmental Assessment Office2005/12/02
Additional Opportunity for the Public to Provide Comment on an Application for the Deltaport Third Berth ProjectJan Hagen, Environmental Assessment Office2005/05/04
Additional Opportunity for Delta Community to Provide Input: Public Information Meeting - May 5, 2005Jan Hagen, Environmental Assessment Office2005/04/25
Notice of Extension of the Public Comment Period for the Deltaport Third Berth (DP3) Project to May 9/05Jan Hagen, Environmental Assessment Office2005/03/21
Notice of Opportunity for Community Input on the Environmental Assessment Certificate Application for the Deltaport Third Berth Project - Public Open House Meetings and InformationDarrell Desjardin, Vancouver Port Authority2005/03/04
Public Comment Invited on an Application for the Deltaport Third Berth Project (DP3)Jan Hagen, Environmental Assessment Office2005/02/14

Proponent Comments/Correspondence

Title

Author

Posted Date

Letter and submission of final compendium of Working Group comments and Vancouver Port Authority responses dated June 16/06.Darrell Desjardin, Vancouver Port Authority2006/06/21
Letter from D.J. Desjardin (VPA) to V. Au (EC) dated April 10/06 responding to the EC letter of March 9/06 regarding DP3 Air Quality.Darrell Desjardin, Vancouver Port Authority2006/04/12
Final Deltaport Third Berth Proposed Habitat Compensation document dated March 12/06 received by EAO April 11/06 (comprising 8 parts) and letter from D. J. Desjardin (VPA) to J. E. Hagen (EAO).Darrell Desjardin, Vancouver Port Authority2006/04/11
Letter from D.J. Desjardin (VPA) dated April 4/06 and attached updated construction schedule to J. E. Hagen (EAO).Darrell Desjardin, Vancouver Port Authority2006/04/04
Summary of Public Consultation Activities and Input: Public Comment Period 3 (Dec 16/05 to Jan 25/06)Vancouver Port Authority2006/03/09
Response letter from P. McLaughlin (VPA) dated March 2/06 to Chief Kim Baird, Tsawwassen FN regarding their comments on the 4 documents (Public Comment Period 3).Patrick McLaughlin, Vancouver Port Authority2006/03/07
Letter from Patrick McLaughlin (VPA) dated Feb 22/06 and Table of Responses dated Feb 14/06 to Rick Le Noury of Delta Residents for a Healthy Community regarding comments on DP3 for the Public Comment Period 3.Patrick McLaughlin, Vancouver Port Authority2006/03/02
Letter from Patrick McLaughlin (VPA) dated Feb 22/06 and Table of Responses dated Feb 14/06 to Nicolas Cuff, Western Canada Wilderness Committee regarding comments on DP3 for the Public Comment Period 3.Patrick McLaughlin, Vancouver Port Authority2006/03/02
Letter from Patrick McLaughlin (VPA) dated Feb 22/06 and Table of Responses dated Feb 14/06 to Gillian Anderson of BC Great Blue Heron Society regarding public comments on DP3 for the Public Comment Period 3.Patrick McLaughlin, Vancouver Port Authority2006/03/02
Letter from Patrick McLaughlin (VPA) dated Feb 22/06 and Table of Responses dated Feb 14/06 to Jeremy McCall of Federation of BC Naturalists regarding public comments on DP3 for the Public Comment Period 3.Patrick McLaughlin, Vancouver Port Authority2006/03/02
Letter from Patrick McLaughlin (VPA) dated Feb 22/06 to various individuals regarding public comments on DP3 for the Public Comment Period 3.Patrick McLaughlin, Vancouver Port Authority2006/03/02
Letter from Patrick McLaughlin (VPA) dated Feb 22/06 and Table of Responses dated Feb 14/06 to Mary Tait, Boundary Bay Conservation Committee regarding public comments on DP3 for the Public Comment Period 3.Patrick McLaughlin, Vancouver Port Authority2006/03/01
Letter dated Feb 9/06 from D.J. Desjardin (VPA) to Andrew Green (Environment Canada) in response to Jan 19/06 letter requesting further clarification on Air Quality Delta Port Third Berth Darrell Desjardin, Vancouver Port Authority2006/02/21
Letter dated Feb 14/06 from Patrick McLaughlin (VPA) to Jan Hagen (EAO) with regards to the Adaptive Management Strategy Agreement for DP3.Patrick McLaughlin, Vancouver Port Authority2006/02/17
Proposed Habitat Compensation Plan dated November 2005  2005/12/02
Draft - Deltaport Third Berth Project - Adaptive Management Strategy dated November 2005  2005/12/02
Amendments to Application Chapter 13 - Air Quality Assessment - November 2005  2005/12/02
Cumulative Effects Assessment Chapter 23 - November 2005  2005/12/02
Letter dated Oct 20/05 from Patrick McLaughlin (Vancouver Port Authority) to Mary Taitt (Boundary Bay Conservation Committee) in response to issues raised in DP3 submission.Patrick McLaughlin, Vancouver Port Authority2005/11/19
Report dated October 2005 from Proponent - Summary of Public Consultation Activities and Input Application Review Phase 24 February 2005 to 31 August 2005 for the Deltaport Third Berth Project - Roberts Bank Container Expansion ProgramNaomi Horsford, Vancouver Port Authority2005/10/24
Letter dated Sept 6/05 from Patrick McLaughlin (Vancouver Port Authority) re: Deltaport Third Berth Project-Public Comment Period 2.Patrick McLaughlin, Vancouver Port Authority2005/09/09
Letter dated Sept 6/05 from Patrick McLaughlin (Vancouver Port Authority) to Paul Ham (City of Surrey) response to May 4/05 comment.Patrick McLaughlin, Vancouver Port Authority2005/09/09
Letter dated Sept 7/05 from Patrick McLaughlin (Vancouver Port Authority) to Jeremy McCall (Federation of BC Naturalists) response to Feb 8 and May 18/05 comments.Patrick McLaughlin, Vancouver Port Authority2005/09/09
Letter dated Sept 7/05 from Patrick McLaughlin (Vancouver Port Authority) to Gillian Anderson (BC Great Blue Heron Society) response to May 18/05 comment.Patrick McLaughlin, Vancouver Port Authority2005/09/09
Letter dated Aug 31/05 from Patrick McLaughlin (Vancouver Port Authority) re: Deltaport Third Berth Project-Public Comment Period 1.Patrick McLaughlin, Vancouver Port Authority2005/09/02
Letter dated Aug 31/05 from Patrick McLaughlin (Vancouver Port Authority) to Pat Jacobsen (Translink) response to May 6/05 comments.Patrick McLaughlin, Vancouver Port Authority2005/09/02
Letter dated Aug 31/05 from Patrick McLaughlin (Vancouver Port Authority) to Francis Cheung (Greater Vancouver Regional District) response to May 26/05 comments. Patrick McLaughlin, Vancouver Port Authority2005/09/02
Letter dated Aug 31/05 from Patrick McLaughlin (Vancouver Port Authority) to Mayor Kurt Alberts (Township of Langley) response to May 9, 11, 12, 13, and 17/05 comments. Patrick McLaughlin, Vancouver Port Authority2005/09/02
Letter dated Aug 31/05 from Patrick McLaughlin (Vancouver Port Authority) to Mayor Marlene Grinnell (City of Langley) response to May 6/05 comments. Patrick McLaughlin, Vancouver Port Authority2005/09/02
Letter dated Aug 31/05 from Patrick McLaughlin (Vancouver Port Authority) Re: Proposed Deltaport Expansion and Langley Rail Crossing Issues. Patrick McLaughlin, Vancouver Port Authority2005/09/02
Letter dated Aug 31/05 from Patrick McLaughlin (Vancouver Port Authority) to Mayor Lois Jackson (The Corporation of Delta) response to comments. Patrick McLaughlin, Vancouver Port Authority2005/09/02
Letter dated July 27/05 from D J Desjardin (VPA) to Jan Hagen (EAO) with clarification of terminal footprint, tug basin design and dredging volumes.Darrell Desjardin, Vancouver Port Authority2005/08/02
Letter dated June 23/05 from Patrick McLaughlin (Proponent) to Joan Hesketh (EAO) requesting a Time Extension for Deltaport Third Berth ProjectPatrick McLaughlin, Vancouver Port Authority2005/06/23
Letter dated Mar. 18/05 from Naomi Horsford (VPA) to Evelyn Feller (Public) in response to the request for a copy of the Deltaport Third Berth Project Application and supporting documentsNaomi Horsford, Vancouver Port Authority2005/03/24
Letter dated Mar. 18/05 from Naomi Horsford (VPA) to June Binkert (Public) in response to the request for a copy of the Deltaport Third Berth Project Application and supporting documentsJune Binkert, Save Our Parkland Association2005/03/24
Letter dated Feb. 11/05 from D.J. Desjardin (VPA) to Jan Hagen (EAO) regarding the Deltaport Third Berth Project (DP3) Environmental Assessment Certificate (EAC) ApplicationDarrell Desjardin, Vancouver Port Authority2005/02/14

Public Comments/Submissions

Title

Author

Posted Date

(3rd Public Comment Period) Email dated Jan 23/06 from Serban Vasilescu (Delta BC) to Jan Hagen (EAO) with comments on the four documents.Serban Vasilescu2006/01/30
(3rd Public Comment Period) Email dated Jan 23/06 from Lucy Bilow (Delta BC) to Jan Hagen (EAO) with comments on the four documents. Lucy Bilow2006/01/30
(3rd Public Comment Period) Letter dated Jan 24/06 from Roger Emsley (Delta BC) to Jan Hagen (EAO) with comments on the four documents.Roger Emsley2006/01/26
(3rd Public Comment Period) Email with attachment dated Jan 24/06 from Jim Ronback (Tsawwassen BC)to Jan Hagen (EAO) with comments on one of the four documents.Jim Ronback2006/01/26
(3rd Public Comment Period) Letter dated Jan 25/06 from Nicolas Cuff, Western Canada Wilderness Committee (Vancouver BC) to Jan Hagen (EAO) with comments.Western Canada Wilderness Committee2006/01/26
(3rd Public Comment Period) Letter dated Jan 23/06 from David Hein and Leslie Slack (Delta BC) to Jan Hagen (EAO) with comments on three of the four documents.Leslie Slack2006/01/26
(3rd Public Comment Period) Letter dated Jan 24/06 from Mary Taitt (Boundary Bay Conservation Committee to Jan Hagen (EAO) with comments on the four documents.Mary Taitt, Boundary Bay Conservation Committee2006/01/26
(3rd Public Comment Period) Email dated Jan 25/06 from George and Maria Helena Stastny (Delta BC) to Jan Hagen (EAO) with comments.George and Maria Stastny2006/01/26
(3rd Public Comment Period) Letter dated Jan 25/06 from Susan Jones (Delta BC) to Jan Hagen (EAO) with comments on the four documents.Susan Jones2006/01/26
(3rd Public Comment Period) Letter dated Jan 25/06 from Julie Hobart (Delta BC) to Jan Hagen (EAO) with comments.Julie Hobart2006/01/26
(3rd Public Comment Period) Email dated Jan 25/06 from Amy Jones (Delta BC) to Jan Hagen (EAO) with comments.Amy Jones2006/01/26
(3rd Public Comment Period) Letter dated Jan 25/06 from Walter Dnistransky (Delta BC) to Jan Hagen (EAO) with comments.Walter Dnistransky2006/01/26
(3rd Public Comment Period) Letter dated Jan 25/06 from Jeremy McCall, Federation of BC Naturalists (Vancouver BC) to Jan Hagen (EAO) with comments.Jeremy McCall, Federation of BC Naturalists2006/01/26
(3rd Public Comment Period) Email dated Jan 25/06 from Doug Drake (Delta BC) to Jan Hagen (EAO) with comments on the four documents.Connie and Doug Drake2006/01/26
(3rd Public Comment Period) Letter dated Jan 25/06 from Renee Wilkins to Jan Hagen (EAO) with comments on the four documents.Renee Wilkins2006/01/26
(3rd Public Comment Period) Email dated Jan 25/06 from Gillian Anderson (BC Great Blue Heron Society) to Jan Hagen (EAO) with comments on the four documents.Gillian Anderson, BC Great Blue Heron Society2006/01/26
(3rd Public Comment Period) Email with attachment dated Jan 25/06 from Gillian Anderson and family (Delta BC) to Jan Hagen (EAO) with comments on the four documents.Gillian and Frank Anderson2006/01/26
(3rd Public Comment Period) Email dated Jan 25/06 from Anne Murray (Delta BC) to Jan Hagen with comments on the four documents. Anne Murray2006/01/25
(3rd Public Comment Period) Letter dated Jan 25/06 from Rick Le Noury (Delta Residents for a Healthy Community) to Jan Hagen (EAO) with comments on the cumulative effects.Rick Le Noury, Delta Residents for a Healthy Community2006/01/25
(3rd Public Comment Period) Letter dated Jan 22/06 from Anne-Marie Filgas (Delta BC) to Jan Hagen with comments.Anne-Marie Filgas2006/01/25
(3rd Public Comment Period) Email dated Jan 24/06 from Adrian Wightman (Delta BC) to Jan Hagen (EAO) with comments on the four documents.Adrian Wightman2006/01/25
(3rd Public Comment Period) Email dated Jan 24/06 from Marilynn King (Delta BC) to Jan Hagen (EAO) with comments.Marilynn King, BBCC/Delta Naturalists2006/01/25
(3rd Public Comment Period) Email dated Jan 24/06 from Liz Gough (Delta BC) to Jan Hagen (EAO) with comments on three of the four documentsLiz Gough2006/01/25
(3rd Public Comment Period) Email dated Jan 24/06 from April Cook (Delta BC) to Jan Hagen (EAO) with comments on the four documents.April Cook2006/01/25
(3rd Public Comment Period) Letter dated Jan 24/06 from Bev Ramey (Vancouver BC) to Jan Hagen (EAO) with comments.Bev Ramey, Federation of BC Naturalists2006/01/25
(3rd Public Comment Period) Email dated Jan 21/06 from Connie Drake and Louise Long to Jan Hagen (EAO) with comments on the four documents.Louise Long2006/01/25
(3rd Public Comment Period) Email dated Jan 24/06 from Rachel Romaniuk (Ladner BC) to Jan Hagen (EAO) with comments on one of the four documents.Rachel Romaniuk2006/01/25
(3rd Public Comment Period) Email dated Jan 24/06 from Wemdy Wulff to Jan Hagen (EAO) with comments on the four documents.Wendy Wulff2006/01/25
(3rd Public Comment Period) Email dated Jan 24/06 from Connie Drake (Delta BC) to Jan Hagen (EAO) with comments on the four documents.Connie Drake2006/01/25
(3rd Public Comment Period) Email dated Jan 24/06 from Vlad Scholz (Delta BC) to Jan Hagen (EAO) with comments.Vlad Scholz2006/01/25
(3rd Public Comment Period) Email dated Jan 23/06 from Norma Pain (Delta BC) to Jan Hagen (EAO) with comments on the four documents.Norma Pain2006/01/25
(3rd Public Comment Period) Email dated Jan 21/06 from Jim Hudson (Delta BC) to Jan Hagen (EAO) with comments.James and Louise Hudson2006/01/25
(3rd Public Comment Period) Email dated Jan 15/06 from Larry Colero (Delta BC) to Jan Hagen (EAO) with comments regarding the 4 documents. Larry Colero2006/01/18
(3rd Public Comment Period) Email dated Jan 15/06 from Chris Colero (Delta BC) to Jan Hagen (EAO) with comments regarding air quality. Chris Colero2006/01/18
(3rd Public Comment Period) Email dated Dec 12/05 from Peter Hamilton (Lifeforce) to Jan Hagen (EAO) with comments. Peter Hamilton, Lifeforce2006/01/18
(3rd Public Comment Period) Letter dated Dec 27/05 from Sharon Grant (Delta BC) to Jan Hagen (EAO) with comments regarding the 4 documents.Sharon Grant2006/01/10
(3rd Public Comment Period) Deltaport Third Berth Project December 13/05 Open House form from Don Brown (Delta BC)  2005/12/21
(3rd Public Comment Period) Deltaport Third Berth Project December 13/05 Open House form from Peter Miller (Delta BC)  2005/12/21
(3rd Public Comment Period) Deltaport Third Berth Project December 13/05 Open House form from Bernice McMahon (Delta BC) Bernice McMahon2005/12/21
(3rd Public Comment Period) Deltaport Third Berth Project December 13/05 Open House form from Margo and Denis Whyte (Delta BC) Margo and Denis Whyte2005/12/21
(3rd Public Comment Period) Deltaport Third Berth Project December 13/05 Open House form from Richard Swanston (Delta BC) Richard Swanston2005/12/21
(3rd Public Comment Period) Deltaport Third Berth Project December 13/05 Open House form from Julie Hobart (Delta BC) Julie Hobart2005/12/21
(3rd Public Comment Period) Deltaport Third Berth Project December 13/05 Open House form from Chris Hopkins (Delta BC) Chris Hopkins2005/12/21
(3rd Public Comment Period) Deltaport Third Berth Project December 13/05 Open House form from Daniel Liddy  2005/12/21
(3rd Public Comment Period) Deltaport Third Berth Project December 13/05 Open House form from Christine Knowlden (Delta BC) Christine Knowlden2005/12/21
Letter dated May 26/05 from Francis Cheung (Regional Engineers Advisory Committee) to Jan Hagen (EAO) with comments regarding the project.Francis Cheung, Regional Engineers Advisory Committee2005/06/20
(2nd Public Comment Period) Emailed letter dated May 18/05 from Jeremy McCall (Federation of BC Naturalists) to Jan Hagen (EAO) with comments regarding the project.Jeremy McCall, Federation of BC Naturalists2005/06/03
(2nd Public Comment Period) Emailed submission dated May 17/05 from Rick Le Noury (Delta Residents for a Healthy Community) to Jan Hagen (EAO) with comments regarding the project.Rick Le Noury, Delta Residents for a Healthy Community2005/05/31
(2nd Public Comment Period) Email dated May 18/05 from Janice Bywater to EAOINFO with comments regarding the project.Janice Bywater2005/05/20
(2nd Public Comment Period) Email dated May 18/05 from Sharon E Walker (Surrey BC) to EAOINFO with comments regarding the project.Sharon E Walker2005/05/20
(2nd Public Comment Period) Letter dated May 13/05 from Al Genge (Downtown Langley Merchants Association) to Jan Hagne (EAO) with comments regarding the train traffic and the impact on Langley.Al Genge, Downtown Langley Merchants Association2005/05/20
(2nd Public Comment Period) Email dated May 18/05 from Judy Williams and Evelyn Feller (Fraser River Coalition) to Jan Hagen (EAO) with comments regarding the project.Judy E Williams, Fraser River Coalition2005/05/19
(2nd Public Comment Period) Email dated May 18/05 from Judy Williams and Evelyn Feller (Fraser River Coalition) to Jan Hagen (EAO) with comments regarding the project.Judy E Williams, Fraser River Coalition2005/05/19
(2nd Public Comment Period) Email dated May18/05 from Mary-Ellen Meyers (Delta BC) to EAOINFO with concerns regarding noise and environmental impact.Mary-Ellen Meyers2005/05/19
(2nd Public Comment Period) Letter dated May 18/05 from Gail McConnell (Delta BC) to Jan Hagen (EAO) with concerns regarding the roadway infrastructure.Gail McConnell2005/05/19
(2nd Public Comment Period) Letter received May 18/05 from Anita Remillard and Milt and Doreen Henniford (Langley BC) to Jan Hagen (EAO) with comments regarding the train traffic and pollution.Milt and Doreen Henniford2005/05/19
(2nd Public Comment Period) Letter dated May 17/05 from J Lundell to Jan Hagen (EAO) with comments regarding the project.J Lundell2005/05/19
(2nd Public Comment Period) Letter dated May 17/05 from Tim Lounsbury (Envision Credit Union, Willoughby) to EAO with comments regarding the train traffic.Tim Lounsbury, Envision Credit Union2005/05/19
(2nd Public Comment Period) Letter dated May 16/05 from Ivan Holmgren (Langley BC) to Jan Hagen (EAO) with comments regarding the project.Ivan Holmgren2005/05/19
(2nd Public Comment Period) Letter dated May 15/05 from Chris Lundquist (Delta BC) with concerns regarding the project.Chris Lundquist2005/05/19
(2nd Public Comment Period) Letter dated May 6/05 from P Birrell (Delta BC) to EAO with comments regarding the project. P L Birrell2005/05/19
(2nd Public Comment Period) Letter dated May 13/05 from Sharon Johnson (Delta BC) to Jan Hagen (EAO) with comments regarding the project.Sharon Johnson2005/05/19
(2nd Public Comment Period) Email dated May 13/05 from Don and Marilyn Ernst (Langley BC) to Jan Hagen (EAO) with comments regarding the rail route.Don and Marilyn Ernst2005/05/18
(2nd Public Comment Period) Email dated May 11/05 from Kathleen Beaton (Delta BC) to Jan Hagen (EAO) with comments regarding the project. Kathleen Beaton2005/05/18
(2nd Public Comment Period) Emailed letter dated May 17/05 from Eric Broberg (Belcarra BC) to Jan Hagen (EAO) with comments regarding the project.Eric Mackay Broberg2005/05/18
(2nd Public Comment Period) Email dated May 17/05 from Keith and Evangeline Hamming (Cloverdale BC) to Jan Hagen (EAO) with comments regarding the project.Keith and Evangeline Hamming2005/05/18
(2nd Public Comment Period) Email dated May 17/05 from Barbara Eveleigh (Delta BC) to Jan Hagen (EAO) with comments regarding the project.Barbara Eveleigh2005/05/18
(2nd Public Comment Period) Email dated May 17/05 from Michael Prettejohn and Carole Crowe (Delta BC) to Jan Hagen (EAO) with comments regarding the truck traffic.Michael Prettejohn2005/05/18
(2nd Public Comment Period) Emailed letter dated May 16/05 from Richard Swanston (Delta BC) to Jan Hagen (EAO) with comments regarding the project.Richard Swanston2005/05/18
(2nd Public Comment Period) Email dated May 17/05 from Jeff and Cathy Lukovich (Delta BC) to Jan Hagen (EAO) with comments regarding increased traffic, noise and pollution.Jeff and Cathy Lukovich2005/05/18
(2nd Public Comment Period) Emailed letter dated May 17/05 from P Rennie (Tsawwassen BC) to Jan Hagen (EAO) with concerns on air quality.Paula and Scott Rennie2005/05/18
(2nd Public Comment Period) Email dated May 17/05 from Pam Krannitz (Delta BC) to Jan Hagen (EAO) with comments regarding the project.Pam Krannitz2005/05/18
(2nd Public Comment Period) Email dated May 17/05 from Wayne Harris (Langley BC) to EAOINFO with comments regarding the train route.Wayne Harris2005/05/18
(2nd Public Comment Period) Email dated May 17/05 from Kim Mackie (Delta BC) to Jan Hagen (EAO) with comments regarding the project.Kim Mackie2005/05/18
(2nd Public Comment Period) Email dated May 17/05 from Blair Anderson to Jan Hagen (EAO) with comments regarding the review of the project.Blair Anderson2005/05/18
(2nd Public Comment Period) Email dated May 17/05 from Bruce, Melanie, Cameron and Amy Williams (Delta BC) to Jan Hagen (EAO) with comments regarding impacts on the environment.Bruce Williams2005/05/18
(2nd Public Comment Period) Letter dated May 16/05 from Mary J Taitt( Boundary Bay Conservation Committee) with attached report entitled "Review of the Vancouver Port Authority's Environmental Assessment Application for the DP3 Project on Roberts Bank... Mary Taitt, Boundary Bay Conservation Committee2005/05/18
(2nd Public Comment Period) Emailed letter dated May 18/05 from Stephen C Davis (Langley BC) to Jan Hagen (EAO) with comments regarding the train traffic in Langley.Stephen Davis2005/05/18
(2nd Public Comment Period) Email dated May 18/05 from Norling and Pat Stevens (Tsawwassen BC) to Jan Hagen (EAO) with comments regarding the project.Norling and Pat Stevens2005/05/18
(2nd Public Comment Period) Email dated May 18/05 from Diane Heal (Delta BC) to Jan Hagen (EAO) with comments regarding truck traffic.Dianne Heal2005/05/18
(2nd Public Comment Period) Emailed letter dated May 18/05 from Scott Drake (Delta BC) to Jan Hagen (EAO) with comments regarding the project.Scott Drake2005/05/18
(2nd Public Comment Period) Email dated May 18/05 from Marcia Johns (Delta BC) to Jan Hagen (EAO) with comments regarding the project.Marcia Johns2005/05/18
(2nd Public Comment Period) Emailed letter dated May 17/05 from Farida Bishay and Jim Northey (Tsatsu Shores Homeowners Corporation) to Jan Hagen (EAO) with comments regarding the project.Jim Northey, Tsatsu Shores Homeowner's Corporation2005/05/18
(2nd Public Comment Period) Email dated May 18/05 from Emilia Antoshchuk (Langley BC) to Jan Hagen (EAO) with comments regarding the project.Emilia Antoshchuk2005/05/18
(2nd Public Comment Period) Email dated May 18/05 from the Anderson family (Delta BC) to Jan Hagen (EAO) with comments regarding the project.Gillian and Frank Anderson2005/05/18
(2nd Public Comment Period) Email dated May 18/05 from Gillian Anderson (BC Great Blue Heron Society) to Jan Hagen (EAO) with comments regarding the project.Gillian Anderson, BC Great Blue Heron Society2005/05/18
(2nd Public Comment Period) Email dated May 18/05 from Russ and Kathy Tichauer (Langley BC) to EAOINFO with comments regarding the rail traffic.Russ and Kathy Tichauer2005/05/18
(2nd Public Comment Period) Letter dated May 17/05 from Harry Smith (Tsawwassen BC) to Jan Hagen (EAO) with comments regarding the project.Harry Smith2005/05/18
(2nd Public Comment Period) Email dated May 13/05 from Leslie Slack and David Hein (Delta BC) with comments regarding the truck traffic and the port.Leslie Slack2005/05/17
(2nd Public Comment Period) Letter dated May 12/05 from Katharine Steig (Vancouver Natural History Society) to Jan Hagen (EAO) with comments regarding the project.Katharine Steig, Vancouver Natural History Society2005/05/17
(2nd Public Comment Period) Email dated May 14/05 from Kathy Verperts (Ladner BC) to EAOINFO with comments regarding the project.Kathy Veperts2005/05/17
(2nd Public Comment Period) Email dated May 14/05 from Peggy D Weatherdon to EAOINFO with comments regarding the train traffic.Peggy D Weatherdon2005/05/17
(2nd Public Comment Period) Email dated May 14/05 from Jim Hendry (Delta BC) to EAOINFO with comments regarding the project.Jim Hendry2005/05/17
(2nd Public Comment Period) Email dated May 15/05 from R McC Hargrave (Tsawwassen BC) to EAOINFO with comments regarding costs to tax payers and pollution and illness risks to residents.R McC Hargrave2005/05/17
(2nd Public Comment Period) Email dated May 15/05 from Doug Reynolds and Bev Yawarski (Delta BC) with comments regarding air quality, rail and truck transportation and light impacts.Doug Reynolds2005/05/17
(2nd Public Comment Period) Emailed letter dated May 15/05 from Susan Jones (Delta BC) to Jan Hagen (EAO) with comments regarding the marine environmental impact assessment.Susan Jones2005/05/17
(2nd Public Comment Period) Faxed letter dated May 16/05 from Dolman with comments regarding rail traffic.Dolman2005/05/17
(2nd Public Comment Period) Letter dated May 11/05 from Paul Burnham (Langley BC) to Jan Hagen (EAO) with comments regarding the train traffic in Langley.Paul Burnham2005/05/17
(2nd Public Comment Period) Submission dated May 12/05 from E J Kolla (Langley BC) to Jan Hagen (EAO) with comments regarding train traffic and the project.E J Kolla2005/05/17
(2nd Public Comment Period) Letter dated May 6/05 from W Synhorst (Delta BC) to Jan Hagen (EAO) with comments regarding the project.W Synhorst2005/05/17
(2nd Public Comment Period) Email dated May 16/05 from Yvonne Haynes (Delta BC) to Jan Hagen (EAO) with comments regarding the project.Yvonne Haynes2005/05/17
(2nd Public Comment Period) Letter dated May 13/05 from Jack Bates (Delta Farmers' Institute) to Jan Hagen (EAO) with comments regarding road traffic and the project.Jack Bates, Delta Farmers' Institute2005/05/17
(2nd Public Comment Period) Letter dated May 12/05 from Don Elkington (Coast Spas) to Jan Hagen (EAO) with concerns regarding the train traffic.Don Elkington, Coast Spas Manufacturing Inc2005/05/17
(2nd Public Comment Period) Email dated May 16/05 from J A Conway (Langley BC) to Jan Hagen (EAO) with comments regarding rail traffic.J A Conway2005/05/17
(2nd Public Comment Period) Email dated May 16/05 from Muriel Dibb (Langley BC) to EAOINFO with comments regarding the trains.Muriel Dibb2005/05/17
(2nd Public Comment Period) Emailed letter dated May 15/05 from Susan Jones (Delta BC) to Jan Hagen (EAO) with comments regarding the process, project description, rationale, scope and residual effects.Susan Jones2005/05/17
(2nd Public Comment Period) Emailed letter dated May 16/05 from Susan Jones (Delta BC) to Jan Hagen (EAO) with comments regarding "A Serious Omission in the EA of the Deltaport Third Berth Project".Susan Jones2005/05/17
(2nd Public Comment Period) Emailed letter dated May 16/05 from John and Laurie Laing (Delta BC) to Jan Hagen (EAO) with comments regarding the project.John and Laurie Laing2005/05/17
(2nd Public Comment Period) Letter dated May 12/05 from Joann Chernen (Ladner BC) to Jan Hagen (EAO) with comments regarding the project.Joann Chernen2005/05/16
(2nd Public Comment Period) Email dated May 11/05 from Lesley Woodward (Delta BC) with comments regarding the project.Lesley Woodward2005/05/13
(2nd Public Comment Period) Email dated May 12/05 from Margaret Meggy (Delta BC) to EAOINFO with comments regarding the project.Margaret Meggy, Great Little Box Co. Ltd2005/05/13
(2nd Public Comment Period) Email dated May 12/05 from Jim McCardell (Tsawwassen BC) to EAOINFO with comments regarding the project.Jim and Shelley McCardell2005/05/13
(2nd Public Comment Period) Letter from W S Lakevold (Langley BC) to Jan Hagen (EAO) with comments regarding the project.W S Lakevold2005/05/13
(2nd Public Comment Period) Presentation received May 12/05 from Arnold Badke (Langley BC) - Presentation to Township of Langley and City of Langley for Third Berth at Deltaport.Arnold Badke2005/05/13
(2nd Public Comment Period) Emailed letter dated May 11/05 from Mike McLennan (Surrey BC) to Jan Hagen (EAO) with comments regarding the rail traffic and the project.Mike McLennan2005/05/12
(2nd Public Comment Period) Email dated May 11/05 from Lisa Everatt (Delta BC) to EAOINFO with comments regarding the project.Lisa Everatt2005/05/12
(2nd Public Comment Period) Letter dated May 8/05 from Jan Storer (Delta BC) to Jan Hagen (EAO) with comments regarding the project.Jan Storer2005/05/12
(2nd Public Comment Period) Letter dated May 6/05 from June Plouffe (Delta BC) to Jan Hagen (EAO) with comments regarding truck traffic.June Plouffe2005/05/12
(2nd Public Comment Period) Form emails/letters with concerns regarding the Scope, Air Quality, Transportation, Noise and Light Impacts, Cumulative Effects and Mitigation.  2005/05/12
(2nd Public Comment Period) Form submission with comments regarding impacts to Langley.  2005/05/12
(2nd Public Comment Period) Form letters/emails listing a few concerns with regards to the project.  2005/05/12
(2nd Public Comment Period) Form submission signed by various public members.  2005/05/12
(2nd Public Comment Period) Email dated May 11/05 from Brigitte Reymond to EAOINFO with comments regarding the project.Brigitte Reymond2005/05/12
(2nd Public Comment Period) Email dated May 11/05 from Sally Hickling (Delta BC) to EAOINFO with comments regarding the project.Sally Hickling2005/05/12
Email dated April 11/05 from Harry Curtis (Langley BC) to Jan Hagen (EAO) with comments regarding the train traffic in Langley.Harry Curtis2005/05/12
Form letters/emails listing a few concerns with regards to the project.  2005/05/11
Emailed letter dated May 9/05 from Anne-Marie Filgas (Delta BC) to Jan Hagen (EAO) with comments regarding the project.Anne-Marie Filgas2005/05/11
Letter dated April 4/05 from Adrain and Jannette Vandop (BC) to Jan Hagen (EAO) with comments regarding the train traffic in Cloverdale and Langley.Adrain and Jannette Vandop2005/05/11
Letter dated May 5/05 from Christopher Gray and Family (Surrey BC) to Jan Hagen (EAO) with comments regarding train traffic in Surrey.Christopher Gray, Connelly Mechanical Systems Ltd2005/05/11
Emailed letter dated May 5/05 from Fred Kruberg (Delta BC) to Jan Hagen (EAO) with comments regarding the project.Fred Kruberg2005/05/11
Email dated May 9/05 from Ed Leach (Delta BC) to EAOINFO with comments regarding the project. Ed Leach2005/05/11
Faxed brief dated May 9/05 from June Binkert (Save Our Parkland Association) to Jan Hagen (EAO) with comments regarding the project.June Binkert, Save Our Parkland Association2005/05/11
Deltaport Third Berth Project April 12/05 Open House form from Elsie Woodward (Delta BC) with attached comments regarding the project.Elsie Woodward2005/05/11
Faxed letter dated May 9/05 from Leone Cox (Tsawwassen Homeowners Association) to Jan Hagen (EAO) with comments regarding the project.Leone Cox, Tsawwassen Homeowners Association2005/05/11
Email dated May 9/05 from J A Conway (Langley BC) to EAOINFO with comments regarding the rail traffic.J A Conway2005/05/11
Email dated May 9/05 from Joanie Buzik to EAOINFO with comments regarding the project and traffic.Joanie Buzik2005/05/11
Email dated May 9/05 from Barbara Docherty (Vancouver BC) to Jan Hagen (EAO) with comments regarding the project.Barbara Docherty2005/05/11
Email dated May 9/05 from Richard Swanston to EAOINFO with comments regarding the project.Richard Swanston2005/05/11
Email dated May 9/05 from Kevin Dowle to EAOINFO with comments regarding the project.Kevin Dowle2005/05/11
Email dated May 9/05 from Liz Gough to Jan Hagen (EAO) with comments regarding the project.Liz Gough2005/05/11
Letter dated May 3/05 from Fiona Old (White Rock BC) to Jan Hagen (EAO) with comments regarding the project. Fiona Old2005/05/11
Email dated May 6/05 from Linda Legaree (Langley BC) to EAOINFO with comments regarding the rail traffic.Linda Legaree2005/05/10
Letter dated May 3/05 from B and T Nicholson (Langley BC) to Jan Hagen (EAO) with comments regarding the project and trains.B and T Nicholson2005/05/10
Emailed letter dated May 6/05 from Roger and Angela Emsley (Delta BC) with comments regarding the project.Roger Emsley2005/05/10
Letter dated May 3/05 from Murray Smith (Langley BC) to EAO with comments regarding train traffic in Langley.Murray D Smith2005/05/10
Email dated May 7/05 from G. Lieuwen (Langley BC) with comments regarding the project. G. Lieuwen2005/05/10
Email dated May 7/05 from Norma Pain (Delta BC) with comments regarding the project. Norma Pain2005/05/10
Emailed letter dated May 8/05 from Vic Rivers (Delta BC) with comments regarding the project. Vic Rivers2005/05/10
Email dated May 8/05 from David Riley (Surrey BC) with comments regarding the project. David Riley2005/05/10
Email dated May 8/05 from Teresa and Rich Jones with comments regarding the project.Teresa and Rich Jones2005/05/10
Email dated May 8/05 from Larry Colero (Delta BC) to EAOINFO with comments regarding the project.Larry Colero2005/05/10
Email dated May 8/05 from Gabi Harper (South Delta BC) to EAOINFO with comments regarding the project.Gabi Harper2005/05/10
Email dated May 8/05 from Claude Paterson (Delta BC) to EAOINFO with comments regarding the project.Claude Paterson2005/05/10
Email dated May 8/05 from Burnice Smith (Delta BC) with comments regarding the project. Burnice Smith2005/05/10
Letter dated May 2/05 from Rhys Griffiths (Langley BC) to Jan Hagen (EAO) with comments regarding the train traffic in Langley.Rhys Griffiths2005/05/09
Letter dated May 2/05 from John and Elly Vandergraaf (Surrey BC) to Jan Hagen (EAO) with comments regarding the train traffic and the project.John and Elly Vandergraaf2005/05/09
Letter dated May 6/05 from William A Taylor (Langley BC) to Jan Hagen (EAO) with comments regarding rail traffic.William A Taylor2005/05/09
Letter dated May 9/05 from Ian Robertson (Delta BC) to Jan Hagen (EAO) with comments regarding the project and trains.Ian D. Robertson2005/05/09
Letter dated May 8/05 from Barry Turriff (Delta BC) to Jan Hagen (EAO) with comments regarding the project.Barry Turriff2005/05/09
Letter dated May 6/05 from Anne Murray (Delta BC) to Jan Hagen (EAO) with comments regarding the project.Anne Murray2005/05/09
Email dated May 5/05 from Marlene and Tullio Caruso (Delta BC) with comments regarding the project.Marlene and Tullio Caruso2005/05/09
Email dated May 5/05 from Cathleen Vecchiato (Langley BC) to Jan Hagen (EAO) with comments regarding the project and the train traffic.Cathleen Vecchiato2005/05/09
Email dated May 5/05 from Randy Lutes (Tsawwassen BC) to Jan Hagen (EAO) with comments regarding the project and truck traffic.Randy Lutes2005/05/09
Email dated May 5/05 from Bruce Colquhoun to EAOINFO with comments regarding the project.Bruce Colquhoun2005/05/09
Email dated May 5/05 from Errick and SuzAnne Kinsey (Points Roberts WA) to EAOINFO with comments regarding truck traffic.Errick and SuzAnne Kinsey2005/05/09
Email dated May 5/05 from Sandi Grant (Delta BC) to EAOINFO with comments regarding truck traffic.Sandi Grant2005/05/09
Email dated May 5/05 from Brian Steeves to EAOINFO with comments regarding the project.Brian Steeves2005/05/09
Form submission signed by various public members.  2005/05/09
Email dated May 2/05 from Eleanor Perri (Langley BC) to EAOINFO with comments regarding the trains in Langley.Jessi Eleanor Perri2005/05/05
Letter dated May 2/05 from Ryan van Baal (Langley BC) to Jan Hagen (EAO) with comments regarding trains and traffic.Ryan van Baal2005/05/05
Document dated March 15/05 from Bob Campbell (West Panorama Ridge Ratepayers Association) to Jan Hagen (EAO) with comments on the application.Bob Campbell, West Panorama Ridge Ratepayers Association2005/05/05
Email dated May 3/05 from Steven Cox (Langley BC) to EAOINFO with comments regarding train traffic in LangleySteven Cox2005/05/05
Comments received May3/05 from Lois S? to Jan Hagen (EAO) regarding the project and train traffic.Lois S?2005/05/05
Email dated May 3/05 from Ron Johannes (Surrey BC) to EAOINFO with comments regarding rail traffic.Ron Johannes2005/05/05
Email dated May 3/05 from Richard Burns (Ladner BC) to EAOINFO with comments regarding Highway 17.Richard Burns2005/05/05
Email dated May 4/05 from Richard Kerr (Langley BC) to Jan Hagen (EAO) with comments regarding rail traffic through Langley.Richard Kerr2005/05/05
Letter dated May 3/05 from Joseph Weber (Langley BC) to Jan Hagen (EAO) with comments regarding the project and train traffic.Joseph J Weber2005/05/05
Email dated May 4/05 from Eileen Lindner to EAOINFO with comments regarding the project.Eileen Lindner2005/05/05
Email dated May 4/05 from Eileen Lindner to EAOINFO with comments regarding the port security.Eileen Lindner2005/05/05
Letter dated May 2/05 from Ken McNames (Tsawwassen BC) to Jan Hagen (EAO) with concerns regarding noise and air pollution.Ken McNames2005/05/05
Faxed letter dated May 4/05 from Norman Severide (Langley BC) to Jan Hagen (EAO) with concerns regarding the project and the effect on Langley.Norman Severide2005/05/05
Form submission with comments regarding impacts to Langley.Public Author2005/05/05
Letter dated May 1/05 from Sherry Baker (Langley BC) to Jan Hagen (EAO) with comments regarding the rail traffic.Sherry Baker, Sherry Baker & Associates2005/05/04
Email dated May 2/05 from Jessie Perri (Langley BC) to EAOINFO with comments regarding the project.Jessi Eleanor Perri2005/05/04
Email dated May 2/05 from Joyce Miller to EAOINFO with comments regarding the project.Joyce Elizabeth Miller2005/05/04
Email dated May 2/05 from Rose Meyer (Delta BC) to EAOINFO with concerns regarding the project. Rose Meyer2005/05/04
Email dated April 29/05 from Lynne Jenvey (Aldergrove BC) to EAOINFO with comments regarding the increase in train traffic through Langley.Lynne Jenvey2005/05/03
Letter dated April 29/05 from Greg Ardron (Langley BC) to Jan Hagen (EAO) with comments regarding the train traffic.Greg Ardron2005/05/03
Letter dated April 29/05 from Trevor R Ardron (Treker Transport Ltd) to Jan Hagen (EAO) with comments regarding train traffic.Trevor R Ardron, Treker Transport Ltd2005/05/03
Email dated April 30/05 from Garrett McKee (Tsawwassen BC) to EAOINFO with comments regarding air pollution in Tsawwassen.Garrett McKee2005/05/03
Form emails with concerns regarding the scope, air quality, Transportation, Noise and Light Impacts, Cumulative Effects, and Mitigation.Public Author2005/05/03
Email dated April 30/05 from Pat Frewer (Lander BC) to EAOINFO with questions regarding the project.Pat Frewer2005/05/03
Email dated April 30/05 from Murray Jack to EAOINFO with comments regarding the project.Murray Jack2005/05/03
Email dated May 1/05 from Jodie Vanderveen (Langley BC) to EAOINFO with comments regarding the train traffic.Jodie Vanderveen2005/05/03
Email dated May 1/05 from Gerhard Rudmin to Jan Hagen (EAO) with comments regarding the train traffic.Gerhard Rudmin2005/05/03
Letter dated April 22/05 from Lynn Stephens (Langley BC) to Jan Hagen (EAO) with comments regarding the train traffic.Lynn Stephens2005/04/29
Letter received April 27/05 from Joyce Peters (Langley BC) to Jan Hagen (EAO) with comments regarding train traffic.Joyce Peters2005/04/29
Email dated April 27/05 from Joan Craik (Langley BC) to EAOINFO with comments regarding the train traffic.Joan Craik2005/04/29
Letter received April 28/05 from Margaret Anderson (Langley BC) to Jan Hagen (EAO) with comments regarding the trains.Margaret Anderson2005/04/29
Letter dated April 25/05 from Ian Robertson (Delta BC) to EAO with comments on the project and clarifying an earlier letter sent to EAO.Ian D. Robertson2005/04/27
Email dated April 26/05 from Keith Day (Delta BC) to EAOINFO with comments regarding the projectKeith Day2005/04/27
Email dated April 26/05 from Andrea McDonald to Jan Hagen (EAO) with comments regarding the train traffic.Andrea McDonald2005/04/27
Email dated April 26/05 from Mike Srigley to EAOINFO with comments regarding the trains in Langley.Mike Srigley2005/04/27
Email dated April 27/05 from Erwin and Ethel Paetkau (Langley BC) to EAOINFO with comments regarding the train traffic through Langley.Erwin and Ethel Paetkau2005/04/27
Email dated April 24/05 from Mike Anderson (Delta BC) to Jan Hagen (EAO) with comments regarding the projectMike Anderson2005/04/26
Email dated April 22/05 with attachments from Gord Simpson (Murrayville BC) to EAOINFO with comments regarding the railway.Gord Simpson2005/04/26
Letter received April 22/05 from Pat, Ed and Paul Nelson (Langley BC) to EAO with comments regarding the project.Pat and Ed and Paul Nelson2005/04/26
Letter received April 25/05 from Lotte Elias (Fort Langley BC) to Jan Hagen (EAO) with comments regarding the train route.Lotte Elias2005/04/26
Letter dated April 21/05 from Erna Buston (Langley BC) to Jan Hagen (EAO) with comments regarding the project.Erna Buston2005/04/26
Email dated April 23/05 from Lorraine Allen (Langley BC) to EAOINFO with comments regarding the coal trains through Langley.Lorraine Allen2005/04/26
Email dated April 23/05 from Lyle Phillips (Langley BC) to EAOINFO with comments regarding the project.Lyle Phillips2005/04/26
Email dated April 23/05 from W D Hayward (Delta BC) to EAOINFO with comments regarding the project.W D Hayward2005/04/26
Email dated April 23/05 from Wilf Cartwright to EAOINFO with comments regarding the trains.Wilf Cartwright2005/04/26
Email dated April 25/05 from Peggy Ruge (Delta BC) to EAOINFO with comments on the project.Peggy Ruge2005/04/26
Email dated April 20/05 from Darryl-Anne Vanderwall to EAOINFO with comments regarding the trainsDarryl-Anne Vanderwall2005/04/22
Email dated April 20/05 from Marybeth Harrison to EAOINFO with comments regarding the trains. Marybeth Harrison2005/04/22
Email dated April 20/05 from Errol Crossan to EAOINFO with a comment regarding the train traffic.Errol Crossan2005/04/22
Email dated April 20/05 from Mark O Gulka (Langley BC) to EAOINFO with comments regarding the rail traffic in Langley. Dr. Mark O Gulka2005/04/22
Email dated April 20/05 from Richard Swanston (Delta BC) to EAOINFO with a request for information regarding the structure along the crest protection Richard Swanston2005/04/22
Email dated April 21/05 from Sandra Lee Bennett to EAOINFO with comments regarding the trains in Langley.Sandra Lee Bennett2005/04/22
Letter dated April 19/05 from Sandra Stoddart-Hansen (Alpha Aviation Inc) to Jan Hagen (EAO) with comments regarding the impact of the proposed project on traffic in and around the Boundary Bay Airport.Sandra Stoddart-Hansen, Alpha Aviation Inc2005/04/22
Letter dated April 19/05 from Melanie Hollands (Langley BC) to Jan Hagen (EAO) with comments regarding the Langley trains.Melanie Hollands2005/04/22
Email dated April 21/05 from Brian Forster to EAOINFO with comments regarding the project.Brian Forster2005/04/22
Email dated April 21/05 from Brian Peters (Surrey BC) to EAOINFO with comments regarding the rail traffic in Surrey and LangleyBrian Peters2005/04/22
Email dated April 21/05 from Chris and Bella Vokes to EAOINFO with comments regarding the rail traffic through the Langleys.Chris and Bella Vokes2005/04/22
Email dated April 21/05 from Michael Simington (Langley BC) to EAOINFO with comments regarding the trains through Langley.Michael Simington2005/04/22
Email dated April 22/05 from Eric Bysouth (Langley BC) to EAOINFO with comments on the projectEric Bysouth2005/04/22
Email received April 19/05 from Liz Gough to Jan Hagen (EAO) with concerns regarding the projectLiz Gough2005/04/21
Letter dated April 18/05 from Robert Frank (Surrey BC) with comments regarding the Langley trains.Robert Frank2005/04/21
Fax letter received April 20/05 from Ralph Lyons (Surrey BC) to Jan Hagen (EAO) with comments regarding the train traffic.Ralph Lyons2005/04/21
Email dated April 19/05 from Roger Emsley (Grove Farm) to Jan Hagen (EAO) with comments regarding public meetings for the projectRoger Emsley2005/04/21
Letter dated April 17/05 from Marjorie Pauy (Langley BC) to Jan Hagen (EAO) with comments regarding train traffic. Marjorie Pauy2005/04/21
Fax letter dated April 20/05 from Debbie Lowe (Langley BC) to Jan Hagen (EAO) with concerns regarding train traffic.Debbie Lowe2005/04/21
Email dated April 19/05 from Peter and Anne Chesworth (Langley BC) to EAOINFO with comments regarding Langley and railroad crossings.Peter and Anne Chesworth2005/04/21
Email dated April 19/05 from Philip Durnford (Langley BC) to EAOINFO with comments regarding rail traffic.Philip Durnford2005/04/21
Email dated April 19/05 from Doug Dyer (Langley BC) to EAOINFO with comments regarding trains and traffic in Langley.Doug Dyer2005/04/21
Email dated April 20/05 from Nancy and Doug Jensen (Langley BC) to EAOINFO with comments regarding the project Nancy and Doug Jensen2005/04/21
Email dated April 20/05 from Dr S K Stepney to EAOINFO with comments regarding train traffic.Dr. S K Stepney2005/04/21
Letter dated Mar 13/05 from Mary Taitt (Boundary Bay Conservation Committee) to Jan Hagen (EAO) with comments regarding the public review process for the projectMary Taitt, Boundary Bay Conservation Committee2005/04/20
Letter dated April 7/05 from Colin Wright (Township of Langley) to Jan Hagen (EAO) with comments regarding the project and the railways.Colin S Wright, Township of Langley2005/04/19
Deltaport Third Berth Project April 12/05 Open House form received from Judy Rithaler (Delta BC)Judy Rithaler2005/04/18
Deltaport Third Berth Project April 12/05 Open House form received from Mildred Harris (Ladner BC)Mildred Harris2005/04/18
Deltaport Third Berth Project April 12/05 Open House form received from Berend Wassink (Ladner BC)Berend Wassink2005/04/18
Deltaport Third Berth Project April 12/05 Open House form received from William L Marr (Langley BC)William L Marr2005/04/18
Deltaport Third Berth Project April 12/05 Open House form received from William D MacDonald (Abbotsford BC)William D MacDonald2005/04/18
Email dated April 13/05 from Roger Emsley (Delta BC) to EAOINFO with comments regarding the project and the public information meetingRoger Emsley2005/04/18
Email dated April 14/05 from Teresa Spence to EAOINFO with comments regarding the projectTeresa Spence2005/04/18
Email dated April 15/05 from Sharon Tymich to EAOINFO with comments regarding the projectSharon Tymich2005/04/18
Email dated April 15/05 from Liz Gough (Ladner BC) to EAOINFO with comments regarding the project and the open house meeting.Liz Gough2005/04/18
Email dated April 14/05 from Michael Owen (Delta BC) to EAOINFO with comments regarding the Public Information Meeting held on April 12/05.Michael Owen2005/04/18
Letter dated April 13/05 from I Bill Gruenthal (Burnaby BC) to Jan Hagen (EAO) with comments regarding the project.I Bill Gruenthal2005/04/18
Letter dated April 13/05 from Ruth Sawatzky (Delta BC) to Jan Hagen (EAO) with comments regarding the project and the open house information meeting.Ruth Sawatzky2005/04/18
Letter dated April 12/05 from William L Marr (Langley BC) to Jan Hagen (EAO) with comments regarding the projectWilliam L Marr2005/04/18
Letter received April 13/05 from Erna Buston (Langley) to Jan Hagen (EAO) with comments regarding rerouting the trains.Erna Buston2005/04/18
A brief received April 7/05 from Roy Mufford (Milner BC) to Jan Hagen (EAO) regarding the affects of Roberts Bank/Delta Port rail traffic in Langley.Roy Mufford2005/04/14
Letter dated April 7/05 from David and Diane Simms (Langley BC) to Jan Hagen (EAO) with comments regarding more trains through Langley.David & Diane Simms2005/04/11
Letter dated April 1/05 from E Buston (Langley BC) to Jan Hagen (EAO) with comments regarding the expansion of Roberts Bank PortErna Buston2005/04/11
Letter dated Mar 29/05 from George Clements (Langley BC) to Jan Hagen (EAO) with comments regarding the project.George Clements2005/04/11
Email dated Apr 5/05 from Dallas Stocker (Langley BC) to EAOINFO with comments regarding the train routes.Dallas Stocker2005/04/11
Letter dated Apr 5/05 from Patrick Yearwood (Greater Langley Chamber of Commerce) to Jan Hagen (EAO) with concerns regarding the projectPatrick Yearwood, Greater Langley Chamber of Commerce2005/04/11
Email dated Apr 10/05 from Marcel Larouche (Braker for Local) to EAOINFO with comments on the projectMarcel Larouche, Bracker for Local2005/04/11
Email dated Apr 8/05 from Doug Bennett to EAOINFO with concerns regarding the projectDoug and Marlene Bennett2005/04/11
Letter dated Apr 7/05 from Jennifer Cotton (Willoughby Parent Advisory Council) to Jan Hagen (EAO) with comments regarding the project.Jennifer Cotton, Willoughby Parent Advisory Council2005/04/11
Letter dated Mar 31/05 from Ian Robertson (Delta, BC) to Jan Hagen (EAO) with comments regarding Vancouver Port Authority's response to a previous letter Ian D. Robertson2005/04/08
Email letter dated Mar. 27/05 from PF Rovtar (Fraser Valley Conservation Coalition) regarding the Application for the Deltaport Third Berth ProjectPF Rovtar2005/03/31
Email letter dated Mar. 30/05 from Roberta C. Hicklin (Public) regarding the Application for the Deltaport Third Berth ProjectRoberta C. Hicklin2005/03/31
Email letter dated Mar. 25/05 from Roy and Joan Peaty (Public) regarding the Application for the Deltaport Third Berth ProjectRoy and Joan Peaty2005/03/31
Email letter dated Mar. 25/05 from Paul J. Schouten (Public) regarding the Application for the Deltaport Third Berth ProjectPaul J. Schouten2005/03/31
Email letter dated Mar. 24/05 from Melanie Hollands (Public) regarding the Application for the Deltaport Third Berth ProjectMelanie Hollands2005/03/31
Email letter dated Mar. 23/05 from Jack and Mary Forbes (Public) regarding the Application for the Deltaport Third Berth ProjectJack and Mary Forbes2005/03/31
Email letter dated Mar. 31/05 from Joseph J. Weber (Public) regarding the Application for the Deltaport Third Berth ProjectJoseph J. Weber2005/03/31
Letter dated Mar. 10/05 from Murray Smith, President (Milner Community Association) regarding the Application for the Deltaport Third Berth ProjectMurray Smith, Milner Community Association2005/03/29
Email letter dated Mar. 18/05 from Arlene Merritt (Public) regarding the Application for the Deltaport Third Berth ProjectArlene Merritt2005/03/21
Fax/letter dated Mar. 21/05 from Ian D. Robertson (Public) regarding the Application for the Deltaport Third Berth ProjectIan D. Robertson2005/03/21
Email letter dated Mar. 17/05 from Ken R. Clarke (Public) regarding the Application for the Deltaport Third Berth ProjectKen R. Clarke2005/03/17
Email letter dated Mar. 17/05 from Keith Anderson, (Public) regarding the Application for the Deltaport Third Berth ProjectKeith Anderson2005/03/17
Email letter dated Mar. 16/05 from Roger Gardener (Public) regarding the Application for the Deltaport Third Berth ProjectRoger Gardener2005/03/17
Email letter dated Mar. 10/05 from Melanie Dutkiewicz (Public) regarding the Application for the Deltaport Third Berth ProjectMelanie Dutkiewicz2005/03/14
Letter/submission dated Mar. 10/05 from Peter A. Niblock (Public) regarding the Application for the Deltaport Third Berth ProjectPeter A. Niblock2005/03/14
Letter dated Mar. 4/05 from Evelyn Feller, Co-Chair (Fraser River Coalition) regarding the Application for the Deltaport Third Berth ProjectEvelyn Feller, Fraser River Coalition2005/03/14
Letter dated Mar. 2/05 from June Binkert, President (Save our Parkland Association) regarding the Application for the Deltaport Third Berth ProjectJune Binkert, Save Our Parkland Association2005/03/07
Email letter dated Mar. 2/05 from Steven Kinsey (Public) regarding the Application for the Deltaport Third Berth Project Steven Kinsey2005/03/04
Email letter dated Feb. 21/05 from Harold Hakesley (Public) regarding the Application for the Deltaport Third Berth ProjectHarold Hakesley2005/03/04
Letter dated Feb. 8/05 from Jeremy McCall (Federation of BC Naturalists) to Jan Hagen (EAO) regarding the environmental assessment review processJeremy McCall, Federation of BC Naturalists2005/02/14

Compendium: Agency Comments / Proponent Responses

Title

Author

Posted Date

Final completed versions of compendiums of Working Group comments on DP3 EA Application and Addendums, and Vancouver Port Authority responses sent to Jan Hagen (EAO) by D.J. Desjardin (VPA) June 16/06.Darrell Desjardin, Vancouver Port Authority2006/06/21
Deltaport Third Berth Project - Compendium of Working Group Comments on the Four Documents and VPA Responses (E) - Issue No: V2 dated February 9, 2006  2006/02/11
Deltaport Third Berth Project - Compendium of First Nation's Comments on Application and VPA Responses (D) - Issue No: 2 dated Dec 13, 2005  2005/12/14
Deltaport Third Berth Project - Compendium of Corporation of Delta Comments on Application and VPA Responses (C) - Issue No: 2 dated December 13, 2005  2005/12/14
Deltaport Third Berth Project - Compendium of Working Group Comments on Technical Volumes in Support of the Application and VPA Responses (B) - Issue No: 10 dated December 12, 2005  2005/12/14
Deltaport Third Berth Project - Compendium of Working Group Comments on Application and VPA Responses (A) - Issue No: 12 dated December 12, 2005  2005/12/14
Deltaport Third Berth Project - Compendium of First Nation's Comments on Application and VPA Responses (D) - Issue No: 1 dated Nov. 28, 2005 Patrick McLaughlin, Vancouver Port Authority2005/12/02
Deltaport Third Berth Project - Compendium of Working Group Comments on Application and VPA Responses (A) - Issue No: 11 dated Oct 26, 2005  2005/10/28
Deltaport Third Berth Project - Compendium of Working Group Comments on Technical Volumes in Support of the Application and VPA Responses (B) - Issue No: 9 dated September 21, 2005  2005/10/05
Deltaport Third Berth Project - Compendium of Corporation of Delta Comments on Application and VPA Responses (C) - Issue No: 1 dated August 9, 2005  2005/08/13
Deltaport Third Berth Project - Compendium of Working Group Comments on Application and VPA Responses (A) - Issue No: 10 dated August 2, 2005  2005/08/03
Deltaport Third Berth Project - Compendium of Working Group Comments on Application and VPA Responses (A) - Issue No: 9 dated July 20, 2005  2005/07/20
Deltaport Third Berth Project - Compendium of Working Group Comments on Technical Volumes in Support of the Application and VPA Responses (B) - Issue No: 8 dated July 4, 2005  2005/07/05
Deltaport Third Berth Project - Compendium of Working Group Comments on Application and VPA Responses (A) - Issue No: 8 dated July 4, 2005  2005/07/05
Deltaport Third Berth Project - Compendium of Working Group Comments on Technical Volumes in Support of the Application and VPA Responses (B) - Issue No: 7 dated June 27, 2005  2005/06/29
Deltaport Third Berth Project - Compendium of Working Group Comments on Application and VPA Responses (A) - Issue No: 7 dated June 27, 2005  2005/06/29
Deltaport Third Berth Project - Compendium of Working Group Comments on Technical Volumes in Support of the Application and VPA Responses (B) - Issue No: 6 dated June 6, 2005  2005/06/07
Deltaport Third Berth Project - Compendium of Working Group Comments on Application and VPA Responses (A) - Issue No: 6 dated June 6, 2005  2005/06/07
Deltaport Third Berth Project - Compendium of Working Group Comments on Technical Volumes in Support of the Application and VPA Responses (B) - Issue No: 5 dated May 30, 2005  2005/06/03
Deltaport Third Berth Project - Compendium of Working Group Comments on Application and VPA Responses (A) - Issue No: 5 dated May 30, 2005  2005/06/03
Deltaport Third Berth Project - Compendium of Working Group Comments on Application and VPA Responses (A) - Issue No: 4 dated May 24, 2005 Jan Hagen, Environmental Assessment Office2005/05/24
Deltaport Third Berth Project - Compendium of Working Group Comments on Technical Volumes in Support of the Application and VPA Responses (B) - Issue No: 4 dated May 24, 2005 Jan Hagen, Environmental Assessment Office2005/05/24
Deltaport Third Berth Project - Compendium of Working Group Comments on Technical Volumes in Support of the Application and VPA Responses (B) - Issue No: 3 dated May 16, 2005  2005/05/16
Deltaport Third Berth Project - Compendium of Working Group Comments on Application and VPA Responses (A) - Issue No: 3 dated May 16, 2005  2005/05/16
Deltaport Third Berth Project - Compendium of Working Group Comments on Application and VPA Responses (A) - Issue No: 2 dated May 7, 2005 Jan Hagen, Environmental Assessment Office2005/05/10
Deltaport Third Berth Project - Compendium of Working Group Comments on Technical Volumes in Support of the Application and VPA Responses (B) - Issue No: 2 dated May 7, 2005 Jan Hagen, Environmental Assessment Office2005/05/10
Deltaport Third Berth Project - Compendium of Working Group Comments on Application and VPA Responses - Issue No: 1 dated April 30, 2005Jan Hagen, Environmental Assessment Office2005/05/03

Compendium: Public Comments / Proponent Responses

Title

Author

Posted Date

Deltaport Third Berth Project - Compendium of Public Comments on the Four Documents (Public Comment Period 3) and VPA Responses dated February 9, 2006  2006/02/11

Completed / Certified

Notices - News Releases

Title

Author

Posted Date

Information Bulletin - Deltaport Expansion Receives Approval from Province Joan Hesketh, Environmental Assessment Office2006/09/29

EA Certificate Documentation

Title

Author

Posted Date

Deltaport Third Berth Project Environmental Assessment Report and Appendices dated June 2006Joan Hesketh, Environmental Assessment Office2006/09/29
Deltaport Third Berth Project Recommendations of the Executive Director and Reasons for Recommendations dated June 30, 2006Joan Hesketh, Environmental Assessment Office2006/09/29
Environmental Assessment Certificate T06-01 for the Deltaport Third Berth Project signed September 28, 2006Joan Hesketh, Environmental Assessment Office2006/09/29
Information Bulletin - Deltaport Expansion Receives Approval from ProvinceJoan Hesketh, Environmental Assessment Office2006/09/29

Post Certificate Documentation

Title

Author

Posted Date

Vancouver Port Authority Deltaport Third Berth Pre-Construction Report prepared by Vancouver Port Authority dated Feb 2007Darrell Desjardin, Vancouver Port Authority2007/04/02
Deltaport Third Berth Project First Post-Certification Meeting - Final Meeting Summary Notes from Feb 23/07  2007/03/30
Last Updated: 2009-11-20
Copyright.Disclaimer.Privacy.Accessibility.