Pre-Application |
EAO Generated Documents |
Title | Author | Posted Date |
| Letter dated Sept 2/03 from Ray Crook (EAO) to Fred J Cummings (TransLink) - Public Consultation Assessment and First Nations Consultation Assessment |
| 2003/09/08 |
| Letter dated Sept 2/03 from Ray Crook (EAO) to Fred Cummings (TransLink) regarding and application for an Environmental Assessment Certificate for the New Fraser River Crossing Project Accepted for Formal Review with Attachments |
| 2003/09/08 |
| Members List - Biophysical/Technical, Socio-economic/Community Working Group Members |
| 2003/08/28 |
| Letters dated Jul 25/03 from Kim Cholette (EAO) to (Chief and Council) various First Nations with attached table summarizing the main environmental assessment milestones |
| 2003/07/31 |
| Letter dated June 30/03 from Ray Crook (EAO) to Chief and Council (Sto:lo Nation) regarding - Environmental Assessment of the new Fraser River Crossing Project | Raymond L Crook, Environmental Assessment Office | 2003/07/10 |
| Finalized Application Terms of Refrence for Translinks application for an Environmental Assessment Certificate with e-mail addressed to Fred Cummings (Translink) from Ray Crook (EAO) dated July 4/03 | Raymond L Crook, Environmental Assessment Office | 2003/07/10 |
| Letter dated Jun 23/03 from Ray Crook (EAO) to Fred Cummings (GVTA) - Environmental Assessment of Proposed New Fraser River Crossing Project | Raymond L Crook, Environmental Assessment Office | 2003/07/03 |
| Letter dated Jun 25/03 from Ray Crook to Debbie Miller (Katzie First Nation) regarding - Environmental Assessment of the New Fraser River Crossing Project | Raymond L Crook, Environmental Assessment Office | 2003/07/03 |
| Letter dated Jun 27/03 from Ray Crook (EAO) to Chief and Council (Semiahmoo First Naiton) regarding - Environmental Assessment of the New Fraser River Crossing Project | Raymond L Crook, Environmental Assessment Office | 2003/07/03 |
| Letter dated Jun 30/03 from Ray Crook (EAO) to Chief and Council (Kwantlen First Nation) regarding - Environmentla Assessment of the New Fraser River Crossing Project | Raymond L Crook, Environmental Assessment Office | 2003/07/03 |
| Letter dated Jun 30/03 from Ray Crook (EAO) to Chief and Council (Tsawwassen First Nation) regarding - Environmental Assessment o the New Fraser River Crossing Project | Raymond L Crook, Environmental Assessment Office | 2003/07/03 |
| Letter dated Jun 30/03 from Ray Crook (EAO) to Chief and Council (Matsqui First Nation) regarding - Environmental Assessment of the New Fraser River Crossing Project | Raymond L Crook, Environmental Assessment Office | 2003/07/03 |
| Letter dated Jun 30/03 from Ray Crook (EAO) to Chief and Council (Kwikwetlem First Nation) regarding - Environmental Assessment of the New Fraser River Crossing Project | Raymond L Crook, Environmental Assessment Office | 2003/07/03 |
| Order Under Section 11 of the Environmental Assessment Act for the New Fraser River Crossing Project, signed by Ray Crook (EAO) Jun 23/03 | Raymond L Crook, Environmental Assessment Office | 2003/06/24 |
| Minutes - New Fraser River Crossing Project, Abernethy Connector Community Open House 0 May 26/03 | Sean Wong, Environmental Assessment Office | 2003/06/09 |
| Minutes - New Fraser River Crossing Project Public Meeting - Langley BC - May 9/03 | Vicki Carmichael, Environmental Assessment Office | 2003/06/03 |
| Minutes - New Fraser River Crossing Project - Pre-application site tour and meeting - Apr 23/03 | Vicki Carmichael, Environmental Assessment Office | 2003/06/02 |
| Minutes - New Fraser River Crossing Project - Public Meeting - Anniedale Traditional School
May 7/03 | Vicki Carmichael, Environmental Assessment Office | 2003/06/02 |
| Email from Ray Crook (EAO) to Fred Cummings (TransLink) regarding the proposed New Fraser River Crossing Project - dated Apr 4/03 | Raymond L Crook, Environmental Assessment Office | 2003/06/02 |
| Memo dated Apr 3/03 from Ray Crook (EAO) to Gord Enemark (CSE) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/09 |
| Memo dated Apr 3/03 from Ray Crook (EAO) to Jane Warner (MSRM) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/09 |
| Memo dated Apr 3/03 from Ray Crook (EAO) to Mike Wilcox (MWLAP) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/09 |
| Memo dated Apr 3/03 from Ray Crook (EAO) to Ian Batey (TNO) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/09 |
| Minutes from the Mar 25/03 New Fraser River Crossing Project Pre-Application Meeting |
| 2003/05/08 |
| Letter dated Apr 3/03 from Ray Crook (EAO) to Debbie Miller (Katzie First Nation) regarding the proposed New Fraser River Crossing Project - Invitation to particpate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Letter dated Apr 3/03 from Ray Crook (EAO) to Chief and Council (Kwantlen First Nation) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Letter dated Apr 3/03 from Ray Crook (EAO) to Chief and Council (Kwikwetlem First Naiton) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Letter dated Apr 3/03 from Ray Crook (EAO) to Chief and Council (Matsqui First Nation) regarding the proposed New Fraser River Crossing - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Letter dated Apr 3/03 from Ray Crook (EAO) to Chief and Council (Semiahmoo First Naiton) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Letter dated Apr 3/03 from Ray Crook (EAO) to Mamey Gold (Sto:lo Nation) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Letter dated Apr 3/03 from Ray Crook (EAO) to Chief and Council (Tsawwassen First Nation) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Letter dated Apr 3/03 from Ray Crook (EAO) to Johnny Carline (GVRD) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Letter dated Apr 3/03 from Ray Crook (EAO) to Marina Stjepovic (Township of Langley) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Letter dated Apr 3/03 from Ray Crook (EAO) to Frank Quinn (District of Maple Ridge) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Letter dated Apr 3/03 from Ray Crook (EAO) to Jim Lowrie (District of Pitt Meadows) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Letter dated Apr 3/03 from Ray Crook (EAO) to Paul Ham (City of Surrey) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Memo dated Apr 3/03 from Ray Crook (EAO) to Linda Sullivan (CEAA) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Memo dated Apr 3/03 from Ray Crook (EAO) to Bill Aird (Canadian Transportation Authority) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment review process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Memo dated Apr 3/03 from Ray Crook (EAO) to Jeff Johansen (Fisheries and Oceans Canada) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Memo dated Apr 3/03 from Ray Crook (EAO) to Andrew Robinson (Environment Canada) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Memo dated Apr 3/03 from Ray Crook (EAO) to Ken Shaw (Fraser Health Authority) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Memo dated Apr 3/03 from Ray Crook (EAO) to Carl Alleyne (Health Canada) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Memo dated Apr 3/03 from Ray Crook (EAO) to Brian Underhill (Land Reserve Commission) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Memo dated Apr 3/03 from Ray Crook (EAO) to Sangita Sudan (LWBC) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assesment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Memo dated Apr 3/03 from Ray Crook (EAO) to Doug Macfarlane (MCAWS) regarding the proposed New Fraser River Crossing Project - Invitation to participate in the environmental assessment process | Raymond L Crook, Environmental Assessment Office | 2003/05/08 |
| Order Under Section 10(1)(c) of the Environmental Assessment Act for the New Fraser River Crossing Project signed by Ray Crook (EAO) on Mar 18/03 | Fred Cummings, Translink | 2003/03/18 |
Federal Comments/Submissions |
Title | Author | Posted Date |
| Workplan for the Cooperative Environmental Assessment of the New Fraser River Crossing Project |
| 2003/06/17 |
Local Government Comments/Submissions |
Title | Author | Posted Date |
| Letter dated Apr 17/03 from Paul Ham (City of Surrey) to Ray Crook (EAO) regarding the proposed New Fraser River Crossing Project - The City of Surrey would like to provide a representative for the Socio-Economic/Community Working Group | Paul Ham, City of Surrey | 2003/05/02 |
Proponent Comments/Correspondence |
Title | Author | Posted Date |
| Workplans |
| 2003/06/09 |
| Report - New Fraser River Crossing Public Consultation Summary |
| 2003/05/13 |
| Presentation dated Mar 25/03 from Proponent in a Pre-application meeting for the New Frawer River Crossing Project to Ray Crook EAO | Fred Cummings, Translink | 2003/04/02 |
| Report - Environmental and Socio-Community Reports Comparative Assessment Phase | Fred Cummings, Translink | 2003/04/01 |
| Letter dated Feb 26/03 from Fred Cummings (Prop) to Ray Crook (EAO) regarding Registration under Harmonized BCEAA - CEAA review process | Fred Cummings, Translink | 2003/03/25 |
Under Review |
Application and Supporting Studies |
Title | Author | Posted Date |
| Application Supplement to the Application for a Project Approval Certificate submitted to the EA Office in November 2003 including the Abernethy Connector | Greater Vancouver Transportation Authority | 2003/12/02 |
| Volume 1: Project Description and Summary. Application for an Environmental Assessment Certificate dated Sept 15/03 | Greater Vancouver Transportation Authority | 2003/09/17 |
| Volume 2: Biophysical and Archaeology Assessment. Application for an Environmental Assessment Certificate dated Sept 15/03 | Greater Vancouver Transportation Authority | 2003/09/17 |
| Volume 3: Socio-Community Assessment. Application for an Environmental Assessment Certificate dated Sept 15/03 | Greater Vancouver Transportation Authority | 2003/09/17 |
| Volume 4: Consultation. Application for an Environmental Assessment Certificate dated Sept 15/03 | Greater Vancouver Transportation Authority | 2003/09/17 |
Aboriginal Comments/Submissions |
Title | Author | Posted Date |
| Letter dated Mar 12/04 from Chief Peter James (Katzie First Nation) to Derek Griffin (EAO) - Response to EAO Letter of Feb 26/04 asking if Katzie was satisfied with TransLink's response to comments on the Application | Chief Peter James, Katzie First Nation | 2004/03/31 |
| Letter dated Jan 16/04 from Chief Peter James(Katzie First Nation) to Kim Cholette (EAO) - Comments on the New Fraser River Crossing Supplement |
| 2004/01/22 |
EAO Generated Documents |
Title | Author | Posted Date |
| Time Limit Extension Order for the New Fraser River Crossing Project dated July 28/04 |
| 2004/07/28 |
| Letter dated June 7/04 from Ray Crook (EAO) to Fred Cummings (TransLink) regarding restarting the 180-days legislated time limit | Fred Cummings, Greater Vancouver Transportation Authority | 2004/06/07 |
| Letter dated Mar 30/04 from Derek Griffin (EAO) to Chief Peter James (Katzie First Nation) response to Katzie's letter of Mar 12/04 | Derek Griffin, Environmental Assessment Office | 2004/03/31 |
| Letter dated Mar 26/04 from Derek Griffin (EAO) to Fred Cummings (TransLink) regarding the New Fraser River Crossing Project - Suspention of time limit for the review of the applicaiton | Derek Griffin, Environmental Assessment Office | 2004/03/29 |
| Letter dated Feb 25/04 from Derek Griffin (EAO) to Fred Cummings (TransLink) re: Lifting the suspension of the time limit for the review of your application. | Derek Griffin, Environmental Assessment Office | 2004/02/27 |
| Letter dated Feb 02/04 from Derek Griffin (EAO) to Fred Cummings (TransLink) re: Response to Fred's letter requesting an extension | Derek Griffin, Environmental Assessment Office | 2004/02/03 |
| Minutes - New Fraser River Crossing Biophysical Working Group Meeting Jan 13/04 |
| 2004/01/22 |
| Minutes - New Fraser River Crossing Socio-Economic Working Group Meeting Jan 13/04 |
| 2004/01/22 |
| Second Order Under Section 13 Amending Section 11 Order |
| 2003/12/04 |
| Letter dated Nov 26/03 from Ray Crook (EAO) to Fred Cummings (TransLink) re: New Fraser River Crossing Project - Second Amendment of Section 11 Order |
| 2003/12/04 |
| Letter dated Nov 28/03 from Ray Crook (EAO) to Fred Cummings (TransLink) re: Acknowledgement of Receipt and Acceptance for Formal Detailed Review of the Application Supplement |
| 2003/12/03 |
| Memo dated Dec 2/03 from Ray Crook (EAO) to Socio-economic and Biophysical/Technical Working Group Members - New Fraser River Crossing Project Application Supplement Review Process |
| 2003/12/03 |
| Minutes - New Fraser River Crossing Working Group Meeting October 21/03 |
| 2003/11/20 |
| Order Under Section 13 |
| 2003/11/19 |
| Issues Tracking Chart - Updated Oct 8/03 |
| 2003/10/29 |
| Letter dated Oct 3/03 from Ray Crook (EAO) to Fred Cummings (TransLink) regarding the New Fraser River Crossing Project - Request to Use Various Means to Advertise Open Houses/Public Meetings with Section 13 Order | Raymond L Crook, Environmental Assessment Office | 2003/10/06 |
Federal Comments/Submissions |
Title | Author | Posted Date |
| Letter dated Apr 13/04 from Linda Sullivan (CEAA) to Chief Peter James (Katzie First Nation) regarding the New Fraser River Crossing Project Supplement | Linda Sullivan, Canadian Environmental Assessment Agency | 2004/04/20 |
| Email dated Mar 31/04 from Jennifer Nener (DFO) to Kim Cholette (EAO) regarding DFO's significant outstanding issues with respect to the project | Jennifer Nener, Department of Fisheries & Oceans | 2004/04/02 |
| Email dated Mar 25/04 from Andrew Robinson (EC) to Kim Cholette regarding the New Fraser River Crossing Project - Outstanding concerns that CWS has for the project | Andrew Robinson, Environment Canada (PYR) | 2004/03/30 |
| Email dated Mar 25/04 from John Mackie (DFO) to Kim Cholette regarding the New Fraser River Crossing Project - comments from the Mar 24/04 meeting with Katzie First Nation | John Mackie, Fisheries and Oceans Canada | 2004/03/30 |
| Email dated Feb 09/04 from Carl Alleyne (HC) to Kim Cholette (EAO) - Comments on the New Fraser River Crossing Supplement - Response from Fred Cummings to Carl Alleyne dated Feb 19/04 | Carl Alleyne, Health Canada | 2004/02/20 |
| Email dated Jan 29/04 from Andrew Robinson (EC) to Kim Cholette (EAO) - Comments on the New Fraser River Crossing Supplement - Response from Fred Cummings to Adrian Duncan dated Feb 16/04 | Andrew Robinson, Environment Canada | 2004/02/20 |
| Email dated Jan 16/04 from Carl Alleyne (HC) to Kim Cholette (EAO) - Comments on the New Fraser River Crossing Supplement - Response from Fred Cummings to Carl Alleyne dated Jan 22/04 |
| 2004/01/26 |
| Email dated Jan 12/04 from Carl Alleyne (HC) to Kim Cholette (EAO) - Comments on the New Fraser River Crossing Supplement - Response from Fred Cummings to Carl Alleyne dated Jan 21/04 |
| 2004/01/19 |
| Letter dated Jan 15/04 from Jennifer Nener (DFO) to Kim Cholette (EAO) - Comments on the New Fraser River Crossing Supplement - Response from TransLink to Jeff Johansen/Jennifer Nener dated Jan 23/04 |
| 2004/01/19 |
| Email dated Jan 12/04 from Linda Sullivan (CEAA) to Derek Griffin (EAO) Comments on the Abernethy Connector Supplement to the Application for the New Fraser River Crossing ProjectResponse from TransLink to Linda Sullivan dated Jan 22/04 | Linda Sullivan, Canadian Environmental Assessment Agency | 2004/01/14 |
| Letter dated Nov 27/03 from Adrian Duncan (EC) to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project - Response from TransLink dated Dec 22/03 to Adrian Duncan |
| 2003/11/28 |
| Letter dated Nov 24/03 from Linda Sullivan (CEAA) to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project -Response from Fred Cummings to Linda Sullivan dated Jan 11/04 | Linda Sullivan, Canadian Environmental Assessment Agency | 2003/11/26 |
| Email dated Nov 25/03 from Jeff Johansen (DFO) to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project - Response from Fred Cummings to Jeff Johansen dated Dec 19/03 | Jeff Johansen, Fisheries & Oceans Canada | 2003/11/26 |
| Letter dated Nov 24/03 from Carl Alleyne (Health Canada) to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project - Letter dated Dec 19/03 from Fred Cummings to Carl Alleyne dated Dec 19/03 | Carl Alleyne, Health Canada | 2003/11/26 |
| Email dated Nov 24/03 from Bill Aird (CTA) to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project -Response from TransLink dated Dec 16/03 to Kim Cholette re: Response to Bill Aird's Comments |
| 2003/11/26 |
| Email dated Nov 25/03 from Bill Aird (CTA) to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project |
| 2003/11/26 |
Local Government Comments/Submissions |
Title | Author | Posted Date |
| Letter dated Jan 20/04 from David Pollock (District of Maple Ridge) to Kim Cholette (EAO) - Comments on the New Fraser River Crossing Supplement -Response from TransLink to David Pollock dated Jan 30/03 | David Pollock, District of Maple Ridge | 2004/01/21 |
| Email dated Jan 16/04 from Ike de Boer (District of Pitt Meadows) to Kim Cholette (EAO) - Comments on the New Fraser River Crossing Supplement |
| 2004/01/19 |
| Email dated Nov 11/03 from Ken Stubbs (GVRD) to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project - Response dated Dec 22/03 from Fred Cummings to Ken Stubbs |
| 2003/11/28 |
| Letter dated Nov 19/03 from Mark Bakken to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project |
| 2003/11/24 |
Notices - News Releases |
Title | Author | Posted Date |
| Public comment invited on the Abernethy Connector Supplement to the application for the New Fraser River Crossing Project |
| 2003/12/16 |
| Public comment invited on an application for the New Fraser River Crossing Project |
| 2003/09/22 |
Provincial Govt Comments/Submissions |
Title | Author | Posted Date |
| Email dated Jan 27/04 from Michael Willcox (WLAP) to Barb Archer (EAO) - Comments on the New Fraser River Crossing Main Application and the Supplement - Response from Fred Cummings (TransLink) to Michael Willcox dated Feb 9/04 | Michael Willcox, Ministry of Water Land and Air Protection | 2004/02/20 |
| Email dated Jan 27/04 from Allan Davidson (MoT) to Kim Cholette (EAO) - Comments on the New Fraser River Crossing Supplement - Response from Fred Cummings to Allan Davidson dated Jan 30/04 | Allan Davidson, Ministry of Transportation | 2004/02/03 |
| Email dated Jan 15/04 from Ken Shaw (Fraser Health Authority) to Kim Cholette (EAO) - Comments on the New Fraser River Crossing Supplement - Response from TransLink to Ken Shaw dated Jan 22/04 |
| 2004/01/21 |
| Letter dated Jan 16/04 from Allan Davidson (MoT) to Kim Cholette (EAO) - Comments on the New Fraser River Crossing Supplement - Response from Fred Cummings to Allan Davidson dated Jan 22/04 |
| 2004/01/19 |
| Email dated Jan 12/04 from Jane Warner (MSRM) to Ray Crook (EAO) Comments on the Abernethy Connector Supplement to the Application for the New Fraser River Crossing Project | Jane Warner, Ministry of Sustainable Resource Management | 2004/01/14 |
| Email dated Jan 12/04 from Michael Willcox (WLAP) to Kim Cholette (EAO) Comments on the Abernethy Connector Supplement to the Application for the New Fraser River Crossing Project - Response from TransLink to Michael Willcox dated Jan 21/04 | Mike Willcox, Ministry of Water, Land and Air Protection | 2004/01/14 |
| Email dated Dec 8/03 from Tony Pellett (LRC) to Kim Cholette (EAO) - Comments on the New Fraser River Crossing Supplement - Response from TransLink to K.B Miller (Tony Pellett) dated Jan 19/04 | Tony Pellett, Agricultural Land Commission | 2004/01/14 |
| Email dated Jan 12/04 from Tony Pellett (LRC) to Kim Cholette (EAO) - Comments on the New Fraser River Crossing Supplement - Response from TransLink to K.B Miller (Tony Pellett) dated Jan 22/04 | Tony Pellett, Agricultural Land Commission | 2004/01/14 |
| Letter dated Jan 6/04 from Chris Zabek (MAFF) to Ray Crook (EAO) Comments on the Abernethy Connector Supplement to the Application for the New Fraser River Crossing Project - Response from TransLink to Chris Zabek dated Jan 20/04 |
| 2004/01/13 |
| Email dated Dec 22/03 from Andrew Taylor (CSE) to Kim Cholette (EAO) - Comments on the New Fraser River Crossing Supplement - Response from TransLink to Andrew Taylor dated Jan 19/04 |
| 2004/01/09 |
| Email dated Nov 28/03 from Vincent Hanemayer (WLAP) to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project - Response from Fred Cummings to Vincent Hanemayer dated Dec 19/03 |
| 2003/12/09 |
| Letter dated Nov 26/03 from Allan Davidson (MoT) to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project -Response from Fred Cummings to Allan Davidson dated Dec 18/03 |
| 2003/11/28 |
| Email dated Nov 21/03 from Michael Willcox (WLAP) to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project - Response dated Dec 22/03 from Fred Cummings to Michael Willcox | Michael Willcox, Ministry of Water Land and Air Protection | 2003/11/26 |
| Email dated Oct 24/03 from Andrew Taylor (CSE)to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project - Response from Fred Cummings (TransLink) to Andrew Taylor (CSE) dated Dec 16/03 |
| 2003/11/24 |
Proponent Comments/Correspondence |
Title | Author | Posted Date |
| Letter dated May 13/04 from TransLink - Responses to Air Quality and Health Concerns Raised by Katzie First Nation |
| 2004/06/22 |
| Letter dated May 13/04 from TransLink - Response to Katzie First Nation Concerns Regarding the Impacts of Project-Related Noise |
| 2004/06/22 |
| Report dated Apr 15/04 by A.F Lill and Associates Ltd. - Report on Katzie Fisheries Issues |
| 2004/06/22 |
| Letter dated June 7/04 from Fred Cummings (TransLink) to Ray Crook (EAO) Re: Addendum to FRC Project's May 13/04 Response to BCEAO's Mar 26/04 Letter | Fred Cummings, Greater Vancouver Transportation Authority | 2004/06/07 |
| Fraser River Crossing Project: Table of Commitments and Assurances - June 7, 2004 | Fred Cummings, Greater Vancouver Transportation Authority | 2004/06/07 |
| Letter dated Mar 11/04 from Fred Cummings (TransLink) to Kim Cholette (EAO) regarding Finalized Mapping for the FRC Project | Fred Cummings, Translink | 2004/03/16 |
| Letter dated Mar 12/04 from Fred Cummings (TransLink) to Kim Cholette (EAO) regarding Lougheed Highway Interchange Option Confirmation | Fred Cummings, Translink | 2004/03/16 |
| Letter dated Mar 2/04 from Fred Cummings (TransLink) to Kim Cholette (EAO) re: The New Fraser River Crossing - Changes at Formosa Nursery due to the Re-alignment of Abernethy Connector | Fred Cummings, Translink | 2004/03/03 |
| Letter dated Feb 23/04 from Fred Cummings (TransLink) to Chief Peter James (Katzie First Nation) re: FRC Response to Katzie First Nation Comments on Jan 16/04 | Fred Cummings, Translink | 2004/02/26 |
| Letter dated Feb 24/04 from Fred Cummings (TransLink) to Kim Cholette re: The New Fraser River Crossing Project Design Changes and maps | Fred Cummings, Translink | 2004/02/25 |
| New Fraser River Crossing Project: Detailed Commitments and Assurances Environmental Best Management Proactices dated Feb 19/04 and Table of Commitments and Assurances |
| 2004/02/24 |
| New Fraser River Crossing Public Consultation and Communication Summary Report - Prepared by Context Research Ltd January 14, 2004 |
| 2004/02/24 |
| Letter dated Feb 09/04 from Fred Cummings (TransLink) to Michael Willcox (WLAP)- Response to Comments on the Application | Fred Cummings, Translink | 2004/02/20 |
| Letter dated Feb 19/04 from Fred Cummings (TransLink) to Carl Alleyne (HC)- Response to Comments on the Application | Fred Cummings, Translink | 2004/02/20 |
| Letter dated Feb 16/04 from Fred Cummings (TransLink) to Adrian Duncan (EC)- Response to Comments on the Application | Fred Cummings, Translink | 2004/02/20 |
| Letter dated Feb 2/04 from Fred Cummings (TransLink) to Derek Griffin (EAO) re: The New Fraser River Crossing Project Request for Extension | Fred Cummings, Translink | 2004/02/04 |
| Letter dated Jan 30/04 from Fred Cummings (TransLink) to David Pollock (District of Maple Ridge)- Response to Comments on the Application |
| 2004/02/03 |
| Letter dated Jan 30/04 from Fred Cummings (TransLink) to Allan Davidson (Ministry of Transportation)- Response to Comments on the Application | Fred Cummings, Translink | 2004/02/03 |
| Letter dated Jan 19/04 from Fred Cummings (TransLink) to K.B. Miller (ALC)- Response to Comments on the Application | Fred Cummings, Translink | 2004/01/30 |
| Letter dated Jan 22/04 from Fred Cummings (TransLink) to K.B. Miller (ALC)- Response to Comments on the Application | Fred Cummings, Translink | 2004/01/30 |
| Letter dated Jan 22/04 from Fred Cummings (TransLink) to Linda Sullivan (CEAA)- Response to Comments on the Application | Fred Cummings, Translink | 2004/01/28 |
| Letter dated Jan 22/04 from Fred Cummings (TransLink) to Jeff Johansen (DFO)- Response to Comments on the Application | Fred Cummings, Translink | 2004/01/28 |
| Letter dated Jan 22/04 from Fred Cummings (TransLink) to Ken Shaw (FHA)- Response to comments on the Application | Fred Cummings, Translink | 2004/01/26 |
| Letter dated Jan 22/04 from Fred Cummings (TransLink) to Allan Davidson (MoT)- Response to Comments on the Application | Fred Cummings, Translink | 2004/01/26 |
| Letter dated Jan 21/04 from Fred Cummings (TransLink) to Carl Alleyne (HC)- Response to Comments on the Application | Fred Cummings, Translink | 2004/01/26 |
| Letter dated Jan 22/04 from Fred Cummings (TransLink) to Carl Alleyne (HC)- Response to Comments on the Application |
| 2004/01/26 |
| Letter dated Jan 20/04 from Fred Cummings (TransLink) to Ting Wu - Response to comments on the Application |
| 2004/01/21 |
| Letter dated Jan 12/04 from Fred Cummings (TransLink) to Leigh and Sheena Holt - Response to comments on the Application |
| 2004/01/21 |
| Letter dated Jan 20/04 from Fred Cummings (TransLink) to Chris Zabek (MAFF)- Response to comments on the Application |
| 2004/01/21 |
| Letter dated Jan 21/04 from Fred Cummings (TransLink) to Michael Willcox (MWLAP)- Response to comments on the Application |
| 2004/01/21 |
| Letter dated Jan 19/04 from Fred Cummings (TransLink) to Andrew Taylor (MCSE) - Response to comments on the Application |
| 2004/01/19 |
| Letter dated Jan 11/04 from Fred Cummings (TransLink) to Linda Sullivan (CEAA) - Response to comments on the Application |
| 2004/01/16 |
| Letter dated Dec 16/03 from Fred Cummings (TransLink) to Andrew Taylor (CSE) - Response to comments on the Application |
| 2004/01/14 |
| Letter dated Dec 18/03 from Fred Cummings (TransLink) to Allan Davidson (MoT) - Response to comments on the New Fraser River Crossing Supplement |
| 2004/01/09 |
| Letter dated Dec 19/03 from Fred Cummings (TransLink) to Carl Alleyne (HC) - Response to comments on the New Fraser River Crossing Supplement |
| 2004/01/09 |
| Letter dated Dec 23/03 from Fred Cummings (TransLink) to Bill Archibald - Response to comments on the New Fraser River Crossing Supplement - Public Meeting on Dec 15/03 |
| 2004/01/07 |
| Letter dated Dec 23/03 from Fred Cummings (TransLink) to Bill Archibald - Response to comments on the New Fraser River Crossing Supplement - Dec 15/03 Forum in Maple Ridge |
| 2004/01/07 |
| Letter dated Dec 16/03 from Fred Cummings (TransLink) to Mark B - Response to comments on the New Fraser River Crossing Supplement |
| 2004/01/07 |
| Letter dated Dec 19/03 from Fred Cummings (TransLink) to Jeff Johansen (DFO) - Response to comments on the New Fraser River Crossing Supplement |
| 2004/01/07 |
| Letter dated Dec 19/03 from Fred Cummings (TransLink) to Vincent Hanemayer (WLAP) - Response to comments on the New Fraser River Crossing Supplement |
| 2004/01/07 |
| Letter dated Dec 22/03 from Fred Cummings (TransLink) to Adrian Duncan (EC) re: FRC Project Response to Comments in Environment Canada's Letter to the Environmental Assessment Office dated Nov 27/03 |
| 2004/01/05 |
| Letter dated Dec 16/03 from Fred Cummings (TransLink) to Kim Cholette (EAO) Re: Response to Comments from Bill Aird, Canadian Transportation Agency |
| 2004/01/05 |
| Letter dated Dec 22/03 from Fred Cummings (TransLink) to Michael Willcox (MWLAP) Re: Response to your Nov 21/03 Email Comments Concerning the New Fraser River Crossing Project Application |
| 2004/01/05 |
| Letter dated Dec 22/03 from Fred Cummings (TransLink) to Ken Stubbs (GVRD) re: FRC Project Response to Your Nov 11/03 Email Comments |
| 2004/01/05 |
| Letter dated Dec 4/03 from Fred Cummings re: Abernethy Connector Public Forum | Fred Cummings, Translink | 2003/12/16 |
| Letter from Fred J Cummings (TransLink) to Kim Cholette (EAO) dated Oct 23/03 regarding New Fraser River Crossing - Potential Impacts onLocal Businessess and Residential Property Values |
| 2003/10/29 |
Public Comments/Submissions |
Title | Author | Posted Date |
| Email dated Feb 17/04 from Richard Cook to Fred Cummings (TransLink)- Comments on the New Fraser River Crossing Supplement | Richard Cook, Davidson Yuen Simpson Architects | 2004/02/20 |
| Email dated Jan 9/04 from Ting Wu to Ray Crook (EAO) Comments on the Abernethy Connector Supplement to the Application for the New Fraser River Crossing Project - Response from TransLink to Ting Wu dated Jan 20/04 | Ting Wu | 2004/01/14 |
| Letter dated Jan 8/03 from Leigh and Sheena Holt to Kim Cholette (EAO) Comments on the Abernethy Connector Supplement to the Application for the New Fraser River Crossing Project - Response from TransLink to Leigh and Sheena Holt dated Jan 12/04 | Leigh and Sheena Holt | 2004/01/14 |
| Email dated Jan 08/04 from Tom Dyer to Kim Cholette - Comments on the New Fraser River Crossing Supplement - Response from Fred Cummings to Tom Dyer dated Jan 19/04 |
| 2004/01/09 |
| Email dated Dec 16/03 from Bill Archibald to Kim Cholette (EAO) Comments on the Abernethy Connector Supplement to the Application for the New Fraser River Crossing Project - Response from Fred Cummings to Bill Archibald dated Dec 23/03 |
| 2004/01/05 |
| Letter dated Dec 11/03 from Kathy Nendick to Kim Cholette (EAO) Comments on the Abernethy Connector Supplement to the Application for the New Fraser River Crossing Project - Response from Fred Cummings (TransLink) to Kathy Nendick dated Dec 30/03 |
| 2003/12/24 |
| Email dated Dec 16/03 from Bill Archibald to Kim Cholette (EAO) Comments on the Abernethy Connector Supplement to the Application for the New Fraser River Crossing Project - Response from Fred Cummings to Bill Archibald dated Dec 23/03 |
| 2003/12/23 |
| Email dated Dec 16/03 from Bill Archibald to Kim Cholette (EAO) Comments on the Abernethy Connector Supplement to the Application for the New Fraser River Crossing Project - Response from Fred Cummings (TransLink) to Bill Archibald dated Jan 8/03 |
| 2003/12/23 |
| Email dated Dec 13/03 from Mark B to Kim Cholette (EAO) Comments on the Abernethy Connector Supplement to the Application for the New Fraser River Crossing Project - Response from Fred Cummings to Mark B dated Dec 16/03 |
| 2003/12/23 |
| Letter dated Dec 9/03 from Charline Hooper to Kim Cholette (EAO) Comments on the Abernethy Connector Supplement to the Application for the New Fraser River Crossing Project - Response from Fred Cummings to Charline Hooper dated Jan 6/04 |
| 2003/12/23 |
| Email dated Dec 8/03 from Larry Lewis to Kim Cholette (EAO) Comments on the Abernethy Connector Supplement to the Application for the New Fraser River Crossing Project | Marty Lewis | 2003/12/16 |
| Letter from Ruth and Paul Guimond to Kim Cholette (EAO) Comments on the Abernethy Connector Supplement to the Application for the New Fraser River Crossing Project - Response from Fred Cummings to Mr. & Mrs. Guimond dated Jan 6/04 | Ruth and Paul Guimond | 2003/12/16 |
| Email dated Dec 2/03 from Suan H Booiman to Kim Cholette (EAO) on the Abernethy Connector Supplement to the Application for the New Fraser River Crossing Project | Suan H Booiman | 2003/12/08 |
| Letter Brian Johnson to Kim Cholette (EAO) on the Abernethy Connector Supplement to the Application for the New Fraser River Crossing Project | Brian Johnson | 2003/12/08 |
| Email dated Nov 24/03 from Eric Phillips to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project | Eric Phillips | 2003/11/26 |
| Letter dated Nov 24/03 from Richard Cook to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project - Response from TransLink to Rickard Cook dated Jan 19/04 | Richard Cook, Davidson Yuen Simpson Architects | 2003/11/25 |
| Fax dated Nov 13/03 from Murdoch Neil Mackay to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project |
| 2003/11/21 |
| Fax dated Nov 19/03 from Murdoch Neil Mackay to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project - Response from Fred Cummings to Murdoch Mackay dated Dec 8/03 |
| 2003/11/21 |
| E-mail dated Nov 17/03 from Derek Thorkelson to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project - Response from Fred Cummings to Derek Thorkelson dated Nov 28/03 | Derek J Thorkelson | 2003/11/21 |
| Letter dated Nov 8/03 from Hilve Niiranen to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project - Response from Fred Cummings to Hilve Niiranen dated Nov 28/03 | Hilve Niiranen | 2003/11/21 |
| Letter dated Nov 18/03 from David Martens to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project - Response from Fred Cummings to Mr. Martens dated Nov 21/03 | David L.G Martens, MDM Construction | 2003/11/21 |
| E-mail dated Nov 13/03 from Bill Archibald to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project - Response from Fred Cummings to Bill Archibald dated Nov 28/03 | Bill Archibald, Trails BC | 2003/11/20 |
| E-mail dated Nov 2/03 from Darryl Fulton to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project - Response from Fred Cummings to Mr. Fulton dated Nov 7/03 |
| 2003/11/03 |
| E-mail dated Nov 2/03 from Kevin Lum to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project - Response from Fred Cummings to Mr. Lum dated Nov 7/03 |
| 2003/11/03 |
| E-mail dated Oct 26/03 from Paul Hosford to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project - Response from Fred Cummings to Mr. Hosford dated Nov 7/03 |
| 2003/10/29 |
| Letter dated Oct 15/03 from Don Edwards to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project -Response from Fred Cummings to Mr. Edwards dated Oct 23/03 |
| 2003/10/24 |
| E-mail dated Oct 9/03 from Cris Guppy to Kim Cholette (EAO) on the application for the New Fraser River Crossing Project - Response from Fred Cummings to Mr. Guppy dated Oct 30/03 - Follow up to response of Oct 30/03 | Cris Guppy, Public Comment | 2003/10/17 |
| E-mail dated Oct 6/03 from Paul & Diane Brinton to Kim Cholette (EAO) - Comments on the application for the New Fraser River Crossing Project - Response from Fred Cummings to Mr. and Mrs. Brinton dated Oct 22/03 | Paul and Diane Brinton | 2003/10/07 |
| E-mail dated Sept 26/03 from Mark S. Hutchinson to Kim Cholette (EAO) - Comments on the application for the New Fraser River Crossing Project - Response from Fred Cummings to Mark Hutchinson dated Oct 3/03 | Mark S Hutchinson | 2003/10/03 |
| E-mail dated Sept 25/03 from Erin Francis to Kim Cholette (EAO) - Comments on the application for the New Fraser River Crossing Project - Response from Fred Cummings to Erin Francis dated Oct 3/03 | Erin Francis, Public Comment | 2003/09/25 |
| E-mail dated Sept 17/03 from John Lang to Kim Cholette (EAO) - Comments on the application for the New Fraser River Crossing Project |
| 2003/09/22 |
| E-mail dated Sept 17/03 from Eric H O'Dell to Kim Cholette (EAO) - Comments on the application for the New Fraser River Crossing Project |
| 2003/09/22 |
| E-mail dated Sept 19/03 from Max Nobbs-Thiessen to Kim Cholette (EAO) - Comments on the application for the New Fraser River Crossing Project - Response from Fred Cummings to Max Nobbs-Thiessen dated Oct 3/03 |
| 2003/09/22 |
| E-mail dated Sept 21/03 from Carol Greer to Kim Cholette (EAO) - Comments on the application for the New Fraser River Crossing Project - Response from Fred Cummings to Ms. Greer dated Oct 30/03 |
| 2003/09/22 |
Completed / Certified |
Notices - News Releases |
Title | Author | Posted Date |
| Information Bulletin - Environmental ok given to New
Fraser River Bridge |
| 2004/11/30 |
EA Certificate Documentation |
Title | Author | Posted Date |
| Information Bulletin - Environmental ok given to New
Fraser River Bridge |
| 2004/11/30 |
| Environmental Assessment Certificate W04-03 for the New Fraser River Crossing Project |
| 2004/08/06 |
| New Fraser River Crossing Project Assessment Report |
| 2004/08/05 |
| New Fraser River Crossing Project - Recommendations of the Executive Director and Reasons for Recommendations | Derek Griffin, Environmental Assessment Office | 2004/08/05 |
Amendment Certificate |
Title | Author | Posted Date |
| Amendment #1 dated June 27/04 to Environmental Assessment Certificate W04-03 for the New Fraser River Crossing Project | Deputy Minister Joan Hesketh, Environmental Assessment Office | 2005/06/29 |
Post Certificate Documentation |
Title | Author | Posted Date |
| Golden Ears Bridge Project Environmental Assessment Certificate W04-03 Status of Compliance Report dated July 2008 |
| 2009/07/28 |
| Golden Ears Bridge Project Environmental Assessment Certificate W04-03 Status of Compliance Report dated July 2007 | John Villamere, Hatfield Consultants | 2007/08/24 |
| Golden Ears Bridge Project Environmental Assessment Certificate W04-03 Status of Compliance Report dated May 2006 | John Villamere, Hatfield Consultants | 2007/08/24 |
|