Kitimat LNG Terminal Project

Type:Typical EA Process (Active and Complete)Status:Completed / Certified
Category:EnergyPre-application

Start Date:

2004/09/14
 

Document Index

Pre-Application

Application Terms of Reference/Information Requirements

Title

Author

Posted Date

Final Terms of Reference, dated April 13/05, for the Kitimat LNG Project  2005/04/13

Aboriginal Comments/Submissions

Title

Author

Posted Date

Letter from Allan Donovan (Donovan & Company) to Joan Hesketh (EAO) dated February 2/05 regarding the proposal to install a liquefied natural gas plant within Haisla Nation TerritoryAllan Donovan, Donovan & Company2006/03/01
Email from Diane Barbetti (Haisla Nation) to John Bones (EAO) received Apr 25/05 regarding comments on the screening of the Kitimat LNG Environmental Assessment applicationDiane Barbetti, Haisla Nation2005/08/04
Report submitted by Diane Barbetti (Haisla Nation) to John Bones (EAO) April 2005 - Comprehensive Study Scoping DocumentDiane Barbetti, Haisla Nation2005/08/03

EAO Generated Documents

Title

Author

Posted Date

Kitimat LNG Terminal Project Working Group Meeting Summary - December 8, 2004  2005/12/20
Letter dated May 4/05 to Rosemary Boulton (Proponent) from John Bones (EAO) regarding Acceptance of Application for EA Certificate for the Kitimat LNG Terminal Project.John Bones, Environmental Assessment Office2005/05/05
Order Under Section 11 of the Environmental Assessment Act signed by John Bones (EAO) dated March 30/05John Bones, Environmental Assessment Office2005/03/31
Order under section 10(1)(c) of the Environmental Assessment Act signed by John Bones (EAO) dated Sept 14/04John Bones, Environmental Assessment Office2004/09/15

Federal Comments/Submissions

Title

Author

Posted Date

Comprehensive Study Scoping Document for the Kitimat LNG Inc. Proposed Liquefied Natural Gas (LNG) Terminal April 2005  2005/08/03
Letter dated Mar. 9/05 to Alfred B. Sorensen (Kitimat LNG Inc) from Robert G. Connelly (CEAA) regarding the proposed construction of the Kitimat LNG project near Kitimat, British Columbia.Robert Connelly, Canadian Environmental Assessment Agency2005/04/19

Proponent Comments/Correspondence

Title

Author

Posted Date

Galveston LNG Preliminary Project Description dated Aug 18/04  2004/09/27

Under Review

Application and Supporting Studies

Title

Author

Posted Date

Environmental Protection Plan Overview - Terminal Operation dated November 10/05Ward Prystay, Jacques Whitford Ltd.2006/03/16
Environmental Protection Plan Overview - Construction Phase dated March 15/06Ward Prystay, Jacques Whitford Ltd.2006/03/16
Map of Emsley Cove Restricted Access Areas dated March 14/06Ward Prystay, Jacques Whitford Ltd.2006/03/14
Map of Emsley Cove Facilities Layout Details dated March 14/06Ward Prystay, Jacques Whitford Ltd.2006/03/14
Map of Bish Cove Facilities Layout Details dated March 14/06Ward Prystay, Jacques Whitford Ltd.2006/03/14
Map from Ward Prystay (Jacques Whitford) to John Bones (EAO) - Restricted Access Areas Map - for Bish Cove Revised March 6/06Ward Prystay, Jacques Whitford Ltd.2006/03/07
Report from Janice Keyes (Karyo) to John Bones (EAO) dated February 28/06 regarding the Kitmat LNG Terminal Project - Public Review Period Summary from January 18/06 - February 22/06Janice Keyes, Karyo Communications2006/03/07
Map from Ward Prystay (Jacques Whitford) to John Bones (EAO) - Emsley Cove Tug and Tanker No-Go Zones dated March 2/06Ward Prystay, Jacques Whitford Ltd.2006/03/06
Map from Ward Prystay (Jacques Whitford) to John Bones (EAO) - Bish Cove Tug and Tanker No-Go Zones dated February 6/06Ward Prystay, Jacques Whitford Ltd.2006/03/06
Kitimat LNG Terminal Working Group Issues Tracking document dated February 24, 2006John Bones, Environmental Assessment Office2006/02/24
Supplement to the January 11/06 Bish Cove Addendum Report Habitat Compensation Options for the Marine Terminal in Bish Cove dated February 2/06Ward Prystay, Jacques Whitford Ltd.2006/02/09
Revised Table of Comparison of Alternative Sites dated February 9/06Ward Prystay, Jacques Whitford Ltd.2006/02/09
Bish Cove Addendum to the Application for an EA Certificate submitted on behalf of proponent to John Bones (EAO)Ward Prystay, Jacques Whitford Ltd.2006/01/13
Map sent by Ward Prystay (Jacques Whitford) to John Bones (EAO) - Restricted Access/Use Areas -For Emsley Cove - dated November 3/05 Ward Prystay, Jacques Whitford Ltd.2005/11/18
Summary of Commitments for the Kitimat LNG Project dated November 17/05Pamela Walton, Jacques Whitford2005/11/18
Memo from Ward Prystay (Jacques Whitford) to Kam Sadar (Environment Canada) regarding Dioxan and Furan Data for Sediments from Emsley Cove including maps dated October 20/05Ward Prystay, Jacques Whitford Ltd.2005/11/15
Report from Ward Prystay (Jacques Whitford) to John Bones (EAO) dated November 10/05 regarding Environmental Protection Plan Overview - Terminal Operations Revision 4Ward Prystay, Jacques Whitford Ltd.2005/11/15
Report from Ward Prystay (Jacques Whitford) to John Bones (EAO) dated November 10/05 regarding Environmental Protection Plan Overview - Construction Phase Revision 3Ward Prystay, Jacques Whitford Ltd.2005/11/15
Meeting Summary - KLNG Terminal Project - Marine Security (with Transport Canada) dated October 31/05Ward Prystay, Jacques Whitford Ltd.2005/11/15
Proposed Environmental Setbacks - Supplemental Drawing No. 2 dated November 10/05Ward Prystay, Jacques Whitford Ltd.2005/11/15
Map from Ron Byres (Moffatt & Nichol) to Kevin Miller (Kitimat LNG Inc.) for Kitimat LNG Import Terminal - Relocated Barge Jetty/Tug Berth Location drawing # 5499-SK-14 dated October 27/05Ron Byres, Moffatt & Nichol2005/11/09
Map from Ron Byres (Moffatt & Nichol) to Kevin Miller (Kitimat LNG Inc.) for Kitimat LNG IMport Terminal - Vessel Maneuverability Limits for Propeller Wash Impact Reduction - Drawing # 5499-SK-15 dated November 3/05Ron Byres, Moffatt & Nichol2005/11/09
Report from Victor Szabo (Moffatt & Nichol) to Kevin Miller (Kitimat LNG Inc.) - Kitimat LNG Import Terminal Revised Propeller Wash Study dated November 9/05Victor Szabo, Moffatt & Nichol2005/11/09
Memo to Kevin Miller (Kitimat LNG Terminal) from Ron Byres (Moffatt & Nichol) dated October 20/05 regarding Tug Berth in Emsley CoveRon Byres, Moffatt & Nichol2005/10/25
Supplementary Information on Alternative Means of Carrying out the KLNG Project - submitted September 26/05  2005/10/14
Process Overview & Terminal Description from Kitimat LNG Working Group Meeting dated September 29/05  2005/10/07
Letter to Rosemary Boulton (Kitimat LNG Inc.) from Harold Westerman (Moffatt & Nichol) dated July 13/05 regarding Kitimat LNG Import Terminal - Termpol Gap AnalysisHarold Westerman, Moffatt & Nichol2005/10/05
Proposed Access Road Extension Key Plan Map - Original Route dated September 8/05 for Kitimat LNG Terminal ProjectKevin Miller, Kitimat LNG Terminal2005/09/28
Proposed Access Road Extension Key Plan Map - Appendix A - Key Plan dated September 8/05 for Kitimat LNG Terminal Project Kevin Miller, Kitimat LNG Terminal2005/09/28
Memo from T.E. Valentine (Macleod Dixon LLP) to Kitimat LNG Inc. (Proponent) dated September 26/05 regarding exclusion zone at Kitimat LNG Inc.T. E. Valentine, Macleod Dixon LLP2005/09/28
2005 Report on Proposals - NFPA 59AKevin Miller, Kitimat LNG Terminal2005/09/28
Kitimat LNG Terminal - Water Management Summary received September 26/05Kevin Miller, Kitimat LNG Terminal2005/09/28
Technical Data Report - Coastal Tailed Frog Survey - Kitimat LNG Terminal - dated September 19/05Kevin Miller, Kitimat LNG Terminal2005/09/28
Technical Data Draft Report - Rare Plant Survey - Kitimat LNG Terminal - dated September 23/05Kevin Miller, Kitimat LNG Terminal2005/09/28
Emsley Cove Sediment Chemistry Results - Dioxin and Furan Analysis dated September 22/05Ward Prystay, Jacques Whitford Ltd.2005/09/26
Dioxin and Furan Analysis in Soil - Lab Results dated March 4/05Ward Prystay, Jacques Whitford Ltd.2005/09/26
Site Location Plan - Map - Drawing No. 1 for Kitimat LNG Terminal Project  2005/09/14
Kitimat LNG Plant Site and Facilities - Map - Drawing No. 2 for Kitimat LNG Terminal Project  2005/09/14
Proposed route for 30m pipeline and 30m powerline R/W to proposed LNG plant - Map - Drawing No. 3 for Kitimat LNG Terminal Project  2005/09/14
Kitimat LNG Terminal Project - Environmental Assessment Review Post-Application Consultation submitted to John Bones (EAO) on September 13/05  2005/09/14
Preliminary Recommendations for Improvements to Access Road to Emsley Cove for Kitimat LNG Inc. - Report dated August 2005.  2005/09/13
Preliminary mapping of eelgrass beds - August 3/05Ward Prystay, Jacques Whitford Ltd.2005/09/08
Kitimat LNG Import Terminal Requested Imagery September 7/05Rochelle Harding, Jacques Whitford2005/09/08
Alternative Site Analysis Watercourse Crossings - Emsley Cove/Bish Cove - Map - August 29/05Kevin Miller, Kitimat LNG Terminal2005/08/31
Figure 1: Typical LNG Terminal Jetty and Figure 2: KLNG Jetty at Emsley Cove - August 30/05Kevin Miller, Kitimat LNG Terminal2005/08/31
Technical Data Report - Breeding Bird Survey August 19/05 for Kitimat LNG Terminal ProjectKevin Miller, Kitimat LNG Terminal2005/08/23
Application for an Environmental Assessment Certificate for the Kitimat LNG Terminal Project submitted by Kitimat LNG Inc. to John Bones (EAO) on June 6 2005.Rosemary Boulton, Kitimat LNG Inc2005/06/09
Appendices to the Application for an Environmental Assessment Certificate for the Kitimat LNG Terminal Project submitted by Kitimat LNG Inc. to John Bones (EAO) on June 6 2005. Rosemary Boulton, Kitimat LNG Inc2005/06/09

Aboriginal Comments/Submissions

Title

Author

Posted Date

Fax letter dated April 13/04 from Chief Steve Wilson (Haisla Nation) to John Bones (EAO) and distribution list re: the Environmental Assessment of the Kitimat LNG ProjectChief Steve Wilson, Kitamaat Village Council2006/04/13
Letter dated April 13/06 from Michael Gordon (M.R, Gordon & Associates) to John Bones (EAO) re: satisfied with Kitimat LNG Assessment ReportMichael R Gordon, M.R. Gordon & Associates Ltd.2006/04/13
Letter from Michael Gordon (M.R. Gordon & Associates Ltd.) to John Bones (EAO) dated March 29/06 regarding comments on the Kitimat LNG Terminal Project Assessment Report and Comprehensive Study ReportMichael R Gordon, M.R. Gordon & Associates Ltd.2006/03/29
Letter from Chief Steve Wilson (Kitamaat Village Council) to John Bones (EAO) dated November 2/05 regarding the Kitimat LNG Terminal Environmental AssessmentChief Steve Wilson, Kitamaat Village Council2006/03/01
Report from Allan Donovan (Donovan & Company) to John Bones (EAO) dated October 27/05 regarding additional evidence of Haisla Nation Aboriginal Title over the proposed site for a liquefied natural gas plantAllan Donovan, Donovan & Company2006/03/01
Letter from Chief Steve Wilson (Haisla Nation) to John Bones (EAO) and Jason Quigley (CEAA) dated January 31/06 regarding the District of Kitimat's request for a public hearing on Kitimat LNG Terminal Project and Beese ReserveChief Steve Wilson, Haisla Nation2006/02/22
Letter from Chief Steve Wilson (Kitamaat Village Council) to John Bones (EAO) dated December 15/05 regarding a signed Agreement in Principle with Kitimat LNG Inc.Chief Steve Wilson, Haisla Nation2005/12/19
Faxed letter from Chief Steve Wilson (Kitamaat Village Council) to John Bones (EAO) dated November 21/05 regarding the Environmental Assessment for Kitimat LNG Terminal ProjectChief Steve Wilson, Haisla Nation2005/11/22
Email from Diane Barbetti (Haisla Nation) to John Bones (EAO) received Aug. 10/05 regarding additional comments on the screening of the Kitimat LNG Environmental Assessment application Diane Barbetti, Haisla Nation2005/08/10
Letter from Michael R. Gordon (M.R. Gordon & Associates Ltd.) to John Bones (EAO) received Aug. 8/05 regarding Haisla Nation comments on the Kitimat LNG Environmental Assessment ApplicationMichael R Gordon, M.R. Gordon & Associates Ltd.2005/08/09

EAO Generated Documents

Title

Author

Posted Date

Time Limit Extension (Section 24) Order for the Kitimat LNG Terminal Project dated March 30/06Joan Hesketh, Environmental Assessment Office2006/03/31
Letter to Rosemary Boulton (Proponent) from John Bones (EAO) dated March 14/06 regarding the resumption of the 180 day time limit prescribed for the completion of Kitimat LNG Terminal ProjectJohn Bones, Environmental Assessment Office2006/03/14
Kitimat LNG Terminal Project Working Group Meeting Summary dated February 15/06John Bones, Environmental Assessment Office2006/03/10
Letter from John Bones (EAO) to Chief Steve Wilson (Haisla Nation) dated December 6/05 regarding accomodation discussions related to the Kitimat LNG Terminal ProjectJohn Bones, Environmental Assessment Office2006/03/01
Letter to Mayor Richard Wozney (District of Kitimat) from John Bones (EAO) dated January 27/06 regarding a proposed date for a public meeting for Kitimat LNG Terminal ProjectJohn Bones, Environmental Assessment Office2006/01/30
Order Under Section 13 Amending Section 11 Order for Kitimat Liquid Natural Gas Terminal Project signed on December 30/05 by John Bones (EAO)John Bones, Environmental Assessment Office2005/12/30
Kitimat LNG Terminal Project Working Group Meeting Summary - September 29, 2005John Bones, Environmental Assessment Office2005/11/25
Letter from John Bones (EAO) to Rosemary Boulton (Kitimat LNG Inc.) dated November 23/05 regarding requirements for the Kitimat LNG Terminal ProjectJohn Bones, Environmental Assessment Office2005/11/23
Letter from John Bones (EAO) to Rosemary Boulton (Kitimat LNG Inc.) dated November 21/05 regarding a temporary suspension of the 180 day time limit prescribed under the Act John Bones, Environmental Assessment Office2005/11/22
Letter from John Bones (EAO) to Rosemary Boulton (Kitimat LNG Inc.) dated November 21/05 regarding the concurrent review of permit applications to the Oil and Gas CommissionJohn Bones, Environmental Assessment Office2005/11/22
Email to Rosemary Boulton and Kevin Miller (Kitimat LNG Inc.) from John Bones (EAO) dated November 18/05 regarding Additional Traditional Use Study Information RequirementsJohn Bones, Environmental Assessment Office2005/11/18
Work Plan for the Cooperative Environmental Assessment of the Kitimat LNG Terminal Project - Established in accordance with the Canada-British Columbia Agreement for Environmental Assessment Cooperation (2004) dated October 27, 2005  2005/11/01
Order Under Section 13 Amending Section 11 Order for Kitimat Liquid Natural Gas Terminal Project signed on August 30/05 by John Bones (EAO)John Bones, Environmental Assessment Office2005/09/06
Letter to Michael Gordon (M. R. Gordon & Associates Ltd.) from John Bones (EAO) sent Aug. 16/05 regarding Haisla Comments on Kitimat LNG Terminal ProjectJohn Bones, Environmental Assessment Office2005/08/16
Kitimat LNG Terminal Project Working Group Meeting Summary - June 27, 2005  2005/07/27
Kitimat LNG Terminal Project Working Group Issues Tracking Table Draft July 26, 2005  2005/07/27
Letter from John Bones (EAO) to Chief Steve Wilson (Haisla Nation) dated July 6/05 regarding Traditional Use Study (TUS) for Kitimat LNG Terminal ProjectJohn Bones, Environmental Assessment Office2005/07/27
Section 13 Amending Section 11 Order dated June 14, 2005.John Bones, Environmental Assessment Office2005/06/14
Letter dated June 6, 2005 to Rosemary Boulton (Kitimat LNG Inc.) from John Bones (EAO) regarding acceptance or application for formal review of the Kitimat LNG Terminal Project.John Bones, Environmental Assessment Office2005/06/07

Federal Comments/Submissions

Title

Author

Posted Date

Email letters dated April 24/06 re: Signed letters of support to the President of CEA AgencyDerek Nishimura, Transport Canada2006/04/27
Letter from Don Fast (Environment Canada) to Mike Henderson (Transport Canada) dated April 18/06 regarding that they are satisfied with the review of the Comprehensive Study Report for the Kitimat LNG Terminal ProjectDon Fast, Environment Canada2006/04/19
Letter dated Apr 10/06 from Jennifer Guscott (INAC) to Dr. Mike Henderson (TC) re: Kitimat LNG Project - Transmittal of Comprehensive Study ReportJennifer Guscott, Indian and Northern Affairs Canada2006/04/11
Report - Safety Zones for LNG Carriers in Atlantic Canada - A Presentation for the Atlantic LNG and CNG Symposium dated June 27-28/05Richard Cobanli, Transport Canada2005/11/10
Report from Margaret Bakelaar (CEAA) to John Bones (EAO) dated July 21/05 - Environmental Assessment Track Report for Kitimat Liquefied Natural Gas (LNG) Terminal ProjectMargaret Bakelaar, Canadian Environmental Assessment Agency2005/11/08
Participant Funding Review Committee Report - Allocation of Funds for Kitimat Liquefied Natural Gas (LNG) Terminal Project dated August 12/05Peter Bedrossian, Canadian Environmental Assessment Agency2005/11/08
Notice of Decision to continue as a Comprehensive Study - Kitimat LNG Inc. - Liquefied Natural Gas Terminal dated November 2/05  2005/11/08
News Release - Kitimat Liquefied Natural Gas Project: Federal Funding Awarded to Participate in the Environmental Assessment dated November 3/05Peter Bedrossian, Canadian Environmental Assessment Agency2005/11/08
Kitimat LNG Regulatory Requirements - Components of a Generic LNG Receiving Terminal table dated September 8/05  2005/10/07
Canadian Environmental Assessment Act - Environmental Assessment Track Report - Summary of First Nations and Public Comments in Relation to the Project - Kitimat LNG Terminal ProjectMargaret Bakelaar, Canadian Environmental Assessment Agency2005/09/28
Email to Kevin Miller (Kitimat LNG Inc.) from Kamuran Sadar (Environment Canada) dated September 26/05 regarding Environment Canada Issues Concerning Kitimat LNG Terminal ProjectKamuran Sadar, Environment Canada2005/09/27
Email to Kevin Miller (Kitimat LNG Inc.) from Kamuran Sadar (Environment Canada) dated September 26/05 regarding Environmental Assessment and Migratory Birds Convention ActKamuran Sadar, Environment Canada2005/09/27
Letter from Gerard A. McDonald (Transport Canada) to Rosemary Boulton (Proponent) on August 15/05 regarding Kitimat LNG Inc. request for TERMPOLGerard McDonald, Transport Canada2005/09/08
Environment Canada comments on the Kitimat LNG Terminal Application Aug. 9/05  2005/08/11
Report from Environment Canada entitled Best Practices for the Reduction of Air Emissions from Construction and Demolition Activities - March 2005  2005/08/11
Report from Health Canada - Review of the Air Quality Health Impact Sections of the Application submitted for Environmental Assessment Approval of the proposed Kitimat LNG Terminal Project submitted Aug. 3/05Jamal Harb, Safe Environments Program - BC/Yukon Region2005/08/03
Additional Comments from Transport Canada regarding the Kitimat LNG Terminal Application Review  2005/07/28
Preliminary Comments from Transport Canada and Fisheries and Oceans Canada regarding the Kitimat LNG Terminal Application Review dated July 15/05  2005/07/27

Local Government Comments/Submissions

Title

Author

Posted Date

Letter from Mayor Richard Wozney (District of Kitimat) to John Bones (EAO) dated January 24/06 regarding a request for a Kitimat public meeting on the new proposed site for the Kitimat LNG Terminal ProjectRichard Wozney, District of Kitimat2006/01/30
Email from Diane Hewlett (District of Kitimat) to John Bones (EAO) dated October 3/05 regarding Kitmat LNG ProjectDiane Hewlett, District of Kitimat2005/10/07
Email from Diane Hewlett (District of Kitimat) to John Bones (EAO) received July 27/05 on Kitimat LNGDiane Hewlett, District of Kitimat2005/08/03
Letter from Richard Wozney, Mayor (District of Kitimat) to John Bones (EAO) dated July 27/05 regarding public support from Kitimat Municipal Council for Kitimat LNG ProjectRichard Wozney, District of Kitimat2005/07/27

Notices - News Releases

Title

Author

Posted Date

Notice of Public Meeting and Public Review Period - Proposal to locate Kitimat LNG Terminal Project at Bish CoveJanice Keyes, Karyo Communications2006/02/03
News Release - Public Comment invited on the Bish Cove Addendum for the Kitimat LNG project. Public comment period runs from January 18 through to January 31st 2006.Rosemary Boulton, Kitimat LNG Inc2006/01/13
News Release - Haisla First Nation negotiate agreement in principle Dec 15/05Patti Schom-Moffatt, Kitimat LNG Terminal2005/12/23
Public comment invited on an application for the Kitimat LNG Terminal Project  2005/06/13

Provincial Govt Comments/Submissions

Title

Author

Posted Date

Email from Penny Buckler (Oil and Gas Commission) to John Bones (EAO) received September 13/05 regarding KLNG Concurrent Permitting RequestPenny Buckler, Oil and Gas Commission2005/09/13
Letter from Craig Stewart (WLAP) to John Bones (EAO) received July 28/05 regarding Kitimat LNG Terminal ProjectCraig Stewart, Ministry of Water, Land and Air Protection2005/08/03
Email from Brent May (MOF) to John Bones (EAO) received July 8/05 regarding revised key dates for Kitimat LNG ProcessBrent May, Ministry of Forests and Range2005/08/03
Letter from Troy Larden (MOE) to John Bones (EAO) dated July 18/05 regarding comments on Kitimat LNG Terminal ProjectTroy Larden, Ministry of Environment2005/07/27
Letter dated June 6, 2005 from Penny Buckler (Oil and Gas Commission) to John Bones (EAO) regarding receipt and acceptance of applications pertaining to the Kitimat LNG Project.Penny Buckler, Oil and Gas Commission2005/06/07

Proponent Comments/Correspondence

Title

Author

Posted Date

Letter from Ward Prystay (Jacques Whitford) to John Bones (EAO) dated March 21/06 regarding a summary of freshwater fish habitat alteration and loss within the KLNG Terminal at Bish CoveWard Prystay, Jacques Whitford Ltd.2006/03/31
Kitimat LNG Terminal Project Public Presentation from the February 15/06.Kevin Miller, Kitimat LNG Terminal2006/02/21
Email received from H. Sanou (Kitimat, BC) to Janice Keyes (Karyo Communications) on January 26/06 regarding the Kitimat LNG Terminal Project H Sanou2006/02/20
Letter dated Dec 22/05 from Rosemary Boulton (Prop) to John Bones (EAO) confirming their estimate of the extent of shoreline modification at Bish (Beese) Cove to be approximately 2.2 hectares.Rosemary Boulton, Kitimat LNG Inc2005/12/28
Letter dated Dec 19/05 from Rosemary Boulton (Prop) to John Bones (EAO) requesting continuance of ongoing environmental assessment process at the Emsley Cove site.Rosemary Boulton, Kitimat LNG Inc2005/12/22
Letter from Kevin Miller (Kitimat LNG) to John Bones (EAO) dated December 21/05 regarding withdrawal of application for concurrent review of permitsKevin Miller, Kitimat LNG Terminal2005/12/21
Letter from Peter Reid (Jacques Whitford) to Kamuran Sadar (Environment Canada) dated November 28/05 regarding Outstanding Air Quality Issues - contains report - Analysis of Commercial Marine Vessel Emissions & Fuel Consumption DataPeter Reid, Jacques Whitford Limited2005/12/01
News Release from Patti Schom-Moffatt (Kitimat LNG Terminal) - Kitimat LNG seeks time to compile additional information - dated November 22/05Patti Schom-Moffatt, Kitimat LNG Terminal2005/11/23
Letter from Rosemary Boulton (Kitimat LNG Inc.) to John Bones (EAO) dated Nov. 21/05 regarding a temporary suspension of the 180 day time limit prescribed under the ActRosemary Boulton, Kitimat LNG Inc2005/11/21
Letter to Kamuran Sadar (Environment Canada) from Eliot Terry (Jacques Whitford Limited) dated September 12/05 regarding Kitimat LNG - Heron Nest SurveyEliot Terry, Jacques Whitford Limited2005/09/23
Letter to Andrew Green (Environment Canada) from Peter Reid (Jacques Whitford Limited) dated September 13/05 regarding Sulphur Dioxide Monitoring Proposal & Commitments Respecting Mitigation for Kitimat LNG ProjectPeter Reid, Jacques Whitford Limited2005/09/23
Letter from Rosemary Boulton (Proponent) to Gerard A. McDonald (Transport Canada) sent July 27/05 regarding Kitimat LNG Inc. request for TERMPOLRosemary Boulton, Kitimat LNG Inc2005/09/08
Letter from Patti Schom-Moffatt (Kitimat LNG Terminal) to Diane Barbetti and Michael Gordon (Haisla First Nation) dated July 14/05 regarding public consulatation with the Haisla CommunityPatti Schom-Moffatt, Kitimat LNG Terminal2005/08/03
Letter dated June 2, 2005 from Rosemary Boulton (Kitimat LNG) to John Bones (EAO) regarding the Kitimat LNG Environmental Assessment Application. Rosemary Boulton, Kitimat LNG Inc2005/06/06

Public Comments/Submissions

Title

Author

Posted Date

Email from April MacLeod (Kitimat Valley Naturalists) to John Bones (EAO) dated January 30/06 regarding the Kitimat LNG Terminal ProjectApril MacLeod, Kitimat Valley Naturalists2006/01/31
Email from Thomas Campbell (Kitimat BC) to John Bones (EAO) received July 27/05 regarding the Kitimat LNG Terminal Project Thomas Campbell2005/08/03
Email from Linda Campbell (Kitimat BC) to John Bones (EAO) received July 27/05 regarding the Kitimat LNG Terminal Project Linda Campbell2005/08/03
Email from Ehyan Caldwell to John Bones (EAO) received July 27/05 regarding the Kitimat LNG Terminal Project Ehyan Caldwell2005/08/03
Email from David Fields to John Bones (EAO) received July 29/05 regarding Kitimat LNG ProjectDavid Fields2005/08/03
E-mail dated July 26, 2005 from Kevin Gillanders (Terrace BC) to EAOINFO regarding the Kitimat LNG Terminal Project. Kevin Gillanders2005/08/02
Letter from Robin LaPointe (Kitimat BC) to John Bones (EAO) received July 29/05 regarding the Kitimat LNG Terminal ProjectRobin Lapointe, K.T. Industrial Development Society2005/07/29
Kitimat LNG Terminal Project Public Comment Form received from Katherine & Ron Lorette (Terrace, BC) to John Bones (EAO) on July 26/05 Katherine & Ron Lorette2005/07/27
Email received from Ken Pitzel (Kitimat, BC) to EAO Information on July 22/05 regarding the Kitimat LNG Terminal Project Ken Pitzel2005/07/25
Letter received from Kitimat Valley Naturalists (Kitimat, BC) to John Bones (EAO) on July 8/05 regarding the Kitmat LNG Terminal Project Kitimat Valley Naturalists2005/07/12
Email received from Eleanor Kendell (Kitimat, BC) to John Bones (EAO) on June 29/05 regarding Kitimat LNG Terminal Project Eleanor Kendell2005/07/05
Kitimat LNG Terminal Project Public Comment Form received from Carol McRobb (Terrace, BC) to John Bones (EAO) on June 30/05 Carol McRobb2005/07/05
Kitimat LNG Terminal Project Public Comment Form received from Ian Black (Terrace, BC) to John Bones (EAO) on June 30/05 Ian Black2005/07/05
Kitimat LNG Terminal Project Public Comment Form received from Allan Lanctot (Terrace, BC) to John Bones (EAO) on June 30/05 Allan Lanctot2005/07/05
Kitimat LNG Terminal Project Public Comment Form received from Sandra Cox (Kitimat, BC) to John Bones (EAO) on June 30/05 Sandra Cox2005/07/05
Kitimat LNG Terminal Project Public Comment Form received from Brian Brockel (Kitimat, BC) to John Bones (EAO) on June 30/05 Brian Brockel2005/07/05
Kitimat LNG Terminal Project Public Comment Form received from Dale Flint (Kitimat, BC) to John Bones (EAO) on June 30/05 Dale Flint2005/07/05
Kitimat LNG Terminal Project Public Comment Form received from Tammy deMedeiros (Kitimat, BC) to John Bones (EAO) on June 30/05 Tammy deMedeiros2005/07/05
Kitimat LNG Terminal Project Public Comment Form received from Manny Arruda (Kitimat, BC) to John Bones (EAO) on June 30/05 Manny Arruda2005/07/05
Kitimat LNG Terminal Project Public Comment Form received from Lucille LaBossiere (Terrace, BC) to John Bones (EAO) on June 30/05 Lucille LaBossiere2005/07/05
Kitimat LNG Terminal Project Public Comment Form received from James LaBossiere (Kitimat, BC) to John Bones (EAO) on June 30/05 James LaBossiere2005/07/05
Kitimat LNG Terminal Project Public Comment Form received from Hans Brown (Kitimat, BC) to John Bones (EAO) on June 30/05 Hans Brown2005/07/05
Letter received from Mario Feldhoff (Kitimat, BC) to John Bones (EAO) on June 30/05 regarding the Kitimat LNG Terminal Project Mario Feldhoff2005/07/05
Kitimat LNG Terminal Project Public Comment Form received from Roberto Vannucci (Kitimat, BC) to John Bones (EAO) on July 4/05 Roberto Vannucci2005/07/05
Kitimat LNG Terminal Project Public Comment Form received from Maddalena Vannucci (Kitimat, BC) to John Bones (EAO) on July 4/05 Maddalena Vannucci2005/07/05
Kitimat LNG Terminal Project Public Comment Form received from Kris Cyganiak (Kitimat, BC) to John Bones (EAO) on July 4/05 Chris Cyganiak2005/07/05
Kitimat LNG Terminal Project Public Comment Form received from Simon Cammish (Kitimat, BC) to John Bones (EAO) on June 29/05 Simon Cammish2005/06/30
Kitimat LNG Terminal Project Public Comment Form received from Joseph Martyres (Kitimat, BC) to John Bones (EAO) on June 29/05 Joseph Martyres2005/06/30
Kitimat LNG Terminal Project Public Comment Form received from Myrtle and Gunter Prett (Kitimat, BC) to John Bones (EAO) on June 29/05 Myrtle & Gunter Prett2005/06/30
Kitimat LNG Terminal Project Public Comment Form received from Rene Jenster (Kitimat, BC) to John Bones (EAO) on June 29/05 Rene Jenster2005/06/30
Kitimat LNG Terminal Project Public Comment Form received from Steven Forrest (Kitimat, BC) to John Bones (EAO) on June 27/05 Steven Forrest2005/06/29
Kitimat LNG Terminal Project Public Comment Form received from John Denholme (Kitimat, BC) to John Bones (EAO) on June 29/05 John Denholme2005/06/29
Kitimat LNG Terminal Project Public Comment Form received from Brenda Horwood (Kitimat, BC) to John Bones (EAO) on June 29/05 Brenda Horwood2005/06/29
Kitimat LNG Terminal Project Public Comment Form received from Anne Zabot (Kitimat, BC) to John Bones (EAO) on June 29/05 Anne Zabot2005/06/29
Kitimat LNG Terminal Project Public Comment Form received from Louis Zabot (Kitimat, BC) to John Bones (EAO) on June 29/05 Louis Zabot2005/06/29
Kitimat LNG Terminal Project Public Comment Form received from Martin Vanderkwaak (Kitimat, BC) to John Bones (EAO) on June 29/05 Martin Vanderkwaak2005/06/29
Kitimat LNG Terminal Project Public Comment Form received from C. R. (Bob) McLeod (Kitimat, BC) to John Bones (EAO) on June 29/05 C.R. (Bob) McLeod2005/06/29
Kitimat LNG Terminal Project Public Comment Form received from Carl Whicher (Kitimat, BC) to John Bones (EAO) on June 29/05 Carl Whicher2005/06/29
Kitimat LNG Terminal Project Public Comment Form received from Neil MacRitchie (Kitimat, BC) to John Bones (EAO) on June 29/05 Neil MacRitchie2005/06/29
Kitimat LNG Terminal Project Public Comment Form received from E. Thorne (Kitimat, BC) to John Bones (EAO) on June 29/05 E. Thorne2005/06/29
Kitimat LNG Terminal Project Public Comment Form received from Mark Lindsay (Terrace, BC) to John Bones (EAO) on June 29/05 Mark Lindsay2005/06/29
Kitimat LNG Terminal Project Public Comment Form received from Bill Hickman (Kitimat, BC) to John Bones (EAO) on June 29/05 Bill Hickman2005/06/29
Kitimat LNG Terminal Project Public Comment Form received from Grant MacDermid (Kitimat, BC) to John Bones (EAO) on June 29/05 Grant MacDermid2005/06/29
Kitimat LNG Terminal Project Public Comment Form received from Sherrin MacDonald (Kitimat, BC) to John Bones (EAO) on June 29/05 Sherrin MacDermid2005/06/29
Kitimat LNG Terminal Project Public Comment Form received from Victor Maskwlak (Kitimat, BC) to John Bones (EAO) on June 29/05 Victor Maskwlak2005/06/29

Concurrent Permitting

Title

Author

Posted Date

Gas Processing Plant Application for Current Permitting submitted by the proponent Kitimat LNG. (prop) to John Bones (EAO) on June 6 2005Rosemary Boulton, Kitimat LNG Inc2005/06/09
Pipeline Lateral and Natural Gas Liquid Lines Application for Current Permitting submitted by the proponent Kitimat LNG. (prop) to John Bones (EAO) on June 6 2005Rosemary Boulton, Kitimat LNG Inc2005/06/09
Transmission Line Application for Current Permitting submitted by the proponent Kitimat LNG. (prop) to John Bones (EAO) on June 6 2005Rosemary Boulton, Kitimat LNG Inc2005/06/09

Completed / Certified

Notices - News Releases

Title

Author

Posted Date

Public Comment Period December 10-24, 2008 for the Proposed Amendment to the EA Certificate for the Kitimat Liquefied Natural Gas Terminal Project  2008/12/02
MoE Information Bulletin - EA Certificate Issued for Kitimat Liquefied Natural Gas Terminal Project  2006/06/06

EA Certificate Documentation

Title

Author

Posted Date

MoE Information Bulletin - EA Certificate Issued for Kitimat Liquefied Natural Gas Terminal Project  2006/06/06
Kitimat LNG - Recommendations of the Executive Director and Reasons for RecommendationsJohn Bones, Environmental Assessment Office2006/06/06
Kitimat LNG - Executive SummaryJohn Bones, Environmental Assessment Office2006/06/06
Kitimat LNG - Project Assessment Report and Comprehensive Study ReportJohn Bones, Environmental Assessment Office2006/06/06
Environmental Assessment Certificate #E06-01 for the Kitimat Liquefied Natural Gas Terminal ProjectJohn Bones, Environmental Assessment Office2006/06/06

Amendment Certificate

Title

Author

Posted Date

Amendment Certificate #1 to the Certificate dated Jan 9, 2009 signed by Robin Junger  2009/01/12
Decision Note dated January 7, 2009 signed by Robin Junger  2009/01/12

Amendment to Certificate Documentation

Title

Author

Posted Date

Amendment Issues Tracking Table  2009/01/07
Email dated Dec 24/08 from Robin Woodworth to EAO re: Comment on the Amendment to the application for the Kitimat LNG Project  2009/01/05
December 16, 2008, letter from District of Kitimat  2008/12/23
Letter dated Dec 10/08 from Margerate Bakelaar (CEAA) to Kevin Miller (Litimat LNG Inc.) Re: outlining the results of the Federal Coordination regulation circulation of the revised Project Description  2008/12/12
Email from Walter Thorne, Dennis Horwood, April MacLeod, Lois Marleau, and Shirley Hill re: Comment on the Amendment  2008/12/12
Letter dated Nov 20/08 from Graeme McLaren (EAO) to Kevin Miller (Kitimat LNG) re: requesting amendment to EA Certificate E06-01  2008/11/20
Application for Certificate Amendment - Cover Letter - Nov 14/08  2008/11/14
Application for Certificate Amendment -Nov 14/08  2008/11/14
Application for Certificate Amendment - Appendix A - Import Facility Plot Plan - Nov 14/08  2008/11/14
Updated Revised Project Description - October 23, 2008  2008/10/24
Email dated Sept 24/08 from Kevin Miller (Kitimat LNG) to Graeme McLaren (EAO) re: EA Certificate Amendment  2008/10/10
Email dated Oct 9/08 from David Eirikson (EA) to Kevin Miller (Kitimat LNG) re: EA Certificate Amendment  2008/10/10
Last Updated: 2009-11-20
Copyright.Disclaimer.Privacy.Accessibility.