East Toba River Montrose Creek Hydroelectric Project

Type:Typical EA Process (Active and Complete)Status:Completed / Certified
Category:EnergyPre-application

Start Date:

2004/09/17
 

Document Index

Pre-Application

Application Terms of Reference/Information Requirements

Title

Author

Posted Date

Terms of Reference dated Nov. 28/05 from Plutonic Power Corp. (Proponent) to Sue Bonnyman (EAO) for the East Toba River and Montrose Creek Hydroelectric ProjectRobert M. Poore, Plutonic Power Corporation2005/12/05

EAO Generated Documents

Title

Author

Posted Date

Order Under Section 11 dated Dec. 1/05 and signed by Sue Bonnyman (EAO)Sue Bonnyman, Environmental Assessment Office2005/12/02
Letter dated Dec. 1/05 from Sue Bonnyman (EAO) to Donald McInnes (Proponent) regarding the section 11 Order and Final Draft Terms of Reference for the ProjectSue Bonnyman, Environmental Assessment Office2005/12/02
Order Under Section 10(1)(c) issued by Sue Bonnyman (EAO) and dated Sept. 16/04. Letter dated Sept. 16/04 from Sue Bonnyman to Donald McInnes (Proponent) regarding the Section 10 OrderSue Bonnyman, Environmental Assessment Office2004/09/21

Proponent Comments/Correspondence

Title

Author

Posted Date

Project description for the East Toba River and Montrose Creek Hydroelectric Projects submitted by Donald McInnes, Plutonic Power Corp. (Proponent) to Sue Bonnyman (EAO) Sept. 17/04Donald McInnes, Plutonic Power Corporation2004/09/17

Under Review

Application and Supporting Studies

Title

Author

Posted Date

Small Hydro Projects: Archaeological Impact Assessment dated Sept. 19/06 for the East Toba River/Montrose Creek Hydroelectric ProjectOscar Gustafson, Knight Piesold Ltd.2006/12/27
Supplemental Report - Small Hydro Projects: Archaeological Impact Assessment dated July 5/06 for the East Toba River/Montrose Creek Hydroelectric Project Chris Brodie, Knight Piesold Ltd.2006/08/08
Application for an Environmental Assessment Certificate for the East Toba River and Montrose Creek Hydroelectric Project submitted by Plutonic Power Corporation to Sue Bonnyman (EAO) on January 16 2006.Donald McInnes, Plutonic Power Corporation2006/01/16
Appendices to Application for an Environmental Assessment Certificate for the East Toba River and Montrose Creek Hydroelectric Project submitted by Plutonic Power Corporation to Sue Bonnyman (EAO) Jan 16 2006Donald McInnes, Plutonic Power Corporation2006/01/16

Aboriginal Comments/Submissions

Title

Author

Posted Date

Email dated Jan. 26/06 from Ken Brown (Klahoose First Nation) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project Ken Brown, Klahoose First Nation2006/01/27
Public Input Form and Letter received Jan. 25/06 from Ken Brown (Klahoose First Nation) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project Ken Brown, Klahoose First Nation2006/01/26

EAO Generated Documents

Title

Author

Posted Date

Time Limit Extension Order signed by Joan Hesketh, extending the time limit to March 13/07Joan Hesketh, Environmental Assessment Office2007/03/13
Letter dated Feb. 13/07 from Sue Bonnyman (EAO) to Donald McInnes (Plutonic Power) advising that the legislated time limit for completing the review of the Project Application is again in effectSue Bonnyman, Environmental Assessment Office2007/02/19
Final Summary Notes from the Nov. 10/06 Fisheries-Hydrology Working Group Meeting for the East Toba River/Montrose Creek Hydroelectric Project Greg Ashcroft, Environmental Assessment Office2006/12/13
Letter dated Nov. 9/06 from Sue Bonnyman (EAO) to Donald McInnes (Plutonic Power Corporation) regarding the timeline suspension for the East Toba River/Montrose Creek Hydroelectric Project Sue Bonnyman, Environmental Assessment Office2006/11/15
Final Summary Notes from the May 10/06 Wildlife Technical Working Group Meeting for the East Toba River/Montrose Creek Hydroelectric Project Greg Ashcroft, Environmental Assessment Office2006/08/30
Final Summary Notes from the May 31/06 Wildlife Technical Working Group Meeting for the East Toba River/Montrose Creek Hydroelectric Project Greg Ashcroft, Environmental Assessment Office2006/08/30
Final Summary Notes from the July 6/06 Fisheries Issues Meeting for the East Toba River/Montrose Creek Hydroelectric Project Greg Ashcroft, Environmental Assessment Office2006/08/30
Final Summary Notes from the May 25/06 Fisheries Technical Committee Meeting for the East Toba River/Montrose Creek Hydroelectric Project Greg Ashcroft, Environmental Assessment Office2006/07/27
Final Summary Notes from the June 14/06 Wildlife Technical Working Group Conference Call for the East Toba River/Montrose Creek Hydroelectric Project Greg Ashcroft, Environmental Assessment Office2006/07/27
Letter dated July 10/06 from Sue Bonnyman (EAO) to Donald McInnes (Plutonic Power Corporation) suspending the East Toba River/Montrose Creek Project Application Review period until Sept. 29/06, to resume on Oct. 2/06 Sue Bonnyman, Environmental Assessment Office2006/07/18
Final Summary Notes from the Mar. 1/06 Hydrology/Fisheries Technical Working Group Meeting for the East Toba River/Montrose Creek Hydroelectric Project Roger Tailleur, Environmental Assessment Office2006/06/12
Final Summary Notes from the Mar. 17/06 Wildlife Technical Working Group Meeting for the East Toba River/Montrose Creek Hydroelectric Project Roger Tailleur, Environmental Assessment Office2006/05/31
Final Summary Notes from the Feb. 9/06 Working Group Meeting for the East Toba River/Montrose Creek Hydroelectric Project Roger Tailleur, Environmental Assessment Office2006/05/01
Letter dated Apr 2/06 from Sue Bonnyman (EAO) to Donald McInnes (Plutonic Power Corporation) regarding environmental assessment reviews and the current treaty process in BC Sue Bonnyman, Environmental Assessment Office2006/04/24
Email dated Mar. 6/06 from Sue Bonnyman (EAO) to Donald McInnes (Plutonic Power Corporation) regarding the public comment period and issue tracking table for the East Toba River/Montrose Creek ProjectSue Bonnyman, Environmental Assessment Office2006/03/09
Letter dated Jan. 15/06 from Sue Bonnyman (EAO) to Donald McInnes (Plutonic Power Corp.) acknowledging receipt of a Jan. 12/06 letter, Environmental Assessment Certificate Application and Concurrent Permit Applications for the ProjectSue Bonnyman, Environmental Assessment Office2006/01/30

Federal Comments/Submissions

Title

Author

Posted Date

Email from Dave Carter (CEAA) to Sue Bonnyman (EAO) and a letter dated June 29/06 from Martin Magne (Parks Canada) regarding the East Toba River/Montrose Creek Hydroelectric Project Archaeological Impact Assessment Report Dave Carter, Canadian Environmental Assessment Agency2006/08/16
Letter dated May 11/06 from Debra Hughes (DFO) to Dave Carter (CEAA) with comments on the East Toba River/Montrose Creek Project ApplicationDebra Hughes, Fisheries and Oceans Canada2006/05/16
Email dated Feb. 28/06 from Jo-Anne McDonald (Transport Canada) c/o Tony Epp to Roger Tailleur (EAO) with comments on the East Toba River/Montrose Creek Project Application Jo-Anne McDonald, Transport Canada2006/03/14

Local Government Comments/Submissions

Title

Author

Posted Date

Letter dated March 21/06 from Donald G. Turner (Powell River Regional District) to Roger Tailleur (EAO) with comments on the East Toba River/Montrose Creek ProjectDon Turner, Powell River Regional District2006/03/27

Notices - News Releases

Title

Author

Posted Date

Public Comment Invited on the Application for the Proposed East Toba River/Montrose Creek Run of River Hydroelectric Project. Public Open House Meetings: Feb. 15/06 Powell River, Feb. 16/06 SecheltSue Bonnyman, Environmental Assessment Office2006/02/02
Public Comment Invited on the Application for the Proposed East Toba River/Montrose Creek Run of River Hydroelectric Project, Feb. 1/06 - Mar 2/06Sue Bonnyman, Environmental Assessment Office2006/01/20

Provincial Govt Comments/Submissions

Title

Author

Posted Date

Memo dated Oct. 18/06 from Scott Babakaiff (MOE) to Mike Willcox (MOE) regarding the "Review of Response to Fish Presence/Absence, Instream Flow, and Operations Monitoring Plan Issues" for the ProjectScott Babakaiff, Ministry of Environment (ESD)2006/11/02
Memo dated June 28/06 from Scott Babakaiff to Mike Willcox (Ministry of Environment) in Response to MOE Comments from Tom Bell on the East Toba River/Montrose Creek Project Application ReportScott Babakaiff, Ministry of Environment (ESD)2006/08/01
Memo dated June 19/06 from Scott Babakaiff to Mike Willcox (Ministry of Environment) regarding the Review of Additional Hydrogeological Information to Supplement the East Toba River/Montrose Creek Project Application Report Scott Babakaiff, Ministry of Environment (ESD)2006/08/01
Letter dated Mar. 21/06 from Tom Bell (Ministry of Environment) to Sue Bonnyman (EAO) with comments on the project Application - surface hydrology and instream flow requirementsTom Bell, Ministry of Environment2006/03/23
Letter dated Mar. 8/06 from Chris Morgan (Ministry of Environment) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project ApplicationChris Morgan, Ministry of Environment (WSD)2006/03/09
Email dated Mar. 3/06 from Steve Waghorn (Ministry of Forests and Range) to Keith Ainsley (Knight Piesold) with comments on the East Toba River/Montrose Creek Project Application Steve Waghorn, Ministry of Forests2006/03/09
Email dated Mar. 6/06 from Steve Waghorn (Ministry of Forests and Range) to Roger Tailleur (EAO) with comments on the East Toba River/Montrose Creek Project Application Steve Waghorn, Ministry of Forests2006/03/09
Email dated Feb. 28/06 from Roger McLaughlin (MEMPR) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project ApplicationRoger McLaughlin, Ministry of Energy, Mines and Petroleum Resources2006/03/01
Letter dated Feb. 17/06 from Paul Martiquet (Vancouver Coastal Health) to Roger Tailleur (EAO) with comments on the East Toba River/Montrose Creek Project ApplicationPaul Martiquet, Vancouver Coastal Health2006/02/24
Email dated Jan. 30/06 from Mike Willcox (Ministry of Environment) in reply to Alan Rebane's (Pacific Mountain Outfitters) Jan. 27/06 emails regarding the East Toba River/Montrose Creek Project ApplicationMike Willcox, Ministry of Environment (ESD)2006/01/31

Proponent Comments/Correspondence

Title

Author

Posted Date

First Nation Issues Tracking Table dated Jan. 5/07Michael Steele, Knight Piesold Ltd.2007/02/12
Response dated Feb. 6/07 to DFO information requirements concerning ongoing review of the East Toba River/Montrose Creek Hydroelectric ProjectChris Brodie, Knight Piesold Ltd.2007/02/07
Letter/report dated Dec. 13/06 from Chris Roddan (Shearwater Services Ltd.) to Grig Cook (Plutonic Power Corporation) regarding the Mar. 2/06 document from Cascadia Forest Products Ltd. regarding the Project ApplicationChris Roddan, Shearwater Services Ltd.2006/12/21
Letter dated Dec. 14/06 from Oscar Gustafson (Knight Piesold) to Sue Bonnyman (EAO) regarding Stream Diversion Environmental Considerations - Follow Up to Actions Items from the Nov. 10/06 Fisheries WG MeetingOscar Gustafson, Knight Piesold Ltd.2006/12/19
Letter dated July 10/06 from Robert Poore (Plutonic Power Corporation) to Sue Bonnyman (EAO) requesting that the review of the East Toba/Montrose Creek Hydroelectric Project be suspended until Sept. 29/06 Robert M. Poore, Plutonic Power Corporation2006/10/31
Letter dated Oct. 11/06 from Oscar Gustafson (Knight Piesold Ltd.) to Sue Bonnyman (EAO) in Response to (DFO) Information Requirements Concerning the East Toba River/Montrose Creek Hydroelectric ProjectOscar Gustafson, Knight Piesold Ltd.2006/10/19
Report on Upper East Toba and Upper Montrose Creek Fisheries Assessments dated Sept. 2006 prepared by Shawn Hamilton and Associates for Knight Piesold Ltd.Oscar Gustafson, Knight Piesold Ltd.2006/10/17
Letter dated Oct. 10/06 from Keith Ainsley (Knight Piesold Ltd.) to Grig Cook (Plutonic Power Corporation) regarding the East Toba/Montrose Creek Hydroelectric Project Access Road Alternatives Assessment in Response to (DFO) RequirementsKeith Ainsley, Knight Piesold Ltd.2006/10/17
Letter dated Oct. 6/06 from Oscar Gustafson (Knight Piesold Ltd.) to Sue Bonnyman (EAO) regarding Fish Presence/Absence, Instream Flow and Operations Monitoring Plan issues identified by (MOE) for the Project. Tables and Figures Attached.Oscar Gustafson, Knight Piesold Ltd.2006/10/16
Email dated June 22/06 from Samuel Mottram (Knight-Piesold Ltd.) to Sue Bonnyman (EAO) and a Hydrological Analysis Table in response to comments received from Scott Babakaiff (MOE) Sam Mottram, Knight Piesold Ltd.2006/08/01
Letter dated June 9/06 and Additional Hydrological Information to Supplement the East Toba River/Montrose Creek Hydroelectric Project Application ReportSam Mottram, Knight Piesold Ltd.2006/06/13
Public and First Nations Consultation Report dated May 17/06 with Appendices A-L for the East Toba River/Montrose Creek ProjectMarc J. Stachiw, Plutonic Power Corporation2006/05/19
Figures 1-15 and letter dated May 11/06 from Oscar Gustafson and Chris Brodie (Knight Piesold Ltd.) to Sue Bonnyman (EAO) in response to comments from Fisheries and Oceans Canada on the East Toba River/Montrose Creek Project ApplicationOscar Gustafson, Knight Piesold Ltd.2006/05/19
Letter dated May 12/06 from Keith Ainsley and Sam Mottram (Knight Piesold Ltd.) to Sue Bonnyman (EAO) with transmission line artistic renditions for the East Toba River/Montrose Creek ProjectKeith Ainsley, Knight Piesold Ltd.2006/05/19
Letter dated May 11/06 from Oscar Gustafson and Chris Brodie (Knight Piesold Ltd.) to Sue Bonnyman (EAO) in response to comments from Tom Bell (MOE) regarding the East Toba River/Montrose Creek Application ReportOscar Gustafson, Knight Piesold Ltd.2006/05/19
Letter dated May 17/06 from Marc J. Stachiw (Plutonic Power Corporation) to Sue Bonnyman (EAO) in response to Government Agency and Public Application Review Comments on the East Toba River/Montrose Creek Project. (Attachments posted separately).Marc J. Stachiw, Plutonic Power Corporation2006/05/19
Table 1: Application Document Review Agency Wildlife/Vegetation Issues Tracking Table for the East Toba River/Montrose Creek ProjectMarc J. Stachiw, Plutonic Power Corporation2006/05/19
Table 2: Application Document Review Issues Tracking Table - Additional Agency Comments for the East Toba River/Montrose Creek ProjectMarc J. Stachiw, Plutonic Power Corporation2006/05/19
Letter dated May 3/06 from Keith Ainsley (Knight Piesold Consulting) to Sue Bonnyman (EAO) in response to Cascadia Forest Products Ltd.'s concerns regarding the proposed East Toba/Montrose Creek Project Transmission Line Keith Ainsley, Knight Piesold Ltd.2006/05/09
Email dated Mar. 15/06 from Oscar Gustafson (Knight Piesold Ltd.) to Sue Bonnyman with Revision 2 of Table 5.4 of the East Toba River/Montrose Creek Project Application reportOscar Gustafson, Knight Piesold Ltd.2006/03/17

Public Comments/Submissions

Title

Author

Posted Date

Email dated Mar. 2/06 from Greg Ferguson (Sechelt, BC ) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project Greg Ferguson2006/04/26
Email dated Feb. 24/06 from Brian Smart (Smart Forest Planning) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project Brian R. Smart, Smart Forest Planning2006/03/17
Email dated Mar. 1/06 from Bill Wheeler (Manson's Landing, BC) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project Bill Wheeler2006/03/06
Email dated Mar. 1/06 from Terry L. Brown (Powell River, BC) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project Terry L. Brown2006/03/06
Letter dated Feb. 24/06 from Katherine Smail, Executive Director (Friends of Cortes Island Society) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project Katherine Smail, Friends of Cortes Island Society2006/03/06
Letter submission dated Mar. 2/06 from J. Walter Cowlard, Planning Superintendent (Cascadia Forest Products Ltd.) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project J. Walter Cowlard, Cascadia Forest Products Ltd.2006/03/06
Email dated Mar. 2/06 from Liz Richardson (Manson's Landing, BC) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project Elizabeth Richardson2006/03/06
Jan. 18/06 Cortes Island Open House Public Input Form received Feb. 24/06 from Fred Zwickel (Manson's Landing, BC) with comments on the East Toba River/Montrose Creek Project Fred Zwickel2006/03/02
Jan. 18/06 Cortes Island Open House Public Input Form received Feb. 24/06 from Ruth Zwickel (Manson's Landing, BC) with comments on the East Toba River/Montrose Creek ProjectRuth Zwickel2006/03/02
Jan. 20/06 Powell River Open House Public Input Form received Feb. 24/06 from Vicki Gillis (Gibson's, BC) with comments on the East Toba River/Montrose Creek Project Vicki Gillis2006/03/02
Jan. 18/06 Cortes Island Open House Public Input Form received Feb. 24/06 from Trude and Sedley Sweeny (Cortes Island, BC) with comments on the East Toba River/Montrose Creek Project Sedley Sweeny and Trude Albright-Sweeny2006/03/02
Email/letter submission received Feb. 27/06 from J.R. Nursall (Whaletown, BC) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project J. R. Nursall2006/03/02
Email dated Feb. 28/06 from Conrad Dombrowski (Manson's Landing, BC) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project Conrad Dombrowski2006/03/02
Email dated Feb. 25/06 from Garvin Morris (Manson's Landing, BC) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project Garvin Morris2006/03/01
Feb. 15/06 Powell River Open House Public Comment Form received Feb. 23/06 from Lori Burge (Lund, BC) regarding the East Toba River/Montrose Creek Project Lori Burge2006/02/24
Feb. 15/06 Powell River Open House Public Comment Form received Feb. 23/06 from Mike Burge (Lund, BC) regarding the East Toba River/Montrose Creek Project Mike Burge2006/02/24
Jan. 18/06 Cortes Island Open House Public Input Form received Feb. 23/06 from K. Mansfield (Manson's Landing, BC) with comments on the East Toba River/Montrose Creek Project K. Mansfield2006/02/23
Jan. 18/06 Cortes Island Open House Public Input Form received Feb. 23/06 from Barry Saxifrage (Manson's Landing, BC) with comments on the East Toba River/Montrose Creek Project Barry Saxifrage2006/02/23
Jan. 18/06 Cortes Island Open House Public Input Form received Feb. 23/06 from Carrie Saxifrage (Manson's Landing, BC) with comments on the East Toba River/Montrose Creek Project Carrie Saxifrage2006/02/23
Jan. 18/06 Cortes Island Open House Public Input Form received Feb. 23/06 from Bill Wheeler (Manson's Landing, BC) with comments on the East Toba River/Montrose Creek Project Bill Wheeler2006/02/23
Jan. 18/06 Cortes Island Open House Public Input Form received Feb. 23/06 from Mary Clare Preston (Manson's Landing, BC) with comments on the East Toba River/Montrose Creek Project Mary Clare Preston2006/02/23
Jan. 18/06 Cortes Island Open House Public Input Form received Feb. 23/06 from Christopher Hatch (Cortes Island, BC) with comments on the East Toba River/Montrose Creek Project Christopher Hatch2006/02/23
Letter received Feb. 8/06 from R. Fitzgerald on behalf of The Butterfly Enthusiasts Club (Powell River, BC) to (EAO) with comments on the East Toba River/Montrose Creek Project R. Fitzgerald, The Butterfly Enthusiasts Club2006/02/08
Two emails dated Jan. 27/06 from Alan Rebane (Pacific Mountain Outfitters) to Sue Bonnyman (EAO) and Mike Willcox (Ministry of Environment) with comments on the East Toba River/Montrose Creek Project Alan Rebane, Pacific Mountain Outfitters Ltd.2006/01/31
Email dated Jan. 30/06 from David Shipway (Manson's Landing, BC) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project David Shipway2006/01/31
Letter dated Jan. 26/06 from Lorraine Flynn and Family (Campbell River, BC) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project Lorraine Flynn and Family2006/01/31
Public Input Form received Jan. 27/06 from Clayton Brown (BC) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project Clayton Brown2006/01/27
Email dated Jan. 27/06 from David Shipway (Manson's Landing, BC) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project David Shipway2006/01/27
Email dated Jan. 23/06 from Ken Collins to (EAOINFO) with comments on the East Toba River/Montrose Creek Project Ken Collins2006/01/27
Letter dated Jan. 19/06 from Sedley Sweeny and Trude Albright-Sweeny (Whaletown, BC) to Sue Bonnyman (EAO) with comments on the East Toba River/Montrose Creek Project Sedley Sweeny and Trude Albright-Sweeny2006/01/26
Sign in Sheet and Public Input Forms received Jan. 20/06 at the Sechelt Open House with comments on the East Toba River/Montrose Creek Project Sue Bonnyman, Environmental Assessment Office2006/01/26
Public Input Forms received Jan. 18/06 at the Cortes Island Open House with comments on the East Toba River/Montrose Creek Project Sue Bonnyman, Environmental Assessment Office2006/01/24
Sign in Sheet and Public Input/Comment Forms received Jan. 19/06 at the Powell River Open House regarding the East Toba River/Montrose Creek Project Sue Bonnyman, Environmental Assessment Office2006/01/24
Sign in Sheet and Public Comment Forms received Jan. 12/06 at the Powell River Open House regarding the East Toba River/Montrose Creek Project Sue Bonnyman, Environmental Assessment Office2006/01/24

Concurrent Permitting

Title

Author

Posted Date

Application from Plutonic Power Corp. (prop) requesting Concurrent Permitting for Crown Land Tenure and Water Licence Applications under the Land Act and Water Act. Submitted to Sue Bonnyman (EAO) on Jan 12/06. **Additional permits added**Donald McInnes, Plutonic Power Corporation2006/01/18

Completed / Certified

Notices - News Releases

Title

Author

Posted Date

Information Bulletin - East Toba River Montrose Creek Hydro Project Approved  2007/04/25

EA Certificate Documentation

Title

Author

Posted Date

Environmental Assessment Certificate E07-01 for the East Toba River Montrose Creek Hydroelectric Project issued April 24/07Joan Hesketh, Environmental Assessment Office2007/04/25
East Toba River Montrose Creek Hydroelectric Project Recommendations of the Executive Director and Reasons for the Recommendations dated March 12/07  2007/04/25
East Toba River Montrose Creek Hydroelectric Project Assessment Report and Appendicies dated March 12/07  2007/04/25
Information Bulletin - East Toba River Montrose Creek Hydro Project Approved  2007/04/25

Amendment Certificate

Title

Author

Posted Date

Amendment #2 to the East Toba River Montrose Creek Hydroelectric Project Environmental Assessment Certificate E07-01 issued July 17/07 Derek Griffin, Environmental Assessment Office2007/07/17
Amendment #3 to the East Toba River Montrose Creek Hydroelectric Project Environmental Assessment Certificate E07-01 issued July17/07 Derek Griffin, Environmental Assessment Office2007/07/17
Amendment #1 to the East Toba River Montrose Creek Hydroelectric Project Environmental Assessment Certificate E07-01 issued June 12/07Joan Hesketh, Environmental Assessment Office2007/06/12

Post Certificate Documentation

Title

Author

Posted Date

Letter dated July 10/07 from Peter Wong (Proponent) to Derek Griffin (EAO) and Environmental Assessment Certificate E07-01 Status Report Number 1 Peter Wong, Toba Montrose Hydro Inc.2007/07/11