Pre-Application |
Application Terms of Reference/Information Requirements |
Title | Author | Posted Date |
| Approved Terms of Reference for the Bear Mountain Wind Park Project dated July 25, 2006 | TJ Schur, Aeolis Wind Power Corporation | 2006/08/09 |
| Draft Terms of Reference for the Environmental Assessment Application under the B.C. Environmental Assessment Act for the Proposed Bear Mountain Wind Park Project dated April, 2006. | TJ Schur, Bear Mountain Wind LP | 2006/04/20 |
EAO Generated Documents |
Title | Author | Posted Date |
| Order under section 13 of the EA Act signed by Martha Anslow (EAO, Project Assessment Manager) dated Nov 27/06. | Martha Anslow, Environmental Assessment Office | 2006/11/28 |
| Letter dated Nov 19/06 from Martha Anslow (EAO) to TJ Schur (BMWLP) re: Application for the Bear Mountain Wind Park Project pursuant to the EA Act - Public Consultation Assessment and First Nations Consultation Assessment | Martha Anslow, Environmental Assessment Office | 2006/11/20 |
| Order under section 11 of the EA Act signed by Alan Calder (EAO, Project Assessment Manager) dated Apr 28/06. | Alan Calder, Environmental Assessment Office | 2006/05/01 |
| Order under section 10(1)(c) of the EA Act signed by Alan Calder (EAO, Project Assessment Manager) dated Nov 01/05. |
| 2005/11/01 |
Notices - News Releases |
Title | Author | Posted Date |
| Public invited to comment on the draft Terms of Reference for the proposed Bear Mountain Wind Park Project from May 2 to 31, 2006. | Alan Calder, Environmental Assessment Office | 2006/04/20 |
Proponent Comments/Correspondence |
Title | Author | Posted Date |
| Public Issues Tracking document dated July 14/06 with respect to the Application Terms of Reference for Bear Mountain Wind Park Project with attached Fact Sheet and report on Wind Turbine Acoustic Noise | TJ Schur, Aeolis Wind Power Corporation | 2006/07/20 |
| Letter dated Oct 27/05 from TJ Schur (Aeolis Wind Power Corporation) to Joan Hesketh (EAO) regarding the proposed Bear-Kiskatinaw Wind Park Project. Project description dated Oct/05 attached. |
| 2005/11/01 |
Public Comments/Submissions |
Title | Author | Posted Date |
| Email dated May 31/06 from Meredith Thornton (Timberline Trail & Nature Club) to EAOINFO regarding comments on the draft Terms of Reference for the Bear Mountain Wind Park Project. |
| 2006/06/01 |
| Letter dated May 31/06 from Shawn and Shawnese Trottier (public) to Alan Calder (EAO) regarding comments on the draft Terms of Reference for the Bear Mountain Wind Park Project. | Shawn and Shawnese Trottier | 2006/05/31 |
| Email dated May 30/06 from Bill Taylor (Dawson Creek) to EAOINFO regarding comments on the draft Terms of Reference for the Bear Mountain Wind Park Project. | Bill Taylor | 2006/05/31 |
Under Review |
Application and Supporting Studies |
Title | Author | Posted Date |
| Letter from Ruth Hardy (Hemmera) to Martha Anslow (EAO) dated February 26/07 regarding Errata to Bear Mountain Wind Park Application | Ruth Hardy, Hemmera | 2007/02/27 |
| Volume 1. Main Document - Application for an Environmental Assessment Certificate for the Bear Mountain Wind Park Project submitted by Bear Mountain Wind LP to Martha Anslow (EAO) November 2006. | TJ Schur, Bear Mountain Wind LP | 2006/11/29 |
| Volume 2. Appendices - Application for an Environmental Assessment Certificate for the Bear Mountain Wind Park Project submitted by Bear Mountain Wind LP to Martha Anslow (EAO) November 2006. | TJ Schur, Bear Mountain Wind LP | 2006/11/29 |
Aboriginal Comments/Submissions |
Title | Author | Posted Date |
| Report on First Nations and Kelly Lake Communities consultation program |
| 2007/03/20 |
| First Nations and Kelly Lake Communities comments and proponent responses tracking table |
| 2007/03/20 |
EAO Generated Documents |
Title | Author | Posted Date |
| Letter dated June 27/07 from Martha Anslow (EAO) to TJ Schur (BMWP) regarding resumption of the project | Martha Anslow, Environmental Assessment Office | 2007/07/03 |
| Letter dated May 10/07 from Derek Griffin (EAO) to TJ Schur (BMWP) regarding project suspension | Derek Griffin, Environmental Assessment Office | 2007/06/01 |
| Summary of the Advisory Working Group Meeting of Mar 23/07 |
| 2007/04/05 |
| Advisory Working Group Meeting Summary dated from January 11, 2007 regarding the proposed Bear Mountain Wind Park Project |
| 2007/03/02 |
| Letter dated Dec 12/06 from Martha Anslow (EAO) to TJ Schur (Proponent) accepting the application for the proposed Bear Mountain Wind Project for formal review | Martha Anslow, Environmental Assessment Office | 2006/12/15 |
Federal Comments/Submissions |
Title | Author | Posted Date |
| Letter dated May 3/07 from Andrew Robinson (CWS/EC) to Martha Anslow (EAO) regarding Preliminary CWS Literature Review - Impacts to Birds and Bats | Andrew G. Robinson, Environment Canada - CWS | 2007/06/01 |
| Letter from Adam La Rusic (Environment Canada) to Martha Anslow (EAO) dated February 14/07 regarding the Environment Canada Comments on the Application for Bear Mountain Wind Park | Adam La Rusic, Environment Canada | 2007/02/27 |
| Letter from Dale Desrochers (DFO) to Linda Sullivan (CEAA) dated January 3/07 regarding the proposed Bear Mountain Wind Project | Dale Desrochers, Fisheries and Oceans Canada | 2007/02/27 |
Local Government Comments/Submissions |
Title | Author | Posted Date |
| Email dated Mar 15/07 from Dr Charl Badenhorst (Northern Health) to Martha Anslow (EAO) re: comment on the Bear Mountain Wind Project | Charl Badenhorst, Northern Health | 2007/03/20 |
| Email dated Mar 15/07 from Bruce Simard (PRRD) to Martha Anslow (EAO) re: comment on the Bear Mountain Wind Project | Bruce Simard, Peace River Regional District | 2007/03/16 |
| Email from Jim Chute (City of Dawson Creek) to Nicole Vinette (EAO) dated February 20/07 regarding the proposed Bear Mountain Wind Project - Advisory WG Meeting Summary | Jim Chute, City of Dawson Creek | 2007/02/27 |
Notices - News Releases |
Title | Author | Posted Date |
| Notice for Public Meetings January 10 and 11/07 |
| 2007/01/05 |
| Invitation to Comment on Bear Mountain Wind Project Environmental Assessment Certificate Application - Dec 7/06 to Feb 4/07 | Martha Anslow, Environmental Assessment Office | 2006/11/29 |
Provincial Govt Comments/Submissions |
Title | Author | Posted Date |
| Bear Mountain Wind Park Project Peace Region Ministry of Environment comments to the draft Regulatory Agency Issues Tracking Table, March 2007 | Graham Suther, Ministry of Environment | 2007/06/01 |
| Summary of Risks to Environmental Values dated April 27/07 submitted by Ministry of Environment re: Bear Mountain Wind Park Project |
| 2007/05/11 |
| Email from Ian Wiles (Forest) to Nicole Vinette (EAO) dated May 9/07 regarding the proposed Bear Mountain Wind Project | Ian Wiles, Ministry of Forests and Range | 2007/05/09 |
| Email from Kerry Clark (MAL) to Martha Anslow (EAO) dated April 5/07 regarding the proposed Bear Mountain Wind Project | Kerry Clark, Agriculture and Lands | 2007/04/10 |
| Email dated Mar 1/07 from Graham Suther (ENV) to Martha Anslow (EAO) re: comment on the Bear Mountain Wind Project | Graham Suther, Ministry of Environment | 2007/03/07 |
| Email from Neil Banera (MEMPR) to Martha Anslow (EAO) dated February 27/07 regarding the proposed Bear Mountain Wind Project | Neil Banera, Ministry of Energy, Mines and Petroleum Resources | 2007/03/01 |
| Letter from Graham Suther (Ministry of Environment) to Martha Anslow (EAO) dated February 8/07 regarding the proposed Bear Mountain Wind Project | Graham Suther, Ministry of Environment | 2007/02/27 |
Proponent Comments/Correspondence |
Title | Author | Posted Date |
| Letter dated July 11/07 from TJ Schur (BMWP) to Martha Anslow (EAO) re: Bear Mountain Wind Park Project and Wind Power Projects on Crown Land Policy | TJ Schur, Bear Mountain Wind LP | 2007/07/18 |
| Final Summary of Commitments and attachment from Bear Mountain Wind LP regarding proposed project | TJ Schur, Bear Mountain Wind LP | 2007/07/18 |
| Regulatory Agency Issues Table and Proponent Responses for proposed Bear Mountain Wind Park Project | TJ Schur, Bear Mountain Wind LP | 2007/07/18 |
| Public comments and proponent responses tracking table |
| 2007/07/16 |
| Bear Mountain Wind Park Project Supplemental Water Supply Report, April 2007 prepared by Hemmera | Ruth Hardy, Hemmera | 2007/06/01 |
| Letter dated May 9/07 from TJ Schur (BMWP) to Graham Suther (MOE) regarding summary of risks to environmental values | TJ Schur, Bear Mountain Wind LP | 2007/06/01 |
| Letter dated May 3/07 from Ruth Hardy (Hemmera) to Graham Suther (MOE) regarding agency comments | Ruth Hardy, Hemmera | 2007/06/01 |
| Letter dated May 25/07 from Paul Kerlinger (Curry & Kerlinger) to TJ Schur (BMWP) regarding Bird & Bat Risk Monitoring / Assessment |
| 2007/06/01 |
| Letter dated Mar 20/07 from Ruth Hardy (Hemmera) to Martha Anslow (EAO) re: Bear Mountain Wind Park EA Application Review | Ruth Hardy, Hemmera | 2007/03/20 |
Public Comments/Submissions |
Title | Author | Posted Date |
| Report on public consultation program |
| 2007/03/20 |
| Email dated Feb 26/07 from Sindy Keith to Martha Anslow (EAO) re: comment on the Bear Mountain Wind Project |
| 2007/03/01 |
| Email dated Feb 6/07 from Shawn Trottier (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/07 |
| Letter dated Feb 4/07 from Carol Erickson (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 5/07 from Meredith Thornton (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Public Comment Form dated Jan 11/07 from Mike Finkle (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Letter dated Feb 4/07 from Joanne Dueck (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Public Comment Form dated Jan 11/07 from Linda Ash (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Letter dated Feb 4/07 from Doug Keith (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Letter dated Feb 4/07 from Carol Erickson (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Six submissions dated Feb 4/07 from Wayne Whitbread (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 3/07 from George Kunz (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Public Comment Form dated Jan 11/07 from Janice and Harold Hansen (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Jan 28/07 from Joyce Lee (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Jan 31/07 from Al and Mary Mottishaw (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 1/07 from Linda Marks (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 2/07 from Mayor Calvin Kruk, City of Dawson Creek to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 2/07 from Judi McGowan (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 2/07 from Barbara Glasier (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 2/07 from Ron Storie (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 2/07 from Greg Gilson (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 3/07 from Sindy Keith (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 3/07 from Ron and Mary Martens (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 4/07 from Alison Fraser (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 4/07 from Maria Schobert (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 4/07 from Jonathan Elden (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 4/07 from Carol Erickson and Donna Laveck (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 4/07 from Brett Wilson (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 4/07 from Marko Marjanovic (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 4/07 from Dr. Chris Garwah (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 4/07 from Brentt Ford (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 5/07 from Wayne Plenert (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 5/07 from Glen Welin (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 5/07 from Clint Shuman (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 5/07 from Sheila Hanshaw (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Letter dated Feb 5/07 from Donna Laveck (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 1/07 from David Kidd (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Letter dated Feb 1/07 from Danielle Lukovich and Brian Bedford (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Jan 11/07 from Keith Sundquist (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 6/07 from Fred Feddema (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 2/07 from Gerry Haines (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Jan 27/07 from Vicki Bouchard (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 5/07 from Allan and Cheri Hankins (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Jan 30/07 from Linda Ash (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Jan 30/07 from Franz Kratschat (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Jan 30/07 from Marc Michaud (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Jan 30/07 from Harvey Glasier (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Jan 30/07 from Jim Zacharias (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Jan 31/07 from Trent Ernst (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 1/07 from Lynn Potratz (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Dec 4/07 from Laurie Embree (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 1/07 from Bill Studley (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 1/07 from Gary Lowe (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Jan 30/07 from Al Mottishaw (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Letter dated Jan 31/07 from Earl Leer (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Public Comment Form dated Jan 11/07 from Darcy Friesen (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Public Comment Form dated Jan 11/07 from Murray Samuelson (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Public Comment Form dated Jan 11/07 from Mark Phinney (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Public Comment Form dated Jan 11/07 from Ralph Hawryluk (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Email dated Feb 1/07 from Donna Laveck (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/02/06 |
| Letter dated Jan 28/07 from Joanne Dueck (Dawson Creek) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/02/05 |
| Email letter from Pamela Wyant (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/02/05 |
| Email letter from Barbara J Frost (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/02/05 |
| Email letter from John Morrison (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/02/05 |
| Email letter from Jane Harper (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/02/05 |
| Email letter from Christabelle Kux-Kardos (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/02/05 |
| Email letter from Rupert Kirk (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/02/05 |
| Email letter from Hilary Crowley (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/02/05 |
| Email letter from Andrew Larstone & Family (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/02/05 |
| Email letter from Linda Eby (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/02/05 |
| Email letter from R Atkins (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/02/05 |
| Email letter from Michael Boronowski (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/02/05 |
| Email letter from Shauna Hill (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/02/05 |
| Email letter from Tim and Tracy Meszaros (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/02/05 |
| Email letter from Gordon Currie (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/02/05 |
| Public Comment Form from Shiela Murray (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/02/05 |
| Email letter from Marie McIvor (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/02/05 |
| Email dated Jan 26/07 from Barbara Swail (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/01/29 |
| Email dated Jan 26/07 from Barbara Swail (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/01/29 |
| Email dated Jan 26/07 from Marilyn Belak (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/01/29 |
| Email dated Jan 25/07 from Bill Taylor (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/01/29 |
| Email dated Jan 22/07 from Peter von Tiessenhausen (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/01/29 |
| Email dated Jan 21/07 from Susan Michaud (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/01/29 |
| Email letter from Daniel & Sharon Bell (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project |
| 2007/01/29 |
| Emails received Jan 11/07 and Jan 15/07 from Racquel Burke (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project | Martha Anslow, Environmental Assessment Office | 2007/01/19 |
| Letter dated Jan 5/07 from Chris and Tanya Thompson (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project | Martha Anslow, Environmental Assessment Office | 2007/01/19 |
| Email dated Jan 13/07 and form dated Jan 11/07 from Leslie Hawryluk (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project | Martha Anslow, Environmental Assessment Office | 2007/01/19 |
| Email dated Jan 9/07 from Pollyanne Moorman (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project | Martha Anslow, Environmental Assessment Office | 2007/01/19 |
| Letter dated Jan 11/07 from Carol Erickson (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project | Martha Anslow, Environmental Assessment Office | 2007/01/19 |
| Email dated Jan 11/07 from Carol Moorman (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project | Martha Anslow, Environmental Assessment Office | 2007/01/19 |
| Public Comment Form dated Jan 11/07 from Stacey Dayus (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project | Martha Anslow, Environmental Assessment Office | 2007/01/19 |
| Public Comment Form dated Jan 10/07 from John Blanchard (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Farm Project | Martha Anslow, Environmental Assessment Office | 2007/01/19 |
| Fax dated Jan 8/07 from Diane Fossum (Bear Mountain Grazing Association) to Martha Anslow (EAO) regarding the Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/01/09 |
| Email dated Jan 5/07 from K. Strasky (Public) to Martha Anslow (EAO) regarding the Bear Mountian Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/01/09 |
| Email dated Jan 3/07 from Trevor Reeves (Public) to Martha Anslow (EAO) regarding the Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/01/04 |
| Email dated Dec 29/06 from Andony Melathopoulos (Public) to Martha Anslow (EAO) regarding the Bear Mountain Wind Park Project | Martha Anslow, Environmental Assessment Office | 2007/01/04 |
| Letter dated Nov 17/06 from Mrs. Christine Kroonen (Public) to Martha Anslow (EAO) regarding the proposed Bear Mountain Wind Project | Martha Anslow, Environmental Assessment Office | 2006/12/22 |
Completed / Certified |
Notices - News Releases |
Title | Author | Posted Date |
| The B.C. Environmental Assessment Office (EAO) invites the public to comment on a proposed amendment to the Environmental Assessment Certificate (EAC) for Bear Mountain Wind Park |
| 2008/09/09 |
| Public invited to comment on the Proposed Amendment to the EA Certificate from Nov 27/07 to Dec 10/07 regarding above ground transmission line and access route | James B. Bracken, Bear Mountain Wind LP | 2007/11/26 |
| Information Bulletin - Bear Mountain Wind Park Project approved. |
| 2007/08/20 |
Proponent Comments/Correspondence |
Title | Author | Posted Date |
| Proponent response dated Dec 17/07 to public comment from Donna Laveck regarding the project | Guido Bachmann, Bear Mountain Wind Limited Partnership | 2007/12/19 |
| Nov 27/07 ERRATA (revised Appendix 6) to supporting document submitted by Bear Mountain Wind Limited Partnership Nov 26/07 regarding the proposed amendment to Certificate #E07-03 | James B. Bracken, Bear Mountain Wind LP | 2007/11/27 |
| Letter dated Nov 19/07 from James B. Bracken (Bear Mountain Wind) to Robin Junger (Associate Deputy Minister) regarding the application for Amendment to Certificate #E07-03 | James B. Bracken, Bear Mountain Wind LP | 2007/11/26 |
| Supporting document submitted by Bear Mountain Wind Limited Partnership Nov 26/07 regarding the proposed amendment to Certificate #E07-03 | James B. Bracken, Bear Mountain Wind LP | 2007/11/26 |
Public Comments/Submissions |
Title | Author | Posted Date |
| September 11, 2008 Comment from Shiela Murray |
| 2008/10/31 |
| Public comment from Donna Laveck regarding the proposed amendment to the Certificate |
| 2007/12/10 |
EA Certificate Documentation |
Title | Author | Posted Date |
| Environmental Assessment Certificate E07-03 for the Bear Mountain Wind Park Project issued August 20/07.
Includes Schedule A & B | Barry Penner, Ministry of Environment | 2007/08/20 |
| Bear Mountain Wind Park Project Assessment Report and Appendicies dated July 2007. | Martha Anslow, Environmental Assessment Office | 2007/08/20 |
| Bear Mountain Wind Park Project Recommendations of the Executive Director and Reasons for the Recommendations dated July 2007. | Derek Griffin, Environmental Assessment Office | 2007/08/20 |
| Information Bulletin - Bear Mountain Wind Park Project approved. |
| 2007/08/20 |
Amendment Certificate |
Title | Author | Posted Date |
| Amendment #3 to the Certificate dated Nov 13, 2008 signed by Robin Junger | Assoc. Deputy Minister Robin Junger, Environmental Assessment Office | 2008/11/17 |
| Letter to Proponent from EAO dated Nov 17, 2008 regarding Amendment #3 to the Environmental Assessment Certificate #E07-03 | Assoc. Deputy Minister Robin Junger, Environmental Assessment Office | 2008/11/17 |
| Amendment #2 to Certificate #E07-03 signed Feb 4/08 and supporting documents |
| 2008/02/08 |
| Amendment #1 to Certificate #E07-03 signed Jan 24/08 and supporting documents | Assoc. Deputy Minister Robin Junger, Environmental Assessment Office | 2008/01/24 |
Amendment to Certificate Documentation |
Title | Author | Posted Date |
| September 22, 2008 Email from Transport Canada regarding Ammendment Review | Paula Doucette, Transport Canada | 2008/09/30 |
| September 24, 2008 Email from Natural Resources Canada regarding Amendment Review | Jennifer Culleton, Natural Resources Canada | 2008/09/30 |
| September 26, 2008 Email from Peace Region Ministry of Environment regarding Amendment Application | Graham Suther, Ministry of Environment | 2008/09/30 |
| Archaeological and Historical Impact Assessment for the new route Bear Mountain Wind Project transmission line prepared by Arrow Archaeology Limited and dated August 2008 | Ileana Acimov, Bear Mountain Wind Limited Partnership | 2008/09/05 |
| September 2, 2008 Letter from Proponent to EAO re: Archaeological and Historical Impact Assessment for the new route Bear Mountain Wind Project transmission line | Ileana Acimov, Bear Mountain Wind Limited Partnership | 2008/09/05 |
| July 9, 2008 Letter from Proponent to EAO | James B. Bracken, Bear Mountain Wind LP | 2008/08/25 |
| July 28, 2008 Response to Proponent from EAO | Nicole Vinette, Environmental Assessment Office | 2008/08/25 |
| Environmental Assessment for the NEW BEAR MOUNTAIN WIND TRANSMISSION Lines Submitted by Corvidae Environmental Consulting Inc. on behalf of the Bear Mountain Wind Partnership dated August 2008 | Ileana Acimov, Bear Mountain Wind Limited Partnership | 2008/08/22 |
| Geological Environmental Assessment for the New BMW Transmission Line Submitted by Corvidae Environmental Consulting Inc. on behalf of the Bear Mountain Wind Partnership dated August 2008 | Ileana Acimov, Bear Mountain Wind Limited Partnership | 2008/08/22 |
| Field Conditions at the Time of Field Assessment Report Submitted by Northern Rockies Environmental Services Ltd. on behalf of the Bear Mountain Wind Partnership dated March 19, 24, and July 10, 2008 | Ileana Acimov, Bear Mountain Wind Limited Partnership | 2008/08/22 |
| Vegetation Assessment for the Bear Mountain Wind Park Transmission Line Submitted by Timberline Natural Resource Group Ltd. on behalf of the Bear Mountain Wind Partnership dated July 31, 2008 | Ileana Acimov, Bear Mountain Wind Limited Partnership | 2008/08/22 |
| Visual Assessment for the Bear Mountain Wind Park Transmission Line Submitted by Timberline Natural Resource Group Ltd. on behalf of the Bear Mountain Wind Partnership dated August 13, 2008 | Ileana Acimov, Bear Mountain Wind Limited Partnership | 2008/08/22 |
| Plan Showing Proposed 25m Powerline Right of Way prepared by T. J. Tryon Land Surveying Ltd. for Bear Mountain Wind Partnership | Ileana Acimov, Bear Mountain Wind Limited Partnership | 2008/08/22 |
| August 8, 2008 cover letter from Proponent to EAO re: wildlife, hydrological, fisheries, aquatics and wetland systems studies (also post studies) | Ileana Acimov, Bear Mountain Wind Limited Partnership | 2008/08/22 |
| August 19, 2008 cover letter from Proponent to EAO re: wildlife, hydrological, fisheries, aquatics and wetland systems, as well as geological, soils, vegetation and visual landscape studies | Ileana Acimov, Bear Mountain Wind Limited Partnership | 2008/08/22 |
| Nov 27/07 ERRATA (revised Appendix 6) to supporting document submitted by Bear Mountain Wind Limited Partnership Nov 26/07 regarding the proposed amendment to Certificate #E07-03 | James B. Bracken, Bear Mountain Wind LP | 2007/11/27 |
| Letter dated Nov 19/07 from James B. Bracken (Bear Mountain Wind) to Robin Junger (Associate Deputy Minister) regarding the application for Amendment to Certificate #E07-03 | James B. Bracken, Bear Mountain Wind LP | 2007/11/26 |
| Supporting document submitted by Bear Mountain Wind Limited Partnership Nov 26/07 regarding the proposed amendment to Certificate #E07-03 | James B. Bracken, Bear Mountain Wind LP | 2007/11/26 |
| Public invited to comment on the Proposed Amendment to the EA Certificate from Nov 27/07 to Dec 10/07 regarding above ground transmission line and access route | James B. Bracken, Bear Mountain Wind LP | 2007/11/19 |
Post Certificate Documentation |
Title | Author | Posted Date |
| Traffic Management Plan - May 2009 - from Bear Mountain Wind Limited Partnership |
| 2009/11/09 |
| Project Update - May 2009 - from Bear Mountain Wind Limited Partnership |
| 2009/11/09 |
| Project Update - August 2009 - from Bear Mountain Wind Limited Partnership |
| 2009/11/09 |
| Project Update - Fall 2009 - from Bear Mountain Wind Limited Partnership |
| 2009/11/09 |
| News Release dated November 2/09 regarding Bear Mountain Wind Park |
| 2009/11/09 |
| Letter dated September 25/09 and supporting documents from Marc Boucher (Bear Mountain Wind ) to Robin Junger (EAO) |
| 2009/10/02 |
| Raptor and Migratory Bird and Bat Monitoring and Followup Report 2008 and Recommendations for 2009 |
| 2009/04/16 |
| 2008 Monitoring Surveys |
| 2009/04/16 |
| Document dated February 2009 from AltaGas Income Trust to EAO |
| 2009/02/25 |
| AltGas submitts Traffic Management Plan for Bear Mountain Wind Park Project |
| 2009/02/25 |
| Bear Mountain Wind submitts fact sheet |
| 2009/02/25 |
| Letter, Compliance Report dated Oct 18/07 and supporting documents from James B. Bracken (Bear Mountain Wind ) to Robin Junger (EAO) | James B. Bracken, Bear Mountain Wind LP | 2008/01/31 |
|