KSL Pipeline Looping Project

Type:Typical EA Process (Active and Complete)Status:Completed / Certified
Category:EnergyPre-application

Start Date:

2005/11/23
 

Document Index

Pre-Application

Application Terms of Reference/Information Requirements

Title

Author

Posted Date

Approved Terms of Reference for KSL Pipeline Looping Project dated May 18, 2007Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2007/05/18
Draft Terms or Reference for the Kitimat - Summit Lake Natural Gas Pipeline Looping Project dated March 2007  2007/03/08

Aboriginal Comments/Submissions

Title

Author

Posted Date

Email dated April 16/07 from Michael Gordon at the request of Dine Barbetti and on behalf of the Haisla Nation to Graeme McLaren (EAO) re: Comment on the Draft Terms of Reference for the KSL projectMichael R Gordon, M.R. Gordon & Associates Ltd.2007/04/17
Email and letter dated April 4/07 from Verne Solonal (MLIB) to Graeme McLaren (EAO) re: Comments from Chief Alec Chingee, Helicopter Flyover-August 2006  2007/04/04

EAO Generated Documents

Title

Author

Posted Date

Order under Section 13 Amending Section 11 Order signed by Graeme McLaren on September 20/07 Graeme McLaren, Environmental Assessment Office2007/09/25
Letter dated Aug 24/07 to Greg Weerers (Pacific Trail Pipelines LP) from Graeme McLaren (EAO) regarding the proposed Kitimat to Summit Lake Natural Gas Pipeline Looping ProjectGraeme McLaren, Environmental Assessment Office2007/08/29
Order under Section 11 signed by Graeme McLaren on Feb 28/07Graeme McLaren, Environmental Assessment Office2007/02/28
Order under section 13 amending section 10 order of the Environmental Assessment Act signed by John Bones (EAO) dated February 28, 2006.John Bones, Environmental Assessment Office2006/02/28
Order under section 10 (1)(c) of the Environmental Assessment Act signed by John Bones (EAO) dated November 23, 2005.John Bones, Environmental Assessment Office2005/11/23

Notices - News Releases

Title

Author

Posted Date

Public Comment Invited on the Draft Terms of Reference for the proposed Kitimat to Summit Lake Pipeline Looping Project  2007/03/08

Provincial Govt Comments/Submissions

Title

Author

Posted Date

Email dated April 2/07 from Mike Peterson (ENV) to Graeme McLaren (EAO) re: Comment on the Draft Terms of Reference for the KSL project Mike Peterson, Ministry of Environment2007/04/04
Email dated April 3/07 from Michael Wu (NH) to Graeme McLaren (EAO) re: Comment on the Draft Terms of Reference for the KSL project Michael Wu, Northern Health Unit2007/04/04

Proponent Comments/Correspondence

Title

Author

Posted Date

Proponent responses to comments submitted on draft terms of reference (version 4) for an application for an Environmental Assessment Certificate during public comment period (March 15 to April 16, 2007)  2007/05/16
Letter dated Oct 26/06 from Greg Weeres (PNG) to Graeme McLaren (EAO) advising of their name change to Pacific Trail Pipelines Limited (PTP) Greg Weeres, Pacific Northern Gas Inc.2006/11/24
Updated Project Description for the Kitimat Summit Lake Pipeline (KSL) Project submitted by Pacific Northern Gas Inc. (Proponent) to John Bones (EAO) dated February 2006.Greg Weeres, Pacific Northern Gas Inc.2006/02/24

Public Comments/Submissions

Title

Author

Posted Date

Email dated April 16/07 from Michael Folkema to Graeme McLaren (EAO) re: Comment on the Draft Terms of Reference for the KSL project  2007/04/20
Email dated April 5/07 from Jim McCormack to Graeme McLaren (EAO) re: Comment on the Draft Terms of Reference for the KSL project  2007/04/11
Letter dated April 3/07 from Ron Burnett to Graeme McLaren (EAO) re: Comment on the Draft Terms of Reference for the KSL project  2007/04/11
Letter received Mar 28/07 from Rob Ault to Graeme McLaren (EAO) re: Comment on the Draft Terms of Reference for the KSL projectRob Alt2007/03/28

Under Review

Application and Supporting Studies

Title

Author

Posted Date

Application Amendment dated Jan 24/08 from Pacific Trail Pipeline (PTP) - Application Amendment to the Environmental Assessment Certificate Application Mark Walmsley, Westland Resource Group2008/02/01
Volume 1 Report - Application for an Environmental Assessment Certificate for the KSL Pipline Looping Project submitted by Pacific Trails Piplines LP to Graeme McLaren (EAO) Oct. 2007. Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2007/10/12
Volume 1 Report Appendices- Application for an Environmental Assessment Certificate for the KSL Pipline Looping Project submitted by Pacific Trails Piplines LP to Graeme McLaren (EAO) Oct. 2007. Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2007/10/12
Volume 2 Baseline Studies - Application for an Environmental Assessment Certificate for the KSL Pipline Looping Project submitted by Pacific Trails Piplines LP to Graeme McLaren (EAO) Oct. 2007. Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2007/10/12
Map Set 1 - Soil and Land Use Ortho Base Maps - Application for an EA Certificate for the KSL Pipline Looping Project submitted by Pacific Trails Piplines LP to Graeme McLaren (EAO) Oct. 2007. Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2007/10/12
Map Set 2 - Vegetation, Wildlife, and Wildlife Habitat Maps - Application for an EA Certificate for the KSL Pipline Looping Project submitted by Pacific Trails Piplines LP to Graeme McLaren (EAO) Oct. 2007.Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2007/10/12
Map Set 3 - Archaeology Base Maps - Application for an EA Certificate for the KSL Pipline Looping Project submitted by Pacific Trails Piplines LP to Graeme McLaren (EAO) Oct. 2007. Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2007/10/12
Map Set 4 - Fish-Bearing Atlas - Fish and Fish Habitat Investigations KP 0 - KP 462 Maps - Application for an EA Certificate for the KSL Pipline Looping Project submitted by Pacific Trails Piplines LP Oct. 2007.Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2007/10/12
Map Set 5 - Fish-Bearing Atlas - Fish and Fish Habitat Investigations Appendix B - Application for an EA Certificate for the KSL Pipline Looping Project submitted by Pacific Trails Piplines LP Oct. 2007. Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2007/10/12
Map Set 6 Vol A - Non-Fish-Bearing Atlas - Fish and Fish Habitat Investigations KP 0 - KP 70 - Application for an EA Certificate for the KSL Pipline Looping Project submitted by Pacific Trails Piplines LP Oct. 2007. Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2007/10/12
Map Set 7 Vol B - Non-Fish-Bearing Atlas - Fish and Fish Habitat Investigations KP 70- KP 120 - Application for an EA Certificate for the KSL Pipline Looping Project submitted by Pacific Trails Piplines LP Oct. 2007. Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2007/10/12
Map Set 8 Vol C - Non-Fish-Bearing Atlas - Fish and Fish Habitat Investigations KP 120 - KP 230 - Application for an EA Certificate for the KSL Pipline Looping Project submitted by Pacific Trails Piplines LP Oct. 2007. Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2007/10/12
Map Set 9 Vol D - Non-Fish-Bearing Atlas - Fish and Fish Habitat Investigations KP 230 - KP 340 - Application for an EA Certificate for the KSL Pipline Looping Project submitted by Pacific Trails Piplines LP Oct. 2007. Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2007/10/12
Map Set 10 Vol E - Non-Fish-Bearing Atlas - Fish and Fish Habitat Investigations KP 340 - KP 462 - Application for an EA Certificate for the KSL Pipline Looping Project submitted by Pacific Trails Piplines LP Oct. 2007 Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2007/10/12

Aboriginal Comments/Submissions

Title

Author

Posted Date

Letter dated Jan 29/08 from Ray Morris (Nee Tahi Buhn Indian Band) to EAO requesting further information on Kitimat Summit Lake (KSL) projectChief Raymond Morris, Nee-Tahi-Buhn First Nation2008/02/01
Email dated December 6/07 from Michael Gordon (MR Gordon & Associates) to Diane Barbetti (Kitamaat Village Council) regarding comments on KSL Pipeline Looping Project Michael R Gordon, M.R. Gordon & Associates Ltd.2007/12/06
Email dated December 4/07 from Fred McKenzie (Kitselas First Nation) to Graeme McLaren (EAO) regarding comments on KSL Pipeline Looping ProjectFred McKenzie, Kitselas First Nation2007/12/05
Email dated November 30/07 from David de Wit (Office of the Wet'suwet'en) to Graeme McLaren (EAO) regarding comments on KSL Pipeline Looping Project David de Wit, Office of the Wet'suwet'en2007/12/04

EAO Generated Documents

Title

Author

Posted Date

Working Group Meeting Summary dated Mar 12/08 May Darling, Environmental Assessment Office2008/05/09
Letter dated Apr 21/08 to Greg Weeres (Proponent) from Graeme McLaren (EAO) regarding the timeline suspension for the Environmental Assessment of the KSL Pipeline Looping ProjectGreg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2008/04/22
Letted dated Mar 31/08 from Graeme McLaren (EAO) to Greg Weeres (Proponent) regarding the request for a Timeline Extension on the Environmental Assessment Review for the KSL Pipeline Looping ProjectGraeme McLaren, Environmental Assessment Office2008/03/31
Working Group Meeting Summary dated Jan 30/08 submitted by Jennifer Downing (EAO) for KSL Pipeline Looping ProjectJennifer Downing, Environmental Assessment Office2008/03/19
Letter dated Feb 27/08 from Graeme McLaren (EAO) to Greg Weeres (Proponent) regarding completing the review of the KSL Pipeline Looping ProjectGraeme McLaren, Environmental Assessment Office2008/03/04
KSL Pipeline Looping Project Working Group Meeting Summary dated December 13/07David Eirikson, Environmental Assessment Office2008/01/31
KSL Pipeline Looping Project Working Group - Fisheries sub-ctte (West) Meeting notes dated Jan 15/08 David Eirikson, Environmental Assessment Office2008/01/31
KSL Pipeline Looping Project Working Group Meeting Summary dated October 24/07Graeme McLaren, Environmental Assessment Office2007/12/05
Letter dated Sept 21/07 to Greg Weerers (Pacific Trail Pipelines LP) from Graeme McLaren (EAO) re: Application for the Kitimat to Summit Lake Natural Gas Pipeline Looping Project Accepted for Formal Review Pursuant to the Environmental Assessment ActGraeme McLaren, Environmental Assessment Office2007/09/25
Letter dated Sept 21/07 to Greg Weerers (Pacific Trail Pipelines LP) from Graeme McLaren (EAO) re: Application for the Kitimat to Summit Lake Natural Gas Pipeline Looping Project First Nation Consultation Assessment and Public Consultation Assessment Graeme McLaren, Environmental Assessment Office2007/09/25

Federal Comments/Submissions

Title

Author

Posted Date

Email dated December 11/07 from Pat Lim (Fisheries and Oceans Canada) to Margaret Bakelaar (Canadian Environmental Assessment Agency) regarding comments on the projectPat Lim, Fisheries and Oceans Canada2007/12/17
Email dated December 6/07 from Margaret Bakelaar (Canadian Environmental Assessment Agency) to Graeme McLaren (EAO) regarding comments on KSL Pipeline Looping Project Margaret Bakelaar, Canadian Environmental Assessment Agency2007/12/11
Email dated November 21/07 from Harp Gill (Transport Canada) to Margaret Bakelaar (Canadian Environmental Assessment Agency) regarding comments on KSL Pipeline Looping Project Harpreet Gill, Transport Canada2007/12/11
Email dated December 11/07 from Harp Gill (Transport Canada) to Margaret Bakelaar (Canadian Environmental Assessment Agency) regarding additional comments to previous letter dated November 21/07Harpreet Gill, Transport Canada2007/12/11
Email dated December 6/07 from Peter Delaney (Department of Fisheries) to Margaret Bakelaar (Canadian Environmental Assessment Agency) regarding comments on KSL Pipeline Looping Project Peter Delaney, Fisheries and Oceans Canada2007/12/07

Local Government Comments/Submissions

Title

Author

Posted Date

Email dated December 10/07 from Ted Pellegrino (Regional District of Kitimat-Stikine) to David Eirikson (EAO) regarding comments on KSL Pipeline Looping Project Ted Pellegrino, Regional District of Kitimat Stikine2007/12/11
Email dated October 22/07 from Jeremy Penninga, Regional District of Bulkley Nechako to EAOINFO regarding Public comments on Kitimat-Summit Lake Pipeline Looping ProjectJeremy Penninga, Regional District of Bulkley-Nechako2007/10/22

Notices - News Releases

Title

Author

Posted Date

Notice for public comment on the Application for the Kitimat-Summit Lake Pipeline Looping Project -October 17/07 - Nov 30/07 Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2007/10/12

Provincial Govt Comments/Submissions

Title

Author

Posted Date

Letter dated January 10/08 from Troy Larden (Ministry of Environment) to Graeme McLaren (EAO) regarding comments on the project Troy Larden, Ministry of Environment2008/01/11
Email dated December 11/07 from Paul Jeakins (Oil and Gas Commission) to Graeme McLaren (EAO) regarding comments on KSL Pipeline Looping Project Paul Jeakins, Oil and Gas Commission2007/12/11
Email dated November 30/07 from John Perras and Rod Meredith (Ministry of Forests and Range) to Graeme McLaren (EAO) regarding range comments on Kitimat-Summit Lake Pipeline Looping ProjectJohn Perras, Ministry of Forest and Range2007/12/03
Email dated November 30/07 from John Gerow (Ministry of Forests and Range) to Graeme McLaren (EAO) regarding range comments on Kitimat-Summit Lake Pipeline Looping ProjectJohn Gerow, Ministry of Forests and Range2007/12/03
Email dated November 30/07 from Michael Peterson (Ministry of Environment) to Graeme McLaren (EAO) regarding ESD Omineca Region comments on the Project Michael Peterson, Ministry of Environment2007/12/03
Email dated November 28/07 from Gord Saito and Karen Tabe (Ministry of Forests and Range) to Graeme McLaren (EAO) regarding range comments on Kitimat-Summit Lake Pipeline Looping Project Gord Saito, Ministry of Forests and Range2007/11/30
Email dated November 29/07 from Gord Simmons (Regional District of Fraser-Fort George) to Graeme McLaren (EAO) regarding comments on Kitimat-Summit Lake Pipeline Looping Project Gord Simmons, Regional District Fraser Fort George2007/11/30

Proponent Comments/Correspondence

Title

Author

Posted Date

Report dated Mar 25/08 from Pacific Trail Pipelines LP (Proponent) to EAO entitled "Draft Conceptual Fisheries Habitat Compensation Plan"Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2008/05/09
Letter dated Apr 18/08 from Greg Weeres (Proponent) to Graeme McLaren (EAO) regarding suspending the review timeline for the KSL Pipeline Looping ProjectGreg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2008/04/18
Report dated Apr 7/08 from Cornerstone Planning Group (Proponent) to EAO entitled "Report on the Results of the First Nation Consultation Program"John Kafka, Cornerstone Planning Group2008/04/09
Report dated Mar 4/08 from Pacific Trail Pipelines LP (Proponent) to EAO entitled "Summary of Issues Raised During Oct 17/07 to Nov 30/07, Public Comment Period and Proponent's Response" Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2008/04/01
Letter dated Mar 28/08 from Pacific Trail Pipelines (Proponent) to Graeme McLaren (EAO) requesting a Timeline Extension on the Environmental Assessment Review for the KSL Pipeline Looping ProjectGreg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2008/03/31
Report dated Mar 26/08 from Westland Resource Group Inc. (Proponent) to Graeme McLaren (EAO) entitled "Draft Environmental Protection Plan (EPP) for the KSL Pipeline Looping Project"Mark Walmsley, Westland Resource Group2008/03/27
Report dated Mar 18/08 from Westland Resource Group Inc (Proponent) to Graeme McLaren (EAO) entitled Draft Access Management Plan - Overview and Annotated Table of Contents for the Proposed Kitimat - Summit Lake Natural Gas Pipeline Looping ProjectMark Walmsley, Westland Resource Group2008/03/18
Environmental Work Sheets illustrating the location of "Special Management Zones" submitted to EAO by Pacific Trail Pipelines (Proponent)Greg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2008/03/07
Proponents assessment of Route Alternatives dated Jan 28/08  2008/02/13
Report dated Jan/08 from Pacific Trail Pipelines Ltd (Proponent) to Graeme McLaren (EAO) entitled Consultation and Communications SummaryGreg Weeres, Pacific Trail Pipelines LP (formerly known as Pacific Northern Gas Inc.)2008/02/08
Letter dated Jan 9/08 from Mark Walmsley (WRG) to Graeme McLaren (EAO) regarding route alternatives for Kitimat Summit Lake (KSL) Mark Walmsley, Westland Resource Group2008/02/01
Draft Project Commitments Table from Mark Walmsley (Proponent) to Graeme McLaren (EAO) dated Nov 8/07 Mark Walmsley, Westland Resource Group2007/11/09

Public Comments/Submissions

Title

Author

Posted Date

Email dated November 30/07 from Christopher Hunter (Burns Lake) to Graeme McLaren (EAO) regarding comments on Kitimat-Summit Lake Pipeline Looping ProjectChristopher Hunter2007/12/03
Fax dated November 27/07 from Jim Culp (Terrace) to Graeme McLaren (EAO) regarding Public comments on Kitimat-Summit Lake Pipeline Looping Project Jim & Shirley Culp, River's Edge Lodge2007/11/30
Email dated November 29/07 from Margaret Ouwehand (Public) to Graeme McLaren (EAO) regarding Public comments on Kitimat-Summit Lake Pipeline Looping Project Margaret Ouwehand2007/11/30
Letter dated November 14/07 from KE Kania and Ron Gerhardi (Fraser Lake) to Graeme McLaren (EAO) regarding Public comments on Kitimat-Summit Lake Pipeline Looping Project K.E. Kania2007/11/23
Public Comment Form received Nov. 23/07 from Kitimat Open House from Cheryl Brown (Terrace) to Graeme McLaren (EAO) regarding public comments on KSL Pipeline Looping Project Cheryl Brown2007/11/23
Public Comment Form received Nov. 7/07 at Burns Lake Open House from Richard Schritt (Burns Lake) to Graeme McLaren (EAO) regarding public comments on KSL Pipeline Looping ProjectRichard Schritt2007/11/09
Public Comment Form received Nov. 9/07 at Summit Lake Open House from Hilary Crowley (Summit Lake) to Graeme McLaren (EAO) regarding public comments on KSL Pipeline Looping Project Hilary Crowley2007/11/09
Email dated Nov. 7/07 from Cary Drummond (Terrace) to Graeme McLaren (EAO) regarding Public comments on Kitimat-Summit Lake Pipeline Looping Project Cary Drummond, Minisstry of Forests and Range2007/11/07
Public Comment Form received Oct. 22/07 at Smithers Open House from Virginia Hoover to Graeme McLaren (EAO) regarding public comments on Kitimat-Summit Lake Pipeline Looping Project Virginia Hoover2007/11/06
Letter dated October 18/07 from Josette Wier (Smithers) to Graeme McLaren (EAO) regarding Public comments on Kitimat-Summit Lake Pipeline Looping Project Public Author2007/10/30
Email dated October 17/07 from Guyle Nunweiler (Ness Lake) to EAOINFO regarding Public comments on Kitimat-Summit Lake Pipeline Looping Project Guyle Nunweiler2007/10/17

Completed / Certified

Notices - News Releases

Title

Author

Posted Date

Information Bulletin - Kitimat-Summit Lake Pipeline Project Approved  2008/06/27

EA Certificate Documentation

Title

Author

Posted Date

Executive Director's Recommendations and Reasons for Recommendations dated May 12, 2008 - Kitimat-Summit Lake Pipeline ProjectGraeme McLaren, Environmental Assessment Office2008/06/27
Kitimat-Summit Lake Pipeline Project Assessment Report Graeme McLaren, Environmental Assessment Office2008/06/27
Environmental Assessment Certificate E08-01 for the Kitimat-Summit Lake Pipeline Project issued June 26, 2008Graeme McLaren, Environmental Assessment Office2008/06/27
Information Bulletin - Kitimat-Summit Lake Pipeline Project Approved  2008/06/27