Prosperity Gold-Copper Project (Pre 2005)

Type:Typical EA Process (Active and Complete)Status:Certificate Issued
Category:MiningPre-application

Start Date:

1995/06/30

Under Review Application and Supporting Studies



Folder

Date Posted

Re: Taseko Mines Environmental Assessment Letter from Ray Hance of Tsilhqot'in National Govt. to Norm Ringstad of EAO on the subject of the land claim with regards to the Prosperity Gold Project. Originally posted 1997/08/012009/03/13
Transmission Line Corridor Selection Report (draft)prepared for Taseko Mines Ltd (proponent) by Triton Environmental Consultants Ltd. Originally posted 1997/12/051997/12/05
Prosperity Gold-Copper Project Taseko Mines Limited Geological and Geochemical Characterization of the Prosperity Deposit Progress Report 1. Originally Posted 1997/08/271997/08/27
Pre-Application for a Mine Development Certificate. Originally posted 1995/06/301995/06/30
Fish Lake Gold-Copper Project Consultation - Results from Open House Presentation - November 4, 1993 Originally posted 1995/06/301995/06/30
Fish Lake Project - Assessment of Alternate Waste Rock Storage Sites - Preliminary Environmental Assessment. Originally posted 1995/06/301995/06/30
Taseko Mines Limited, Fish Lake Project - Economic Assessment of Alternate Waste Rock Storage Sites (prepared by KC Minty & Assoc Ltd for Proponent). Originally posted 1995/06/301995/06/30
Preliminary Environmental Analysis of the Aquatic Resources of Fish Lake & Fish Creek, with Concepts for Mitigation & Compensation. Originally posted 1995/06/301995/06/30
Taseko Mines Ltd - Helping Build Investment in BC Mining - Fish Lake Gold-Copper Project - Information Document. Originally posted 1995/06/301995/06/30
Safety, Hydrogeology & Mining Considerations for Fish Lake Open Pit Design. Originally posted 1995/06/301995/06/30
Aquatic Resources of Fish Lake, Fish Creek & Related Fish Habitat Compensation Sites. Originally posted 1995/06/301995/06/30
Last Updated: 2010-03-18