Folder | Date Posted |
| Time Limit Extension Order dated July 11/06 | 2006/07/12 |
| Time Limit Extension Order dated June 1/06 | 2006/06/05 |
| Final Notes of the Cascade Technical Fisheries Working Group Meeting, held March 21, 2006. | 2006/04/11 |
| Final Notes of the Cascade Working Group Meeting-Application Review, held March 2, 2006. | 2006/03/31 |
| Letter dated Mar 24/06 to Bill Harland (Powerhouse Developments Inc) from Raymond L. Crook (EAO) regarding resuming the 180-day time period for completing the review of the Cascade Heritage Power Project | 2006/03/24 |
| Letter dated Nov 30/05 from Joan Hesketh (DM, EAO) to Powerhouse Developments Inc. with comments on letters by tourism organizations regarding the Cascade Power project | 2005/12/16 |
| Letter dated Nov 17/05 form Derek Griffin (EAO) to Loretta Robinson (City of Grand Forks Chamber of Commerce) in response to Aug 12/05 & Aug 15/05 comments on the project. | 2005/11/23 |
| Letter dated Nov 17/05 form Derek Griffin (EAO) to Becky Deane (Grand Forks Community Trails Society) in response to Aug 12/05 comment on the project. | 2005/11/23 |
| Letter dated Nov 17/05 form Derek Griffin (EAO) to Wolfgang Schmidt (Gold Canyon Highlands Tourism Association) in response to Aug 12/05 comment on the project. | 2005/11/23 |
| Letter dated Nov 17/05 form Derek Griffin (EAO) to Boundary Tourism Coalition in response to Aug 12/05 comment on the project. | 2005/11/23 |
| Letter dated Nov 17/05 form Derek Griffin (EAO) to Jean Johnson (Boundary Country Tourism) in response to Aug 12/05 comment on the project. | 2005/11/23 |
| Letter dated Nov 17/05 form Derek Griffin (EAO) to Chris Moslin (Boundary Region of Trails BC) in response to Aug 12/05 comment on the project. | 2005/11/23 |
| Letter dated Nov 17/05 form Derek Griffin (EAO) to Wayne Hall (Copper Ridge Development Corp) in response to Aug 12/05 comment on the project. | 2005/11/23 |
| Letter dated Nov 17/05 form Derek Griffin (EAO) to Wendy Darbyshire (Christina Lake Chamber of Commerce) in response to July 4/05 & Aug 12/05 comment on the project. | 2005/11/23 |
| Letter dated Nov 17/05 from Derek Griffin (EAO) to Gordon Planedin (Cascade Cove Campground) in response to July 5/05 comment on the project. | 2005/11/23 |
| Letter dated Nov 17/05 form Derek Griffin (EAO) to D.G. Robinson (Christina Lake Golf Club) regarding the Cascade Heritage Power Project. | 2005/11/23 |
| Letter dated Nov 17/05 form Derek Griffin (EAO) to Grace and Ron McGregor (Hummingbird Have B & B) in response to July 10/05 comment on the project. | 2005/11/23 |
| Letter dated Nov 17/05 form Derek Griffin (EAO) to Rick and Marie Seymour (Owl Mountain Ranch) regarding the Cascade Heritage Power Project. | 2005/11/23 |
| Letter dated Nov 17/05 form Derek Griffin (EAO) to Bob and Lucinda Dupee (Wildways Adventure Sports) in response to July 11/05 & Sept 6/05 comment on the project. | 2005/11/23 |
| Letter dated Nov 17/05 form Derek Griffin (EAO) to Scott and Patricia Campbell in response to Aug 20/05 comment on the project. | 2005/11/23 |
| Letter dated Sept 12/05 from Derek Griffin (EAO) to Doug Robertson (Christina Lake Golf Club) regarding the proponent's response to their comments on the project | 2005/09/14 |
| Letter dated Sept 2/05 from Derek Griffin (EAO) to Kathy O'Malley (KRRC) responding to their letter of Aug 15/05 regarding the project | 2005/09/08 |
| Letter dated Aug 22/05 from Derek Griffin (EAO) to Pauline Terbasket (ONA) regarding their next steps with the project review | 2005/08/23 |
| Letter dated Aug 15/05 from Derek Griffin (EAO) to Bill Harland (proponent) regarding their request for the suspension of the time limit for the review of their application | 2005/08/16 |
| Cascade Update dated Jul 18/05 from Garth Thoroughgood to review agencies on the status of the project | 2005/07/19 |
| Letter dated Jul 15/05 from Derek Griffin (EAO) to Bill Harland (proponent) accepting their request to suspend the time period for the review of the project | 2005/07/15 |
| Water Availability Working Group - Final Meeting Notes dated Sept 30/04 | 2005/07/14 |
| Water Availability Working Group - Final Meeting Notes dated May 18/04 | 2005/07/14 |
| Standard letter from Derek Griffin (EAO) regarding Powerhouse Developments Inc. responses to comments on the Cascade Heritage Power Project (recipient list attached) | 2005/06/24 |
| Reply letter dated June 22, 2005 from Derek Griffin (EAO) to William P. Harland (proponent) regarding the review of the Cascade Heritage Power Project | 2005/06/23 |
| Letter dated Jun 17/05 from Derek Griffin (EAO) to Pauline Terbasket (Okanagan Nation Alliance) regarding the Proponent's response to ONA comments on the Additional Information for the Project | 2005/06/20 |
| Email dated Jun 8/05 from Derek Griffin to review agencies regarding the proponent's responses to all the agencies original comments on the Additional Information | 2005/06/08 |
| Email dated May 6/05 from Garth Thoroughgood (EAO) to the review agency working group with an update on the project | 2005/05/11 |
| Email dated Apr 4/05 from Garth Thoroughgood (EAO) to the project review agencies regarding the latest update on the project | 2005/04/26 |
| SUMMARY - Potential Effects of the Cascade Heritage Power Project on the Allocation of Water in the Kettle River Basin dated November 15, 2004 | 2004/12/29 |
| FULL REPORT - Potential Effects of the Cascade Heritage Power Project on the Allocation of Water in the Kettle River Basin dated Nov 15, 2004 with cover letter dated Dec 17/04 | 2004/12/29 |
| Potential Effects of the Cascade Heritage Power Project on the Allocation of Water in the Kettle River Basin - FINAL DRAFT dated September 29/04 | 2004/09/20 |
| Summary - Potential Effects of the Cascade Heritage Power Project on the Allocation of Water in the Kettle River Basin - DRAFT - September 29/04
| 2004/09/20 |
| Cascade review update dated June 29/04 | 2004/07/05 |
| Reply letter dated March 25/04 from Honourable George Abbott (SRM) to Dennis A. Snook (Ferry County Board of Commissioners) regarding the project | 2004/05/14 |
| Reply letter dated March 25/04 from Honourable George Abbott (SRM) to Joy Osterberg (Water Resource Inventory Area 60) regarding the project | 2004/05/14 |
| Reply letter dated March 29/04 from Honourable George Abbott (SRM) to the Honourable Maria Cantwell (United States Senate) regarding the project | 2004/05/14 |
| Reply letter dated March 29/04 from Honourable George Abbott (SRM) to the Honourable Patty Murray (United States Senate) regarding the project | 2004/05/14 |
| Review Update Meeting Notes dated March 10/04 | 2004/04/23 |
| January 15/04 Water Availability Working Group Final Meeting Notes | 2004/03/12 |
| Letter dated March 8/04 from Derek Griffin (EAO) to Bill Harland (proponent) officially suspending the 180 day time limit for the review of the project | 2004/03/09 |
| Cascade Heritage Power Project Review Update dated March 9/04 | 2004/03/09 |
| Cascade Heritage Power Project Review Update dated Feb 27/04 by Garth Thoroughgood (EAO) | 2004/02/27 |
| Letter dated February 23/04 from Derek Griffin (EAO) to Bill Harland (proponent, PDI) regarding the next steps now that the public comment period has closed | 2004/02/25 |
| Summary notes of meeting with the Boundary Water Availability Committee dated December 10/03 | 2004/02/19 |
| Email dated January 8/04 from Garth Thoroughgood (EAO) to list of recipients regarding the first Water Availability Working Group Meeting in Grand Forks | 2004/02/19 |
| Presentation by Richard Penner at the January 15/04 Water Availability Working Group Meeting | 2004/02/19 |
| Email dated February 17/04 from Garth Thoroughgood (EAO) to recipients attaching Water Availability Working Group Revised Terms of Reference and Responses to the Boundary Water Availability Questions. Other two attachments not attached | 2004/02/19 |
| Section 13 order dated January 7, 2004 | 2004/01/12 |
| Letter dated January 7/04 from Derek Griffin (EAO) to William P. Harland (proponent) introducing the new section 13 order. Order attached to the letter | 2004/01/08 |
| Letter dated January 2/04 from Derek Griffin (EAO) to Mike L. Blankenship and Board Members (Ferry County Board of Commissioners) agreeing that the county should participate in the Water Availability Working Group for the project | 2004/01/02 |
| Email dated December 17/03 from Garth Thoroughgood (EAO) to Cascade Review Participants regarding a project update and appended at the end of the email, the November 6/03 meeting notes | 2003/12/30 |
| Letter dated Nov 14/3 from Derek Griffin (EAO) to Bill Harland (proponent) advising their October 2003 Additional Information is accepted and the project will proceed to formal review | 2003/11/17 |
| Section 13 Order Amending Section 11 Order, signed on November 13/03 for the Cascade Heritage Power Project | 2003/11/13 |
| Letter dated September18/03 from Derek Griffin (EAO) to WP Harland (Sea Breeze Power Corp.) regarding the several deficiencies that need to be addressed before the Additional Information can be accepted for review | 2003/09/23 |
| Cascade Heritage Power Project - Review Update dated September 22, 2003 | 2003/09/23 |
| Project Review Update dated Aug 22/03 from Garth Thoroughgood (EAO) regarding Cascade Heritage Power Project. | 2003/08/22 |
| Order Under Section 11 and Schedule A dated Aug18/03 for the Cascade Heritage Power Project signed by Derek Griffin (EAO) | 2003/08/19 |
| Transition Order 02-02 for the Cascade Heritage Power Park Project | 2002/12/31 |
| Letter from S. Wynn (EAO) to D. Greff (Christina Lake) regarding maps of September 2000 Quarterly Summary Report. | 2001/02/08 |
| Letter from D Griffin (EAO) to Cascade Project Committee members regarding proponent's September 2000 Quarterly Summary Report | 2000/10/16 |
| Cascade Heritage Power Park Project Technical Fisheries Meeting Final Minutes (June 5, 2000) | 2000/07/17 |
| Letter from S Wynn (DM EAO) to D Heflick with comments on the Cascade Heritage Power Park project | 2000/05/31 |
| Technical Fisheries Meeting Notes February 16 2000 Grand Forks BC | 2000/03/24 |
| Letter from D Griffin (EAO) to Project Committee Members with minutes of January 5/00 meeting and attachments | 2000/02/10 |
| Memo from D Griffin (EAO) to Project Committee Members with December 15, 1999 Meeting Minutes | 2000/02/04 |
| Memo from D Griffin (EAO) to Climate Change Workshop Participants with Climate Change Workshop Final Minutes | 2000/02/04 |
| Letter from S Wynn (DM) to D Pharand (Grand Forks Watershed Coalition) with comments on the Cascade Heritage | 2000/01/31 |
| Letter from S Wynn (DM) to D Heflick (Citizens for a Bi-National Review of the Dam) regarding Cascade Heritage Power Park | 2000/01/31 |
| Letter from S Wynn (DM) to N Dechiron (Granby Wilderness Society) regarding Cascade Heritage Power Park | 2000/01/31 |
| Cascade Heritage Power Park Public Meeting Minutes (Christina Lake, November 30, 1999 7:30 - 9:30 pm) | 2000/01/19 |
| Open letter from D Griffin (EAO) to the general public and public interest groups in regards to Cascade Heritage Power Park Project | 2000/01/17 |
| Letter from D Griffin (EAO) to Project Committee with copy of the final project report specifications | 2000/01/17 |
| Letter from D Griffin (EAO) to Proponent regarding the finalized project report specifications for the Cascade Heritage Power Park | 2000/01/13 |
| Project Report Specifications for the Powerhouse Energy Corp Jan 6/00 | 2000/01/13 |
| Letter from D Griffin (EAO) to Project Committee Members regarding Jan2/00 meeting | 2000/01/13 |
| Letter from D Griffin (EAO) to Project Committee Members regarding December 15, 1999 meeting | 2000/01/12 |
| Letter from D Griffin (EAO) to Proponent regarding draft project report specifications | 2000/01/12 |
| Letter from D Griffin (EAO) to Project Committee Members regarding Dec 15/99 meeting | 2000/01/12 |
| Letter from D Griffin (EAO) to J and L Ashdown regarding Cascade Heritage Power Park | 2000/01/07 |
| Letter from D Griffin (EAO) to L Tatangelo regarding Cascade Heritage Power Park | 2000/01/07 |
| Letter from D Griffin (EAO) to (see attached list) regarding Cascade Heritage Power Park | 2000/01/06 |
| Form letter from D Griffin (EAO) to (see attached list) | 1999/12/30 |
| Response letter from D Griffin (EAO) to D Heflick regarding timeline extension | 1999/12/21 |
| Memo from D Griffin (EAO) to Review Agencies regarding the Cascade Heritage Power Park Draft Project Report Specifications | 1999/11/15 |
| Memo from D Griffin (EAO) to PC members with regards to Cascade Heritage Power Park Draft Project Report Specifications | 1999/11/15 |
| Open letter to the general public & public interest groups inviting comment on the Cascade Heritage Power Park Draft Project Report Specifications | 1999/11/09 |
| Cascade Heritage Power Park Project Draft Project Report Specifications November 2, 1999 | 1999/11/05 |
| Letter from D Griffin (EAO) to Proponent regarding the Draft Specifications for the Cascade Heritage Power Park Project | 1999/11/05 |
| Cascade Heritage Power Park Project Committee Meeting Final Minutes September 21, 1999 8:30am - 1:30pm (Grand Forks City Hall) | 1999/10/19 |
| Memo from D Griffin (EAO) to S Wynn (DM, EAO) regarding Cascade Heritage Power Park Stage 1 recommendation for a project report stage of the EAA | 1999/10/13 |
| Letter fr. D Griffin (EAO) to Proponent with regards to stage 1 of the review & order further review under the project report stage of the EA process | 1999/10/13 |
| Response letter from S Wynn (DM, EAO) to K O'Malley (Christina Lake, BC) regarding the Cascade Heritage Power Park project | 1999/10/06 |
| Response letter from S Wynn (DM, EAO) to (see dist list) regarding the Cascade Heritage Power Park project | 1999/10/01 |
| Letter fr. S. Wynn (Deputy Minister EAO) to J. Brockmeyer & C. Wilson(Christina Lake) in response to Cascade Heritage Power Park | 1999/09/29 |
| Cascade Heritage Power Park - Progress Report Session Christina Lake Community Hall August 17, 1999 7:00pm - 9:00pm | 1999/09/24 |
| Cascade Heritage Power Park Project Committe Meeting Final Minutes August 17, 1999 9:00am - 12:00pm (Grand Forks City Hall) | 1999/09/23 |
| Response letter from S Wynn (DM, EAO) to (see distribution list) with regards to Cascade Heritage Power Park project | 1999/09/22 |
| Letters fr. D Griffin (EAO) to C McCrory, M Burgoon, & D Pharand regarding a request for a 3 month timeline extension to the public comment period | 1999/09/14 |
| Response letter from D Griffin (EAO) to R Durand (Christina Lake, BC) regarding request for a 3 month timeline extension to the public comment period | 1999/09/14 |
| Letter from D Griffin (EAO) to Proponent regarding public letters that have been received on September 8/99 | 1999/09/10 |
| Letter from D Griffin (EAO) to Proponent with regards to the public comments received from September 3/99 to September 7/99 | 1999/09/08 |
| Letter from D Griffin (EAO) to Proponent regarding the public comment period has concluded and inviting comment on them | 1999/09/07 |
| Presentation outline prepared by (EAO) regarding a Progress Reporting Session on Aug 17/99 for the Cascade Heritage Power Park Review | 1999/08/20 |
| Letter from D Griffin (EAO) to PC Members regarding the PC Members Final Meeting Minutes | 1999/08/12 |
| Letter from D Griffin (EAO) to proponent regarding the agency comments on the application and invitation to provide a response to these comments | 1999/08/12 |
| Memo from D Griffin (EAO) to PC Members regarding the PC Meeting on August 17, 1999 Attached: Draft Agenda | 1999/08/12 |
| Letter fr. S Wynn (DM, EAO) on behalf of the Joan Sawicki (Minister, MELP) to S Campbell (Christina Lake, BC) regarding Cascade Heritage Power Park | 1999/08/10 |
| Cascade Heritage Power Park Project Committee Meeting Final Minutes June 24, 1999 1:00pm - 3:30pm (Grand Forks City Hall) | 1999/08/06 |
| Letter from G Thoroughgood (EAO) to Proponent regarding the public comments which have been posted on the Project Registry | 1999/07/30 |
| Letter from D Griffin (EAO) to Proponent regarding the acceptable information distribution and consultation to the public and First Nations | 1999/07/30 |
| Letter from D Griffin (EAO) to R Penner (MELP) regarding the proponents request for a concurrent review of its water licence application | 1999/07/29 |
| Cascade Heritage Power Park Project (Environmental Assessment Office copies of overheads used at the July 14, 1999 meeting in Christina Lake, BC) | 1999/07/28 |
| Email from G Thoroughgood (EAO) to PC Members regarding the extension of the public comment deadline to September 3, 1999 | 1999/07/28 |
| Letter from D Griffin (EAO) to Senator B Morton (Washington State Senate) regarding the application that has been submitted | 1999/07/08 |
| Letter from D Griffin (EAO) to R Baker (CP Railway) with regards to the proposal to use CPR's railroad bridge & adjacent right of way | 1999/07/08 |
| Letter from D Griffin (EAO) to R Hobbs (West Kootenay Power Ltd) with regards to the proposal to use WKO's right of way for its transmission line | 1999/07/08 |
| Letter fr. D Griffin (EAO) to T Goode (City of Grand Forks) with regards to whether the City of Grand Forks is going to participate as a PC Member | 1999/06/23 |
| Letter fr. D Griffin (EAO) to L Robinson (RDKB) with regards to whether the Regional District-Kootenay Boundary is going to participate as a PC Member | 1999/06/23 |
| Letter from D. Griffin (EAO) to Government Agencies regarding intention to participate in the review of the Cascade project. | 1999/06/23 |
| Letter from D. Griffin (EAO) to Paul Scott (CEAA) regarding how federal agencies intend to participate in review. | 1999/06/23 |
| Letter from D Griffin (EAO) to Larry Robinson (RDKB) regarding membership on the project committee for Cascade Heritage Power Park Project | 1999/06/23 |
| Letter fr. D Griffin (EAO) to prop. with regards to an understanding that an application will be submitted for the Cascade Heritage Power Park project | 1999/06/22 |
| Letter from D. Griffin (EAO) to First Nations organizations explaining opportunities available for First Nations participation in the review. | 1999/06/22 |
| Memo from D. Griffin (EAO) to PC members and Review Agencies regarding invitation to provide written comments on the application. | 1999/06/22 |
| Letter from D. Griffin (EAO) to First Nations organizations regarding invitation to comment on the application for a project approval certificate. | 1999/06/22 |
| Letter from D. Griffin (EAO) to J. Pakoota (Collville Confederated Tribes) requesting comments on the application. | 1999/06/22 |
| Letter from D. Griffin (EAO) to M. James (Sinixt Nation) requesting comments on the application. | 1999/06/22 |
| Letter from D. Griffin (EAO) to Rebecca Inman (US Department of Ecology) regarding input from the Washington State Department of Ecology. | 1999/06/22 |
| Letter fr. D. Griffin (EAO) to W. Ling (Proponent) with regards to receiving the application for a project approval certificate under the EA Act. | 1999/06/15 |
| Letter fr. D. Griffin (EAO) to W. Ling (Proponent) with regards to changes to wording in the application before it is accepted for review under EA Act | 1999/06/15 |
| Letter fr. D. Griffin (EAO) to W. Ling (Proponent) with regards to the changes made in the Application now being complete. | 1999/06/15 |
| Open letter from D. Griffin (EAO) to the general public & public interest groups inviting comments on the application by Aug. 16/99 | 1999/06/15 |
| Letter fr. S. Wynn (Deputy Minister EAO) to W. Ling (Proponent) with regards to the appointment of Derek Griffin as Project Director | 1999/01/05 |
| Memo fr. S. Wynn (Deputy Minister EAO) to D. Griffin (EAO) with regards to the appointment of Derek Griffin as Project Director on the Cascade Project | 1999/01/05 |
|