|  | McGregor/Herrick Hydroelectric Project |
| Type: | Typical EA Process (Active and Complete) | Status: | Pre-Application | | Category: | Energy | Pre-application Start Date: | 2006/01/23 | | Comments: | TransCanada Energy Ltd. proposes to construct a 49.8 MW on the McGregor River and a 33.2 MW hydroelectric facilities on Herrick Creek with approximately 110 km of transmission line connecting the two facilities. Application ETA unknown at this time. | | Location: | 120 km NE of Prince George |
|
|
|