|  | Upper Pitt River Water Power Project |
| Type: | Typical EA Process (Active and Complete) | Status: | Pre-Application | | Category: | Energy | Pre-application Start Date: | 2007/02/19 | | Comments: | Seven interconnected run-of-river hydroelectric facilities with a total generating capacity of approximately 180MW, and transmission line approximately 42 km in length. | | Location: | 45km N of Pitt Meadows- upper Pitt River Watershed |
|
|
|