| Type: | Typical EA Process (Active and Complete) | Status: | Under Review |
| Category: | Energy | Pre-application Start Date: | 2008/04/18 |
| Comments: | BC Hydro is proposing to install an approximately 500 MW turbine into an existing turbine bay at the Mica Generating Station and a capacitor station on the existing Mica-Nicola 500 kV transmission line. |
| Location: | 135 km north of Revelstoke |