| Feedback |
|---|
-
We welcome your
feedback
about our Web site.
|
|  | | Type: | Typical EA Process (Active and Complete) | Status: | Pre-Application | | Category: | Energy | Pre-application Start Date: | 2008/11/20 | | Comments: | Premier Renewable Energy proposes to develop a wind power generation facility, consisting of approx 40 2.0 MW wind turbines, an interconnecting collector system, access roads, and an overhead transmission line to connect to the existing Fernie substation. | | Location: | 10 kilometres east-northeast of Fernie, BC |
|
|
|