|  | | Type: | Typical EA Process (Active and Complete) | Status: | Pre-Application | | Category: | Energy | Pre-application Start Date: | 2008/11/19 | | Comments: | A new 80 MW capacity hydroelectric project on Kinskuch Lake. Major components include a small concrete dam, tunnel, penstocks, powerhouse and tailrace, and a 39 km 138 KV transmission line connecting with the existing transmission line along highway 37. | | Location: | Kinskuch Lake (28km Northeast of Alice Arm) |
|
|
|