| Feedback |
|---|
-
We welcome your
feedback
about our Web site.
|
|  | Nicomen Wind Energy Project |
| Type: | Typical EA Process (Active and Complete) | Status: | Pre-Application | | Category: | Energy | Pre-application Start Date: | 2008/11/19 | | Comments: | Proponent proposes to construct 35 - 2.0 MW wind turbines, an interconnecting collector system, a substation, access roads, and an overhead transmission line to connect to the existing BCTC substation at Spencers Bridge. | | Location: | About 12 km east-southeast of Lytton |
|
|
|