| Type: | Typical EA Process (Active and Complete) | Status: | Under Review |
| Category: | Energy | Pre-application Start Date: | 2008/12/11 |
| Comments: | EnCana Corporation is proposing to build and operate a natural gas processing facility. The proposed Project is designed to process natural gas from the Horn River Basin at a rate greater than or equal to 5.634 million m3/day |
| Location: | 60km northeast of Fort Nelson |