Ministry of Environment
EcoCat:The Ecological Reports Catalogue
EcoCat Image
 

Report: Cowichan Lake Weir Operation Protocol Assessment and Review

Report Documents
 
Map Plotfiles
  • No files of this type available
 
Data Files
  • No files of this type available
 
Digital Map Files
  • No files of this type available
 
Image Document
  • No files of this type available
 
Video Files
  • No files of this type available
 
All Documents

  • No files available

Contact

  • If you have any questions on the information presented, or require additional report data or attachments, please contact the Report Contact

 
The Cowichan Lake weir is used to store water in Cowichan Lake to regulate flow in the Cowichan River during the spring and summer period. The operation of the weir is guided by a set of operational protocols that have been developed based on past experience and knowledge of the system. The purpose of this study was to assess these protocols using hydrological analysis and recommend changes to improve the reliability of the system.

Author:  Kerr Wood Leidal Associates Ltd.; Prepared for BC Conservation Foundation

Date Published:  Mar 2010

Report ID:  24297

Audience:  Government and Public

The Cowichan Lake weir is used to store water in Cowichan Lake to regulate flow in the Cowichan River during the spring and summer period. The weir is usually operated from April 1st or but not earlier than March 1st in dry years until lake levels start to rise as a result of increased inflow in the fall. The operation of the weir is guided by a set of operational protocols that have been developed based on past experience and knowledge of the system. The primary purpose of these protocols is to maintain minimum flow in the river of 25 m3/s from April 1st to April 30th, 15 m3/s from April 1st to June 14th and 7 m3/s from June 15th until the end of the control season when lake levels rise as a result of increased inflow in the fall (typically before Nov 4th). The purpose of this study was to assess these protocols using hydrological analysis and recommend changes to improve the reliability of the system. An operational model of the Cowichan Lake Weir has been developed to assess impacts of changing the weir operation protocol on the ability to maintain lake levels at or above the weir crest during the early control season (prior to July 9th) and to maintain lake levels above zero storage before the end of the control season (when lake levels rise due to increased inflow typically before Nov 4). In addition, an assessment of how changing the weir operation impacts peak lake levels has also been completed. This project was co-funded by Living Rivers-Georgia Basin/Vancouver Island (2006-11), a program of the BC Living Rivers Trust Fund.

Report Type
  Water
 
Subject
  Region - Vancouver Island
  Watershed Groups - 920 - Vancouver Island (East) Rivers
  Water Information - Hydrometric / Hydrology
  Water Information - Water Management
  Water Information - Water Supply
 


Warranty Disclaimer

This information is provided as a public service by the Government of British Columbia, Box 9411, Victoria, British Columbia, Canada V8W 9V1. This Web site and all of the information it contains are provided "as is" without warranty of any kind, whether express or implied. All implied warranties, including, without limitation, implied warranties of merchantability, fitness for a particular purpose, and non-infringement, are hereby expressly disclaimed. Limitation of Liabilities Under no circumstances will the Government of British Columbia be liable to any person or business entity for any direct, indirect, special, incidental, consequential, or other damages based on any use of this Web site or any other Web site to which this site is linked, including, without limitation, any lost profits, business interruption, or loss of programs or information, even if the Government of British Columbia has been specifically advised of the possibility of such damages.


 

COPYRIGHT | DISCLAIMER | PRIVACY | ACCESSIBILITY