Search Results

1 results returned.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Title Sort descending Sort ascending Primary
Author Sort ascending Sort descending
Date Sort ascending Sort descending
Abstract / Details
View
Hard
copy
Project completion abstract for landslide and gully rehabilitation: project # 4270005, Kelowna CWS, Southern Interior Forest Region Silvatech Consulting Ltd.
2003
A
D
Abstract: Under the FRBC program and the 2002-03 FIA project #2056001 a detailed-engineered design was created and 3.2km's were constructed to the engineered design specifications. The final phase of this project was to complete permanent deactivation of the old road location, to eliminate public access. This project is directly related to our 2002-03 FIA project 2056001. It is the deactivation of the original road location that has been replaced by an environmentally improved road location. The completion of the permanent deactivation has created a public benefit by addressing the current issues of illegal dumping, accidents and sediment runoff, all of which have the potential to greatly affect domestic water quality in Kelowna Creek.
 
Silvatech Consulting Ltd., Ross, Paul; Fuhr, Ron. 2003. Project completion abstract for landslide and gully rehabilitation: project # 4270005, Kelowna CWS, Southern Interior Forest Region. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2003MR107
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA), Road, Construction, British, Columbia, Riparian, Areas, Management
ISSN:  Scientific Name: 
ISBN:  English Name: 
Other Identifier: 
 
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.

EIRS Search Options

Useful Contacts