Search Results

1 results returned.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Title Sort descending Sort ascending Primary
Author Sort ascending Sort descending
Date Sort ascending Sort descending
Abstract / Details
View
Hard
copy
Environmental management plan for restoring fish passage to the stream crossing at 12.8 km on the Chuchinka - Crocker FSR DWB Forestry Services Ltd.
2006
A
D
Abstract: In the fall of 2005 DWB Forestry Services Ltd. (DWB) was retained by Canadian Forest Products Ltd. (CanFor), Prince George Woodlands Division, to complete a site plan and prepare an Environmental Management Plan (EMP) for the upgrading of fish passage of the Corrugated Steel Pipe (CSP) located at 12.8 km on the Chuchinka-Crocker Forest Service Road (FSR) in the Anzac Operating Area. An 800 mm x 24 meter long CSP is the present crossing structure at this location. The unnamed creek that flows through the CSP is a direct tributary to the Anzac River. In 2001, the Ministry of Water, Land, and Air Protection (MWLAP) assessed the culvert for compliance in relation to fish passage and Q100-year flood event. DWB conducted two formal reviews with regards to CSP passage and ability to accommodate a Q100 flood event. The review process included the sampling and classifying of the unnamed stream. This site was identified by DWB as Site ANZ 007 and MWLAP Site #53. In November 2005, DWB Forestry Services Ltd. (DWB) was retained by Canadian Forest Products Ltd. (CanFor), Prince George Woodlands Division, to prepare an Environmental Management Plan (EMP) for the replacement of a Corrugated Metal Pipe (CMP) at 15.4 Km on the Chuchinka-Crocker Forest Service Road (FSR). Based on the stream classification conducted by DWB in 2004, this crossing spans a default S3 stream. The aforementioned CMP was assessed in 2001 by the Ministry of Water, Land and Air Protection and determined to be a barrier to fish migration. As a result, the CMP will be replaced with a 12-meter concrete box stringer bridge. This EMP includes a description of the present site conditions, a fish habitat assessment, an assessment of the proposed crossing structure, anticipated impacts to fisheries resources, details concerning timing windows, and recommended practices for the removal and replacement of the CMP. DWB Forestry Services Ltd.
 
DWB Forestry Services Ltd.. 2006. Environmental management plan for restoring fish passage to the stream crossing at 12.8 km on the Chuchinka - Crocker FSR. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2006MR213
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA), Culverts, British, Columbia, Maintenance, Repair, Fish, habitat, improvement
ISSN:  Scientific Name: 
ISBN:  English Name: 
Other Identifier: 
 
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.

EIRS Search Options

Useful Contacts