Search Results

1 results returned.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Title Sort descending Sort ascending Primary
Author Sort ascending Sort descending
Date Sort ascending Sort descending
Abstract / Details
View
Hard
copy
Hydrological Assessment: Site Plan Development DWB Forestry Services Ltd.
2007
A
D
Abstract: This project is to develop engineered site plans for the replacement of the high priority culvert crossings. Specific objectives of this project for each high priority crossing include: 1. Hydrological assessment to determine structure size and configuration to accomodate fish passage and Q100 flows. - Q100 flow calculations - General arrangement and configuration of the crossing structure 2. Crossing Site Plan and Crossing Layout - Site plan and design signed by a Professional Engineer - Deactiviation plans and prescriptions 3. Fisheries Consultation - DFO/MoE approvals of the Site Plans and designs - DFO/MoE approvals of any instream works related to the planning and implementation of the associated construction and/or deactivation works. DWB Forestry Services Limited.
 
DWB Forestry Services Ltd., Canadian Forest Products Ltd. - Vanderhoof Division. 2007. Hydrological Assessment: Site Plan Development. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2007MR017
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA), Culverts, British, Columbia, Maintenance, Repair
ISSN:  Scientific Name: 
ISBN:  English Name: 
Other Identifier: 
 
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.

EIRS Search Options

Useful Contacts