Site 9 - Road 20 - The objective at this site is to remove the existing culvert, which is a partial barrier to fish, and to replace it with a bridge, which will restore fish passage. Approximately 5,000 meters of habitat will be gained.
Site 11 - Road 232 - At this site, the object is to remove the existing culvert, which is a full barrier to fish, and to replace it with a bridge which will provide for the passage of fish. Approximately 2,300 meters of habitat will be gained.