2006/07 Project #4636001 included the preparation of 5 Site Plans and the construction of 1 bridge however due to snow delays, the bridge was not installed. This project involves the installation of the bridge at site J36 (the bridge is currently in the yard at the Kamloops Forest District office) and the deactivation of the cuvlert at site J35 (including blocking the road and signage).
Keywords: Forest, Investment, Account, (FIA), British, Columbia