A fish passage culvert assessment was completed by ForFish Consulting for BCTS Kamloops through Forsite's FIA project management on Septermber 14.2006. There was a damaged 600mm CMP installed at the stream crossing. The culvert was determined to be a low water barrier and a potentioal high water barrier to fish passage. The FPCI score for the crossing was 42.