J9 and J38 structure maintanence Unwin, Lyle
2010
A
D
Abstract: A detailed plan was completed for Site J9 to outline the required works to reconstruct the inlet fillsope, install 400 mm diameter CSP's, and construct rock lined sumps and channels. The reader is referred to the drawing entitled 'Reconstruction Works - Site J9 at 64 km on the 1900 Road' and dated August 4. 2009.
 
Unwin, Lyle. 2010. J9 and J38 structure maintanence. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2010MR028
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA), British, Columbia