Search Results

1 results returned.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Title Sort descending Sort ascending Primary
Author Sort ascending Sort descending
Date Sort ascending Sort descending
Abstract / Details
View
Hard
copy
Fish Passage Culvert Removal, TFL 23 Swan, Frances
2010
A
D
Abstract: In 2008 Interfor completed Fish Passage Culvert Assessments on selected watersheds on TFL 23. Based on the fish barrier scoring tool (MoE 2008), the three culverts under this project had cumulative scores above 20 and were determined to be barriers. As the culverts were located on non-status roads that had limited ATV access, the prescribed restoration treatment was to remove the culverts and restore the channel. The work was carried out under the FIA Road Deactivation activity.
 
Swan, Frances. 2010. Fish Passage Culvert Removal, TFL 23. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2010MR031
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA), British, Columbia
ISSN:  Scientific Name: 
ISBN:  English Name: 
Other Identifier: 
 
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.

EIRS Search Options

Useful Contacts