Search Results

1 results returned.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Title Sort descending Sort ascending Primary
Author Sort ascending Sort descending
Date Sort ascending Sort descending
Abstract / Details
View
Hard
copy
Culvert Replacement at Site K3 on a Tributary to Kelly River Jones, Stephen
2010
A
D
Abstract: Non Status Roads within the Boundary TSA- , Snowy River Resources Ltd., November 30, 2002 identified this location as a partial upstream barrier to rainbow trout migration with a Parker score of 39. The existing culverts (photo 1) had been installed prior to 1995 and could convey more than Q100 but the outlets were perched and emptied onto rock and were a full barrier to fish passage.A hydrologic assessment and new crossing design were completed November 18, 2008 (project 4881001). Materials were purchased in early 2009 (project 5046004) and the installation of the structure occurred September 11-13, 2009. 1. The assessment that contributed to the decision to restore fish passage at this crossing is: ?Fish Passage Culvert Inspection, Status and Non Status Roads within the Boundary TSA-, Snowy River Resources Ltd., November 30, 2002, FPCIP score = 39.
 
Jones, Stephen. 2010. Culvert Replacement at Site K3 on a Tributary to Kelly River. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2010MR039
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA), British, Columbia
ISSN:  Scientific Name: 
ISBN:  English Name: 
Other Identifier: 
 
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.

EIRS Search Options

Useful Contacts