Search Results

1 results returned.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Title Sort descending Sort ascending Primary
Author Sort ascending Sort descending
Date Sort ascending Sort descending
Abstract / Details
View
Hard
copy
Fish Passage Culvert Replacement with a New Bridge at Site Red 1 on Red Creek Jones, Stephen
2010
A
D
Abstract: The report -2008 Fish Passage Culvert Assessments, Cascades Forest District FIA Project SOTSA185045001-, Karen Grainger, R.P.Bio, November 2008 identified this location as an upstream barrier to rainbow trout migration in Red Creek with a score of 26. The existing culvert had been installed in the 1980?s and had the following characteristics: was not embedded, had a 12cm outlet drop and was too narrow for the stream width (photos 1 and 2). A hydrologic assessment and new crossing design were completed March 13, 2009 and the supply and installation of the structure occurred August 27-29, 2009. The assessments that contributed to the decision to restore fish passage at this crossing are: -2008 Fish Passage Culvert Assessments, Cascades Forest District FIA Project SOTSA185045001 -, Karen Grainger, R.P.Bio., November 2008. The score according to the March 2008 Fish Passage Protocol methodology was 26.
 
Jones, Stephen. 2010. Fish Passage Culvert Replacement with a New Bridge at Site Red 1 on Red Creek. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2010MR041
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA), British, Columbia
ISSN:  Scientific Name: 
ISBN:  English Name: 
Other Identifier: 
 
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.

EIRS Search Options

Useful Contacts