Search Results

1 results returned.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Title Sort descending Sort ascending Primary
Author Sort ascending Sort descending
Date Sort ascending Sort descending
Abstract / Details
View
Hard
copy
QC 128 Road Deactivation Milne, Michael J.
2010
A
D
Abstract: Roads treated as part of this project were determined through overview analysis to be moderate or higher risk with respect to resources at stake. Priority roads were constructed between 1980 and 1995. Permanent deactivation was prescribed to address the issues in all cases on 7.0 km of non-status road. Hazards included failed or failing road prisms and drainage structures, uncontrolled drainage, and erosion, generally. Several landslides had occurred off roads QC128 and 128G with impact on tributary channels. Portions of roads QC128, 128G, and 128G9 are located on Class IV and V terrain. No prior work of a similar nature had been done on any road in this project.
 
Milne, Michael J.. 2010. QC 128 Road Deactivation. Forest Investment Account (FIA) - Forest Science Program. Forest Investment Account Report. FIA2010MR051
 
Topic: FLNRORD Research Program
Keywords: Forest, Investment, Account, (FIA), Northern, goshawk, Habitat, British, Columbia
ISSN:  Scientific Name: 
ISBN:  English Name: 
Other Identifier: 
 
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.

EIRS Search Options

Useful Contacts