Search Results

1 results returned.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Title Sort descending Sort ascending Primary
Author Sort ascending Sort descending
Date Sort ascending Sort descending
Abstract / Details
View
Hard
copy
Resource Road Rehabilitation Handbook: Planning and Implementation Guidelines (Interim Methods) - Appendix 1 Moore, G.D.
1994
A
D
Abstract: The Matlset Road system is built on very steep south and west-facing slopes above Matlset Narrows and Bedwell Sound, 13 km northeast of Tofino, B.C. (Figure 1). Timber on the surrounding slopes was harvested about 10 years ago. Several road sections have nearly been lost to severe landsliding; fill along the crest of much of the road system is highly distressed and will likely fail. Deactivation work with a tracked excavator and eventual vegetation reclamation will have positive results and are the only possible means of preventing or limiting future landsliding along the substandard road system.
 
Moore, G.D.. 1994. Resource Road Rehabilitation Handbook: Planning and Implementation Guidelines (Interim Methods) - Appendix 1. Ministry of Environment, Lands and Parks; Ministry of Forests. Watershed Restoration Program Technical Circular. WRTC03
 
Topic: 
Keywords: matslet road, vegetation reclamation
ISSN:  Scientific Name: 
ISBN:  English Name: 
Other Identifier: 
 
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.

EIRS Search Options

Useful Contacts