Search Results

1 results returned.
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.
Title Sort descending Sort ascending Primary
Author Sort ascending Sort descending
Date Sort ascending Sort descending
Abstract / Details
View
Hard
copy
Operation and Maintenance Manual for New Works Template BC Ministry of Water Land and Air Protection
2001
A
D
Abstract: Regular inspection and maintenance of flood mitigation works is necessary to maintain the dependability of the flood mitigation system. The flood mitigation system refers to the integration of all of the components and activities that are required to ensure the long term ongoing protection of habitable areas during peak flows up to the design flood event. It includes (but not necessarily limited to) the following: the flood mitigation works (the Works); an Operation and Maintenance (O&M) manual; the legal access agreements, which are needed for the works but may also extend beyond the immediate vicinity of the works to facilitate access for the removal of sediment build-up and log debris jams; andother components implemented to ensure public safety (such as emergency operations plans and procedures, warning systems, and flood monitoring operations).
 
BC Ministry of Water Land and Air Protection. 2001. Operation and Maintenance Manual for New Works Template. BC Ministry of Water Land and Air Protection
 
Topic: 
Keywords: flood mitigation
ISSN:  Scientific Name: 
ISBN:  English Name: 
Other Identifier: 
 
To copy the URL of a document, Right Click on the document title, select "Copy Shortcut/Copy Link", then paste as needed. Only documents available to the public have this feature enabled.

EIRS Search Options

Useful Contacts