Routine effectiveness evaluations of instream restoration treatments: Stoney Creek and Corkscrew Creek | ||||||||
Author |
Murphy, Liz | ||||||||
Date |
2006 | ||||||||
Abstract |
Field evaluations were conducted in September of 2005 and project reporting was completed in February of 2005. The compendium report produced for this project encompassed the REE results from two streams on an individual reach basis. Mean physical and biological performance ratings were calculated for both individual structure types as well as across all structure types for each stream. Based on the results, no immediate remedial works were recommended at the time of the report. A follow up REE should be conducted by 2008 to reassess the structures and to make further recommendations. prepared by Liz Murphy and Jason A. Yarmish. | ||||||||