Port Alice debris flow: November 2004 : site inspection
Author
Walsh, Bruce
Date
2005
Abstract
On November 17, 2004, debris flows occurred on Gully 1 and Gully 2 and deposited material within the realigned channels outside the protective dikes around Port Alice (Figure 1). As requested, Mr. Bruce Walsh, P.Eng., of Northwest Hydraulic Consultants Ltd. (nhc) and Mr. Mike Wise, of GeoWise Engineering Ltd. (GWE) completed an assessment of this event. Northwest Hydraulic Consultants.