Document Details
Title |
Pre-code culvert replacement | ||||||
Author |
DWB Forestry Services Ltd. | ||||||
Date |
2005 | ||||||
Abstract |
Specific objectives of this project include: 1. Hydrological assessment to determine structure size and configuration to accommodate Q100 flows and fish passage guidelines; Q100 flow calculations; General arrangement and configuration of the crossing structure. 2. Road Layout and Design and Site Plan; Site plan and design signed by a professional engineer. 3. Fisheries Habitat Assessment and Consultation; DFO/MoE approvals of the road layout and site plan designs; DFO/MoE approvals of any instream works associated for the construction planning and implementation of the associated construction works. Prepared by: DWB Forestry Services Ltd. | ||||||
Report Number |
FIA2005MR178 | ||||||
|
|||||||