Document Details

Title
Environmental Clean-up of old non-status roads and trails - Mt. Elphinstone
Author
Marquis, David
Date
2008
Abstract
The project will focus on the implementation of completed prescriptions for high priority roads located on Mt. Elphinstone. The prescribed works are designed to: 1) protect the structural integrity of the existing roads; 2) establish a functioning and self maintaining drainage system through the removal of old non-functioning drainage structures (i.e. wood box culverts) and replace them with self maintaining well armored crossing and; 3) to manage water, soil erosion and control sediment through a series of cross drains and out-sloping of the roads. Planned environmental maintenance for the 2007/08 fiscal includes approximately 3485 meters of old road named Guy?s Gulch, Dude?s Bypass and Black Tower.
Report Number
FIA2008MR271
 
Title
View
Project Completion Abstract
Dude's Bypass Map
Black Tower Map

EIRS Search Options

Useful Contacts