Project Status Report

Current EA Projects

Project Name

Category Name

Status

Start Date

Certified / Completed

Ajax Mine Project Mining Pre-Application 2011/02/25
Aley Mine Project Mining Pre-Application 2014/09/19
Arctos Anthracite Project Mining Pre-Application 2013/04/18
Aurora LNG Digby Island Energy Pre-Application 2014/06/23
Aurora LNG Grassy Point Energy Pre-Application 2014/06/23
Baldy Ridge Extension Mining Pre-Application 2014/06/05
Banks Island North Wind Energy Project Energy Pre-Application 2007/05/22
Bear River Gravel Project Mining Pre-Application 2005/03/08
Bingay Main Coal Project Mining Pre-Application 2012/11/30
Blackwater Gold Project Mining Pre-Application 2012/11/05
Brucejack Gold Mine Project Mining Under Review 2013/02/06
Burnco Aggregate Project Mining Pre-Application 2010/01/18
Bute Inlet Hydroelectric Project Energy Pre-Application 2008/04/16
Carbon Creek Coal Mine Project Mining Pre-Application 2012/05/09
Coal Mountain Phase 2 Project Mining Pre-Application 2014/09/11
Cogburn Magnesium Mining Pre-Application 2005/03/24
Coquihalla Pass Resort Development Project Tourist Destination Resorts Pre-Application 2005/06/20
Crab/Europa Hydroelectric Development Energy Pre-Application 2007/09/18
Crown Mountain Coking Coal Project Mining Pre-Application 2014/10/30
Eagle Mountain - Woodfibre Gas Pipeline Project Energy Pre-Application 2013/08/01
Echo Hill Coal Project Mining Pre-Application 2012/11/02
Europa Creek Hydroelectric Project Energy Pre-Application 2006/04/20
Farrell Creek 88-I South Gas Plant Project Energy Pre-Application 2012/06/12
Fording River Operations Swift Project Mining Pre-Application 2011/09/06
Garibaldi at Squamish Project - (1997) Tourist Destination Resorts Under Review 1997/12/08
Garibaldi at Squamish Project - (2006) Tourist Destination Resorts Under Review 1997/12/08
Garibaldi at Squamish Project - (2013) Tourist Destination Resorts Under Review 1997/12/08
Gething Coal Project Mining Pre-Application 2006/11/10
Giscome Quarry and Lime Plant Project Mining Pre-Application 2007/04/12
Grassy Point LNG Energy Pre-Application 2014/08/08
Hackney Hills Wind Project Energy Pre-Application 2007/08/01
Harper Creek Copper-Gold-Silver Project Mining Pre-Application 2008/09/18
Hawkeye Energy Corporation Green Energy Grid Project Energy Pre-Application 2008/09/10
Highland Valley Copper Refinery Industrial Pre-Application 2006/07/24
Hills Bar Aggregate Quarrying Project Mining Pre-Application 2003/07/21
Horizon Mine Coal Project Mining Pre-Application 2005/09/20
James White Park Well Project Water Management Pre-Application 2011/06/17
Kemess Underground Mine Project Mining Pre-Application 2014/02/07
Kingsvale to Oliver Natural Gas Pipeline Reinforcement Project Energy Pre-Application 2011/11/10
Kinskuch Hydro Project Energy Pre-Application 2008/11/19
Klinaklini Hydroelectric Project Energy Pre-Application 2006/11/07
Kootenay West Mine Project Mining Pre-Application 2013/03/01
Kutcho Copper-Zinc-Silver-Gold Mine Project Mining Pre-Application 2005/07/29
LNG Canada Export Terminal Project Energy Under Review 2013/04/03
Lodgepole Coal Mine Mining Pre-Application 2006/01/09
Marten Ridge Wind Energy Energy Pre-Application 2008/11/20
McGregor/Herrick Hydroelectric Project Energy Pre-Application 2006/01/23
Morrison Copper/Gold Project Mining Under Review 2003/09/30
Mount George Wind Park Energy Pre-Application 2008/01/09
Mount Kathleen Wind Park Energy Pre-Application 2007/12/20
Murray River Coal Project Mining Pre-Application 2012/06/29
Nicomen Wind Energy Project Energy Pre-Application 2008/11/19
Nulki Hills Wind Project Energy Pre-Application 2012/11/26
Pacific Northern Gas Looping Project Energy Pre-Application 2013/07/24
Prince Rupert LNG Project Energy Pre-Application 2013/05/02
Raven Underground Coal Project Mining Pre-Application 2009/08/12
Revelstoke Generating Station Unit 6 Project Energy Pre-Application 2013/04/11
Roberts Bank Terminal 2 Project Transportation Pre-Application 2014/11/05
Rocky Creek Energy Project Energy Pre-Application 2009/11/04
Ruddock Creek Mine Project Mining Pre-Application 2009/02/12
Ryan River Hydro Project Energy Pre-Application 2008/03/07
Schaft Creek Mine Project Mining Pre-Application 2006/08/14
Sechelt Carbonate Project Mining Pre-Application 2005/11/23
South Meager Geothermal Project Energy Pre-Application 2004/07/16
Spanish Mountain Gold Project Mining Pre-Application 2011/08/02
Sukunka Coal Mine Project Mining Pre-Application 2013/01/25
Sundance Wind Project Energy Pre-Application 2012/10/31
Sustut Copper Project Mining Pre-Application 2003/03/28
Taylor Wind Project Energy Pre-Application 2012/10/31
Terminal A Extension Project Transportation Pre-Application 2014/06/06
Tsilhqot'in Power Development Project Energy Pre-Application 2008/06/09
Upper Pitt River Water Power Project Energy Pre-Application 2007/02/19
Vancouver Island Cable Project Energy Pre-Application 2005/10/25
Wildmare Wind Energy Project Energy Under Review 2007/05/09
Woodfibre LNG Project Energy Pre-Application 2013/11/27

Certified/Complete Projects

Project Name

Category Name

Status

Start Date

Certified / Completed

Sea-To-Sky Highway Upgrade Project Transportation Amendments 2003/02/03 2004/06/04
Younger NGL Plant Expansion Project Energy Amendments 1996/02/19 1996/06/11
Waneta Hydroelectric Expansion Project (2003) Energy Amendments 2003/06/12 2007/11/13
Whistler Nordic Centre Tourist Destination Resorts Amendments 2004/02/16 2005/04/05
Galore Creek Copper-Gold-Silver Project Mining Amendments 2004/02/25 2007/02/16
Port Mann/Highway 1 Project Transportation Amendments 2006/05/18 2008/06/12
Upper Harrison Water Power Project Energy Amendments 2004/12/30 2006/09/21
Brule Mine Project Mining Amendments 2005/01/13 2006/07/04
Dokie Wind Energy Project Energy Amendments 2005/04/12 2006/08/08
Upper Lillooet Hydro Project Energy Amendments 2010/05/18 2013/01/08
McLymont Creek Hydroelectric Project Energy Amendments 2010/09/28 2012/05/31
Kokish River Hydroelectric Project Energy Amendments 2008/07/11 2011/11/24
Cabin Gas Plant Project Energy Amendments 2008/12/11 2010/01/28
Keenleyside Powerplant Project Energy Amendments 1995/06/30 1998/04/27
Seven Mile Unit 4 (Generation Station) Project Energy Amendments 1995/06/30 1996/04/25
Waneta Generating Station Upgrade Project Energy Amendments 1995/06/30 1998/05/26
Nazko Lava Quarry Extension Project Mining Amendments 1995/06/30 1996/02/22
Willow Creek Project Mining Amendments 1995/06/30 1998/03/06
Mt. Milligan Gold/Copper Project (2006) Mining Amendments 2006/10/13 2009/03/16
West Stoddart Gas Processing Facility Project Energy Amendments 1997/12/15 1998/04/23
Jedney Gas Plant & Pipeline Expansion Energy Amendments 1996/11/14 1997/02/18
New Fraser River Crossing Project Water Management Amendments 2003/03/18 2004/08/06
Bear Mountain Wind Park Project Energy Amendments 2005/11/01 2007/08/20
Peejay Secure Landfill Project Waste Disposal Amendments 2006/11/10 2008/08/26
Interior-Lower Mainland Transmission Project Energy Amendments 2006/12/18 2009/06/03
Revelstoke Generating Station Unit 5 Project Energy Amendments 1995/06/30 2007/05/30
East Toba River Montrose Creek Hydroelectric Project Energy Amendments 2004/09/17 2007/04/24
Bevan Avenue Wells Project Water Management Amendments 2008/04/16 2011/05/10
Mica Generating Station Unit 5 Energy Amendments 2008/04/18 2010/04/07
Big Silver Creek Waterpower Project Energy Amendments 2008/06/18 2012/08/17
Eskay Creek Mine Mill Expansion Project Mining Amendments 1994/03/29
Taiga Wood Treatment Plant Industrial Amendments 1997/05/27 1997/09/30
Island Cogeneration Project Energy Amendments 1997/10/08 1998/04/09
Mt. Milligan Project Mining Amendments 1997/01/01 2009/03/16
Southern Crossing Energy Amendments 1998/01/16 1999/05/17
Pingston Creek Hydroelectric Project Energy Amendments 1998/02/17 1999/05/18
Stronsay Lead/Zinc Project Mining Amendments 1992/12/16
Squamish Groundwater Water Management Amendments 1998/12/19 1999/03/31
Mt. Polley Copper Project Mining Amendments 1992/10/06
Tulsequah Chief Mine Project Mining Amendments 2000/09/19 2002/12/12
Bulrush Natural Gas Production Energy Amendments 1995/06/30 1995/12/22
Caribou Gas Processing Plant Energy Amendments 1996/07/30 1996/11/13
Fort Nelson Electrical Generation Project Energy Amendments 1998/08/10 1998/09/25
Highway Gas and Liquids Plant and Pipeline Project Energy Amendments 1996/10/28 1997/02/06
Jedney Gas Plant Energy Amendments 1995/12/13 1996/04/25
Cougar Pit Coal Mining Amendments 1995/06/30 1997/04/24
Huckleberry Copper and Gold Mine Mining Amendments 1995/06/30 1995/12/22
Kwoiek Creek Hydroelectric Project Energy Amendments 2001/03/20 2009/03/12
Peace Valley OSB Project (formerly Slocan-LP OSB Project) Industrial Amendments 2001/09/05 2002/01/14
Brilliant Powerplant Expansion Project Energy Amendments 2000/11/30 2001/10/16
McMahon Co-Generation Project Energy Amendments 1991/05/27
Boundary Lake Sour Gas Plant Project Energy Amendments 1990/05/02
Line Creek Coal Project Mining Amendments 1992/07/25
Burnaby Lake Rejuvenation Water Management Amendments 2002/05/24 2002/09/25
Wolverine Coal Mine Mining Amendments 2001/12/31 2005/01/13
Canada Line Transportation Amendments 2003/02/22 2005/06/07
Vancouver Convention Centre Expansion Water Management Amendments 2003/02/04 2004/07/28
Stave Falls Powerplant Project Energy Amendments 1995/06/28
South Fraser Perimeter Road Project Transportation Amendments 2003/02/03 2008/07/24
Cape Scott Wind Farm Project Energy Certificate Extension 2003/06/11 2004/09/21
Kitimat LNG Terminal Project Energy Certificate Extension 2004/09/14 2006/06/01
Red Chris Porphyry Copper-Gold Mine Project Mining Certificate Extension 2003/11/26 2005/08/24
Wartenbe Wind Energy Project Energy Certificate Extension 2005/04/12 2006/10/05
Ruby Creek Molybdenum Mining Certificate Extension 2005/06/08 2007/09/10
Jumbo Glacier Resort Project Tourist Destination Resorts Certificate Extension 1995/06/30 2004/10/12
Hermann Mine Project Mining Certificate Extension 2006/07/06 2008/11/24
Pacific Trail Pipelines Project Energy Certificate Extension 2005/11/23 2008/06/26
Babkirk Secure Landfill Project Waste Disposal Certificate Extension 2007/01/16 2008/12/03
Cascade Heritage Power Project Energy Certificate Extension 1999/06/15 2006/08/03
Upper Toba Valley Hydroelectric Project Energy Certificate Extension 2007/07/24 2009/03/31
Melvin Creek/Cayoosh Project Tourist Destination Resorts Certificate Extension 1996/11/01 2000/08/14
Sulphurets Gold/Silver Project Mining Certificate Extension 1997/09/22 1993/04/05
WGSI LNG Storage Project Energy Certificate Extension 1997/09/25 1999/04/09
Laredo Limestone Project - Extension Project Mining Certificate Extension 1997/10/30 1993/06/24
Forrest Kerr Hydroelectric Project Energy Certificate Extension 2002/06/20 2003/03/13
Eagle Rock Quarry Project Mining Certificate Extension 2002/12/16 2003/09/17
Stewart Bulk Terminals Wharf Expansion Project Transportation Certificate Extension 2002/03/30 2002/10/08
Vancouver Island Generation Project Energy Certificate Issued 2002/06/01 2003/12/17
Line Creek Operations Phase II Mining Certificate Issued 2009/09/28 2013/09/25
Orca Sand and Gravel Project Mining Certificate Issued 2003/09/30 2005/07/14
Holberg Wind Energy Project Energy Certificate Issued 2003/12/16 2004/10/22
NaiKun Offshore Wind Energy Project Energy Certificate Issued 2003/11/27 2009/12/10
Swamp Point Aggregate Mine Project Mining Certificate Issued 2005/04/07 2006/06/21
Nahwitti Wind Farm Project Energy Certificate Issued 2004/12/16 2011/12/21
Site C Clean Energy Project Energy Certificate Issued 2011/08/02 2014/10/14
Cache Creek Landfill Extension Waste Disposal Certificate Issued 2008/08/28 2010/01/06
Prosperity Gold-Copper Project (Pre 2005) Mining Certificate Issued 1995/06/30 2010/01/14
Vancouver Airport Fuel Delivery Project Other Certificate Issued 2009/02/10 2013/12/11
Evergreen Line Rapid Transit Project Transportation Certificate Issued 2006/03/15 2011/02/02
Kitsault Mine Project Mining Certificate Issued 2010/04/08 2013/03/18
Prosperity Gold-Copper Project Mining Certificate Issued 1995/06/30 2010/01/14
Fiberco Pulp Mill Expansion Project Industrial Certificate Issued 1995/06/30 1996/01/25
Elkhorn Quarry Extension Project Mining Certificate Issued 1995/06/30 1995/09/19
Salmon Aquaculture Review (Former Section 40) Other Certificate Issued 1995/11/12 1997/08/26
McGillivray Coal Mining Certificate Issued 1996/01/04 1996/07/24
Highland Valley Centre for Sustainable Waste Management Waste Disposal Certificate Issued 2005/08/02 2008/10/02
Mackenzie Green Energy Centre Project Energy Certificate Issued 2006/03/09 2007/11/06
Evergreen Light Rail Transit Project Transportation Certificate Issued 2006/03/15 2011/02/02
Kemess South Project Mining Certificate Issued 1995/06/30 1996/04/29
Bodie Dump Mining Certificate Issued 1995/06/30 1996/02/23
Chemainus Wells Water Supply Project Water Management Certificate Issued 2003/06/14 2009/03/09
Coastal GasLink Pipeline Project Energy Certificate Issued 2012/12/11 2014/10/23
Vancouver Island Transmission Reinforcement Project Energy Certificate Issued 2005/01/11 2007/02/12
Northern Rockies Secure Landfill Project Waste Disposal Certificate Issued 2007/04/02 2009/03/31
Tumbler Ridge Wind Energy Project Energy Certificate Issued 2007/05/11 2012/03/27
Meikle Wind Energy Project Energy Certificate Issued 2007/05/09 2014/06/24
Northwest Transmission Line (NTL) Project Energy Certificate Issued 2007/05/31 2011/02/23
Thunder Mountain Wind Project Energy Certificate Issued 2007/08/01 2009/12/10
Roman Coal Mine Mining Certificate Issued 2007/09/11 2012/12/14
Quality Wind Project Energy Certificate Issued 2008/02/07 2010/07/09
Narrows Inlet Hydro Project Energy Certificate Issued 2008/02/05 2014/01/15
KSM (Kerr-Sulphurets-Mitchell) Project Mining Certificate Issued 2008/04/25 2014/07/29
Mica Generating Station Unit 6 Energy Certificate Issued 2008/04/18 2010/04/07
Tretheway Creek Waterpower Project Energy Certificate Issued 2008/06/18 2012/08/17
Greenville - Kincolith Road Project Transportation Certificate Issued 1996/01/17 1999/10/20
Trans Mountain Pipe Line Modification Energy Certificate Issued 1997/02/06 1997/04/23
Taylor Straddle Plant Project Energy Certificate Issued 1997/04/12 1997/10/14
Ring Border Gas Plant Expansion Project Energy Certificate Issued 1997/07/03 1998/01/14
Babkirk Special Waste Treatment Facility Project Waste Disposal Certificate Issued 1998/01/06 1998/05/05
District of Chilliwack Groundwater Well Project Water Management Certificate Issued 1998/08/27 1998/11/23
SkyTrain Extension Review Transportation Certificate Issued 1998/09/01 1999/05/31
Burns Bog Ecosystem Review Other Certificate Issued 1999/06/28
Port Alberni Cogeneration Project Energy Certificate Issued 1999/08/20 1999/12/10
Maxhamish Pipeline Project Energy Certificate Issued 1999/09/01 1999/12/07
Tom MacKay Lake Waste Rock & Tailings Project Mining Certificate Issued 2000/02/18 2000/07/21
Kamloops Groundwater Project Water Management Certificate Issued 2000/11/10 2004/04/13
North Lakeside Well Water Management Certificate Issued 2001/07/20 2001/10/24
Basal Aquifer Dewatering Project Water Management Certificate Issued 2002/02/19 2002/08/14
Coursier Dam Decommissioning Project Energy Certificate Issued 2002/12/16 2003/05/08
City of Prince George - Fishtrap Island Collector Well Water Management Certificate Issued 2003/02/21 2004/02/26
Deltaport Third Berth Project Transportation Certificate Issued 2003/03/18 2006/09/28
Cranbrook Deep Wells Project Water Management Certificate Issued 2001/10/30 2004/10/15
Silverberry Secure Landfill Waste Disposal Certificate Issued 2002/01/15 2002/07/10
Shovel Creek Waterpower Project Energy Certificate Issued 2008/06/18 2012/08/17
Lafarge Cement Plant Modernization Industrial Certificate Issued 1996/04/30 1996/09/22
Fortune Creek Gas Project Energy Certificate Issued 2011/11/08 2013/10/07
Westcoast Connector Gas Transmission Project Energy Certificate Issued 2012/11/09 2014/11/25
Pacific NorthWest LNG Project Energy Certificate Issued 2013/07/16 2014/11/25
Prince Rupert Gas Transmission Project Energy Certificate Issued 2013/06/06 2014/11/25
Ashcroft Ranch Landfill Project Waste Disposal Certificate Refused 2003/03/03 2011/09/08
Kemess North Copper-Gold Mine Project Mining Certificate Refused 2003/10/29 2008/03/07
Raising of Sooke Reservoir Dam by One Metre Water Management Projects that do not require an EA certificate 2003/05/21 2003/05/21
Encana 4-26 Refrigeration Project Energy Projects that do not require an EA certificate 2014/01/13 2014/01/13
NorskeCanada's Crofton De-Inking Plant Industrial Projects that do not require an EA certificate 2003/08/15 2003/08/15
Prince George Wood Residue Fired Cogeneration Project Energy Projects that do not require an EA certificate 2003/11/17 2003/11/17
Chilliwack Well 9 Water Management Projects that do not require an EA certificate 2009/07/14 2009/07/14
Dunkley Lumber Mill Expansion Industrial Projects that do not require an EA certificate 2004/09/30 2004/09/30
GM Shrum Units 1 to 5 TRP Energy Projects that do not require an EA certificate 2010/05/10 2010/05/10
Squamish Oceanfront Park Development Project Other Projects that do not require an EA certificate 2010/12/08 2010/12/08
Richmond Island Milltown Marina and Boatyard Project Water Management Projects that do not require an EA certificate 2012/04/27 2012/04/27
Kamloops Airport Expansion Transportation Projects that do not require an EA certificate 2008/06/25 2008/06/25
Black Mountain Reservoir Project Water Management Projects that do not require an EA certificate 2008/08/25 2009/03/25
Gold River Power Project Energy Projects that do not require an EA certificate 2009/08/07 2009/08/07
Vintage Landing Resort and Wellness Village Tourist Destination Resorts Projects that do not require an EA certificate 2005/11/03 2005/11/03
Cranbrook Airport Expansion Project Transportation Projects that do not require an EA certificate 2006/03/13 2006/03/13
GM Shrum Generating Station Upgrade Energy Projects that do not require an EA certificate 2007/03/12 2007/03/12
Smithers Regional Airport Runway Expansion Transportation Projects that do not require an EA certificate 2007/08/01 2007/09/20
29694 Marshall Road Extension Mining Projects that do not require an EA certificate 2008/04/10 2008/04/10
Royal Bay Evaluation Other Projects that do not require an EA certificate 1999/07/19
Dawson Creek Liquid Nitrogen Plant Industrial Projects that do not require an EA certificate 2011/09/01 2011/09/01
Mainland Coast Bottled Water Water Management Projects that do not require an EA certificate 2011/08/16 2011/08/16
UBC Okanagan Geoexchange Project Water Management Projects that do not require an EA certificate 2012/02/10 2012/02/10
Progress Town North Gas Project Energy Projects that do not require an EA certificate 2014/11/10 2014/11/10
Air Liquide Liquid Nitrogen Plant Industrial Projects that do not require an EA certificate 2012/09/24 2012/09/24
North Thompson Emergency Water Intake Project Water Management Projects that do not require an EA certificate 2014/06/25 2014/06/25
Dawson Liquids Extractions Project Energy Projects that do not require an EA certificate 2013/04/08 2013/04/08
Encana 8-21 Refrigeration Project Energy Projects that do not require an EA certificate 2014/10/30 2014/10/30
Westham Canoe Pass Tidal Marsh Water Management Projects that do not require an EA certificate 2013/10/24 2013/10/24
Debolt Saline Water Project Water Management Projects that do not require an EA certificate 2011/01/11 2011/06/06
Central South Mine Project Mining Terminated 2010/09/08 2012/03/20
Heritage Secure Landfill Project Waste Disposal Terminated 2009/01/19 2013/07/30
Cariboo Gold Project Mining Terminated 2000/04/11 2009/04/29
Glacier/Howser Project Energy Terminated 2007/01/15 2012/11/27
Davidson Project Mining Terminated 2005/07/18 2012/01/10
Trend Coal Project Mining Withdrawn 2004/09/21 2005/02/23
PAC-RIM Pipeline Project Energy Withdrawn 1995/10/02
Terrace Green Street Well Project Water Management Withdrawn 2005/03/24 2007/06/14
Mount McDonald Wind Power Project Energy Withdrawn 2009/02/12 2014/05/21
Chu Molybdenum Mine Project Mining Withdrawn 2009/05/01 2013/07/18
CCS Sunrise Secure Landfill Project Waste Disposal Withdrawn 2009/11/20 2011/09/15
Crowsnest Co-generation Plant Project Energy Withdrawn 1995/06/30 2002/12/02
Kamloops Energy Recovery Project Energy Withdrawn 1995/06/30 2001/06/28
Red Mountain Gold Project Mining Withdrawn
Red Chris Copper and Gold Mine Mining Withdrawn 1995/10/02 2003/06/17
Bronson Slope Gold and Copper Mine Mining Withdrawn 1995/11/17 2002/10/09
Princeton Power Project Energy Withdrawn 2006/03/27 2012/02/03
Wapiti Power Development Project Energy Withdrawn 2006/04/03 2012/06/07
Pembina Condensate Pipeline Project Energy Withdrawn 2006/06/22 2014/06/11
Mount Clifford Wind Energy Project Energy Withdrawn 2007/05/09 2010/07/19
Nascall River Hydroelectric Project Energy Withdrawn 2007/09/06 2014/05/13
Telkwa Coal Project Mining Withdrawn 1997/02/10 2003/08/31
Silvertip Silver/Lead/Zinc Mine Project Mining Withdrawn 1998/08/25
Lumby Muscovite Project Mining Withdrawn 1995/06/30
Bamberton Town Development Other Withdrawn 1995/06/30
Inland Pacific Connector (IPC) Pipeline Project Energy Withdrawn 2002/02/06 2011/06/09
Container Terminal 2 Project Transportation Withdrawn 2003/03/18 2006/02/06
Port Alberni Generation Project Energy Withdrawn 2001/06/08 2001/11/27
Statlu Creek Waterpower Project Energy Withdrawn 2008/06/18 2014/05/28
Crystal Peak Garnet Project Mining Withdrawn 1995/06/30 2003/12/21
Wolverine Secure Landfill Project Waste Disposal Withdrawn 2011/12/23 2014/06/12
Mount Klappan Coal Project Mining Withdrawn 2004/10/08 2013/04/12