THIS INFORMATION IS CONSIDERED HISTORICAL AS IT REPRESENTS CHANNEL CONDITIONS AND CONFIGURATION AT THE TIME OF THE SURVEY ONLY. USER MUST ACCEPT RESPONSIBILITY OF ENSURING THAT THE ACCURACY AND COMPLETENESS OF PROVIDED DATA IS SUITABLE FOR THE NEEDS OF THE PROJECT OR STUDY. IT IS PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND, WHETHER EXPRESS OR IMPLIED. UNDER NO CIRCUMSTANCES WILL THE GOVERNMENT OF BRITISH COLUMBIA BE LIABLE TO ANY PERSON OR BUSINESS ENTITY FOR ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR OTHER DAMAGES BASED ON ANY USE OF THIS INFORMATION. NUSATSUM RIVER XS1 80RPP5 OCTOBER 22 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 160 260 0.00 136.73 1 DUMMY 1980 1980 5000.00 159 259 5000.00 136.73 2 C/L LOGGING ROAD 14.03 158 258 5014.03 133.45 3 EDGE RD 3.79 157 257 5017.82 132.55 4 TOE RD 5.65 156 256 5023.47 133.65 5 BOLT LB XS-1 2.32 155 255 5025.79 133.10 6 7.27 154 254 5033.06 132.83 7 4.69 153 253 5037.75 131.73 8 TOP 4.69 152 252 5042.44 128.81 9 TOE 4.25 151 251 5046.69 128.38 10 4.30 150 250 5050.99 127.47 11 STADIA PEG O/L 1.52 149 249 5052.52 127.25 12 3.22 148 248 5055.74 126.28 13 6.63 147 247 5062.37 124.06 14 3.53 146 246 5065.90 123.41 15 1.36 145 245 5067.26 122.88 16 1.58 144 244 5068.83 122.90 17 TOP 1.87 143 243 5070.70 119.88 18 EXTREME H.W. 0.10 142 242 5070.80 118.86 19 TOE ROCK FACE 2.32 141 241 5073.13 118.34 20 D-0.10 2.18 140 240 5075.31 118.17 21 D-0.27 2.80 139 239 5078.11 118.23 22 2.60 138 238 5080.71 118.78 23 6.79 137 237 5087.50 119.26 24 4.30 136 236 5091.80 119.17 25 1.20 135 235 5093.00 118.87 26 D-0.2 2.90 134 234 5095.90 118.57 27 D-0.5 2.30 133 233 5098.20 119.40 28 NUSATSUM RIVER XS1 80RPP5 OCTOBER 22 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.30 132 232 5100.50 119.45 29 TOP BAR 1.90 131 231 5102.40 119.01 30 C/L CHAN D-0.36 2.90 130 230 5105.30 119.38 31 W/L BCHAN 2.80 129 229 5108.10 119.86 32 3.70 128 228 5111.79 119.98 33 SPIKE/BAR XS-1 1.90 127 227 5113.69 120.14 34 8.00 126 226 5121.69 120.42 35 3.30 125 225 5124.99 119.97 36 6.80 124 224 5131.79 120.21 37 TOP CUT ON BAR 2.79 123 223 5134.58 118.92 38 W/L LB 1610 1.31 122 222 5135.88 118.52 39 D-0.4 TOE 4.60 121 221 5140.48 118.42 40 D-0.5 4.59 120 220 5145.07 118.36 41 D-0.7 2.71 119 219 5147.78 118.45 42 D-0.50 5.84 118 218 5153.62 118.73 43 D-0.30 2.79 117 217 5156.42 118.59 44 D-0.48 1.79 116 216 5158.20 118.39 45 D-0.7 5.13 115 215 5163.33 118.74 46 0.43 114 214 5163.76 119.11 47 W/L RB 1600 2.13 113 213 5165.89 119.22 48 TOE 1.70 112 212 5167.59 120.63 49 NAT BNDY 0.93 111 211 5168.52 121.49 50 TOP CUTBANK 4.45 110 210 5172.97 121.66 51 3.30 109 209 5176.27 124.48 52 5.04 108 208 5181.32 126.03 53 4.85 107 207 5186.17 127.37 54 REF SPIKE RB -.7 8.15 106 206 5194.32 127.71 55 13.74 105 205 5208.07 128.80 56 NUSATSUM RIVER XS1 80RPP5 OCTOBER 22 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 7.96 104 204 5216.03 129.41 57 TOP CRK 4.14 103 203 5220.17 128.73 58 TOE 4.24 102 202 5224.41 128.82 59 TOE 4.89 101 201 5229.30 130.82 60 TOP CRK 8.94 100 200 5238.24 131.57 61 ON SLOPE TOE MTN JOIN 160-100 N63 39 13E 5238.237 NUSATSUM R. XS2 (U/S EDGE BR) 80RPP5 OCTOBER 19 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 144 244 0.00 128.90 1 DUMMY 1980 5000.00 143 243 5000.00 128.90 2 TOP ABUT. L/B 0.40 142 242 5000.40 128.28 3 GRND. 1.00 141 241 5001.40 127.71 4 GRND. 1.00 140 240 5002.40 127.50 5 GRND. 1.00 139 239 5003.40 127.21 6 GRND. 1.00 138 238 5004.40 126.96 7 GRND. 2.00 137 237 5006.40 125.77 8 GRND. 1.00 136 236 5007.40 125.39 9 GRND. 1.00 135 235 5008.40 125.07 10 GRND. 1.00 134 234 5009.40 124.73 11 GRND. 1.00 133 233 5010.40 124.33 12 GRND. 1.00 132 232 5011.40 123.59 13 GRND. 1.00 131 231 5012.40 121.67 14 GRND. 1.15 130 230 5013.55 120.78 15 EDGE SUPPORT 1.15 129 229 5014.70 120.40 16 EDGE SUPPORT 2.70 128 228 5017.40 116.46 17 BREAK 0.50 127 227 5017.90 114.83 18 W/L LB 0.00 126 226 5017.90 113.43 19 0.50 125 225 5018.40 113.47 20 1.00 124 224 5019.40 113.88 21 1.00 123 223 5020.40 114.16 22 1.00 122 222 5021.40 114.27 23 1.00 121 221 5022.40 114.38 24 1.00 120 220 5023.40 114.48 25 1.00 119 219 5024.40 114.38 26 1.00 118 218 5025.40 114.43 27 1.00 117 217 5026.40 114.27 28 NUSATSUM R. XS2 (U/S EDGE BR) 80RPP5 OCTOBER 19 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.00 116 216 5027.40 114.15 29 1.00 115 215 5028.40 113.83 30 1.00 114 214 5029.40 113.68 31 1.00 113 213 5030.40 113.50 32 0.50 112 212 5030.90 113.77 33 0.00 111 211 5030.90 114.83 34 W/L R/B 1.06 D 2.30 110 210 5033.20 123.49 35 TOP 1.20 109 209 5034.40 123.08 36 GROUND LEV. 0.90 108 208 5035.30 123.63 37 EDGE SUPPORT GL 1.30 107 207 5036.60 124.58 38 EDGE SUPPORT GL 0.60 106 206 5037.20 124.63 39 1.20 105 205 5038.40 126.95 40 1.00 104 204 5039.40 127.54 41 1.00 103 203 5040.40 127.92 42 1.00 102 202 5041.40 127.86 43 1.00 101 201 5042.40 127.95 44 GROUND 1.00 100 200 5043.40 128.90 45 TOP ABUT. R/B JOIN 144-100 N52 35 41E 5043.400 NUSATSUM RIVER XS3 80RPP5 OCTOBER 23 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 121 221 0.00 127.14 1 DUMMY 1980 5000.00 120 220 5000.00 127.14 2 TOP BANK 5.67 119 219 5005.67 122.28 3 ON SLOPE 5.27 118 218 5010.94 119.01 4 SPIKE LB 0.96 117 217 5011.90 118.57 5 TOP BANK 1.62 116 216 5013.52 116.20 6 TOP 0.77 115 215 5014.29 113.47 7 W/L L/B 2.88 114 214 5017.18 113.55 8 0.07D 1.46 113 213 5018.64 113.37 9 0.37D 3.12 112 212 5021.76 113.40 10 0.40D 4.91 111 211 5026.67 113.49 11 0.50D 4.59 110 210 5031.27 113.49 12 0.40D 5.78 109 209 5037.05 113.54 13 0.24D 6.51 108 208 5043.56 113.38 14 0.45D 2.94 107 207 5046.49 113.14 15 0.6D 1.90 106 206 5048.39 113.72 16 W/L R/B 9:30 2.25 105 205 5050.64 114.50 17 AHW TRASH LINE 3.09 104 204 5053.73 115.70 18 C/L CREEK 5.39 103 203 5059.12 117.53 19 C/L CREEK 6.48 102 202 5065.60 119.03 20 C/L CREEK 5.39 101 201 5070.98 121.01 21 TOE BANK CK BED 1.70 100 200 5072.68 121.46 22 TOP BANK CK BNK JOIN 121-100 N37 23 16E 5072.683 NUSATSUM RIVER XS4 80RPP5 OCTOBER 21 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 177 277 0.00 128.07 1 DUMMY 1980 5000.00 176 276 5000.00 128.07 2 C/L HWY 5+21.4 5.17 175 275 5005.17 127.76 3 EDGE ASPHALT 2.59 174 274 5007.76 127.53 4 BOLT LB HWY 20 1.80 173 273 5009.56 127.30 5 2.98 172 272 5012.54 126.79 6 TOP 2.85 171 271 5015.40 124.69 7 O/S 4.04 170 270 5019.44 120.50 8 O/S 3.69 169 269 5023.13 119.25 9 ON SLOPE 3.69 168 268 5026.82 118.76 10 ON SLOPE 4.47 167 267 5031.29 117.31 11 TOE CLIFF 8.34 166 266 5039.63 116.46 12 7.99 165 265 5047.62 115.58 13 7.79 164 264 5055.40 115.38 14 SPIKE O/L 1.45 163 263 5056.85 115.23 15 TOP CUTBANK 0.94 162 262 5057.80 113.64 16 TOE CUTBANK 4.75 161 261 5062.55 110.49 17 TOE MTN 9.10 160 260 5071.65 110.53 18 TOE DITCH 2.10 159 259 5073.75 109.88 19 TOE DITCH 9.80 158 258 5083.55 109.95 20 1.91 157 257 5085.46 110.37 21 5.11 156 256 5090.57 110.52 22 TOP VEG LINE 2.58 155 255 5093.15 109.90 23 TOE CHAN 7.10 154 254 5100.25 109.94 24 7.50 153 253 5107.75 110.67 25 2.62 152 252 5110.37 110.15 26 5.19 151 251 5115.57 110.25 27 9.88 150 250 5125.45 110.31 28 SPIKE LB NUSATSUM RIVER XS4 80RPP5 OCTOBER 21 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.60 149 249 5127.05 110.30 29 TOP CUT BAR 3.09 148 248 5130.13 108.28 30 W/L LB 1340 TOE 3.09 147 247 5133.23 107.65 31 D-0.62 1.89 146 246 5135.12 107.74 32 D-0.54 2.13 145 245 5137.25 107.99 33 D-0.25 ON RAPIDS 8.01 144 244 5145.26 108.17 34 D-0.28 6.10 143 243 5151.36 108.00 35 D-0.58 ON RAPIDS 7.50 142 242 5158.87 107.91 36 2.53 141 241 5161.40 107.95 37 4.07 140 240 5165.47 108.38 38 0.98 139 239 5166.46 108.64 39 W/L R/B 1000 8.00 138 238 5174.45 108.47 40 TOE ROCK CUT 1.29 137 237 5175.75 109.38 41 BREAK 3.40 136 236 5179.14 109.56 42 TOE 0.50 135 235 5179.64 110.46 43 TOP R/B 4.80 134 234 5184.44 110.56 44 SPIKE 30.40 133 233 5214.84 110.24 45 12.60 132 232 5227.44 109.89 46 3.60 131 231 5231.04 109.79 47 7.00 130 230 5238.04 109.30 48 10.00 129 229 5248.04 109.82 49 10.60 128 228 5258.64 109.58 50 6.80 127 227 5265.44 108.97 51 5.10 126 226 5270.54 108.94 52 1.30 125 225 5271.84 109.38 53 10.50 124 224 5282.34 109.29 54 2.20 123 223 5284.54 109.62 55 10.30 122 222 5294.84 109.48 56 TOP NUSATSUM RIVER XS4 80RPP5 OCTOBER 21 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.80 121 221 5296.64 108.97 57 TOE BCHAN 4.20 120 220 5300.84 108.68 58 2.90 119 219 5303.74 108.68 59 TOE BCHAN (DRY) 2.60 118 218 5306.34 110.43 60 4.00 117 217 5310.34 110.30 61 2.20 116 216 5312.54 109.62 62 TOE 15.50 115 215 5328.04 110.03 63 1.50 114 214 5329.54 110.38 64 TOP 3.30 113 213 5332.84 109.63 65 2.90 112 212 5335.74 109.67 66 TOE 2.70 111 211 5338.44 110.26 67 TOP 2.11 110 210 5340.55 109.80 68 8.80 109 209 5349.35 109.83 69 TOE 1.50 108 208 5350.84 110.20 70 TOP 16.80 107 207 5367.64 110.04 71 6.20 106 206 5373.84 110.46 72 TOP RD SPOIL 3.00 105 205 5376.84 109.92 73 TOE RD SPOIL 1.60 104 204 5378.44 109.82 74 G/L BOLT RB 4.40 103 203 5382.84 110.00 75 TOE 5.30 102 202 5388.14 110.82 76 EDGE SHLDR 4.09 101 201 5392.23 110.89 77 EDGE PAVEMENT 3.39 100 200 5395.63 110.95 78 C/L HWY 20 JOIN 177-100 N37 07 43E 5395.626 NUSATSUM RIVER XS5 80RPP5 OCTOBER 21 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 222 622 0.00 109.25 1 DUMMY 1980 5000.00 221 621 5000.00 109.25 2 C/L HWY=10+68.5R 3.77 220 620 5003.77 109.30 3 EDGE PAVE 0.84 219 619 5004.62 109.18 4 BOLT LB HWY 20 1.50 218 618 5006.12 109.03 5 TOP SHLDR 1.74 217 617 5007.86 108.60 6 7.03 216 616 5014.89 103.30 7 TOP SHLDR HWY 20 1.80 215 615 5016.69 102.79 8 TOE HWY 20 2.90 214 614 5019.59 102.62 9 5.90 213 613 5025.49 102.74 10 13.71 212 612 5039.20 102.68 11 TOP OLD CHAN 1.00 211 611 5040.21 102.16 12 TOE OLD CHAN 1.90 210 610 5042.11 102.24 13 TOE OLD CHAN 1.01 209 609 5043.12 102.76 14 TOP OLD CHAN 2.10 208 608 5045.22 102.70 15 TOP OLD CHAN 5.49 207 607 5050.71 101.67 16 TOE OLD CHAN 1.69 206 606 5052.40 101.37 17 C/L OLD CHAN 2.19 205 605 5054.59 101.59 18 TOE OLD CHAN 1.90 204 604 5056.49 102.58 19 TOP OLD CHAN 1.50 203 603 5057.99 102.61 20 SPIKE 3.59 202 602 5061.58 102.70 21 6.40 201 601 5067.98 102.55 22 4.98 200 600 5072.97 103.08 23 5.30 199 599 5078.27 102.85 24 12.89 198 598 5091.16 102.68 25 7.80 197 597 5098.97 103.23 26 TOP 4.10 196 596 5103.07 102.25 27 TOE 7.60 195 595 5110.67 103.14 28 TOE SPOIL NUSATSUM RIVER XS5 80RPP5 OCTOBER 21 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.42 194 594 5114.09 104.38 29 TOP SPOIL 6.51 193 593 5120.59 104.32 30 7.15 192 592 5127.75 103.55 31 TOP 1.40 191 591 5129.14 102.23 32 TRASH LINE 1.22 190 590 5130.37 101.77 33 TOE BANK 3.79 189 589 5134.16 101.49 34 D-0.04 2.60 188 588 5136.75 101.05 35 D-0.5 C/L BCHAN 1.28 187 587 5138.04 101.32 36 D-0.23 TOE 1.81 186 586 5139.85 101.97 37 WET BAR 11.18 185 585 5151.03 102.01 38 W/L BCHAN 2.60 184 584 5153.63 102.11 39 4.30 183 583 5157.92 102.31 40 SPIKE R/B 1.00 182 582 5158.92 102.42 41 TOP ROCK CUT 1.30 181 581 5160.22 101.07 42 W/L LB 1140 0.90 180 580 5161.12 100.59 43 D-0.46 TOE 1.70 179 579 5162.82 100.49 44 D-0.57 3.64 178 578 5166.46 100.18 45 D-0.85 3.16 177 577 5169.62 100.37 46 D-1.3 2.00 176 576 5171.62 100.35 47 D-0.8 2.30 175 575 5173.93 101.14 48 W/L RB MCHAN 0.61 174 574 5174.53 101.40 49 ON BAR 1.60 173 573 5176.13 101.27 50 W/L STREAM 4.70 172 572 5180.83 100.97 51 C/L STREAM D.44 2.30 171 571 5183.13 101.24 52 D-.24 1.70 170 570 5184.83 101.99 53 TOP BAR 16.01 169 569 5200.84 102.45 54 10.60 168 568 5211.43 102.33 55 13.39 167 567 5224.83 102.05 56 W/L LB BAR NUSATSUM RIVER XS5 80RPP5 OCTOBER 21 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.90 166 566 5226.73 101.74 57 D-.35 3.60 165 565 5230.32 101.81 58 C/L CHAN 0.24 4.50 164 564 5234.82 101.85 59 D-.22 2.00 163 563 5236.82 102.04 60 W/L RB 1157 1.20 162 562 5238.03 102.07 61 0.40 161 561 5238.43 102.40 62 TOP BANK 9.70 160 560 5248.12 102.37 63 SPIKE RB 9.20 159 559 5257.32 102.29 64 TOP SAND BAR 1.10 158 558 5258.42 101.80 65 TOE D-.16W 2.71 157 557 5261.13 101.85 66 TOE D-.11W 0.19 156 556 5261.33 102.22 67 TOP 7.81 155 555 5269.13 101.93 68 TOP 2.20 154 554 5271.33 101.62 69 8.00 153 553 5279.32 101.58 70 18.20 152 552 5297.53 101.36 71 W/L BRK 2.40 151 551 5299.93 100.98 72 TOE BANK 0.4 D 1.40 150 550 5301.33 102.45 73 TOP BANK ISLAND 3.10 149 549 5304.43 102.38 74 1.30 148 548 5305.73 101.66 75 5.71 147 547 5311.44 102.06 76 9.30 146 546 5320.73 102.33 77 2.71 145 545 5323.44 101.86 78 17.60 144 544 5341.04 102.27 79 TOP 4.10 143 543 5345.14 101.32 80 TOE ISLAND 2.50 142 542 5347.64 101.25 81 TOE 2.08 141 541 5349.73 101.81 82 8.23 140 540 5357.96 102.17 83 TOP BAR 8.60 139 539 5366.56 101.19 84 NUSATSUM RIVER XS5 80RPP5 OCTOBER 21 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 9.44 138 538 5376.00 100.88 85 TOE CHAN (DRY 3.46 137 537 5379.46 102.47 86 TOP BAR 21.19 136 536 5400.65 102.13 87 TOP BAR 1.97 135 535 5402.62 101.56 88 3.79 134 534 5406.40 101.68 89 2.39 133 533 5408.79 101.04 90 5.07 132 532 5413.87 100.62 91 TOE CHANNEL (DRY 4.26 131 531 5418.13 101.76 92 TOE CUT 1.01 130 530 5419.13 103.13 93 TOP R/B 2.19 129 529 5421.32 103.50 94 SPIKE TOP 6.28 128 528 5427.60 102.25 95 TOE 19.92 127 527 5447.52 102.75 96 5.60 126 526 5453.12 103.19 97 16.20 125 525 5469.32 102.62 98 16.61 124 524 5485.92 102.69 99 TOP 5.49 123 523 5491.42 101.63 100 TOE 2.60 122 522 5494.02 101.62 101 TOE 3.71 121 521 5497.73 102.99 102 TOP 14.59 120 520 5512.32 103.35 103 19.80 119 519 5532.12 103.21 104 6.00 118 518 5538.12 101.83 105 TOE OLD BCHAN 10.00 117 517 5548.12 101.98 106 3.30 116 516 5551.42 102.79 107 6.70 115 515 5558.12 102.88 108 1.91 114 514 5560.03 102.52 109 6.10 113 513 5566.12 102.76 110 TOP 4.11 112 512 5570.24 101.46 111 TOE OLD CHAN 2.19 111 511 5572.43 101.61 112 TOE OLD CHAN NUSATSUM RIVER XS5 80RPP5 OCTOBER 21 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.89 110 510 5575.32 103.01 113 3.21 109 509 5578.52 101.85 114 TOE OLD RD 4.90 108 508 5583.42 101.97 115 TOE OLD RD 4.20 107 507 5587.62 102.59 116 7.70 106 506 5595.32 102.63 117 GL BOLT RB 2.30 105 505 5597.62 102.60 118 4.09 104 504 5601.71 102.26 119 TREE LINE ON HWY 11.89 103 503 5613.60 102.68 120 TOE SHLDR 2.31 102 502 5615.92 103.35 121 TOP SHLDR 5.60 101 501 5621.51 103.59 122 EDGE PAVEMENT 3.50 100 500 5625.01 103.68 123 C/L HWY 20 JOIN 222-100 N48 43 57E 5625.010 NUSATSUM RIVER XS6 80RPP5 OCTOBER 21 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 168 268 0.00 96.61 1 DUMMY 1980 5000.00 167 267 5000.00 96.61 2 BOLT LB 11.80 166 266 5011.80 96.82 3 TOP 0.90 165 265 5012.70 96.54 4 TRASH LINE 2.30 164 264 5015.00 96.62 5 1.50 163 263 5016.50 96.85 6 13.90 162 262 5030.40 96.92 7 6.71 161 261 5037.11 96.89 8 11.29 160 260 5048.40 97.11 9 TOP CUT BANK 0.72 159 259 5049.12 96.41 10 VEG LINE 0.72 158 258 5049.84 96.02 11 TOE CUT BANK 7.28 157 257 5057.12 96.20 12 2.00 156 256 5059.12 96.59 13 4.59 155 255 5063.71 96.45 14 1.90 154 254 5065.61 96.90 15 TOP BAR 16.19 153 253 5081.80 96.62 16 SPIKE LB C/L BAR 20.47 152 252 5102.26 96.41 17 TOP BAR 9.58 151 251 5111.85 95.93 18 3.25 150 250 5115.10 95.36 19 TOE BAR 3.82 149 249 5118.92 95.42 20 W/L LB 1010 9.50 148 248 5128.41 95.15 21 D-0.24 9.70 147 247 5138.12 94.90 22 D-0.40 1.48 146 246 5139.60 94.62 23 D-0.72 2.60 145 245 5142.20 94.60 24 D-0.68 7.70 144 244 5149.90 94.66 25 D-0.72 2.50 143 243 5152.40 94.79 26 D-0.47 2.30 142 242 5154.70 95.23 27 W/L R/B 15:10 2.40 141 241 5157.10 95.84 28 TOP BAR MCHAN NUSATSUM RIVER XS6 80RPP5 OCTOBER 21 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 16.51 140 240 5173.61 96.43 29 14.10 139 239 5187.71 96.25 30 10.60 138 238 5198.31 96.30 31 5.61 137 237 5203.91 96.50 32 TOP 3.29 136 236 5207.20 95.90 33 TOE 11.60 135 235 5218.80 96.11 34 9.80 134 234 5228.60 96.37 35 SPIKE TREE LN IS 7.19 133 233 5235.79 95.67 36 9.09 132 232 5244.88 94.42 37 D-0.11 TOE 12.53 131 231 5257.41 94.70 38 D-0.14W 0.99 130 230 5258.40 95.24 39 TOE CUT BANK 0.70 129 229 5259.10 97.94 40 TOP CUT BANK 4.80 128 228 5263.90 97.26 41 23.70 127 227 5287.60 97.61 42 10.00 126 226 5297.60 98.27 43 3.10 125 225 5300.70 98.77 44 10.82 124 224 5311.52 98.38 45 TOP 7.92 123 223 5319.44 96.51 46 TOE 3.09 122 222 5322.52 96.89 47 11.08 121 221 5333.61 97.44 48 6.79 120 220 5340.40 98.52 49 TOP 10.90 119 219 5351.30 98.57 50 20.20 118 218 5371.50 98.61 51 SPIKE 0.60 117 217 5372.09 98.57 52 6.10 116 216 5378.19 98.25 53 3.61 115 215 5381.80 97.04 54 TOE 4.50 114 214 5386.30 97.82 55 EDGE DWY 3.50 113 213 5389.80 97.88 56 EDGE DWY NUSATSUM RIVER XS6 80RPP5 OCTOBER 21 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 28.39 112 212 5418.19 98.23 57 16.60 111 211 5434.79 97.99 58 12.60 110 210 5447.39 97.78 59 10.54 109 209 5457.93 96.23 60 4.49 108 208 5462.42 96.39 61 TOE 3.23 107 207 5465.65 97.40 62 TOP 8.37 106 206 5474.02 96.80 63 8.16 105 205 5482.19 97.70 64 GL BOLT RB 5.29 104 204 5487.48 97.84 65 11.88 103 203 5499.36 97.62 66 TOE RD 1.62 102 202 5500.99 98.26 67 TOP SHLDR 4.50 101 201 5505.48 98.45 68 EDGE PAVE 3.70 100 200 5509.19 98.56 69 C/L HWY 20 JOIN 168-100 N51 06 54E 5509.187 NUSATSUM RIVER XS7 80RPP5 OCTOBER 21 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 204 604 0.00 94.79 1 DUMMY 1980 5000.00 203 603 5000.00 94.79 2 PI 5+90.9 59.80 202 602 5059.80 94.83 3 END XS-7 29.20 201 601 5089.00 93.71 4 SPIKE O/L 2.40 200 600 5091.40 93.65 5 END PAVEMENT 34.00 199 599 5125.39 92.75 6 28.60 198 598 5154.00 92.64 7 33.50 197 597 5187.50 92.41 8 28.90 196 596 5216.39 92.18 9 27.90 195 595 5244.30 91.96 10 C/L SMITH RD 10.11 194 594 5254.41 91.53 11 C/L OVERFLOW CH 4.20 193 593 5258.60 91.72 12 10.70 192 592 5269.30 91.78 13 29.13 191 591 5298.43 91.61 14 DYKE PROF 7+07.5 17.17 190 590 5315.60 91.49 15 4.30 189 589 5319.90 91.67 16 EDGE RD 10.50 188 588 5330.40 92.08 17 5.00 187 587 5335.39 92.35 18 BOLT LB 11.89 186 586 5347.29 92.01 19 17.00 185 585 5364.29 92.18 20 TOP 3.90 184 584 5368.19 91.45 21 TOE 2.31 183 583 5370.50 91.33 22 TOE 0.71 182 582 5371.20 91.58 23 NAT BNDY 2.69 181 581 5373.90 92.29 24 TOP 6.10 180 580 5379.99 92.21 25 TOP 2.20 179 579 5382.19 90.18 26 MHW 2.31 178 578 5384.50 90.42 27 TOE 2.70 177 577 5387.20 90.38 28 C/L DRY CHAN NUSATSUM RIVER XS7 80RPP5 OCTOBER 21 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.19 176 576 5389.38 90.66 29 TOE 0.80 175 575 5390.19 90.95 30 4.20 174 574 5394.39 91.18 31 0.91 173 573 5395.30 91.38 32 TOP DRY CHAN 13.82 172 572 5409.12 91.70 33 1.18 171 571 5410.30 91.29 34 5.98 170 570 5416.28 91.62 35 IPR 8.10 169 569 5424.38 91.79 36 13.80 168 568 5438.18 91.48 37 4.00 167 567 5442.18 91.13 38 9.80 166 566 5451.99 91.17 39 15.19 165 565 5467.18 91.00 40 SPIKE LB 4.10 164 564 5471.28 90.83 41 1.90 163 563 5473.18 90.42 42 TOE D-0.14 1.00 162 562 5474.18 90.46 43 TOE D# 1.20 161 561 5475.38 90.93 44 5.50 160 560 5480.88 90.96 45 13.40 159 559 5494.28 90.71 46 6.98 158 558 5501.26 91.25 47 4.02 157 557 5505.28 90.10 48 W/L 1.20 156 556 5506.48 89.72 49 TOE D-0.40 1.80 155 555 5508.28 90.16 50 D-0.94 4.82 154 554 5513.10 89.77 51 D-0.45 3.28 153 553 5516.37 89.97 52 D-0.40 ON 3.05 152 552 5519.43 90.30 53 D-0.25 ON RAPIDS 4.08 151 551 5523.51 90.70 54 D-0.10 ON RAPIDS 3.67 150 550 5527.18 90.82 55 D-0.27 ON RAPIDS 5.76 149 549 5532.94 90.92 56 D-0.27 ON RAPID NUSATSUM RIVER XS7 80RPP5 OCTOBER 21 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.19 148 548 5534.13 91.13 57 W/L RB 1645 7.05 147 547 5541.18 91.65 58 SPIKE RB MCHAN 4.19 146 546 5545.37 90.40 59 TOE BAR D-0.55 0.81 145 545 5546.18 90.61 60 D-0.36 8.60 144 544 5554.78 90.74 61 D-0.1W F LOG JM 12.91 143 543 5567.69 91.48 62 20.20 142 542 5587.88 91.50 63 25.80 141 541 5613.68 91.95 64 C/L 22.99 140 540 5636.66 93.14 65 TOP CUT 0.91 139 539 5637.58 91.51 66 TOE CUT 1.49 138 538 5639.07 90.77 67 6.56 137 537 5645.63 90.40 68 C/L BCHAN 5.43 136 536 5651.06 91.18 69 TOP 8.08 135 535 5659.13 91.13 70 TOP BAR 2.22 134 534 5661.35 90.55 71 TOE BAR 1.52 133 533 5662.86 90.46 72 5.30 132 532 5668.16 90.73 73 6.47 131 531 5674.64 90.61 74 D-0.14 W NOFLOW 5.51 130 530 5680.15 90.54 75 D-0.16 W NOFLOW 1.73 129 529 5681.88 91.06 76 1.70 128 528 5683.58 91.70 77 HWM 2.88 127 527 5686.46 93.14 78 TOP 5.28 126 526 5691.74 94.00 79 SPIKE 19.50 125 525 5711.24 93.65 80 C/L OLD HWY 16.60 124 524 5727.84 93.68 81 12.20 123 523 5740.04 93.66 82 15.80 122 522 5755.84 93.91 83 11.60 121 521 5767.44 93.66 84 NUSATSUM RIVER XS7 80RPP5 OCTOBER 21 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.70 120 520 5770.14 93.80 85 EDGE RD 4.80 119 519 5774.94 93.99 86 EDGE RD 2.70 118 518 5777.64 93.87 87 CENTRE TRANSMISS 36.01 117 517 5813.65 93.71 88 17.60 116 516 5831.25 93.82 89 19.69 115 515 5850.94 94.39 90 7.13 114 514 5858.07 94.09 91 TOP CHAN 3.30 113 513 5861.37 92.00 92 TOE 2.60 112 512 5863.96 92.11 93 TOE 2.90 111 511 5866.86 93.47 94 TOP CHAN 6.19 110 510 5873.05 93.23 95 2.22 109 509 5875.28 94.16 96 5.77 108 508 5881.04 94.09 97 BOLT R/B 3.28 107 507 5884.32 93.95 98 4.59 106 506 5888.91 93.38 99 TOE 2.73 105 505 5891.64 93.64 100 EDGE OLD HWY 2.70 104 504 5894.34 93.85 101 EDGE OLD HWY 5.80 103 503 5900.13 93.58 102 9.60 102 502 5909.73 94.12 103 TOP SHLDR 5.41 101 501 5915.14 94.62 104 EDGE PAVE 3.60 100 500 5918.74 94.86 105 C/L HWY 20 JOIN 604-500 NORTH 5918.741 NUSATSUM RIVER XS8 80RPP5 OCTOBER 23 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 197 297 0.00 87.59 1 DUMMY 1980 5000.00 196 296 5000.00 87.59 2 C/L RD 11+00 6.80 195 295 5006.80 87.53 3 SHOULDER RD 29.19 194 294 5035.99 88.35 4 EDGE RD 10.00 193 293 5045.99 88.08 5 19.30 192 292 5065.29 88.15 6 20.49 191 291 5085.78 88.72 7 10.36 190 290 5096.14 88.21 8 TOP RISE 3.09 189 289 5099.23 86.91 9 7.90 188 288 5107.13 86.88 10 TOP 2.80 187 287 5109.93 85.60 11 TOE 3.30 186 286 5113.23 85.30 12 TOE 3.60 185 285 5116.83 86.80 13 TOP 7.30 184 284 5124.13 87.00 14 SPIKE 19.99 183 283 5144.12 86.54 15 19.00 182 282 5163.12 86.69 16 4.00 181 281 5167.12 86.01 17 11.10 180 280 5178.22 85.29 18 1.10 179 279 5179.32 86.12 19 5.90 178 278 5185.22 84.71 20 15.21 177 277 5200.43 85.38 21 22.60 176 276 5223.03 85.83 22 22.00 175 275 5245.02 86.20 23 TOP 1.30 174 274 5246.32 85.36 24 TOE 1.90 173 273 5248.22 85.34 25 3.20 172 272 5251.42 85.86 26 BP 21.93 171 271 5273.36 85.74 27 C/L RD CLEARING 12.77 170 270 5286.12 85.82 28 SPIKE NUSATSUM RIVER XS8 80RPP5 OCTOBER 23 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 11.00 169 269 5297.12 86.28 29 2.61 168 268 5299.73 85.12 30 TOE OLD BANK 11.09 167 267 5310.83 85.65 31 TOP BANK 0.61 166 266 5311.43 84.19 32 TOE BANK 3.11 165 265 5314.54 84.74 33 10.38 164 264 5324.93 84.80 34 W/L L/B 4.02 163 263 5328.94 84.07 35 TOE 2.25 162 262 5331.19 83.03 36 1.14D 7.27 161 261 5338.46 83.51 37 0.60D 2.69 160 260 5341.15 83.76 38 0.34D 0.89 159 259 5342.05 84.11 39 W/L R/B 15:30 4.92 158 258 5346.96 83.74 40 3.50 157 257 5350.46 84.86 41 19.27 156 256 5369.73 84.87 42 1.92 155 255 5371.65 85.43 43 33.01 154 254 5404.65 85.85 44 6.80 153 253 5411.45 85.36 45 4.69 152 252 5416.15 85.84 46 5.69 151 251 5421.84 85.47 47 8.79 150 250 5430.62 85.92 48 TOE 0.50 149 249 5431.12 86.25 49 TOP 2.00 148 248 5433.12 86.41 50 SPIKE 17.71 147 247 5450.83 86.00 51 0.11 146 246 5450.93 85.67 52 7.10 145 245 5458.03 85.86 53 13.00 144 244 5471.03 85.27 54 LOW SPOT 11.80 143 243 5482.83 86.34 55 9.10 142 242 5491.93 86.41 56 NUSATSUM RIVER XS8 80RPP5 OCTOBER 23 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6.01 141 241 5497.94 85.87 57 21.90 140 240 5519.84 85.99 58 13.03 139 239 5532.87 85.22 59 3.09 138 238 5535.96 84.63 60 TOE 8.61 137 237 5544.57 84.39 61 3.29 136 236 5547.87 84.57 62 3.30 135 235 5551.17 85.70 63 TOP 20.70 134 234 5571.87 85.83 64 4.12 133 233 5575.99 85.60 65 22.73 132 232 5598.72 85.51 66 3.36 131 231 5602.09 85.20 67 2.89 130 230 5604.98 85.27 68 TOE 1.92 129 229 5606.90 85.95 69 10.81 128 228 5617.71 86.14 70 TOP 5.22 127 227 5622.92 84.06 71 LOW POINT CHAN 10.09 126 226 5633.01 84.89 72 20.76 125 225 5653.78 86.08 73 TOP 5.79 124 224 5659.56 86.37 74 12.47 123 223 5672.03 85.89 75 5.09 122 222 5677.12 86.24 76 TOE BANK AHW 0.10 121 221 5677.22 88.13 77 TOP BANK 1.59 120 220 5678.82 88.20 78 SPIKE 5.80 119 219 5684.62 88.00 79 8.00 118 218 5692.62 87.56 80 8.80 117 217 5701.42 88.10 81 26.00 116 216 5727.42 87.71 82 TOP 6.10 115 215 5733.52 85.99 83 TOE 1.50 114 214 5735.02 86.06 84 TOE NUSATSUM RIVER XS8 80RPP5 OCTOBER 23 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 4.50 113 213 5739.52 87.72 85 TOP 5.70 112 212 5745.22 88.02 86 TOP 1.50 111 211 5746.72 86.60 87 TOE 2.20 110 210 5748.92 88.11 88 TOP 8.90 109 209 5757.81 87.52 89 8.82 108 208 5766.64 87.34 90 2.10 107 207 5768.74 87.52 91 EDGE RD 3.78 106 206 5772.51 87.62 92 REBAR R/B CL RD 6.07 105 205 5778.59 87.49 93 TOP RD EDGE RD 2.30 104 204 5780.88 86.45 94 TOE RD FILL 7.63 103 203 5788.51 87.11 95 TOE RD FILL HWY 1.90 102 202 5790.41 88.54 96 TOP 3.70 101 201 5794.11 88.77 97 EDGE PAVEMENT 3.20 100 200 5797.31 88.81 98 NAIL C/L RD JOIN 197-100 N46 44 33E 5797.309 NUSATSUM RIVER XS9 80RPP5 OCTOBER 23 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 209 609 0.00 81.29 1 DUMMY 1980 5000.00 208 608 5000.00 81.29 2 SPIKE C/L 15+00 5.20 207 607 5005.20 81.21 3 EDGE RD 0.80 206 606 5006.00 80.87 4 7.91 205 605 5013.90 80.84 5 2.20 204 604 5016.10 80.53 6 TOP 12.99 203 603 5029.10 80.35 7 TOE 2.70 202 602 5031.80 80.43 8 SPIKE 7.39 201 601 5039.19 80.03 9 2.80 200 600 5041.99 79.75 10 TOE 0.1D 1.90 199 599 5043.89 80.26 11 TOP TRASH LINE 9.90 198 598 5053.79 80.95 12 13.90 197 597 5067.69 81.85 13 TOP BANK 1.45 196 596 5069.14 80.64 14 TOE BANK 1.10 195 595 5070.24 80.63 15 AHW TRASH LINE 0.71 194 594 5070.96 80.08 16 4.28 193 593 5075.24 79.99 17 3.30 192 592 5078.53 79.44 18 W/L L/B 1.62 191 591 5080.16 79.06 19 0.40D 1.91 190 590 5082.06 78.76 20 0.58D 6.66 189 589 5088.72 78.95 21 0.46D 3.49 188 588 5092.21 78.93 22 0.50D 1.48 187 587 5093.70 79.11 23 0.27D 1.20 186 586 5094.90 79.34 24 W/L R/B 13:30 1.81 185 585 5096.71 80.29 25 AHW TOP ROCKS 0.90 184 584 5097.61 81.02 26 TOP 4.19 183 583 5101.79 81.55 27 BP 3.09 182 582 5104.89 81.52 28 SPIKE NUSATSUM RIVER XS9 80RPP5 OCTOBER 23 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 11.40 181 581 5116.29 81.32 29 MIDDLE ISLAND 11.81 180 580 5128.10 81.66 30 TOP CUT BANK 0.79 179 579 5128.89 80.46 31 TOE CUT BANK ISL 15.00 178 578 5143.89 80.60 32 18.70 177 577 5162.59 80.43 33 TOP 5.49 176 576 5168.09 79.61 34 TOE 4.20 175 575 5172.29 79.77 35 TOE 0.61 174 574 5172.90 80.46 36 TOP 3.39 173 573 5176.29 79.66 37 TOE BAR 22.71 172 572 5198.99 80.27 38 TOE 0.90 171 571 5199.89 81.27 39 TOP CHAN. 20.90 170 570 5220.79 81.05 40 6.71 169 569 5227.50 81.52 41 9.09 168 568 5236.59 80.88 42 3.40 167 567 5239.99 80.74 43 1.10 166 566 5241.09 79.78 44 4.50 165 565 5245.59 79.66 45 1.30 164 564 5246.89 80.00 46 TOE 1.00 163 563 5247.89 80.62 47 TOP 9.91 162 562 5257.79 81.03 48 TOE 13.11 161 561 5270.90 80.88 49 1.40 160 560 5272.30 80.50 50 7.78 159 559 5280.09 80.60 51 TOP 5.52 158 558 5285.60 80.02 52 TOE 2.34 157 557 5287.94 80.14 53 TOE BANK 0.80 156 556 5288.74 80.90 54 TOP BANK 7.66 155 555 5296.40 80.94 55 2.49 154 554 5298.89 81.16 56 SPIKE NUSATSUM RIVER XS9 80RPP5 OCTOBER 23 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6.00 153 553 5304.88 81.69 57 LOG JAM PILE 5.03 152 552 5309.91 80.95 58 5.58 151 551 5315.49 80.60 59 1.51 150 550 5317.00 81.22 60 7.70 149 549 5324.71 81.25 61 10.41 148 548 5335.12 81.12 62 7.00 147 547 5342.11 80.20 63 LOW POINT CHAN. 15.02 146 546 5357.13 81.29 64 24.16 145 545 5381.28 81.65 65 6.93 144 544 5388.22 81.02 66 2.97 143 543 5391.19 81.67 67 8.92 142 542 5400.11 81.38 68 7.87 141 541 5407.98 81.27 69 3.13 140 540 5411.10 81.57 70 16.78 139 539 5427.88 81.57 71 TOP BAR 3.51 138 538 5431.39 80.98 72 TOE BAR 1.92 137 537 5433.31 80.57 73 TOE CUT BANK 4.58 136 536 5437.89 81.55 74 TOP CUT BANK 4.39 135 535 5442.27 81.88 75 BP 3.60 134 534 5445.87 82.46 76 BP 3.40 133 533 5449.27 83.98 77 TOP BANK 13.63 132 532 5462.90 83.96 78 TOP 1.89 131 531 5464.80 82.38 79 TOE 2.72 130 530 5467.52 82.62 80 TOE 2.77 129 529 5470.29 84.11 81 TOP 20.77 128 528 5491.06 84.50 82 SPIKE 1.44 127 527 5492.50 84.30 83 TOP BANK 2.75 126 526 5495.25 81.72 84 TOE NUSATSUM RIVER XS9 80RPP5 OCTOBER 23 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 5.17 125 525 5500.42 80.42 85 BP 1.00 124 524 5501.42 79.41 86 TOE 1.81 123 523 5503.23 79.19 87 2.36 122 522 5505.59 80.19 88 BP 4.01 121 521 5509.60 80.44 89 TOP 1.14 120 520 5510.74 79.07 90 TOE 3.49 119 519 5514.24 79.48 91 TOP 4.00 118 518 5518.24 78.32 92 BP TOE 6.94 117 517 5525.18 79.24 93 TOE 6.08 116 516 5531.26 84.27 94 TOP 3.00 115 515 5534.26 84.42 95 SPIKE 13.70 114 514 5547.96 84.29 96 17.90 113 513 5565.86 84.67 97 BP 2.60 112 512 5568.46 83.80 98 EDGE RD 1.50 111 511 5569.96 83.80 99 SPIKE C/L RD 2.70 110 510 5572.66 83.89 100 EDGE RD 3.66 109 509 5576.32 84.05 101 TOE 11.07 108 508 5587.40 90.29 102 BP 8.47 107 507 5595.86 95.28 103 TOP 1.39 106 506 5597.25 95.42 104 SPIKE 24.11 105 505 5621.36 95.39 105 18.89 104 504 5640.25 95.17 106 R/B REBAR 3.70 103 503 5643.95 95.27 107 TOP BANK 2.52 102 502 5646.47 93.06 108 TOE 1.94 101 501 5648.41 93.31 109 EDGE RD 4.69 100 500 5653.10 93.47 110 JOIN 609-500 NORTH 5653.099 NUSATSUM RIVER XS10 80RPP5 OCTOBER 24 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 260 660 0.00 71.97 1 DUMMY 1980 5000.00 259 659 5000.00 71.97 2 23+31.8 BLUE 14.00 258 658 5014.00 71.12 3 2.00 257 657 5016.00 71.67 4 20.30 256 656 5036.30 71.56 5 26.70 255 655 5063.00 71.72 6 7.10 254 654 5070.10 72.59 7 9.80 253 653 5079.90 73.25 8 22.20 252 652 5102.10 72.92 9 22.65 251 651 5124.74 71.52 10 1.51 250 650 5126.25 71.93 11 7.79 249 649 5134.04 72.09 12 3.89 248 648 5137.93 70.69 13 TOE 10.78 247 647 5148.71 72.26 14 11.28 246 646 5160.00 72.41 15 SPIKE 25.80 245 645 5185.80 72.94 16 16.29 244 644 5202.09 72.68 17 15.70 243 643 5217.79 72.76 18 18.99 242 642 5236.78 72.99 19 SPIKE. 9.02 241 641 5245.80 73.12 20 TOP 6.61 240 640 5252.41 71.15 21 TOE 8.90 239 639 5261.30 71.52 22 4.21 238 638 5265.51 71.07 23 LOW PT. 8.08 237 637 5273.59 72.02 24 BP 5.29 236 636 5278.88 73.47 25 31.69 235 635 5310.57 73.42 26 SPIKE 3.41 234 634 5313.98 73.36 27 8.80 233 633 5322.78 72.75 28 NUSATSUM RIVER XS10 80RPP5 OCTOBER 24 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.10 232 632 5325.87 73.02 29 25.12 231 631 5350.99 73.23 30 10.01 230 630 5361.00 73.31 31 3.82 229 629 5364.82 72.47 32 5.28 228 628 5370.10 72.28 33 TOE 3.50 227 627 5373.60 73.46 34 TOP 8.29 226 626 5381.89 73.37 35 TOP 8.32 225 625 5390.21 72.21 36 3.38 224 624 5393.59 72.24 37 2.09 223 623 5395.68 73.49 38 TOP OLD CHAN 6.07 222 622 5401.76 73.96 39 SPIKE 34.69 221 621 5436.45 73.68 40 18.98 220 620 5455.43 73.59 41 2.60 219 619 5458.03 73.19 42 10.50 218 618 5468.53 73.29 43 TOP 4.10 217 617 5472.62 72.20 44 TOE 9.51 216 616 5482.14 72.19 45 TOP 3.30 215 615 5485.43 70.25 46 TOE 1.99 214 614 5487.43 70.97 47 0.24D 6.70 213 613 5494.13 70.42 48 TOE 1.40 212 612 5495.53 70.97 49 EDGE CHAN TOP 9.00 211 611 5504.53 71.24 50 4.80 210 610 5509.33 70.26 51 EDGE RD 7.80 209 609 5517.13 70.38 52 EDGE RD 6.50 208 608 5523.63 71.75 53 TOP 5.70 207 607 5529.32 72.00 54 REBAR XS-10 6.60 206 606 5535.92 72.21 55 3.90 205 605 5539.82 72.92 56 NUSATSUM RIVER XS10 80RPP5 OCTOBER 24 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 14.90 204 604 5554.72 73.43 57 19.40 203 603 5574.12 73.15 58 24.20 202 602 5598.32 73.59 59 2.00 201 601 5600.32 73.28 60 18.91 200 600 5619.23 73.62 61 23.13 199 599 5642.36 73.78 62 9.56 198 598 5651.92 73.62 63 SPIKE 18.60 197 597 5670.52 73.86 64 13.20 196 596 5683.71 73.87 65 15.00 195 595 5698.71 73.07 66 21.80 194 594 5720.51 73.68 67 7.30 193 593 5727.81 73.52 68 TOP 1.20 192 592 5729.01 72.67 69 TOE 6.80 191 591 5735.82 72.03 70 BP 3.00 190 590 5738.82 71.79 71 TOE 1.11 189 589 5739.92 73.19 72 TOP 7.91 188 588 5747.83 73.34 73 TOP 4.09 187 587 5751.92 71.93 74 5.20 186 586 5757.12 71.92 75 TOE 2.00 185 585 5759.12 72.61 76 3.70 184 584 5762.82 72.81 77 2.21 183 583 5765.02 72.09 78 9.80 182 582 5774.82 73.05 79 1.12 181 581 5775.94 73.51 80 7.11 180 580 5783.05 73.56 81 8.27 179 579 5791.32 73.00 82 8.80 178 578 5800.12 74.07 83 1.00 177 577 5801.11 73.79 84 EDGE VEG. NUSATSUM RIVER XS10 80RPP5 OCTOBER 24 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 8.13 176 576 5809.24 73.32 85 BP 5.48 175 575 5814.73 73.53 86 7.18 174 574 5821.91 73.09 87 SPIKE 6.19 173 573 5828.11 71.92 88 TOE 12.41 172 572 5840.52 73.12 89 TOE 4.60 171 571 5845.12 73.42 90 TOP CHAN 6.59 170 570 5851.71 73.41 91 0.19 169 569 5851.90 73.71 92 12.10 168 568 5864.00 73.49 93 TOP 11.00 167 567 5875.00 72.65 94 TOE BAR 3.10 166 566 5878.10 72.90 95 4.10 165 565 5882.20 72.46 96 21.70 164 564 5903.90 71.30 97 1.80 163 563 5905.70 71.13 98 TOE .05D 3.40 162 562 5909.10 72.81 99 TOP 7.90 161 561 5917.00 72.36 100 TOP 3.00 160 560 5920.00 71.92 101 2.40 159 559 5922.40 71.52 102 TOE 3.50 158 558 5925.90 72.60 103 12.10 157 557 5938.00 73.01 104 TOP 3.20 156 556 5941.20 72.14 105 TOE 4.90 155 555 5946.10 72.09 106 W/L L/B 11.40 154 554 5957.50 71.88 107 0.24D 5.60 153 553 5963.10 71.69 108 0.44D 3.80 152 552 5966.90 71.37 109 0.78D 2.20 151 551 5969.10 71.41 110 0.7D 0.70 150 550 5969.80 72.12 111 W/L R/B 12:00 1.40 149 549 5971.20 72.52 112 TOP BAR NUSATSUM RIVER XS10 80RPP5 OCTOBER 24 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 7.80 148 548 5979.00 72.60 113 EDGE ISLAND M CH 4.00 147 547 5983.00 73.24 114 23.01 146 546 6006.01 73.06 115 10.79 145 545 6016.80 72.84 116 TOP 2.40 144 544 6019.20 72.46 117 6.70 143 543 6025.90 73.75 118 TOP EDGE CHAN 2.10 142 542 6028.00 73.11 119 13.00 141 541 6041.00 72.83 120 24.00 140 540 6065.00 73.33 121 4.93 139 539 6069.93 72.70 122 6.99 138 538 6076.92 72.58 123 1.19 137 537 6078.11 72.98 124 9.99 136 536 6088.10 72.98 125 SPIKE 10.78 135 535 6098.88 72.66 126 6.24 134 534 6105.12 72.12 127 EDGE ISLAND 7.82 133 533 6112.95 72.17 128 11.05 132 532 6124.00 71.52 129 8.52 131 531 6132.52 71.22 130 TOE 1.67 130 530 6134.19 72.00 131 TOP OLD CHAN 15.81 129 529 6150.00 72.71 132 1.31 128 528 6151.31 71.14 133 BP 2.80 127 527 6154.11 70.39 134 TOE 8.23 126 526 6162.34 70.63 135 TOE 2.01 125 525 6164.35 71.72 136 TOP 12.40 124 524 6176.75 71.53 137 TOP 1.52 123 523 6178.27 70.95 138 TOE 2.40 122 522 6180.67 71.20 139 TOE OLD CHAN 0.76 121 521 6181.43 71.83 140 TOP OLD CHAN NUSATSUM RIVER XS10 80RPP5 OCTOBER 24 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 10.98 120 520 6192.41 71.90 141 TOP BANK 4.65 119 519 6197.06 69.70 142 TOE ISLAND BANK 3.05 118 518 6200.11 69.99 143 TOE 0.52 117 517 6200.63 70.28 144 TOP 10.85 116 516 6211.48 70.68 145 14.63 115 515 6226.11 70.58 146 8.58 114 514 6234.69 70.11 147 TOE 6.38 113 513 6241.07 75.98 148 BP 6.87 112 512 6247.94 81.32 149 TOP BANK 0.50 111 511 6248.44 81.32 150 SPIKE TOP 13.72 110 510 6262.16 81.71 151 TOE 13.39 109 509 6275.55 86.52 152 TOP BANK 4.65 108 508 6280.20 86.87 153 SPIKE 4.76 107 507 6284.96 87.24 154 12.05 106 506 6297.00 87.90 155 19.64 105 505 6316.65 88.25 156 TOE 3.26 104 504 6319.91 88.83 157 TOE BP 7.68 103 503 6327.59 90.73 158 TOP BANK 4.98 102 502 6332.57 90.93 159 BOLT RB EDGE RD 10.70 101 501 6343.27 91.03 160 C/L RD 7.60 100 500 6350.86 91.29 161 IP EDGE RD JOIN 260-100 N52 39 18E 6350.863 NUSATSUM RIVER XS11 80RPP5 OCTOBER 24 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 206 606 0.00 65.85 1 DUMMY 1980 5000.00 205 605 5000.00 65.85 2 BOLT RD EDGE 2.81 204 604 5002.81 66.18 3 19.29 203 603 5022.09 66.60 4 47.39 202 602 5069.48 65.77 5 50.30 201 601 5119.78 65.45 6 SPIKE E. FIELD 8.90 200 600 5128.68 64.76 7 BP 2.30 199 599 5130.98 64.66 8 EDGE CHANNEL CR 7.80 198 598 5138.79 63.64 9 LOG JAM 4.00 197 597 5142.78 63.45 10 TOE 0.3D 1.90 196 596 5144.68 65.37 11 TOP BANK CREEK 3.00 195 595 5147.68 65.23 12 EDGE FIELD 53.40 194 594 5201.08 65.21 13 25.21 193 593 5226.29 65.43 14 FIELD LEVEL 8.33 192 592 5234.62 64.85 15 TOP 2.49 191 591 5237.12 63.89 16 TOE 0.15D 1.81 190 590 5238.93 63.90 17 0.13D TOE 8.88 189 589 5247.81 65.00 18 TOP 14.19 188 588 5261.99 65.05 19 TOP 2.00 187 587 5264.00 64.74 20 BP SMALL CREEK 5.09 186 586 5269.09 64.93 21 TOE 1.59 185 585 5270.68 65.73 22 EDGE BUSH LINE 4.10 184 584 5274.78 65.72 23 SPIKE 25.30 183 583 5300.08 65.84 24 EDGE FIELD 11.50 182 582 5311.59 65.42 25 EDGE LOG JAM 1.40 181 581 5312.98 64.89 26 0.48DEDGE POND 4.80 180 580 5317.78 64.92 27 0.46D M. POND 3.00 179 579 5320.78 66.19 28 0.2D EDGE POND NUSATSUM RIVER XS11 80RPP5 OCTOBER 24 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 5.10 178 578 5325.88 65.85 29 10.50 177 577 5336.38 65.94 30 58.63 176 576 5395.02 66.24 31 43.68 175 575 5438.69 66.55 32 FLOODED AREA 20.29 174 574 5458.98 66.62 33 SPIKE 1.00 173 573 5459.98 66.67 34 VEG. LINE 1.40 172 572 5461.38 66.11 35 0.02D 4.00 171 571 5465.39 66.20 36 0.16 10.00 170 570 5475.38 66.50 37 TOP BAR 4.20 169 569 5479.58 66.29 38 TOP BAR 3.80 168 568 5483.38 65.54 39 0.36D TOE 3.60 167 567 5486.98 65.41 40 0.4D C/L 1.00 166 566 5487.98 65.52 41 0.15D TOE 1.00 165 565 5488.98 65.93 42 TOP BAR 2.60 164 564 5491.58 65.45 43 W/L MAIN CHAN LB 2.00 163 563 5493.58 64.52 44 2.80 162 562 5496.38 62.49 45 2.5D 2.00 161 561 5498.38 64.99 46 0.4D 2.40 160 560 5500.78 65.33 47 W/L MAIN CHAN 2.40 159 559 5503.18 65.77 48 EDGE MAIN CHAN 11.70 158 558 5514.88 66.38 49 W/L 15:00 4.70 157 557 5519.58 65.87 50 0.52D 2.00 156 556 5521.58 65.63 51 TOE BANK 0.8D 3.80 155 555 5525.38 66.43 52 EDGE BAR 15.60 154 554 5540.98 66.88 53 4.00 153 553 5544.98 65.00 54 TOE BANK 0.42D 4.20 152 552 5549.18 65.06 55 TOE 0.34D 3.40 151 551 5552.58 66.01 56 NUSATSUM RIVER XS11 80RPP5 OCTOBER 24 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.70 150 550 5556.28 66.33 57 10.70 149 549 5566.98 65.92 58 2.80 148 548 5569.78 66.58 59 19.10 147 547 5588.88 66.91 60 16.30 146 546 5605.18 66.90 61 0.70 145 545 5605.88 66.14 62 10.10 144 544 5615.98 66.64 63 30.10 143 543 5646.08 66.84 64 2.80 142 542 5648.88 67.28 65 TOP 8.10 141 541 5656.98 67.16 66 3.13 140 540 5660.11 66.12 67 TOP 3.89 139 539 5664.00 66.39 68 1.02 138 538 5665.02 66.00 69 TOE 11.59 137 537 5676.61 65.90 70 0.11D WET BAR 3.59 136 536 5680.21 66.46 71 10.50 135 535 5690.71 66.36 72 12.18 134 534 5702.89 65.70 73 TOE BANK WET BAR 5.51 133 533 5708.40 67.14 74 TOP BANK 2.58 132 532 5710.98 66.97 75 SPIKE 29.80 131 531 5740.78 67.01 76 8.20 130 530 5748.98 66.61 77 2.80 129 529 5751.78 65.11 78 5.00 128 528 5756.78 65.17 79 1.80 127 527 5758.58 65.55 80 1.40 126 526 5759.98 65.54 81 TOE CUT 2.00 125 525 5761.98 66.66 82 TOP CHAN BANK 23.10 124 524 5785.08 67.24 83 21.40 123 523 5806.48 66.84 84 NUSATSUM RIVER XS11 80RPP5 OCTOBER 24 1980 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 26.50 122 522 5832.98 66.96 85 22.00 121 521 5854.98 67.24 86 19.00 120 520 5873.98 67.36 87 18.90 119 519 5892.89 67.23 88 21.40 118 518 5914.29 68.06 89 8.80 117 517 5923.09 67.53 90 TOP BANK 1.75 116 516 5924.84 66.21 91 TOE BANK ISLAND 6.50 115 515 5931.33 65.61 92 8.78 114 514 5940.12 65.39 93 MUD LEVEL 1.03 113 513 5941.14 65.13 94 0.22D 4.48 112 512 5945.62 65.03 95 0.31D 1.56 111 511 5947.18 65.45 96 TOE 1.00 110 510 5948.19 66.75 97 TOP BANK 5.50 109 509 5953.68 67.75 98 8.30 108 508 5961.98 67.78 99 INST SPIKE 7.69 107 507 5969.67 67.59 100 23.18 106 506 5992.86 67.59 101 4.90 105 505 5997.76 68.06 102 24.80 104 504 6022.56 68.15 103 EDGE DRIVEWAY 3.40 103 503 6025.96 67.96 104 EDGE DRIVEWAY 17.70 102 502 6043.66 67.88 105 8.50 101 501 6052.17 68.63 106 TOE 16.65 100 500 6068.82 79.21 107 REBAR R/B TOP JOIN 206-100 N54 45 00E 6068.820