THIS INFORMATION IS CONSIDERED HISTORICAL AS IT REPRESENTS CHANNEL CONDITIONS AND CONFIGURATION AT THE TIME OF THE SURVEY ONLY. USER MUST ACCEPT RESPONSIBILITY OF ENSURING THAT THE ACCURACY AND COMPLETENESS OF PROVIDED DATA IS SUITABLE FOR THE NEEDS OF THE PROJECT OR STUDY. IT IS PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND, WHETHER EXPRESS OR IMPLIED. UNDER NO CIRCUMSTANCES WILL THE GOVERNMENT OF BRITISH COLUMBIA BE LIABLE TO ANY PERSON OR BUSINESS ENTITY FOR ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR OTHER DAMAGES BASED ON ANY USE OF THIS INFORMATION. BULKLEY RIVER X/S 1 PROJ#85RPP-12 SEPT 27 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1099 0.00 516.22 1 DUMMY 2000.00 1100 2000.00 516.22 2 CL RAILROAD 2.84 1101 2002.84 516.19 3 TOP BALLAST 3.16 1102 2005.99 515.79 4 . 10.72 1103 2016.71 515.66 5 TOP GRADE 1.91 1104 2018.62 514.23 6 TOE @ FENCELINE 2.90 1105 2021.52 514.58 7 EDGE FIELD 46.24 1106 2067.76 515.00 8 . 8.02 1107 2075.78 515.11 9 . 15.62 1108 2091.40 515.21 10 . 8.08 1109 2099.48 514.66 11 . 16.75 1110 2116.23 515.35 12 . 1.70 1111 2117.93 514.48 13 . 2.29 1112 2120.21 513.90 14 TOE 5.85 1113 2126.06 513.39 15 . 2.88 1114 2128.94 513.60 16 . 2.90 1115 2131.84 513.09 17 . 13.68 1116 2145.52 513.68 18 . 1.96 1117 2147.49 513.34 19 . 2.73 1118 2150.22 513.75 20 . 16.48 1119 2166.70 513.54 21 . 14.06 1120 2180.76 513.51 22 BOLT LB 3.54 1121 2184.30 513.40 23 . 2.66 1122 2186.96 513.18 24 TRASHLINE 4.96 1123 2191.92 512.58 25 . 7.58 1124 2199.49 512.10 26 . 3.08 1125 2202.57 511.62 27 WL LB 1.55 1126 2204.12 511.37 28 . 2.81 1127 2206.93 510.83 29 . 4.04 1128 2210.97 510.48 30 . 6.86 1129 2217.83 510.15 31 . 4.45 1130 2222.27 510.36 32 . 5.60 1131 2227.88 509.89 33 . 3.84 1132 2231.71 509.64 34 . 5.18 1133 2236.90 509.67 35 . 4.96 1134 2241.86 509.49 36 . 5.52 1135 2247.38 509.41 37 . 6.47 1136 2253.86 509.54 38 . 6.65 1137 2260.51 509.83 39 . 9.15 1138 2269.66 510.94 40 . 2.60 1139 2272.25 511.64 41 WL RB 4.06 1140 2276.31 513.54 42 TOE NAT-BOUNDRY 0.30 1141 2276.62 514.30 43 . 4.05 1142 2280.67 517.11 44 . 1.45 1143 2282.11 519.77 45 TOP BANK 15.56 1144 2297.67 520.80 46 BOLT RB TOE END BULKLEY RIVER X/S 2 PROJ#85RPP-12 SEPT 27 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2099 0.00 518.04 1 DUMMY 2000.00 2100 2000.00 518.04 2 CL RAILROAD 2.01 2101 2002.01 518.21 3 TOP BALLAST 1.27 2102 2003.28 517.72 4 TOE BALLAST 8.04 2103 2011.32 516.98 5 BOLT LB 3.34 2104 2014.66 516.62 6 TOP BANK 3.41 2105 2018.07 513.57 7 NATURAL BOUNDARY 0.13 2106 2018.20 512.86 8 TOE 2.92 2107 2021.11 512.34 9 WL LB 1.51 2108 2022.62 511.94 10 . 3.99 2109 2026.61 511.58 11 . 6.70 2110 2033.30 511.54 12 . 6.93 2111 2040.24 511.55 13 . 7.95 2112 2048.18 511.32 14 . 6.24 2113 2054.42 511.34 15 . 5.12 2114 2059.54 511.28 16 . 5.67 2115 2065.21 511.26 17 . 4.86 2116 2070.07 511.25 18 . 5.13 2117 2075.20 511.27 19 . 7.24 2118 2082.45 510.88 20 . 5.16 2119 2087.61 510.95 21 . 8.16 2120 2095.77 511.44 22 . 1.62 2121 2097.39 512.39 23 WL RB 11.19 2122 2108.58 513.01 24 TOP 5.64 2123 2114.22 514.10 25 . 3.22 2124 2117.44 514.60 26 NATURAL BOUNDARY 2.69 2125 2120.13 515.44 27 TOP 2.99 2126 2123.12 515.81 28 BOLT RB 7.97 2127 2131.08 516.40 29 . 17.70 2128 2148.79 517.18 30 . 20.82 2129 2169.60 518.15 31 TOE- RISING BYND END BULKLEY RIVER X/S 3 PROJ#85RPP-12 SEPT 27 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3099 0.00 519.67 1 DUMMY 2000.00 3100 2000.00 519.67 2 CL RAILROAD 1.65 3101 2001.65 519.66 3 TOP BALLAST 1.53 3102 2003.18 519.16 4 TOE BALLAST 7.98 3103 2011.15 518.52 5 BOLT LB 2.93 3104 2014.08 517.68 6 TOP BANK 2.16 3105 2016.25 515.18 7 . 0.39 3106 2016.63 514.32 8 TOE 1.94 3107 2018.58 513.78 9 WL LB 2.31 3108 2020.89 513.42 10 . 5.15 3109 2026.04 513.13 11 . 3.86 3110 2029.90 512.95 12 . 6.59 3111 2036.50 513.04 13 . 7.48 3112 2043.98 513.05 14 . 9.57 3113 2053.54 513.16 15 . 7.29 3114 2060.83 513.05 16 . 11.32 3115 2072.15 513.06 17 . 8.08 3116 2080.23 512.92 18 . 8.52 3117 2088.75 512.89 19 . 6.55 3118 2095.31 512.90 20 . 6.88 3119 2102.19 512.87 21 . 9.09 3120 2111.28 512.89 22 . 7.92 3121 2119.20 513.25 23 . 4.54 3122 2123.74 513.75 24 WL RB 3.53 3123 2127.27 514.62 25 NATURAL BOUNDARY 1.39 3124 2128.67 515.32 26 . 0.82 3125 2129.48 516.24 27 TOP 1.42 3126 2130.90 516.27 28 BOLT RB 21.06 3127 2151.97 515.86 29 NATURAL GROUND END BULKLEY RIVER X/S 4 PROJ#85RPP-12 SEPT 27 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 4099 0.00 525.37 1 DUMMY 2000.00 4100 2000.00 525.37 2 OS 6.88 4101 2006.88 523.10 3 . 8.44 4102 2015.32 521.44 4 . 11.94 4103 2027.26 520.62 5 TOP 5.04 4104 2032.30 518.88 6 TOE 11.43 4105 2043.73 517.91 7 . 11.56 4106 2055.29 516.79 8 TOE 7.12 4107 2062.41 516.81 9 TOE 10.48 4108 2072.89 517.37 10 FENCELINE 3.41 4109 2076.30 517.69 11 TOE 4.35 4110 2080.65 518.22 12 TOE GRADE 1.55 4111 2082.20 518.96 13 TOP 2.20 4112 2084.40 519.40 14 BOLT LB 1.56 4113 2085.96 519.97 15 TOP BALLAST 1.88 4114 2087.85 519.73 16 CL RAILROAD 1.79 4115 2089.63 519.68 17 TOP BALLAST 1.25 4116 2090.89 518.99 18 TOE BALLAST 3.13 4117 2094.02 517.46 19 TOE 9.43 4118 2103.44 516.86 20 . 5.85 4119 2109.29 515.77 21 NATURAL BOUNDARY 1.32 4120 2110.62 515.34 22 TOE 3.06 4121 2113.67 514.62 23 WL LB 1.80 4122 2115.48 514.32 24 . 6.61 4123 2122.08 514.05 25 . 2.85 4124 2124.93 513.68 26 . 2.38 4125 2127.31 513.61 27 . 5.58 4126 2132.89 513.52 28 . 6.26 4127 2139.15 513.67 29 . 5.26 4128 2144.41 513.79 30 . 7.07 4129 2151.47 514.00 31 . 8.47 4130 2159.95 513.81 32 . 7.83 4131 2167.77 513.99 33 . 8.26 4132 2176.03 514.07 34 . 13.76 4133 2189.80 514.23 35 . 17.46 4134 2207.25 514.27 36 . 11.96 4135 2219.21 514.49 37 . 2.37 4136 2221.58 514.57 38 WL RB 3.97 4137 2225.55 515.15 39 NATURAL BOUNDARY 1.61 4138 2227.16 515.92 40 . 3.43 4139 2230.59 516.76 41 BOLT RB TOP 7.84 4140 2238.43 517.23 42 30M-TO-RISE END BULKLEY RIVER X/S 5 PROJ#85RPP-12 SEPT 27 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 5099 0.00 519.08 1 DUMMY 2000.00 5100 2000.00 519.08 2 CL RAILROAD 1.57 5101 2001.57 519.06 3 TOP BALLAST 1.25 5102 2002.82 518.62 4 TOE BALLAST 3.06 5103 2005.88 518.15 5 TOP 2.07 5104 2007.95 516.68 6 TOE 4.78 5105 2012.74 516.77 7 TOE 1.74 5106 2014.48 517.47 8 TOP 6.34 5107 2020.82 517.87 9 . 16.17 5108 2036.99 517.94 10 BOLT LB 1.87 5109 2038.86 517.72 11 . 4.26 5110 2043.11 516.41 12 NATURAL BOUNDARY 0.03 5111 2043.14 516.01 13 TOE 4.06 5112 2047.20 515.48 14 WL LB 1.75 5113 2048.95 515.25 15 . 4.43 5114 2053.38 514.93 16 . 5.98 5115 2059.37 514.82 17 . 7.61 5116 2066.98 514.83 18 . 10.32 5117 2077.29 514.79 19 . 10.05 5118 2087.34 514.86 20 . 14.18 5119 2101.53 514.80 21 . 11.10 5120 2112.62 514.73 22 . 11.08 5121 2123.70 514.65 23 . 10.57 5122 2134.27 514.70 24 . 7.01 5123 2141.28 514.69 25 . 7.16 5124 2148.44 515.00 26 . 3.24 5125 2151.68 515.42 27 WL RB 2.74 5126 2154.43 516.06 28 NATURAL BOUNDARY 2.21 5127 2156.64 516.68 29 TOE 2.55 5128 2159.18 517.94 30 TOP-BOLT RB 59.60 5129 2218.79 517.23 31 IN-FIELD 43.91 5130 2262.70 517.39 32 TOE 2.88 5131 2265.58 518.40 33 . 5.23 5132 2270.81 518.31 34 TOE 7.36 5133 2278.17 520.76 35 RISING BEYOND END BULKLEY RIVER X/S 6 PROJ#85RPP-12 SEPT 27 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6099 0.00 521.65 1 DUMMY 2000.00 6100 2000.00 521.65 2 CL RAILROAD 1.21 6101 2001.21 521.62 3 TOP BALLAST 1.51 6102 2002.72 521.10 4 TOE BALLAST 5.81 6103 2008.54 520.48 5 . 2.60 6104 2011.14 519.95 6 BOLT LB 1.37 6105 2012.51 519.85 7 TOP RIPRAP 6.21 6106 2018.71 516.20 8 WL LB 2.22 6107 2020.93 515.91 9 . 3.01 6108 2023.94 515.61 10 . 3.12 6109 2027.06 515.04 11 . 6.74 6110 2033.80 514.25 12 . 9.20 6111 2043.00 513.78 13 . 9.79 6112 2052.78 513.98 14 . 8.18 6113 2060.97 514.84 15 . 6.47 6114 2067.43 515.10 16 . 8.41 6115 2075.84 515.33 17 . 10.26 6116 2086.10 515.38 18 . 6.73 6117 2092.83 515.58 19 . 4.17 6118 2097.00 515.90 20 . 2.20 6119 2099.20 516.23 21 WL RB 3.34 6120 2102.54 516.98 22 TOE 3.21 6121 2105.75 518.40 23 TOP 1.24 6122 2106.99 518.44 24 BOLT RB 14.81 6123 2121.80 518.43 25 . 2.76 6124 2124.56 518.25 26 . 4.41 6125 2128.97 518.23 27 . 3.69 6126 2132.67 518.81 28 . 6.05 6127 2138.71 518.59 29 TOE 3.24 6128 2141.95 519.41 30 . 3.42 6129 2145.37 520.82 31 TOP 6.83 6130 2152.20 520.62 32 100M-TOE END BULKLEY RIVER X/S 7 PROJ#85RPP-12 SEPT 27 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 7099 0.00 522.86 1 DUMMY 2000.00 7100 2000.00 522.86 2 CL RAILROAD 1.93 7101 2001.93 522.83 3 TOP BALLAST 1.12 7102 2003.05 522.57 4 TOE BALLAST 3.77 7103 2006.82 521.83 5 . 14.16 7104 2020.98 521.57 6 . 3.37 7105 2024.36 521.88 7 . 17.10 7106 2041.46 521.49 8 . 6.92 7107 2048.38 520.46 9 . 12.77 7108 2061.15 521.09 10 TOP 3.64 7109 2064.79 518.97 11 TOE 7.03 7110 2071.82 518.69 12 TOE 3.10 7111 2074.92 519.40 13 TOP 13.97 7112 2088.89 518.97 14 . 14.65 7113 2103.54 519.08 15 . 14.00 7114 2117.55 519.20 16 . 9.96 7115 2127.50 519.22 17 BOLT LB 4.25 7116 2131.75 518.90 18 TOP BANK 0.57 7117 2132.32 517.77 19 TOE 5.34 7118 2137.65 516.52 20 WL LB 1.46 7119 2139.11 516.24 21 . 4.00 7120 2143.11 515.94 22 . 6.65 7121 2149.76 515.80 23 . 9.62 7122 2159.38 515.64 24 . 8.49 7123 2167.87 515.90 25 . 6.32 7124 2174.19 515.89 26 . 5.95 7125 2180.14 515.79 27 . 6.50 7126 2186.64 515.56 28 . 2.77 7127 2189.41 515.47 29 . 4.54 7128 2193.94 515.27 30 . 3.30 7129 2197.24 515.28 31 . 4.97 7130 2202.21 515.63 32 . 4.05 7131 2206.26 516.01 33 . 4.87 7132 2211.13 516.28 34 . 2.86 7133 2213.99 516.61 35 WL RB 4.93 7134 2218.92 517.19 36 NATURAL BOUNDARY 3.50 7135 2222.42 518.33 37 TOE 3.67 7136 2226.09 521.92 38 TOP 1.40 7137 2227.49 521.88 39 BOLT RB 12.62 7138 2240.11 521.71 40 . 8.39 7139 2248.50 521.81 41 TOE 5.59 7140 2254.09 523.64 42 ON SLOPE END BULKLEY RIVER X/S 8 PROJ#85RPP-12 SEPT 26 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 8099 0.00 525.14 1 DUMMY 2000.00 8100 2000.00 525.14 2 CL RAILROAD 1.34 8101 2001.34 525.10 3 TOP BALLAST 1.21 8102 2002.55 524.70 4 TOE BALLAST 4.33 8103 2006.88 524.06 5 TOP GRADE 1.97 8104 2008.85 523.00 6 TOE 0.78 8105 2009.62 522.93 7 TOP 1.21 8106 2010.84 522.22 8 TOE 3.45 8107 2014.29 522.29 9 . 3.82 8108 2018.11 522.95 10 BOLT LB 1.35 8109 2019.46 522.85 11 TOP 0.23 8110 2019.69 521.99 12 . 3.44 8111 2023.14 518.87 13 NATURAL BOUNDARY 0.00 8112 2023.14 518.11 14 TOE 1.54 8113 2024.68 517.86 15 WL LB 1.28 8114 2025.96 517.69 16 . 4.12 8115 2030.08 517.14 17 . 7.45 8116 2037.53 517.01 18 . 4.42 8117 2041.96 516.72 19 . 3.94 8118 2045.90 516.60 20 . 5.13 8119 2051.02 516.74 21 . 7.36 8120 2058.38 516.72 22 . 6.57 8121 2064.95 516.81 23 . 9.78 8122 2074.73 516.99 24 . 6.56 8123 2081.30 517.13 25 . 7.60 8124 2088.90 517.31 26 . 7.68 8125 2096.58 517.32 27 . 11.02 8126 2107.60 517.52 28 . 12.74 8127 2120.34 517.64 29 . 17.75 8128 2138.09 517.61 30 . 1.41 8129 2139.49 517.89 31 WL RB 3.02 8130 2142.51 518.66 32 TOE 2.27 8131 2144.79 520.10 33 TOP 2.35 8132 2147.13 520.22 34 BOLT RB 15.79 8133 2162.92 519.81 35 100M-TO-TOE END BULKLEY RIVER X/S 9 PROJ#85RPP-12 SEPT 26 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 9099 0.00 525.86 1 DUMMY 2000.00 9100 2000.00 525.86 2 EDGE-BUSH-LINE 17.24 9101 2017.24 524.86 3 BOLT LB 1.12 9102 2018.36 524.71 4 TOP BANK 1.13 9103 2019.49 523.38 5 TOE 4.83 9104 2024.32 523.19 6 TOP BANK 4.60 9105 2028.92 521.11 7 . 1.04 9106 2029.97 519.56 8 . 2.60 9107 2032.57 519.11 9 NATURAL BOUNDARY 2.36 9108 2034.93 518.04 10 WL LB 1.05 9109 2035.98 517.67 11 . 3.97 9110 2039.94 517.31 12 . 7.44 9111 2047.38 517.21 13 . 6.47 9112 2053.85 516.79 14 . 6.56 9113 2060.41 516.51 15 . 5.56 9114 2065.97 516.42 16 . 6.78 9115 2072.75 516.59 17 . 4.96 9116 2077.71 516.63 18 . 6.12 9117 2083.83 516.79 19 . 8.76 9118 2092.58 517.10 20 . 7.90 9119 2100.48 517.39 21 . 6.04 9120 2106.52 517.67 22 . 1.84 9121 2108.36 518.08 23 WL RB 2.81 9122 2111.17 518.77 24 NATURAL BOUNDARY 2.38 9123 2113.55 519.71 25 TOP 2.22 9124 2115.76 520.19 26 . 3.23 9125 2119.00 520.23 27 BOLT RB @ FIELD 17.45 9126 2136.45 520.51 28 TOE BANK 4.08 9127 2140.54 522.36 29 ON SLOPE END BULKLEY RIVER X/S 10 PROJ#85RPP-12 SEPT 26 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 10099 0.00 525.17 1 DUMMY 2000.00 10100 2000.00 525.17 2 SLOW-RISE-BYND 8.58 10101 2008.58 524.83 3 TOP 2.44 10102 2011.01 524.26 4 . 4.01 10103 2015.02 522.68 5 TOE 3.32 10104 2018.34 521.89 6 . 6.74 10105 2025.08 521.38 7 . 4.37 10106 2029.45 521.14 8 . 1.98 10107 2031.43 521.42 9 . 3.92 10108 2035.35 521.66 10 BOLT LB 5.10 10109 2040.46 521.32 11 TOP 2.74 10110 2043.19 520.40 12 . 1.93 10111 2045.12 519.47 13 TOE 3.12 10112 2048.24 518.74 14 WL LB 1.82 10113 2050.06 518.40 15 . 4.31 10114 2054.37 518.11 16 . 4.98 10115 2059.35 517.80 17 . 4.62 10116 2063.97 517.66 18 . 3.64 10117 2067.61 517.56 19 . 2.51 10118 2070.12 517.53 20 . 4.66 10119 2074.79 517.45 21 . 6.58 10120 2081.37 517.45 22 . 9.11 10121 2090.48 517.56 23 . 8.19 10122 2098.67 517.91 24 . 7.48 10123 2106.15 517.56 25 . 8.15 10124 2114.30 517.54 26 . 5.76 10125 2120.06 518.06 27 . 2.61 10126 2122.67 518.78 28 WL RB 3.91 10127 2126.58 519.49 29 NATURAL BOUNDARY 0.53 10128 2127.11 520.00 30 TOP 5.94 10129 2133.06 521.22 31 TOE 5.88 10130 2138.93 525.95 32 BOLT RB 9.22 10131 2148.15 527.80 33 RISING-BEYOND END BULKLEY RIVER X/S 11 PROJ#85RPP-12 SEPT 26 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 11099 0.00 532.03 1 DUMMY 2000.00 11100 2000.00 532.03 2 CL RAILROAD 2.04 11101 2002.04 531.97 3 TOP BALLAST 1.32 11102 2003.36 531.22 4 TOE 8.79 11103 2012.15 530.51 5 BOLT LB 3.15 11104 2015.31 529.83 6 TOP BANK 2.55 11105 2017.86 527.55 7 . 2.15 11106 2020.01 526.02 8 . 2.54 11107 2022.55 523.79 9 . 3.59 11108 2026.14 522.14 10 TOE 11.67 11109 2037.81 521.84 11 TOP RIPRAP 3.12 11110 2040.93 519.87 12 WL LB 0.61 11111 2041.54 519.54 13 . 2.85 11112 2044.39 519.41 14 . 5.09 11113 2049.48 519.23 15 . 5.75 11114 2055.23 519.14 16 . 7.94 11115 2063.17 518.81 17 . 5.95 11116 2069.12 518.99 18 . 8.06 11117 2077.18 519.02 19 . 7.30 11118 2084.48 519.16 20 . 8.72 11119 2093.20 519.25 21 . 4.55 11120 2097.75 519.40 22 . 10.80 11121 2108.55 519.40 23 . 16.20 11122 2124.76 519.46 24 . 4.27 11123 2129.03 519.49 25 . 2.01 11124 2131.04 519.91 26 WL RB 3.95 11125 2134.99 520.60 27 . 1.89 11126 2136.88 521.21 28 . 5.93 11127 2142.81 522.55 29 TOP 6.82 11128 2149.63 523.05 30 BOLT RB 29.93 11129 2179.56 524.08 31 TOE-BENCH 7.55 11130 2187.12 527.24 32 TOP-BENCH 6.36 11131 2193.48 527.43 33 TOE-SLOPE END BULKLEY RIVER X/S 12 PROJ#85RPP-12 SEPT 25 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 12099 0.00 524.98 1 DUMMY 2000.00 12100 2000.00 524.98 2 TOP-BENCH 5.92 12101 2005.92 524.39 3 TOE 27.70 12102 2033.63 524.48 4 . 9.02 12103 2042.65 524.72 5 . 14.64 12104 2057.29 525.15 6 . 13.06 12105 2070.35 524.97 7 TOP-BENCH 4.79 12106 2075.14 524.12 8 TOE 4.83 12107 2079.96 523.91 9 . 4.42 12108 2084.38 524.03 10 BOLT LB 1.73 12109 2086.11 523.91 11 TOP BANK 1.97 12110 2088.08 522.94 12 . 2.57 12111 2090.66 521.99 13 TOE 2.57 12112 2093.23 521.32 14 . 9.43 12113 2102.66 520.89 15 WL LB 3.18 12114 2105.85 520.68 16 . 7.10 12115 2112.95 520.39 17 . 5.47 12116 2118.41 520.28 18 . 7.73 12117 2126.15 520.34 19 . 8.03 12118 2134.18 520.20 20 . 9.66 12119 2143.84 520.29 21 . 7.84 12120 2151.68 520.16 22 . 5.52 12121 2157.20 520.04 23 . 4.35 12122 2161.54 520.02 24 . 5.96 12123 2167.51 520.00 25 . 6.26 12124 2173.77 520.28 26 . 7.99 12125 2181.76 520.36 27 . 2.77 12126 2184.53 520.67 28 . 2.35 12127 2186.88 520.92 29 WL RB 5.59 12128 2192.47 521.57 30 NATURAL BOUNDARY 1.39 12129 2193.86 522.29 31 TOP 4.25 12130 2198.11 523.14 32 . 14.88 12131 2212.99 523.84 33 BOLT RB TOE 3.67 12132 2216.66 525.54 34 RISING-BEYOND END BULKLEY RIVER X/S 13 PROJ#85RPP-12 SEPT 25 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 13099 0.00 529.71 1 DUMMY 2000.00 13100 2000.00 529.71 2 CL RAILROAD 1.88 13101 2001.88 529.63 3 TOP BALLAST 1.25 13102 2003.14 529.27 4 TOE BALLAST 2.36 13103 2005.49 529.14 5 BOLT LB 1.60 13104 2007.09 529.14 6 TOP BANK 5.35 13105 2012.44 525.13 7 TOE 5.25 13106 2017.68 524.97 8 TOP RIPRAP 2.98 13107 2020.66 523.01 9 . 1.49 13108 2022.15 522.13 10 WL LB 0.96 13109 2023.11 521.67 11 . 6.18 13110 2029.28 521.39 12 . 3.75 13111 2033.03 521.10 13 . 8.15 13112 2041.18 520.81 14 . 5.33 13113 2046.51 520.74 15 . 6.80 13114 2053.30 520.74 16 . 6.74 13115 2060.04 520.91 17 . 6.19 13116 2066.23 521.04 18 . 6.18 13117 2072.41 521.18 19 . 6.29 13118 2078.71 521.25 20 . 7.93 13119 2086.64 521.49 21 . 9.32 13120 2095.96 521.61 22 . 6.94 13121 2102.90 521.87 23 . 2.08 13122 2104.98 522.14 24 WL RB 2.97 13123 2107.95 522.71 25 TOE 1.17 13124 2109.13 523.50 26 . 3.38 13125 2112.50 524.32 27 TOP 3.72 13126 2116.22 524.43 28 BOLT RB 1.76 13127 2117.98 524.32 29 EDGE FIELD 25.74 13128 2143.72 524.79 30 FLAT-BEYOND END BULKLEY RIVER X/S 14 PROJ#85RPP-12 SEPT 25 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 14099 0.00 524.71 1 DUMMY 2000.00 14100 2000.00 524.71 2 BUSH-LINE 6.46 14101 2006.46 524.89 3 . 3.25 14102 2009.71 525.31 4 . 14.24 14103 2023.95 525.22 5 BOLT LB 1.71 14104 2025.66 524.78 6 TOP BANK 1.27 14105 2026.94 523.79 7 TOE 3.47 14106 2030.41 523.16 8 WL LB 4.10 14107 2034.51 522.86 9 . 10.22 14108 2044.74 522.56 10 . 8.51 14109 2053.25 522.32 11 . 6.86 14110 2060.10 522.27 12 . 5.84 14111 2065.95 522.21 13 . 5.49 14112 2071.44 522.17 14 . 6.25 14113 2077.69 522.18 15 . 5.52 14114 2083.21 522.07 16 . 7.08 14115 2090.29 521.87 17 . 5.15 14116 2095.43 521.80 18 . 5.96 14117 2101.39 522.06 19 . 5.41 14118 2106.79 522.19 20 . 8.12 14119 2114.92 522.59 21 . 9.58 14120 2124.49 522.82 22 . 2.79 14121 2127.28 523.19 23 WL RB 3.08 14122 2130.36 523.96 24 TOE 0.12 14123 2130.48 524.44 25 . 3.67 14124 2134.15 526.08 26 TOP 1.10 14125 2135.26 526.10 27 BOLT RB 4.49 14126 2139.75 525.94 28 EDGE FIELD 50.19 14127 2189.94 525.57 29 FLAT FIELD END BULKLEY RIVER X/S 15 PROJ#85RPP-12 SEPT 25 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 15099 0.00 525.86 1 DUMMY 2000.00 15100 2000.00 525.86 2 CL ROAD 7.23 15101 2007.23 525.91 3 TOP-DITCH 12.77 15102 2020.01 525.85 4 BOLT LB 1.79 15103 2021.80 525.55 5 TOP-ABUT 0.04 15104 2021.83 525.01 6 TOE-ABUT 4.00 15105 2025.84 524.54 7 . 16.31 15106 2042.15 524.83 8 . 13.00 15107 2055.15 524.90 9 TOP 1.59 15108 2056.74 523.90 10 TOE 4.15 15109 2060.89 523.62 11 PILLAR 2.58 15110 2063.46 523.19 12 WL LB 1.91 15111 2065.37 522.95 13 . 6.23 15112 2071.60 522.56 14 . 7.02 15113 2078.61 522.27 15 . 6.24 15114 2084.85 522.08 16 . 3.63 15115 2088.48 522.10 17 . 3.70 15116 2092.17 521.98 18 . 5.62 15117 2097.80 521.94 19 . 4.71 15118 2102.51 522.04 20 . 5.14 15119 2107.65 522.47 21 CL PILLAR 3.05 15120 2110.70 522.22 22 TOP CRIBBING 5.71 15121 2116.41 521.86 23 . 4.70 15122 2121.11 521.83 24 . 6.00 15123 2127.11 521.85 25 . 7.27 15124 2134.38 522.01 26 . 7.77 15125 2142.15 522.38 27 . 5.51 15126 2147.66 522.76 28 . 2.84 15127 2150.50 523.10 29 . 1.59 15128 2152.09 523.25 30 WL RB CRIBBING 2.63 15129 2154.72 523.68 31 CL PILLAR 2.04 15130 2156.76 523.87 32 TOE BANK 1.49 15131 2158.25 525.15 33 . 4.96 15132 2163.22 526.61 34 TOE-ROAD 1.35 15133 2164.56 527.16 35 . 3.30 15134 2167.86 527.72 36 BOLT RB 14.02 15135 2181.88 526.64 37 . 14.68 15136 2196.56 525.99 38 FLAT-BEYOND END BULKLEY RIVER X/S 16 PROJ#85RPP-12 SEPT 25 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 16099 0.00 529.20 1 DUMMY 2000.00 16100 2000.00 529.20 2 CL RAILROAD 4.29 16101 2004.29 529.00 3 CL RAILROAD 11.04 16102 2015.34 528.63 4 TOP-RR 17.23 16103 2032.57 527.05 5 . 30.12 16104 2062.69 526.02 6 . 20.83 16105 2083.52 526.09 7 ROAD INTERSECT 9.72 16106 2093.24 526.07 8 BOLT LB 6.97 16107 2100.20 525.30 9 TOP-ABUT 0.03 16108 2100.24 525.08 10 AP 33.69 16109 2133.92 524.94 11 TOP 1.52 16110 2135.44 523.97 12 TOE-ABUT 3.64 16111 2139.08 523.10 13 CL PILLAR 2.76 16112 2141.85 523.25 14 WL LB 0.39 16113 2142.24 522.92 15 . 6.73 16114 2148.97 522.71 16 . 8.09 16115 2157.06 522.26 17 . 2.51 16116 2159.57 522.16 18 . 4.75 16117 2164.32 522.12 19 . 3.46 16118 2167.78 522.13 20 . 3.32 16119 2171.10 522.10 21 . 2.00 16120 2173.10 522.10 22 . 4.80 16121 2177.90 522.06 23 . 6.36 16122 2184.26 520.90 24 . 0.13 16123 2184.39 522.29 25 . 2.68 16124 2187.07 522.28 26 . 0.67 16125 2187.74 521.25 27 . 3.15 16126 2190.89 521.99 28 . 4.22 16127 2195.11 522.06 29 . 4.36 16128 2199.47 522.00 30 . 5.21 16129 2204.68 521.90 31 . 4.93 16130 2209.61 521.99 32 . 7.59 16131 2217.20 522.19 33 . 5.89 16132 2223.09 522.52 34 . 4.91 16133 2228.00 522.93 35 . 2.20 16134 2230.20 523.21 36 WL RB @ CRIBBING 2.69 16135 2232.89 523.39 37 CL PILLAR 1.51 16136 2234.40 523.69 38 TOE 1.77 16137 2236.17 524.96 39 . 3.75 16138 2239.92 526.19 40 . 3.82 16139 2243.74 527.28 41 BOLT RB TOP 10.84 16140 2254.58 526.22 42 CL-DITCH END BULKLEY RIVER X/S 17 PROJ#85RPP-12 SEPT 25 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 17099 0.00 525.21 1 DUMMY 2000.00 17100 2000.00 525.21 2 BACK-HOUSE 22.06 17101 2022.06 525.44 3 TOP 13.37 17102 2035.42 525.39 4 TOP LAWN 3.94 17103 2039.36 525.26 5 BOLT LB 2.78 17104 2042.13 523.76 6 TOE 3.15 17105 2045.28 523.21 7 WL LB 2.87 17106 2048.16 522.93 8 . 6.88 17107 2055.04 522.76 9 . 8.82 17108 2063.86 522.40 10 . 5.20 17109 2069.06 522.25 11 . 5.67 17110 2074.73 522.27 12 . 6.30 17111 2081.03 522.21 13 . 9.21 17112 2090.23 522.15 14 . 6.04 17113 2096.27 522.21 15 . 5.81 17114 2102.08 522.12 16 . 0.98 17115 2103.06 522.13 17 . 5.73 17116 2108.79 522.05 18 . 6.75 17117 2115.54 522.04 19 . 6.63 17118 2122.16 522.26 20 . 4.95 17119 2127.11 522.40 21 . 3.58 17120 2130.69 522.50 22 . 3.33 17121 2134.02 522.89 23 . 2.18 17122 2136.20 523.19 24 WL RB 4.05 17123 2140.25 524.05 25 NATURAL BOUNDARY 2.93 17124 2143.17 525.72 26 TOP BANK 1.05 17125 2144.22 525.87 27 BOLT RB 9.86 17126 2154.09 525.83 28 FLAT-BEYOND END BULKLEY RIVER X/S 18 PROJ#85RPP-12 SEPT 25 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 18099 0.00 529.98 1 DUMMY 2000.00 18100 2000.00 529.98 2 CL RAILROAD 1.96 18101 2001.96 529.87 3 TOP BALLAST 0.95 18102 2002.90 529.48 4 TOE BALLAST 5.60 18103 2008.50 528.70 5 . 3.80 18104 2012.30 526.32 6 TOE 1.30 18105 2013.61 526.01 7 TOE-DITCH 1.26 18106 2014.87 527.02 8 . 21.76 18107 2036.63 527.02 9 . 33.84 18108 2070.47 527.50 10 TOP 0.78 18109 2071.26 526.17 11 TOE 2.32 18110 2073.58 526.10 12 TOE 1.93 18111 2075.51 527.24 13 TOP-ROAD 8.09 18112 2083.60 527.26 14 TOP-ROAD 2.38 18113 2085.98 526.03 15 TOE 2.21 18114 2088.20 526.03 16 TOE 2.06 18115 2090.26 526.47 17 FENCE-LINE 6.70 18116 2096.96 527.23 18 . 11.43 18117 2108.40 527.53 19 . 7.50 18118 2115.89 527.67 20 BOLT LB 2.47 18119 2118.36 527.56 21 TOP BANK 0.30 18120 2118.66 526.71 22 TOE 2.28 18121 2120.94 525.03 23 . 2.99 18122 2123.93 524.42 24 WL LB 2.24 18123 2126.17 524.06 25 . 10.86 18124 2137.03 523.87 26 . 12.58 18125 2149.61 523.74 27 . 13.57 18126 2163.19 523.67 28 . 7.52 18127 2170.70 523.52 29 . 9.91 18128 2180.61 523.38 30 . 10.88 18129 2191.49 523.46 31 . 6.84 18130 2198.33 523.55 32 . 12.56 18131 2210.89 523.82 33 . 20.10 18132 2231.00 524.09 34 . 7.02 18133 2238.01 524.28 35 . 3.84 18134 2241.85 524.37 36 WL RB 7.08 18135 2248.93 524.86 37 TOE 2.33 18136 2251.26 525.85 38 TOE 11.28 18137 2262.54 526.95 39 BOLT RB 9.06 18138 2271.60 527.35 40 TOE 3.10 18139 2274.70 528.40 41 TOP 9.84 18140 2284.54 528.61 42 FLAT-BEYOND END BULKLEY RIVER X/S 19 PROJ#85RPP-12 SEPT 25 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 19099 0.00 528.64 1 DUMMY 2000.00 19100 2000.00 528.64 2 EDGE ROAD 16.69 19101 2016.69 528.79 3 EDGE ROAD 4.50 19102 2021.19 528.10 4 . 14.03 19103 2035.23 527.75 5 . 5.78 19104 2041.01 528.81 6 TOP 13.90 19105 2054.90 528.86 7 . 1.69 19106 2056.60 529.29 8 BOLT LB 1.99 19107 2058.58 529.44 9 TOP BANK 1.64 19108 2060.23 528.00 10 . 1.24 19109 2061.46 526.63 11 TOE 3.14 19110 2064.60 525.76 12 WL LB 2.36 19111 2066.96 525.49 13 . 5.58 19112 2072.54 525.09 14 . 4.07 19113 2076.62 524.88 15 . 5.19 19114 2081.81 524.97 16 . 3.95 19115 2085.76 525.07 17 . 4.61 19116 2090.37 525.17 18 . 6.88 19117 2097.25 525.18 19 . 7.36 19118 2104.61 525.29 20 . 4.78 19119 2109.39 525.29 21 . 5.56 19120 2114.95 525.33 22 . 13.85 19121 2128.81 525.23 23 . 6.95 19122 2135.76 525.03 24 . 4.96 19123 2140.71 524.94 25 . 6.11 19124 2146.82 524.86 26 . 4.57 19125 2151.39 524.96 27 . 4.18 19126 2155.58 524.93 28 . 5.16 19127 2160.74 524.92 29 . 6.41 19128 2167.15 525.04 30 . 9.71 19129 2176.85 525.23 31 . 4.80 19130 2181.66 525.50 32 . 2.28 19131 2183.94 525.82 33 WL RB 1.82 19132 2185.75 526.14 34 TOE 0.27 19133 2186.02 526.54 35 . 1.71 19134 2187.74 527.36 36 TOP 6.41 19135 2194.15 527.94 37 . 2.91 19136 2197.06 528.56 38 BOLT RB 1.87 19137 2198.93 528.96 39 TOP @ FIELD 22.18 19138 2221.11 528.74 40 . 18.53 19139 2239.64 530.74 41 TOE HILL END BULKLEY RIVER X/S 20 PROJ#85RPP-12 SEPT 25 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 20099 0.00 530.15 1 DUMMY 2000.00 20100 2000.00 530.15 2 FLAT-BEYOND 17.78 20101 2017.78 529.77 3 BOLT LB 1.88 20102 2019.66 529.70 4 TOP BANK 1.53 20103 2021.19 528.78 5 . 2.49 20104 2023.68 527.96 6 TOP 0.15 20105 2023.83 527.26 7 TOE 2.81 20106 2026.64 526.46 8 WL LB 1.78 20107 2028.42 526.12 9 . 3.07 20108 2031.49 525.84 10 . 3.81 20109 2035.30 525.69 11 . 6.75 20110 2042.06 525.72 12 . 5.84 20111 2047.90 525.66 13 . 6.49 20112 2054.39 525.34 14 . 4.01 20113 2058.40 525.41 15 . 6.32 20114 2064.72 525.39 16 . 8.37 20115 2073.09 525.44 17 . 6.82 20116 2079.91 525.46 18 . 9.87 20117 2089.77 525.49 19 . 7.32 20118 2097.09 525.46 20 . 8.75 20119 2105.84 525.83 21 . 8.51 20120 2114.35 525.84 22 . 7.89 20121 2122.24 526.07 23 . 2.15 20122 2124.39 526.19 24 . 0.73 20123 2125.12 526.48 25 WL RB 2.79 20124 2127.91 527.16 26 TOE 1.45 20125 2129.36 528.06 27 TOP 6.50 20126 2135.86 529.51 28 . 5.65 20127 2141.51 531.17 29 TOP 2.30 20128 2143.81 531.23 30 BOLT RB END BULKLEY RIVER X/S 21 PROJ#85RPP-12 SEPT 25 1985 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 21099 0.00 539.08 1 DUMMY 2000.00 21100 2000.00 539.08 2 CL RAILROAD 4.44 21101 2004.44 539.01 3 CL RAILROAD 2.16 21102 2006.61 539.04 4 TOP-RR-BALLAST 1.00 21103 2007.61 538.58 5 BOLT LB 0.50 21104 2008.11 538.49 6 TOP RR 7.74 21105 2015.85 534.74 7 TOE 8.86 21106 2024.70 533.97 8 TOP BERM 3.89 21107 2028.60 531.38 9 TOE 3.86 21108 2032.45 531.05 10 TOP BENCH 5.22 21109 2037.68 528.03 11 TOE 3.15 21110 2040.83 527.79 12 WL LB 2.76 21111 2043.59 527.59 13 . 5.98 21112 2049.56 527.48 14 . 13.05 21113 2062.61 527.39 15 . 14.93 21114 2077.54 527.31 16 . 17.90 21115 2095.44 527.31 17 . 17.50 21116 2112.94 527.26 18 . 6.97 21117 2119.91 527.00 19 . 7.11 21118 2127.01 526.74 20 . 5.05 21119 2132.06 526.66 21 . 7.90 21120 2139.97 526.79 22 . 5.44 21121 2145.41 526.89 23 . 5.07 21122 2150.48 527.35 24 . 3.25 21123 2153.73 527.84 25 WL RB 2.68 21124 2156.41 528.53 26 NATURAL BOUNDARY 1.47 21125 2157.88 529.36 27 TOE 1.05 21126 2158.93 531.15 28 TOP BANK 0.78 21127 2159.71 531.24 29 BOLT RB 23.97 21128 2183.68 531.10 30 IN FIELD 10.36 21129 2194.03 530.55 31 IN FIELD 7.25 21130 2201.28 530.82 32 TOE BENCH 7.03 21131 2208.31 532.01 33 TOP BENCH 8.47 21132 2216.78 532.29 34 FLAT BEYOND END