CAMPBELL AND QUINSAM RIVERS NOVEMBER 11 1990 FLOODING HWM'S ESTABLISHED IN THE FIELD BY SPECIAL PROJECTS SECTION IN NOVEMBER 1990 HWM'S LEVELLED TO GEODETIC ELEVATION ON DECEMBER 3, 1990 BY TECHNICAL SUPPORT SECTION UNDER PROJECT 9036F058 CAMPBELL RIVER NOVEMBER 1990 HWM's HWM ELEVATION DESCRIPTION FLOODPLAIN DWG. 1 2.32 meters ABOVE SLAB 88-28-1 2 2.96 meters CORNER OF FENCE 88-28-1 3 3.18 meters TOP CONC. WALL D/S END 88-28-2 4 3.20 meters CORNER PARKING LOT 88-28-2 5 6.40 meters AT TBM SPIKE XS12 RB 88-28-2 6 8.28 meters BASE FIR @ CONFLUENCE 88-28-2 CAMPBELL & QUINSAM RIVERS