THIS INFORMATION IS CONSIDERED HISTORICAL AS IT REPRESENTS CHANNEL CONDITIONS AND CONFIGURATION AT THE TIME OF THE SURVEY ONLY. USER MUST ACCEPT RESPONSIBILITY OF ENSURING THAT THE ACCURACY AND COMPLETENESS OF PROVIDED DATA IS SUITABLE FOR THE NEEDS OF THE PROJECT OR STUDY. IT IS PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND, WHETHER EXPRESS OR IMPLIED. UNDER NO CIRCUMSTANCES WILL THE GOVERNMENT OF BRITISH COLUMBIA BE LIABLE TO ANY PERSON OR BUSINESS ENTITY FOR ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR OTHER DAMAGES BASED ON ANY USE OF THIS INFORMATION. CHILAKO RIVER CROSS-SECTION 1 0+225 PROJECT 9330F043 SEPT 30 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 601.00 1 DUMMY 2000.00 800 700 2000.00 601.00 2 ON-SLOPE 1.83 801 701 2001.83 599.79 3 G/L BOLT LB 4.34 802 702 2006.17 596.87 4 . 0.65 803 703 2006.82 596.51 5 HWM 2.66 804 704 2009.48 594.66 6 TOE 1.05 805 705 2010.53 594.32 7 . 0.76 806 706 2011.29 594.24 8 . 0.52 807 707 2011.81 593.93 9 WL-LB 1.76 808 708 2013.57 593.69 10 .26 2.32 809 709 2015.90 593.54 11 .4 1.61 810 710 2017.51 593.42 12 .53 2.39 811 711 2019.90 593.54 13 .4 4.00 812 712 2023.91 593.77 14 .18 4.21 813 713 2028.11 593.35 15 .58 2.28 814 714 2030.39 593.17 16 .78 3.14 815 715 2033.53 593.09 17 .85 3.70 816 716 2037.23 593.21 18 .73 2.08 817 717 2039.31 593.23 19 .72 3.10 818 718 2042.41 593.24 20 .7 1.58 819 719 2044.00 593.25 21 .69 2.80 820 720 2046.80 593.40 22 .55 2.05 821 721 2048.84 593.93 23 WL-RB 1.51 822 722 2050.36 594.47 24 TOE-ERROSION 0.42 823 723 2050.78 595.49 25 TOP-EROSION 1.82 824 724 2052.60 596.49 26 HWM 1.56 825 725 2054.16 596.73 27 . 1.49 826 726 2055.65 596.77 28 G/L BOLT RB CHILAKO RIVER CROSS-SECTION 1 0+225 PROJECT 9330F043 SEPT 30 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 11.90 827 727 2067.55 596.81 29 FLAT JOIN 799-827 N42 51 44E 2067.548 CHILAKO RIVER CROSS-SECTION 2 0+263 PROJECT 9330F043 SEPT 30 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 699 599 0.00 607.30 1 DUMMY 2000.00 700 600 2000.00 607.30 2 . 9.88 701 601 2009.88 607.24 3 RWY 5.83 702 602 2015.71 607.27 4 G/L BOLT LB 1.14 703 603 2016.85 607.09 5 TOP-ABUT-WALL 0.06 704 604 2016.91 604.16 6 TOP-SEAT 0.79 705 605 2017.71 604.16 7 TOP-SEAT 0.08 706 606 2017.78 601.12 8 GL-SEAT 1.10 707 607 2018.89 600.72 9 . 4.22 708 608 2023.10 597.44 10 . 3.17 709 609 2026.28 595.65 11 . 2.56 710 610 2028.84 594.61 12 . 1.04 711 611 2029.88 594.43 13 . 0.29 712 612 2030.17 593.95 14 WL-LB 1.56 713 613 2031.73 593.33 15 .62 1.16 714 614 2032.89 593.21 16 .74 2.15 715 615 2035.04 593.18 17 .77 1.86 716 616 2036.90 593.16 18 .8 1.85 717 617 2038.75 593.27 19 .68 1.23 718 618 2039.99 593.82 20 .15 0.52 719 619 2040.50 593.80 21 .16-EDGE-PIER 2.63 720 620 2043.13 593.88 22 .08-EDGE-PIER 1.83 721 621 2044.96 592.84 23 1.1 1.02 722 622 2045.98 592.59 24 1.38 4.76 723 623 2050.74 592.70 25 1.25 1.12 724 624 2051.86 592.76 26 1.18 3.03 725 625 2054.89 593.14 27 .81 4.70 726 626 2059.60 593.56 28 .4 CHILAKO RIVER CROSS-SECTION 2 0+263 PROJECT 9330F043 SEPT 30 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.60 727 627 2061.20 593.86 29 .09 2.30 728 628 2063.49 593.85 30 .1 0.37 729 629 2063.86 593.94 31 WL-RB 1.75 730 630 2065.60 594.61 32 EDGE-PIER 2.65 731 631 2068.25 595.39 33 EDGE-PIER 2.04 732 632 2070.30 595.20 34 . 0.81 733 633 2071.11 594.87 35 . 3.73 734 634 2074.83 596.16 36 . 5.70 735 635 2080.53 599.34 37 . 6.74 736 636 2087.27 603.74 38 . 3.38 737 637 2090.65 603.65 39 GL-SEAT 0.27 738 638 2090.92 603.86 40 TOP-SEAT 1.15 739 639 2092.07 603.88 41 TOP-SEAT 0.16 740 640 2092.22 607.01 42 TOP-ABUT 0.33 741 641 2092.56 607.01 43 TOP-ABUT 0.47 742 642 2093.02 606.85 44 G/L BOLT RB 13.40 743 643 2106.42 606.89 45 RWY 20.54 744 644 2126.97 606.84 46 . JOIN 699-744 N44 43 46E 2126.965 CHILAKO RIVER RAILWAY C/L PROFILE 0+267 PROJECT 9330F043 SEPT 30 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 836 536 0.00 607.58 1 CL-RWY 39.91 837 537 39.91 607.41 2 CL-RWY 27.06 838 538 66.97 607.34 3 CL-RWY 13.03 839 539 80.00 607.30 4 CL-RWY-END-BR 25.22 840 540 105.23 607.23 5 CL-RWY-CL-PIER 24.76 841 541 129.98 607.15 6 CL-RWY-CL-PIER 25.19 842 542 155.17 607.01 7 CL-RWY-END-BR 28.08 843 543 183.25 606.90 8 CL-RWY 27.27 844 544 210.53 606.81 9 CL-RWY 35.62 845 545 246.15 606.69 10 CL-RWY CHILAKO RIVER CROSS-SECTION 3 0+271 PROJECT 9330F043 SEPT 30 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 607.63 1 DUMMY 2000.00 798 698 2000.00 607.63 2 . 29.63 797 697 2029.63 607.44 3 TRACKS 29.12 796 696 2058.75 607.36 4 TRACKS 19.88 795 695 2078.64 607.20 5 G/L BOLT LB 1.36 794 694 2080.00 607.10 6 TOP-ABUT 0.15 793 693 2080.15 604.17 7 TOP-SEAT 0.80 792 692 2080.95 604.17 8 TOP-SEAT 0.03 791 691 2080.98 601.66 9 TOE-ABUT 1.27 790 690 2082.26 601.47 10 . 4.26 789 689 2086.52 598.90 11 . 4.74 788 688 2091.26 595.69 12 . 3.00 787 687 2094.26 593.94 13 WL-LB 3.37 786 686 2097.63 592.85 14 1.07 1.86 785 685 2099.49 592.81 15 1.12 0.99 784 684 2100.48 592.81 16 1.15 1.35 783 683 2101.83 593.34 17 .61 0.70 782 682 2102.53 593.93 18 WL 1.33 781 681 2103.86 594.54 19 EDGE-PIER-COR 2.58 780 680 2106.45 593.69 20 .26-EDGE-PIER 0.58 779 679 2107.03 593.45 21 .48-TOP-FOOT 0.02 778 678 2107.04 593.06 22 .89 0.30 777 677 2107.34 592.87 23 1.07 1.06 776 676 2108.40 592.25 24 1.69 3.64 775 675 2112.04 592.64 25 1.31 2.26 774 674 2114.30 592.80 26 1.14 0.98 773 673 2115.28 592.90 27 1.05 1.79 772 672 2117.07 593.06 28 .89 CHILAKO RIVER CROSS-SECTION 3 0+271 PROJECT 9330F043 SEPT 30 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.49 771 671 2118.56 593.28 29 .68 5.49 770 670 2124.04 593.75 30 .22 1.30 769 669 2125.35 593.95 31 WL-RB 2.23 768 668 2127.58 594.81 32 . 1.27 767 667 2128.85 594.95 33 EDGE-PIER 2.47 766 666 2131.32 595.56 34 EDGE-PIER 1.18 765 665 2132.50 595.46 35 . 1.65 764 664 2134.15 594.95 36 . 1.67 763 663 2135.82 595.69 37 . 2.86 762 662 2138.68 596.42 38 . 4.43 761 661 2143.11 598.87 39 . 2.01 760 660 2145.12 600.53 40 . 5.91 759 659 2151.03 603.71 41 . 2.73 758 658 2153.76 603.58 42 GL-SEAT 0.18 757 657 2153.94 603.87 43 TOP-SEAT 1.21 756 656 2155.15 603.88 44 TOP-SEAT 0.11 755 655 2155.25 607.00 45 TOP-ABUT 0.33 754 654 2155.59 607.01 46 TOP-ABUT 0.94 753 653 2156.53 606.76 47 G/L BOLT RB 3.65 752 652 2160.17 606.90 48 RWY 25.41 751 651 2185.59 606.88 49 RWY 27.58 750 650 2213.17 606.76 50 . JOIN 799-750 N45 30 13E 2213.171 CHILAKO RIVER CROSS-SECTION 4 0+382 PROJECT 9330F043 SEPT 30 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 596.19 1 DUMMY 2000.00 800 700 2000.00 596.19 2 G/L BOLT LB FLAT 2.85 801 701 2002.85 596.01 3 . 4.78 802 702 2007.64 595.34 4 . 1.29 803 703 2008.92 594.87 5 . 1.57 804 704 2010.50 594.71 6 . 4.39 805 705 2014.88 595.29 7 . 9.15 806 706 2024.03 595.80 8 . 4.72 807 707 2028.75 595.81 9 . 7.23 808 708 2035.98 595.41 10 . 6.36 809 709 2042.34 595.14 11 . 1.69 810 710 2044.03 594.81 12 . 4.96 811 711 2048.99 594.63 13 . 1.29 812 712 2050.29 594.38 14 . 7.26 813 713 2057.55 594.05 15 WL-LB 6.72 814 714 2064.26 593.88 16 .16 4.17 815 715 2068.43 593.78 17 .28 4.92 816 716 2073.35 593.56 18 .51 2.69 817 717 2076.04 593.50 19 .55 1.72 818 718 2077.76 593.63 20 .4 1.78 819 719 2079.54 593.80 21 .24 1.33 820 720 2080.87 593.83 22 .2 0.52 821 721 2081.38 594.02 23 WL-RB 2.42 822 722 2083.80 595.23 24 . 0.32 823 723 2084.12 595.35 25 HWL 1.64 824 724 2085.76 596.54 26 TOE-EROSION 0.23 825 725 2085.99 597.02 27 TOP-EROS-BANK 1.17 826 726 2087.15 597.11 28 . CHILAKO RIVER CROSS-SECTION 4 0+382 PROJECT 9330F043 SEPT 30 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.70 827 727 2088.86 597.12 29 . 12.69 828 728 2101.55 597.02 30 . 9.65 829 729 2111.20 597.13 31 . 7.12 830 730 2118.32 597.13 32 G/L BOLT RB 17.29 831 731 2135.61 597.03 33 . 9.66 832 732 2145.27 596.79 34 . 21.70 833 733 2166.97 596.63 35 TOE-RWY JOIN 799-833 N00 53 47E 2166.968 CHILAKO RIVER CROSS-SECTION 5 0+944 PROJECT 9330F043 SEPT 30 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 828 728 0.00 596.97 1 DUMMY 2000.00 827 727 2000.00 596.97 2 FLAT 30M TOE S 4.97 826 726 2004.97 597.00 3 RBAR LB XS5 0.75 825 725 2005.72 596.90 4 TOP 1.73 824 724 2007.45 596.10 5 TOE 1.21 823 723 2008.65 596.23 6 TOE 1.51 822 722 2010.17 596.61 7 TOP 1.36 821 721 2011.53 596.66 8 TOP 3.20 820 720 2014.72 594.94 9 TOE 0.71 819 719 2015.44 594.77 10 WL LB 2.44 818 718 2017.88 594.38 11 W420 1.64 817 717 2019.52 594.40 12 W400 1.50 816 716 2021.02 594.44 13 W360 3.73 815 715 2024.75 594.51 14 W300 3.94 814 714 2028.70 594.55 15 W250 4.00 813 713 2032.69 594.54 16 W250 4.46 812 712 2037.15 594.53 17 W250 1.83 811 711 2038.99 594.78 18 WL RB 1330HRS 2.62 810 710 2041.61 596.61 19 . 1.71 809 709 2043.32 596.99 20 . 2.88 808 708 2046.20 597.13 21 G/L BOLT RB 4.44 807 707 2050.64 597.29 22 . 3.78 806 706 2054.43 596.93 23 . 6.32 805 705 2060.75 597.13 24 . 2.67 804 704 2063.41 596.68 25 . 2.24 803 703 2065.66 596.38 26 . 3.99 802 702 2069.65 596.39 27 TOE 3.96 801 701 2073.61 598.58 28 TOP CHILAKO RIVER CROSS-SECTION 5 0+944 PROJECT 9330F043 SEPT 30 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6.94 800 700 2080.54 599.03 29 NG JOIN 828-800 N55 56 08W 2080.542 CHILAKO RIVER CROSS-SECTION 6 1+769 PROJECT 9330F043 SEPT 30 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 825 725 0.00 602.23 1 DUMMY 2000.00 824 724 2000.00 602.23 2 ON SLOPE 1.86 823 723 2001.86 600.09 3 HWM 2.62 822 722 2004.47 598.04 4 G/L REBAR LB 0.82 821 721 2005.29 597.98 5 . 0.21 820 720 2005.50 597.22 6 . 0.91 819 719 2006.42 597.11 7 WL LB 0.93 818 718 2007.34 597.00 8 W1400 1.81 817 717 2009.16 596.97 9 W1900 2.43 816 716 2011.59 596.91 10 W240 3.01 815 715 2014.60 596.80 11 W330 1.87 814 714 2016.47 596.80 12 W370 1.40 813 713 2017.87 596.35 13 W820 0.63 812 712 2018.50 596.22 14 W950 2.08 811 711 2020.58 596.40 15 W780 1.49 810 710 2022.07 596.51 16 W660 2.47 809 709 2024.53 596.68 17 W490 1.49 808 708 2026.02 597.17 18 WL RB 1000HRS 1.62 807 707 2027.64 597.56 19 . 1.18 806 706 2028.82 598.28 20 . 2.65 805 705 2031.47 599.03 21 . 0.60 804 704 2032.06 599.62 22 HWM 1.41 803 703 2033.47 600.08 23 TOP 4.36 802 702 2037.83 600.57 24 REBAR RB 9.13 801 701 2046.96 600.96 25 . 2.53 800 700 2049.49 601.63 26 . JOIN 825-800 S50 30 07E 2049.489 CHILAKO RIVER CROSS-SECTION 7 2+458 PROJECT 9330F043 SEPT 28 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 603.97 1 DUMMY 2000.00 800 700 2000.00 603.97 2 NG 7.58 801 701 2007.58 603.72 3 . 10.77 802 702 2018.35 603.43 4 . 14.83 803 703 2033.17 603.22 5 G/L BOLT LB 9.86 804 704 2043.04 602.99 6 . 5.05 805 705 2048.09 602.25 7 . 5.43 806 706 2053.51 602.12 8 . 3.49 807 707 2057.01 602.09 9 . 2.11 808 708 2059.11 601.95 10 TOP HWM 1.35 809 709 2060.47 600.33 11 TOE 3.87 810 710 2064.34 598.99 12 WL LB 1600HRS 1.72 811 711 2066.05 598.70 13 W310 1.96 812 712 2068.01 598.64 14 W360 3.98 813 713 2071.99 598.76 15 W2500 4.04 814 714 2076.03 598.80 16 W2400 2.64 815 715 2078.67 598.81 17 W2400 1.72 816 716 2080.39 598.73 18 W310 4.50 817 717 2084.89 598.77 19 W270 4.41 818 718 2089.30 598.79 20 W260 0.95 819 719 2090.25 599.04 21 WL RB 1.44 820 720 2091.69 599.44 22 . 2.03 821 721 2093.71 600.46 23 . 3.58 822 722 2097.29 600.85 24 G/L REBAR RB 7.15 823 723 2104.44 600.80 25 . 6.67 824 724 2111.12 600.76 26 . 2.13 825 725 2113.25 600.56 27 . 2.41 826 726 2115.66 600.62 28 . CHILAKO RIVER CROSS-SECTION 7 2+458 PROJECT 9330F043 SEPT 28 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.61 827 727 2118.27 601.81 29 TOP 0.99 828 728 2119.26 601.85 30 HWM 1.72 829 729 2120.98 602.12 31 . 5.68 830 730 2126.67 602.58 32 . JOIN 799-830 N78 12 12E 2126.667 CHILAKO RIVER CROSS-SECTION 8 3+087 PROJECT 9330F043 SEPT 28 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 603.44 1 DUMMY 2000.00 800 700 2000.00 603.44 2 NG 6.24 801 701 2006.24 603.08 3 . 1.98 802 702 2008.22 602.86 4 . 5.00 803 703 2013.22 603.10 5 REBAR LB 4.76 804 704 2017.99 603.19 6 . 1.74 805 705 2019.73 602.79 7 . 6.04 806 706 2025.76 602.55 8 . 2.36 807 707 2028.12 601.84 9 . 1.96 808 708 2030.09 601.38 10 TOP 1.41 809 709 2031.50 600.59 11 WL LB 1400HRS 0.74 810 710 2032.23 600.42 12 W1900 3.09 811 711 2035.32 600.23 13 W370 4.18 812 712 2039.51 599.81 14 W780 1.54 813 713 2041.04 599.66 15 W950 0.70 814 714 2041.75 599.55 16 W1050 2.54 815 715 2044.28 599.51 17 W1080 1.08 816 716 2045.36 599.40 18 W1190 1.16 817 717 2046.52 599.55 19 W1050 0.62 818 718 2047.14 600.04 20 W570 1.30 819 719 2048.44 600.26 21 W340 0.65 820 720 2049.09 600.60 22 WL RB 1.73 821 721 2050.82 600.74 23 . 1.71 822 722 2052.54 601.09 24 . 1.23 823 723 2053.77 601.18 25 TOE 2.88 824 724 2056.64 602.69 26 . 0.75 825 725 2057.40 603.87 27 HWM 1.63 826 726 2059.03 605.02 28 . CHILAKO RIVER CROSS-SECTION 8 3+087 PROJECT 9330F043 SEPT 28 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.53 827 727 2059.56 605.20 29 G/L BOLT RB 2.57 828 728 2062.13 607.10 30 ON SLOPE JOIN 799-828 S37 05 33E 2062.125 CHILAKO RIVER CROSS-SECTION 9 3+626 PROJECT 9330F043 SEPT 28 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 822 722 0.00 605.92 1 DUMMY 2000.00 821 721 2000.00 605.92 2 ON SLOPE 3.03 820 720 2003.03 603.78 3 HWM 1.00 819 719 2004.03 603.41 4 G/L BOLT LB 1.67 818 718 2005.70 602.38 5 WL LB 1.18 817 717 2006.88 601.68 6 W680 1.36 816 716 2008.23 601.07 7 W1250 2.65 815 715 2010.89 600.53 8 W1850 3.92 814 714 2014.81 600.04 9 W2310 2.95 813 713 2017.76 600.53 10 W1850 1.23 812 712 2018.98 600.70 11 W1650 2.44 811 711 2021.42 601.27 12 W1100 1.48 810 710 2022.90 601.46 13 W920 2.14 809 709 2025.04 601.82 14 W550 2.90 808 708 2027.94 602.36 15 WL RB 110 HRS 3.92 807 707 2031.86 603.24 16 . 3.48 806 706 2035.34 603.47 17 . 2.99 805 705 2038.33 603.60 18 . 3.86 804 704 2042.19 604.05 19 . 5.84 803 703 2048.04 603.98 20 . 5.45 802 702 2053.48 604.18 21 G/L REBAR RB 4.33 801 701 2057.81 604.34 22 . 5.95 800 700 2063.76 604.33 23 . JOIN 822-800 N56 03 58E 2063.764 CHILAKO RIVER CROSS-SECTION 10 4+077 PROJECT 9330F043 SEPT 28 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 606.03 1 DUMMY 2000.00 800 700 2000.00 606.03 2 . 7.36 801 701 2007.36 605.84 3 . 5.67 802 702 2013.02 605.57 4 . 2.52 803 703 2015.54 605.43 5 . 8.21 804 704 2023.75 605.40 6 . 2.54 805 705 2026.29 605.29 7 . 2.46 806 706 2028.75 605.45 8 . 1.37 807 707 2030.12 605.74 9 . 4.56 808 708 2034.68 605.68 10 . 2.70 809 709 2037.38 605.65 11 . 0.91 810 710 2038.29 605.48 12 . 1.75 811 711 2040.04 605.58 13 REBAR LB 3.74 812 712 2043.78 605.62 14 . 2.33 813 713 2046.11 605.55 15 . 0.96 814 714 2047.07 605.32 16 TOP CUT 0.89 815 715 2047.95 604.65 17 . 0.48 816 716 2048.43 603.46 18 . 1.24 817 717 2049.67 603.15 19 WL LB 1620HRS 1.89 818 718 2051.57 602.94 20 W2000 3.02 819 719 2054.59 602.86 21 W2800 2.57 820 720 2057.15 602.54 22 W600 2.34 821 721 2059.49 602.00 23 W1140 1.12 822 722 2060.61 601.89 24 W1260 0.87 823 723 2061.49 601.99 25 W1160 1.34 824 724 2062.82 602.04 26 W1140 1.48 825 725 2064.30 602.18 27 W970 1.59 826 726 2065.89 602.57 28 W570 CHILAKO RIVER CROSS-SECTION 10 4+077 PROJECT 9330F043 SEPT 28 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.79 827 727 2066.68 603.01 29 W1300 0.99 828 728 2067.68 602.96 30 W1900 0.75 829 729 2068.43 602.78 31 W3600 1.83 830 730 2070.26 602.76 32 W380 1.62 831 731 2071.88 602.95 33 W2000 0.79 832 732 2072.68 603.13 34 WL RB 0.72 833 733 2073.40 603.69 35 . 0.85 834 734 2074.25 604.38 36 . 0.65 835 735 2074.89 604.45 37 . 0.58 836 736 2075.47 604.58 38 G/L BOLT RB 1.59 837 737 2077.07 604.70 39 TOE 1.16 838 738 2078.22 605.13 40 . 1.34 839 739 2079.57 606.23 41 ON SLOPE 2.23 840 740 2081.80 607.92 42 ON SLOPE JOIN 799-840 S86 19 40E 2081.795 CHILAKO RIVER CROSS-SECTION 11 4+644 PROJECT 9330F043 SEPT 28 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 822 722 0.00 606.93 1 DUMMY 2000.00 821 721 2000.00 606.93 2 FLAT 10.94 820 720 2010.94 607.05 3 G/L REBAR LB 2.95 819 719 2013.89 606.88 4 . 2.17 818 718 2016.06 606.47 5 TOP 1.41 817 717 2017.47 605.79 6 TOE 1.28 816 716 2018.75 605.59 7 .-TOP 3.57 815 715 2022.32 604.40 8 WL-LB 1.52 814 714 2023.84 604.02 9 .4 1.75 813 713 2025.59 603.81 10 .61 1.80 812 712 2027.39 603.60 11 .81 1.47 811 711 2028.86 603.57 12 .84 2.51 810 710 2031.37 603.56 13 .84 2.35 809 709 2033.72 603.44 14 .93 2.03 808 708 2035.75 603.50 15 .9 2.26 807 707 2038.01 603.63 16 .78 2.08 806 706 2040.09 603.61 17 .8-TOE 2.41 805 705 2042.50 604.42 18 WL-RB 3.67 804 704 2046.17 605.91 19 . 2.14 803 703 2048.31 607.47 20 HWM 0.53 802 702 2048.84 608.01 21 TOP-BANK 5.58 801 701 2054.42 608.03 22 REBAR 5.16 800 700 2059.57 608.02 23 ROLLING JOIN 822-800 N72 22 17E 2059.573 CHILAKO RIVER CROSS-SECTION 12 5+471 PROJECT 9330F043 SEPT 28 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 830 730 0.00 609.64 1 DUMMY 2000.00 829 729 2000.00 609.64 2 FENCE 2.60 828 728 2002.60 609.58 3 . 2.66 827 727 2005.26 609.52 4 G/L BOLT LB 1.55 826 726 2006.80 609.56 5 . 4.07 825 725 2010.88 609.52 6 . 6.30 824 724 2017.17 609.41 7 TOP 0.45 823 723 2017.63 609.21 8 HWM 2.48 822 722 2020.10 607.06 9 . 0.40 821 721 2020.50 606.51 10 WL-LB 1.32 820 720 2021.82 605.87 11 .65 0.83 819 719 2022.65 605.40 12 1.13 1.32 818 718 2023.98 605.63 13 .9 1.51 817 717 2025.49 605.67 14 .87 1.43 816 716 2026.92 606.05 15 .49 0.22 815 715 2027.13 605.67 16 .88 2.44 814 714 2029.57 605.65 17 .9 2.59 813 713 2032.17 605.87 18 .65 1.80 812 712 2033.97 606.25 19 .27 3.69 811 711 2037.66 606.17 20 .33 1.29 810 710 2038.95 606.32 21 .19 4.02 809 709 2042.98 606.33 22 TOE-.15 0.41 808 708 2043.38 606.50 23 WL-RB 1.86 807 707 2045.24 607.88 24 TOP 1.31 806 706 2046.55 608.08 25 HWM 2.92 805 705 2049.47 608.33 26 . 5.67 804 704 2055.14 608.45 27 . 7.28 803 703 2062.42 608.53 28 . CHILAKO RIVER CROSS-SECTION 12 5+471 PROJECT 9330F043 SEPT 28 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 4.91 802 702 2067.33 608.77 29 . 15.61 801 701 2082.94 608.56 30 G/L BOLT @ FIELD 12.83 800 700 2095.77 608.76 31 FLAT JOIN 830-800 S67 52 43W 2095.774 CHILAKO RIVER CROSS-SECTION 13 6+238 PROJECT 9330F043 SEPT 27 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 609.79 1 DUMMY 2000.00 800 700 2000.00 609.79 2 FIELD 13.08 801 701 2013.08 609.60 3 FIELD LEVEL 8.03 802 702 2021.11 609.70 4 REBAR LB 1.56 803 703 2022.67 609.66 5 . 2.67 804 704 2025.35 609.47 6 TOP BANK 1.02 805 705 2026.37 609.08 7 . 1.21 806 706 2027.57 608.41 8 . 1.69 807 707 2029.27 607.45 9 WL LB 1320HRS 0.92 808 708 2030.19 607.06 10 W402 1.44 809 709 2031.63 606.59 11 W880 1.10 810 710 2032.73 606.40 12 W1050 0.06 811 711 2032.79 606.38 13 W1080 1.99 812 712 2034.79 606.33 14 W1130 1.95 813 713 2036.74 606.15 15 W1300 2.93 814 714 2039.67 605.80 16 W1670 2.30 815 715 2041.97 605.79 17 W1660 1.98 816 716 2043.95 605.85 18 W1600 1.86 817 717 2045.80 606.14 19 W1300 1.43 818 718 2047.24 606.27 20 W1200 1.64 819 719 2048.88 606.73 21 W700 0.49 820 720 2049.37 607.44 22 WL RB 0.49 821 721 2049.86 608.32 23 . 1.00 822 722 2050.85 608.90 24 . 0.71 823 723 2051.56 609.10 25 . 1.01 824 724 2052.57 610.15 26 TOP 0.94 825 725 2053.51 610.06 27 G/L BOLT RB HWM 2.90 826 726 2056.41 610.16 28 . CHILAKO RIVER CROSS-SECTION 13 6+238 PROJECT 9330F043 SEPT 27 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.78 827 727 2060.19 610.00 29 . 6.04 828 728 2066.23 610.03 30 . 5.50 829 729 2071.72 609.79 31 FIELD LVEL 4.83 830 730 2076.55 609.84 32 . JOIN 799-830 N25 44 25E 2076.550 CHILAKO RIVER CROSS-SECTION 14 7+020 PROJECT 9330F043 SEPT 27 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 855 755 0.00 611.47 1 DUMMY 2000.00 854 754 2000.00 611.47 2 . 5.30 853 753 2005.30 611.24 3 . 2.71 852 752 2008.01 610.44 4 . 2.71 851 751 2010.72 610.46 5 . 3.07 850 750 2013.80 610.73 6 . 3.98 849 749 2017.77 610.67 7 . 1.52 848 748 2019.29 610.85 8 . 3.07 847 747 2022.36 610.87 9 FIELD 5.96 846 746 2028.32 610.89 10 G/L BOLT LB 2.75 845 745 2031.07 610.65 11 HWM 2.15 844 744 2033.22 610.43 12 . 1.92 843 743 2035.14 610.40 13 . 3.31 842 742 2038.45 610.41 14 . 2.97 841 741 2041.43 610.40 15 . 1.35 840 740 2042.77 610.26 16 . 0.86 839 739 2043.63 610.02 17 . 1.72 838 738 2045.35 609.89 18 TOP 1.33 837 737 2046.68 609.21 19 . 0.59 836 736 2047.27 607.79 20 WL LB 0.25 835 735 2047.51 607.51 21 W300 0.81 834 734 2048.33 607.52 22 W300 2.10 833 733 2050.42 607.39 23 W420 1.24 832 732 2051.67 607.27 24 W550 1.31 831 731 2052.97 607.27 25 W550 2.46 830 730 2055.43 607.18 26 W620 2.35 829 729 2057.79 607.14 27 W690 2.77 828 728 2060.56 607.18 28 W650 CHILAKO RIVER CROSS-SECTION 14 7+020 PROJECT 9330F043 SEPT 27 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.24 827 727 2062.80 607.12 29 W680 2.53 826 726 2065.33 607.19 30 W610 2.65 825 725 2067.98 607.35 31 W460 2.27 824 724 2070.25 607.55 32 W2700 1.16 823 723 2071.41 607.81 33 WL RB 1145HRS 0.91 822 722 2072.32 608.31 34 . 0.37 821 721 2072.70 608.94 35 . 0.31 820 720 2073.01 609.21 36 . 0.76 819 719 2073.77 609.53 37 . 0.67 818 718 2074.44 610.08 38 . 0.25 817 717 2074.68 610.71 39 TOP CUT 1.36 816 716 2076.04 610.77 40 . 1.12 815 715 2077.16 610.35 41 1.87 814 714 2079.03 610.38 42 . 1.59 813 713 2080.62 610.46 43 . 1.47 812 712 2082.09 610.82 44 . 1.48 811 711 2083.57 611.00 45 REBAR RB 4.65 810 710 2088.22 610.99 46 . 1.79 809 709 2090.01 610.60 47 . 2.90 808 708 2092.91 610.60 48 . 1.56 807 707 2094.47 610.19 49 . 1.59 806 706 2096.06 610.02 50 . 1.94 805 705 2098.00 609.95 51 . 2.68 804 704 2100.68 609.72 52 . 2.41 803 703 2103.09 609.62 53 . 1.86 802 702 2104.95 610.01 54 . 1.42 801 701 2106.37 610.33 55 . 1.42 800 700 2107.79 610.54 56 . JOIN 855-800 S04 48 19W 2107.786 CHILAKO RIVER CROSS-SECTION 15 7+796 PROJECT 9330F043 SEPT 27 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 846 746 0.00 612.30 1 DUMMY 2000.00 845 745 2000.00 612.30 2 . 12.24 844 744 2012.24 612.21 3 . 9.67 843 743 2021.91 612.33 4 . 4.28 842 742 2026.19 612.44 5 G/L BOLT LB 2.91 841 741 2029.10 612.30 6 . 4.39 840 740 2033.49 612.35 7 . 2.59 839 739 2036.08 612.04 8 TOP 1.04 838 738 2037.12 610.09 9 HWM 0.77 837 737 2037.88 610.05 10 . 0.65 836 736 2038.53 609.36 11 . 0.58 835 735 2039.11 608.43 12 WL LB 0.32 834 734 2039.43 608.04 13 W400 1.30 833 733 2040.73 607.79 14 W650 1.84 832 732 2042.57 607.56 15 W880 1.79 831 731 2044.36 607.37 16 W1060 2.57 830 730 2046.93 607.28 17 W1160 2.16 829 729 2049.09 607.30 18 W1120 3.09 828 728 2052.18 607.42 19 W1020 2.49 827 727 2054.68 607.52 20 W920 2.36 826 726 2057.04 607.57 21 W880 1.39 825 725 2058.43 608.44 22 WL RB 1030HRS 1.16 824 724 2059.59 608.86 23 . 0.96 823 723 2060.55 609.68 24 . 1.76 822 722 2062.31 609.72 25 . 0.86 821 721 2063.16 609.89 26 . 1.20 820 720 2064.37 610.38 27 0.74 819 719 2065.11 610.87 28 . CHILAKO RIVER CROSS-SECTION 15 7+796 PROJECT 9330F043 SEPT 27 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.19 818 718 2066.30 611.26 29 . 1.73 817 717 2068.03 611.34 30 . 2.87 816 716 2070.90 611.24 31 G/L REBAR RB 5.53 815 715 2076.43 611.18 32 . 4.17 814 714 2080.59 610.90 33 . 2.90 813 713 2083.49 611.04 34 . 1.92 812 712 2085.41 610.61 35 . 2.77 811 711 2088.18 610.08 36 . 2.05 810 710 2090.23 610.11 37 . 1.65 809 709 2091.88 610.38 38 . 2.24 808 708 2094.12 610.40 39 . 6.35 807 707 2100.48 610.49 40 . 3.87 806 706 2104.35 610.37 41 . 2.04 805 705 2106.39 610.51 42 . 0.90 804 704 2107.29 610.78 43 . 1.38 803 703 2108.67 610.87 44 . 1.56 802 702 2110.23 610.91 45 . 1.74 801 701 2111.97 611.41 46 . 2.29 800 700 2114.25 611.53 47 . JOIN 846-800 N36 21 09E 2114.253 CHILAKO RIVER CROSS-SECTION 16 8+256 PROJECT 9330F043 SEPT 27 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 612.54 1 DUMMY 2000.00 800 700 2000.00 612.54 2 . 6.04 801 701 2006.04 612.58 3 . 2.75 802 702 2008.79 612.58 4 . 1.59 803 703 2010.38 612.47 5 REBAR LB 1.57 804 704 2011.95 611.99 6 . 2.27 805 705 2014.22 611.96 7 . 2.26 806 706 2016.48 611.67 8 HWM 1.10 807 707 2017.58 611.46 9 TOP 1.52 808 708 2019.10 610.42 10 . 1.74 809 709 2020.84 609.44 11 . 0.73 810 710 2021.57 608.76 12 WL LB 1610RS 0.79 811 711 2022.35 608.49 13 W300 0.72 812 712 2023.07 608.26 14 W510 1.18 813 713 2024.24 608.11 15 W680 0.99 814 714 2025.24 607.87 16 W920 0.81 815 715 2026.04 607.56 17 W1210 0.59 816 716 2026.63 607.35 18 W1420 2.61 817 717 2029.24 607.23 19 W1540 1.54 818 718 2030.78 607.15 20 W1640 2.66 819 719 2033.44 607.09 21 W1700 2.60 820 720 2036.04 607.03 22 W1740 2.57 821 721 2038.61 606.59 23 W2S7 1.13 822 722 2039.74 607.04 24 W1740 1.00 823 723 2040.75 607.60 25 W1180 1.37 824 724 2042.12 608.29 26 W 0.57 825 725 2042.68 608.76 27 WL RB 1.69 826 726 2044.37 610.09 28 . CHILAKO RIVER CROSS-SECTION 16 8+256 PROJECT 9330F043 SEPT 27 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.24 827 727 2045.61 610.36 29 . 1.19 828 728 2046.81 610.91 30 . 0.74 829 729 2047.55 611.41 31 . 0.68 830 730 2048.23 611.46 32 HWM 1.90 831 731 2050.13 611.81 33 G/L BOLT RB 2.10 832 732 2052.23 612.57 34 ON SLOPE JOIN 799-832 N84 19 16E 2052.228 CHILAKO RIVER CROSS-SECTION 17 8+991 PROJECT 9330F043 SEPT 27 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 834 734 0.00 614.89 1 DUMMY 2000.00 833 733 2000.00 614.89 2 . 4.43 832 732 2004.43 614.29 3 . 1.80 831 731 2006.23 614.09 4 . 2.15 830 730 2008.38 613.90 5 . 2.02 829 729 2010.40 613.83 6 CL RD 1.90 828 728 2012.29 613.87 7 . 3.79 827 727 2016.09 613.88 8 G/L BOLT LB 1.09 826 726 2017.18 613.71 9 TOP 1.21 825 725 2018.39 612.39 10 . 0.73 824 724 2019.12 611.67 11 . 1.17 823 723 2020.29 610.85 12 . 0.85 822 722 2021.14 610.11 13 . 0.61 821 721 2021.75 609.70 14 . 1.05 820 720 2022.80 609.54 15 WL LB 0.68 819 719 2023.48 609.29 16 W2600 1.16 818 718 2024.64 609.04 17 W520 1.66 817 717 2026.30 608.65 18 W850 1.16 816 716 2027.46 608.63 19 W920 3.03 815 715 2030.48 608.60 20 W950 3.31 814 714 2033.79 608.61 21 W950 2.63 813 713 2036.42 608.74 22 W820 3.51 812 712 2039.93 608.91 23 W640 3.28 811 711 2043.21 608.90 24 W650 1.76 810 710 2044.96 609.20 25 W360 0.57 809 709 2045.53 609.55 26 WL RB 1500HRS 0.67 808 708 2046.20 610.14 27 . 1.01 807 707 2047.22 610.46 28 . CHILAKO RIVER CROSS-SECTION 17 8+991 PROJECT 9330F043 SEPT 27 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.56 806 706 2047.78 610.77 29 . 0.86 805 705 2048.64 610.96 30 . 1.73 804 704 2050.37 612.27 31 TOP 2.73 803 703 2053.09 612.43 32 G/L REBAR RB 2.13 802 702 2055.23 612.18 33 . 1.90 801 701 2057.12 611.87 34 . 3.11 800 700 2060.23 612.62 35 . JOIN 834-800 N48 59 47E 2060.232 CHILAKO RIVER CROSS-SECTION 18 9+854 PROJECT 9330F043 SEPT 25 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 835 735 0.00 614.34 1 DUMMY 2000.00 834 734 2000.00 614.34 2 . 8.31 833 733 2008.31 614.27 3 . 3.53 832 732 2011.84 614.25 4 G/L BOLT LB 1.74 831 731 2013.58 614.31 5 . 2.29 830 730 2015.87 614.23 6 . 1.08 829 729 2016.95 614.03 7 . 1.08 828 728 2018.03 613.49 8 HWM JULY93 1.99 827 727 2020.02 612.65 9 . 1.14 826 726 2021.16 612.33 10 . 1.17 825 725 2022.33 611.18 11 . 0.77 824 724 2023.10 610.57 12 WL LB 0.79 823 723 2023.89 610.14 13 W4400 0.80 822 722 2024.69 609.66 14 W900 1.19 821 721 2025.89 609.51 15 w1120 3.78 820 720 2029.67 609.22 16 W1340 2.27 819 719 2031.94 609.05 17 W1550 2.70 818 718 2034.65 608.91 18 W1660 2.80 817 717 2037.45 608.98 19 W1620 1.90 816 716 2039.35 609.03 20 W1560 1.96 815 715 2041.31 609.00 21 W1570 1.46 814 714 2042.77 609.45 22 W1140 0.78 813 713 2043.55 609.92 23 W660 1.18 812 712 2044.73 610.57 24 WL RB 1600HRS 0.33 811 711 2045.06 611.33 25 . 1.15 810 710 2046.21 611.88 26 . 1.02 809 709 2047.23 612.64 27 TOP 2.13 808 708 2049.36 612.76 28 . CHILAKO RIVER CROSS-SECTION 18 9+854 PROJECT 9330F043 SEPT 25 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.34 807 707 2050.70 612.98 29 . 1.93 806 706 2052.63 612.79 30 . 1.39 805 705 2054.01 613.01 31 . 1.46 804 704 2055.47 613.40 32 . 1.83 803 703 2057.30 613.42 33 G/L BOLT RB 2.60 802 702 2059.90 613.36 34 . 4.92 801 701 2064.82 613.55 35 . 6.71 800 700 2071.53 613.62 36 NG JOIN 835-800 S01 23 41W 2071.534 CHILAKO RIVER CROSS-SECTION 19 10+472 PROJECT 9330F043 SEPT 25 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 827 727 0.00 612.73 1 DUMMY 2000.00 826 726 2000.00 612.73 2 . 4.16 825 725 2004.16 612.69 3 . 3.58 824 724 2007.75 612.53 4 . 3.76 823 723 2011.51 613.10 5 G/L BOLT LB 2.76 822 722 2014.26 613.06 6 . 1.13 821 721 2015.39 613.03 7 TOP 1.32 820 720 2016.71 612.38 8 . 0.97 819 719 2017.68 612.20 9 . 0.73 818 718 2018.41 611.84 10 . 1.57 817 717 2019.98 610.55 11 WL LB 0.88 816 716 2020.85 610.16 12 W440 2.79 815 715 2023.65 609.36 13 W930 0.04 814 714 2023.68 609.29 14 W1270 2.55 813 713 2026.23 609.20 15 W1370 2.70 812 712 2028.93 608.96 16 W1630 3.19 811 711 2032.12 608.76 17 W1820 2.04 810 710 2034.17 609.20 18 W1380 2.49 809 709 2036.65 609.51 19 W1070 2.07 808 708 2038.72 609.65 20 W940 0.94 807 707 2039.66 609.89 21 W700 0.57 806 706 2040.24 610.59 22 WL RB 1400HRS 0.18 805 705 2040.42 611.14 23 . 0.76 804 704 2041.18 611.45 24 . 0.71 803 703 2041.89 612.16 25 . 1.13 802 702 2043.02 613.47 26 HWM JULY93 2.01 801 701 2045.03 614.76 27 ON SLOPE 1.02 800 700 2046.05 615.57 28 G/L BOLT RB JOIN 827-800 S82 02 45E 2046.051 CHILAKO RIVER CROSS-SECTION 20 11+141 PROJECT 9330F043 SEPT 25 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 798 698 0.00 620.17 1 DUMMY 2000.00 799 699 2000.00 620.17 2 G/L BOLT LB 1.00 800 700 2001.00 620.17 3 TOP BANK 6.20 801 701 2007.20 614.86 4 ON SLOPE 0.99 802 702 2008.19 613.72 5 HWM JULY93 0.54 803 703 2008.73 612.31 6 . 0.94 804 704 2009.67 612.26 7 . 0.50 805 705 2010.17 610.69 8 TOE 0.72 806 706 2010.89 610.59 9 WL LB 1140HRS 1.14 807 707 2012.03 610.30 10 W300 1.05 808 708 2013.08 609.95 11 W640 1.35 809 709 2014.43 609.65 12 W940 1.18 810 710 2015.62 609.39 13 W1200 0.95 811 711 2016.57 609.19 14 W1400 0.71 812 712 2017.28 609.12 15 W1470 1.55 813 713 2018.83 608.93 16 W1680 3.01 814 714 2021.84 608.98 17 W1620 1.37 815 715 2023.21 609.11 18 W1470 1.87 816 716 2025.08 609.32 19 W1300 1.71 817 717 2026.78 609.47 20 W1120 1.86 818 718 2028.65 609.67 21 W940 1.71 819 719 2030.36 610.12 22 W490 1.06 820 720 2031.41 610.57 23 WL RB 1.35 821 721 2032.77 611.20 24 . 0.24 822 722 2033.01 611.79 25 . 1.48 823 723 2034.49 612.45 26 . 0.38 824 724 2034.86 613.23 27 . 0.38 825 725 2035.24 613.46 28 HWM CHILAKO RIVER CROSS-SECTION 20 11+141 PROJECT 9330F043 SEPT 25 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.62 826 726 2036.87 613.60 29 G/L BOLT RB 2.25 827 727 2039.12 613.56 30 . 1.13 828 728 2040.24 613.29 31 . 4.69 829 729 2044.94 613.34 32 . JOIN 798-829 S65 06 43E 2044.936 CHILAKO RIVER CROSS-SECTION 21 11+806 PROJECT 9330F043 SEPT 24 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 613.92 1 DUMMY 2000.00 800 700 2000.00 613.92 2 G/L BOLT LB HWM 6.08 801 701 2006.08 613.83 3 . 4.70 802 702 2010.79 613.86 4 . 3.54 803 703 2014.33 613.86 5 . 1.62 804 704 2015.95 613.66 6 TOP 0.75 805 705 2016.69 612.73 7 . 0.64 806 706 2017.33 612.59 8 . 0.92 807 707 2018.25 612.53 9 . 1.04 808 708 2019.29 612.36 10 . 1.04 809 709 2020.34 611.98 11 . 0.86 810 710 2021.20 611.34 12 . 1.69 811 711 2022.88 610.64 13 WL LB 1600HRS 1.21 812 712 2024.10 610.37 14 W2900 1.90 813 713 2025.99 610.12 15 W520 3.37 814 714 2029.36 610.10 16 W550 3.44 815 715 2032.81 610.14 17 W520 3.25 816 716 2036.06 610.21 18 W440 3.20 817 717 2039.26 610.23 19 W410 1.53 818 718 2040.79 610.36 20 W2800 3.13 819 719 2043.92 610.32 21 W3500 2.01 820 720 2045.93 610.19 22 W460 1.78 821 721 2047.71 610.15 23 W500 1.32 822 722 2049.03 610.65 24 WL RB 0.29 823 723 2049.32 610.80 25 . 0.70 824 724 2050.02 611.99 26 . 1.04 825 725 2051.06 612.74 27 . 0.61 826 726 2051.67 613.19 28 . CHILAKO RIVER CROSS-SECTION 21 11+806 PROJECT 9330F043 SEPT 24 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.61 827 727 2053.29 613.28 29 . 1.21 828 728 2054.50 613.27 30 G/L BOLT RB 0.87 829 729 2055.37 613.17 31 . 2.22 830 730 2057.59 613.24 32 . 0.91 831 731 2058.49 613.04 33 . 3.35 832 732 2061.85 613.21 34 . 2.23 833 733 2064.08 613.09 35 . 2.12 834 734 2066.20 612.69 36 . 3.83 835 735 2070.03 612.34 37 . 1.78 836 736 2071.81 612.26 38 . 4.45 837 737 2076.26 612.77 39 . 4.40 838 738 2080.66 612.93 40 . JOIN 799-838 N75 43 34E 2080.657 CHILAKO RIVER CROSS-SECTION 22 12+256 PROJECT 9330F043 SEPT 24 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 613.33 1 DUMMY 2000.00 800 700 2000.00 613.33 2 . 3.36 801 701 2003.36 613.15 3 . 2.46 802 702 2005.82 613.01 4 . 3.43 803 703 2009.25 613.30 5 G/L BOLT LB 4.25 804 704 2013.50 613.36 6 . 3.51 805 705 2017.01 613.09 7 . 3.46 806 706 2020.47 613.01 8 . 1.38 807 707 2021.85 613.00 9 . 1.49 808 708 2023.35 612.55 10 . 1.11 809 709 2024.46 612.57 11 . 1.10 810 710 2025.56 612.15 12 . 0.98 811 711 2026.54 612.03 13 . 0.90 812 712 2027.44 611.59 14 . 2.00 813 713 2029.44 611.60 15 . 1.16 814 714 2030.60 611.06 16 . 1.65 815 715 2032.25 610.95 17 . 2.35 816 716 2034.60 610.83 18 WL LB 1400HRS 4.17 817 717 2038.77 610.57 19 W2700 3.25 818 718 2042.02 610.46 20 W400 1.26 819 719 2043.27 610.24 21 W600 1.17 820 720 2044.45 609.59 22 W1250 1.00 821 721 2045.44 609.30 23 W1550 2.92 822 722 2048.36 609.77 24 W1060 2.22 823 723 2050.59 609.61 25 W1270 2.11 824 724 2052.70 609.48 26 W1360 2.15 825 725 2054.84 609.32 27 W1540 1.76 826 726 2056.61 609.19 28 W1640 CHILAKO RIVER CROSS-SECTION 22 12+256 PROJECT 9330F043 SEPT 24 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.21 827 727 2057.82 609.61 29 W1220 0.64 828 728 2058.45 610.03 30 W780 1.55 829 729 2060.00 610.18 31 W660 0.95 830 730 2060.95 610.78 32 WL RB 0.02 831 731 2060.97 611.57 33 . 1.92 832 732 2062.89 612.26 34 . 0.44 833 733 2063.33 612.71 35 . 0.64 834 734 2063.97 613.42 36 HWM JULY93 0.78 835 735 2064.74 613.91 37 TOP 2.46 836 736 2067.21 613.93 38 G/L BOLT RB 0.97 837 737 2068.17 613.88 39 . 0.58 838 738 2068.75 613.67 40 . 1.20 839 739 2069.95 613.53 41 . JOIN 799-839 N81 14 44E 2069.954 CHILAKO RIVER CROSS-SECTION 23 12+960 PROJECT 9330F043 SEPT 24 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 614.48 1 DUMMY 2000.00 800 700 2000.00 614.48 2 FIELD LEVEL 8.00 801 701 2008.00 614.49 3 G/L BOLT LB 2.73 802 702 2010.73 614.50 4 . 1.59 803 703 2012.33 614.25 5 . 2.31 804 704 2014.64 613.29 6 . 1.42 805 705 2016.06 613.30 7 . 1.12 806 706 2017.18 613.54 8 . 1.24 807 707 2018.42 613.59 9 . 2.27 808 708 2020.69 614.11 10 . 0.93 809 709 2021.62 614.18 11 . 2.55 810 710 2024.17 613.52 12 . 0.78 811 711 2024.94 613.28 13 . 1.31 812 712 2026.25 613.36 14 . 0.03 813 713 2026.28 613.19 15 . 1.63 814 714 2027.91 613.60 16 . 2.15 815 715 2030.06 613.82 17 . 2.56 816 716 2032.62 614.32 18 . 5.30 817 717 2037.92 614.37 19 . 2.30 818 718 2040.22 614.00 20 . 1.66 819 719 2041.87 613.88 21 . 3.62 820 720 2045.50 614.06 22 . 0.88 821 721 2046.37 613.76 23 . 2.69 822 722 2049.06 613.61 24 TOP 0.34 823 723 2049.40 613.43 25 . 0.72 824 724 2050.13 612.84 26 . 0.65 825 725 2050.77 612.71 27 . 1.27 826 726 2052.05 612.97 28 . CHILAKO RIVER CROSS-SECTION 23 12+960 PROJECT 9330F043 SEPT 24 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.79 827 727 2052.84 612.97 29 . 0.63 828 728 2053.46 612.77 30 . 1.12 829 729 2054.58 612.37 31 . 1.52 830 730 2056.10 611.66 32 . 1.21 831 731 2057.31 611.05 33 . 0.41 832 732 2057.71 610.99 34 . 3.00 833 733 2060.71 610.93 35 WL LB 1200HRS 1.11 834 734 2061.83 610.58 36 W400 1.53 835 735 2063.36 610.60 37 W370 0.97 836 736 2064.33 610.89 38 W2800 0.88 837 737 2065.21 610.84 39 W1300 1.00 838 738 2066.21 610.74 40 W2200 1.56 839 739 2067.77 610.79 41 W1600 2.22 840 740 2069.99 610.80 42 W1600 1.70 841 741 2071.69 610.18 43 W7800 2.20 842 742 2073.89 609.98 44 W960 1.07 843 743 2074.96 609.82 45 W1120 0.87 844 744 2075.82 609.74 46 W1200 1.56 845 745 2077.38 609.84 47 . 1.11 846 746 2078.50 609.93 48 W1030 1.36 847 747 2079.85 610.18 49 W800 0.72 848 748 2080.57 610.47 50 W480 0.74 849 749 2081.31 610.94 51 WL RB 0.48 850 750 2081.80 611.30 52 . 0.61 851 751 2082.41 611.95 53 . 1.00 852 752 2083.40 612.37 54 . 0.06 853 753 2083.47 612.82 55 . 0.00 854 754 2083.47 613.56 56 HWM JULY93 CHILAKO RIVER CROSS-SECTION 23 12+960 PROJECT 9330F043 SEPT 24 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.74 855 755 2084.21 614.02 57 TOP CUT BANK 0.94 856 756 2085.15 614.01 58 . 2.05 857 757 2087.20 613.91 59 . 0.97 858 758 2088.17 613.92 60 G/L BOLT RB 1.39 859 759 2089.56 613.93 61 . 23.43 860 760 2112.98 614.19 62 . 11.88 861 761 2124.86 614.20 63 FIELD LEVEL JOIN 799-861 S84 22 36E 2124.859 CHILAKO RIVER CROSS-SECTION 24 13+851 PROJECT 9330F043 SEPT 24 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 614.58 1 DUMMY 2000.00 800 700 2000.00 614.58 2 NG 5.38 801 701 2005.38 614.66 3 G/L BOLT LB 0.99 802 702 2006.37 614.61 4 TOP 0.92 803 703 2007.29 614.32 5 . 1.98 804 704 2009.27 614.26 6 . 1.07 805 705 2010.34 613.89 7 HWM JULY93 0.93 806 706 2011.27 613.73 8 . 0.80 807 707 2012.07 613.69 9 . 1.84 808 708 2013.91 613.17 10 . 1.50 809 709 2015.41 613.40 11 . 1.99 810 710 2017.40 613.34 12 . 1.92 811 711 2019.32 613.08 13 . 1.33 812 712 2020.66 613.01 14 . 2.69 813 713 2023.35 612.27 15 . 4.79 814 714 2028.13 611.60 16 . 1.28 815 715 2029.41 611.16 17 WL LB 1045HRS 1.62 816 716 2031.03 610.77 18 W 2.21 817 717 2033.25 610.50 19 W650 2.56 818 718 2035.81 610.35 20 W800 1.60 819 719 2037.41 609.78 21 W1350 1.81 820 720 2039.22 609.66 22 W1500 1.34 821 721 2040.55 609.95 23 W1200 2.34 822 722 2042.90 609.97 24 W1200 0.96 823 723 2043.86 610.10 25 W1000 TOE 0.57 824 724 2044.43 611.16 26 WL RB 1.63 825 725 2046.05 612.44 27 . 2.22 826 726 2048.27 613.48 28 . CHILAKO RIVER CROSS-SECTION 24 13+851 PROJECT 9330F043 SEPT 24 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.25 827 727 2048.52 614.68 29 TOP CUT BANK 2.40 828 728 2050.92 614.72 30 G/L BOLT RB 1.82 829 729 2052.74 614.63 31 . 4.06 830 730 2056.81 613.99 32 . 4.99 831 731 2061.80 613.32 33 . 10.05 832 732 2071.85 612.33 34 TOE BACKCHANNEL 4.57 833 733 2076.42 612.34 35 TOE BACKCHANNEL 11.34 834 734 2087.75 615.13 36 FIELD LEVEL JOIN 799-834 S68 44 48E 2087.755 CHILAKO RIVER CROSS-SECTION 25 13+955 PROJECT 9330F043 SEPT 23 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 655 755 0.00 614.88 1 DUMMY 2000.00 654 754 2000.00 614.88 2 . 10.93 653 753 2010.93 614.98 3 . 18.33 652 752 2029.26 615.35 4 . 17.59 651 751 2046.85 615.82 5 . 18.24 650 750 2065.09 616.34 6 . 14.39 649 749 2079.48 616.86 7 TOP EDGE ROAD 4.90 648 748 2084.38 616.94 8 G/L BOLT LB 4.30 647 747 2088.67 617.14 9 TOP ABUT 0.12 646 746 2088.79 615.58 10 GL ABUT 0.30 645 745 2089.09 615.58 11 OPP SEAT 1.55 644 744 2090.64 615.44 12 . 1.68 643 743 2092.32 615.01 13 . 1.06 642 742 2093.38 614.76 14 . 0.15 641 741 2093.53 614.06 15 . 1.24 640 740 2094.78 613.28 16 OPP CL PIER 0.56 639 739 2095.33 612.62 17 . 0.86 638 738 2096.19 612.27 18 . 0.69 637 737 2096.88 612.03 19 . 0.39 636 736 2097.27 611.56 20 . 1.53 635 735 2098.80 611.34 21 . 1.38 634 734 2100.18 611.20 22 OPP EDGE BENT 0.51 633 733 2100.69 611.18 23 WL LB 0.11 632 732 2100.81 610.99 24 CL BENT 0.47 631 731 2101.28 610.87 25 OPP EDGE BENT 0.69 630 730 2101.97 610.76 26 W440 0.76 629 729 2102.73 610.70 27 W1480 2.25 628 728 2104.98 610.55 28 W640 CHILAKO RIVER CROSS-SECTION 25 13+955 PROJECT 9330F043 SEPT 23 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.12 627 727 2106.11 610.46 29 . 1.73 626 726 2107.84 610.42 30 W780 1.85 625 725 2109.69 610.20 31 W980 1.63 624 724 2111.31 610.08 32 W1100 1.00 623 723 2112.31 610.24 33 OPP EDGE BENT 0.75 622 722 2113.06 610.44 34 OPP CL BENT 0.26 621 721 2113.33 610.90 35 OPP EDGE BENT 0.90 620 720 2114.23 610.87 36 W3200 0.91 619 719 2115.14 611.18 37 WL RB 1600 1.04 618 718 2116.18 612.22 38 . 0.57 617 717 2116.76 612.26 39 . 1.15 616 716 2117.91 611.75 40 . 0.90 615 715 2118.80 611.66 41 OPP PIER 1.01 614 714 2119.82 611.98 42 . 1.02 613 713 2120.84 613.10 43 . 1.02 612 712 2121.86 613.96 44 HWM JULY93 1.15 611 711 2123.00 614.71 45 . 1.45 610 710 2124.45 614.75 46 OPP SEAT 0.28 609 709 2124.73 614.79 47 G/L ABUT 0.02 608 708 2124.75 617.14 48 TOP ABUT 4.29 607 707 2129.04 617.02 49 . 7.62 606 706 2136.67 616.80 50 . 5.97 605 705 2142.64 616.52 51 G/L BOLT RB 8.68 604 704 2151.32 616.23 52 . 13.14 603 703 2164.46 615.82 53 . 14.78 602 702 2179.24 615.46 54 . 16.74 601 701 2195.98 615.31 55 . 12.65 600 700 2208.63 615.30 56 TOP EDGE ROAD JOIN 655-600 S15 48 57E 2208.634 CHILAKO RIVER CROSS-SECTION 26 13+965 PROJECT 9330F043 SEPT 23 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 452 352 0.00 614.77 1 DUMMY 2000.00 451 351 2000.00 614.77 2 . 10.57 450 350 2010.57 614.85 3 . 16.37 449 349 2026.94 615.13 4 . 18.59 448 348 2045.53 615.65 5 . 21.03 447 347 2066.56 616.28 6 . 8.86 446 346 2075.42 616.53 7 . 5.00 445 345 2080.42 616.69 8 TOP EDGE ROAD 7.40 444 344 2087.82 617.02 9 G/L BOLT LB 4.38 443 343 2092.21 617.15 10 TOP ABUT 0.09 442 342 2092.30 615.82 11 GL ABUT 0.30 441 341 2092.59 615.77 12 OPP EDGE SEAT 0.80 440 340 2093.40 615.61 13 . 1.93 439 339 2095.33 614.83 14 . 1.76 438 338 2097.09 613.83 15 HWM 1.25 437 337 2098.34 613.31 16 OPP CL PIERS 0.56 436 336 2098.90 612.06 17 . 0.51 435 335 2099.42 611.69 18 . 1.25 434 334 2100.66 611.62 19 . 1.25 433 333 2101.91 611.19 20 WL LB 0.99 432 332 2102.91 610.70 21 W530 0.88 431 331 2103.78 610.38 22 OPP EDGE BENT 0.44 430 330 2104.22 610.33 23 CL BENT 0.41 429 329 2104.63 610.31 24 OPP EDGE BENT 0.94 428 328 2105.56 610.28 25 W940 0.92 427 327 2106.48 610.22 26 W1000 1.29 426 326 2107.77 610.27 27 W940 1.59 425 325 2109.36 610.41 28 W800 CHILAKO RIVER CROSS-SECTION 26 13+965 PROJECT 9330F043 SEPT 23 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.70 424 324 2111.05 610.50 29 W700 1.67 423 323 2112.72 610.79 30 W430 1.04 422 322 2113.76 610.71 31 W470 1.03 421 321 2114.79 610.34 32 W860 0.94 420 320 2115.74 610.72 33 OPP EDGE BENT 0.74 419 319 2116.48 610.84 34 CL BENT 0.46 418 318 2116.93 611.19 35 WL RB 1420HRS 0.63 417 317 2117.56 611.24 36 . 2.05 416 316 2119.61 611.31 37 . 0.63 415 315 2120.24 611.61 38 . 1.01 414 314 2121.25 611.76 39 . 0.61 413 313 2121.87 612.09 40 . 0.51 412 312 2122.38 612.82 41 OPP CL PIERS 1.01 411 311 2123.39 613.56 42 . 0.90 410 310 2124.30 613.93 43 HWM JULY93 1.19 409 309 2125.49 614.90 44 . 2.32 408 308 2127.81 615.35 45 OPP END SEAT 0.33 407 307 2128.15 615.40 46 GL ABUT 0.12 406 306 2128.26 617.15 47 TOP ABUT 2.56 405 305 2130.82 616.95 48 G/L BOLT RB 6.69 404 304 2137.51 616.94 49 . 13.95 403 303 2151.46 616.40 50 . 22.51 402 302 2173.97 615.57 51 . 12.20 401 301 2186.17 615.37 52 . 15.06 400 300 2201.23 615.28 53 TOP EDGE ROAD JOIN 452-400 S15 59 44E 2201.231 CHILAKO RIVER WOODEN BRIDGE (LOWER MUD RD) 13+962 PROJECT 9330F043 SEPT23 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 800 200 0.00 614.70 1 CL L MUD ROAD 22.80 801 201 22.80 614.58 2 CENTRE LINE 21.27 802 202 44.06 614.60 3 CENTRE LINE 20.98 803 203 65.04 614.51 4 CENTRE LINE 17.00 804 204 82.05 614.53 5 CENTRE LINE 9.39 805 205 91.43 614.71 6 END PAVEMENT 16.65 806 206 108.09 614.82 7 CENTRE LINE 19.55 807 207 127.63 614.96 8 CENTRE LINE 29.01 808 208 156.64 615.52 9 CENTRE LINE 25.83 809 209 182.47 616.29 10 CENTRE LINE 20.04 810 210 202.52 616.97 11 CENTRE LINE 9.04 811 211 211.56 617.13 12 END WOOD DECK 5.90 812 212 217.46 617.16 13 CL PIER 6.00 813 213 223.47 617.17 14 CL BENT 12.15 814 214 235.62 617.15 15 CL BENT 5.95 815 215 241.57 617.16 16 CL PIER 5.96 816 216 247.53 617.14 17 END WOOD DECK 8.89 817 217 256.42 617.03 18 CENTRE LINE 12.66 818 218 269.07 616.57 19 CENTRE LINE 18.52 819 219 287.59 615.88 20 CENTRE LINE 12.05 820 220 299.64 615.56 21 CENTRE LINE 12.89 821 221 312.53 615.42 22 CENTRE LINE 13.83 822 222 326.36 615.39 23 CENTRE LINE 13.77 823 223 340.13 615.45 24 CENTRE LINE 21.64 824 224 361.77 615.60 25 CENTRE LINE 23.54 825 225 385.31 615.81 26 CENTRE LINE 19.98 826 226 405.29 616.08 27 CENTRE LINE 26.37 827 227 431.65 616.60 28 CENTRE LINE CHILAKO RIVER WOODEN BRIDGE (LOWER MUD RD) 13+962 PROJECT 9330F043 SEPT23 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 27.44 828 228 459.09 617.23 29 CL PAVMNT CHILAKO RIVER CROSS-SECTION 27 14+130 PROJECT 9330F043 SEPT 23 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 825 725 0.00 614.00 1 DUMMY 2000.00 824 724 2000.00 614.00 2 . 4.45 823 723 2004.45 613.64 3 . 7.83 822 722 2012.29 614.23 4 G/L BOLT LB 1.85 821 721 2014.14 614.07 5 0. 1.65 820 720 2015.79 614.30 6 TOP CUT 0.41 819 719 2016.20 613.99 7 HWM 1.69 818 718 2017.90 613.17 8 . 1.28 817 717 2019.18 611.91 9 . 2.18 816 716 2021.36 611.27 10 WL LB 1.70 815 715 2023.06 610.56 11 W720 1.39 814 714 2024.45 610.54 12 W723 3.82 813 713 2028.27 610.55 13 W 4.08 812 712 2032.35 610.57 14 W700 2.86 811 711 2035.22 610.67 15 W600 2.91 810 710 2038.13 610.78 16 W500 2.28 809 709 2040.41 611.28 17 WL RB 1310HRS 1.06 808 708 2041.47 611.65 18 TOE CUT 1.04 807 707 2042.52 613.05 19 TOP CUT 2.08 806 706 2044.59 613.99 20 HWM JULY93 0.96 805 705 2045.55 614.74 21 TOP BANK 4.88 804 704 2050.42 615.36 22 . 2.93 803 703 2053.35 616.00 23 G/L BOLT RB 2.79 802 702 2056.15 615.97 24 . 1.87 801 701 2058.02 615.70 25 . 5.57 800 700 2063.59 615.79 26 NG JOIN 825-800 S80 16 16E 2063.590 CHILAKO RIVER CROSS-SECTION 28 14+798 PROJECT 9330F043 SEPT 23 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 837 737 0.00 614.43 1 DUMMY 2000.00 836 736 2000.00 614.43 2 NG 5.71 835 735 2005.71 614.97 3 G/L BOLT LB 3.20 834 734 2008.92 615.07 4 TOP BANK 0.77 833 733 2009.69 614.13 5 HWM 0.36 832 732 2010.05 613.69 6 . 2.06 831 731 2012.11 613.51 7 TOP CUT 0.27 830 730 2012.38 611.61 8 WL LB 2.44 829 729 2014.81 610.85 9 W750 0.56 828 728 2015.37 610.57 10 W1050 2.65 827 727 2018.02 610.21 11 W1320 0.43 826 726 2018.45 610.38 12 W1200 1.82 825 725 2020.27 610.67 13 W920 2.01 824 724 2022.28 611.40 14 W1800 3.05 823 723 2025.33 611.44 15 W1500 3.36 822 722 2028.70 611.44 16 W1700 2.36 821 721 2031.05 611.34 17 W300 3.37 820 720 2034.43 611.02 18 W600 2.65 819 719 2037.07 610.85 19 W790 2.16 818 718 2039.23 611.14 20 W520 2.16 817 717 2041.40 611.65 21 WL RB 1115HRS 0.53 816 716 2041.93 612.31 22 . 1.27 815 715 2043.20 612.48 23 . 1.08 814 714 2044.29 613.54 24 . 0.54 813 713 2044.83 614.04 25 . 0.90 812 712 2045.72 614.11 26 . 0.46 811 711 2046.19 614.36 27 HWM JULY93 0.40 810 710 2046.58 614.52 28 . CHILAKO RIVER CROSS-SECTION 28 14+798 PROJECT 9330F043 SEPT 23 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.96 809 709 2047.54 615.13 29 TOP 2.02 808 708 2049.56 615.23 30 . 1.96 807 707 2051.52 615.15 31 TOP 0.91 806 706 2052.43 614.68 32 TOE MOUND 0.86 805 705 2053.29 614.44 33 FENCE LINE 2.61 804 704 2055.89 614.21 34 . 7.54 803 703 2063.44 614.15 35 . 9.91 802 702 2073.34 614.17 36 . 6.34 801 701 2079.69 614.27 37 FIELD 4.94 800 700 2084.62 614.24 38 G/L BOLT RB JOIN 837-800 S78 12 17E 2084.624 CHILAKO RIVER CROSS-SECTION 29 15+356 PROJECT 9330F043 SEPT 23 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 615.08 1 DUMMY 2000.00 800 700 2000.00 615.08 2 NG FIELD 2.58 801 701 2002.58 615.37 3 . 1.39 802 702 2003.97 614.87 4 . 2.73 803 703 2006.70 614.86 5 . 3.01 804 704 2009.72 613.56 6 . 5.15 805 705 2014.86 613.74 7 . 5.43 806 706 2020.29 613.42 8 . 3.38 807 707 2023.68 612.87 9 . 3.45 808 708 2027.12 612.20 10 . 4.84 809 709 2031.96 612.09 11 TOE CHAN 3.15 810 710 2035.12 613.34 12 TOE CUT 0.18 811 711 2035.30 614.33 13 HWM B CHAN 2.00 812 712 2037.30 615.40 14 TOP 14.81 813 713 2052.11 615.36 15 FIELD LEVEL 16.14 814 714 2068.26 615.60 16 . 8.19 815 715 2076.45 615.35 17 . 25.48 816 716 2101.93 615.52 18 . 19.06 817 717 2120.99 615.95 19 . 18.43 818 718 2139.41 615.97 20 . 17.49 819 719 2156.90 615.72 21 . 0.32 820 720 2157.22 615.71 22 G/L BOLT LB 4.52 821 721 2161.74 615.70 23 TOP CUT 0.40 822 722 2162.14 614.52 24 TOE CUT 2.39 823 723 2164.52 613.17 25 . 0.78 824 724 2165.30 612.19 26 WL LB 1010HRS 0.68 825 725 2165.98 611.85 27 W3600 1.30 826 726 2167.29 611.41 28 W780 CHILAKO RIVER CROSS-SECTION 29 15+356 PROJECT 9330F043 SEPT 23 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.55 827 727 2168.84 611.38 29 W780 1.69 828 728 2170.53 611.59 30 W580 2.33 829 729 2172.86 611.91 31 W2800 2.26 830 730 2175.12 612.08 32 W1000 1.67 831 731 2176.79 612.12 33 W500 1.65 832 732 2178.44 612.08 34 W600 0.71 833 733 2179.16 611.83 35 W3100 1.18 834 734 2180.33 611.63 36 W540 1.07 835 735 2181.40 611.47 37 W680 0.79 836 736 2182.20 611.80 38 W340 1.07 837 737 2183.26 612.15 39 WL RB 1.84 838 738 2185.11 613.32 40 . 1.00 839 739 2186.10 613.87 41 . 0.85 840 740 2186.95 614.22 42 . 1.03 841 741 2187.98 614.52 43 HWM JULY93 0.66 842 742 2188.64 615.80 44 TOP CUT 1.51 843 743 2190.15 615.89 45 . 8.17 844 744 2198.32 615.64 46 EDGE FIELD 4.60 845 745 2202.92 615.37 47 FIELD 10.58 846 746 2213.50 615.21 48 . 21.29 847 747 2234.78 615.03 49 G/L BOLT RB 18.86 848 748 2253.64 615.01 50 . 16.24 849 749 2269.89 615.11 51 . 15.24 850 750 2285.13 615.10 52 CL AIRSTRIP JOIN 799-850 S51 53 21E 2285.125 CHILAKO RIVER CROSS-SECTION 30 15+890 PROJECT 9330F043 SEPT 22 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 616.39 1 DUMMY 2000.00 800 700 2000.00 616.39 2 . 6.37 801 701 2006.37 616.14 3 . 2.35 802 702 2008.72 616.30 4 . 2.24 803 703 2010.96 616.12 5 . 1.43 804 704 2012.39 616.21 6 G/L BOLT LB 2.69 805 705 2015.08 616.21 7 TOP 0.24 806 706 2015.32 615.51 8 HWM 0.95 807 707 2016.26 614.87 9 . 1.28 808 708 2017.55 614.37 10 . 0.54 809 709 2018.08 613.84 11 WL LB 1645HRS 1.04 810 710 2019.12 613.24 12 W600 1.86 811 711 2020.98 612.92 13 W920 0.78 812 712 2021.76 612.89 14 W940 2.05 813 713 2023.81 612.96 15 W880 2.43 814 714 2026.24 613.19 16 W640 2.54 815 715 2028.79 613.61 17 W2300 1.52 816 716 2030.30 613.85 18 WL 0.99 817 717 2031.29 614.02 19 BAR 1.81 818 718 2033.10 614.01 20 . 1.74 819 719 2034.84 613.86 21 WL 1.63 820 720 2036.48 613.68 22 W1600 1.47 821 721 2037.95 613.19 23 W670 2.34 822 722 2040.29 613.38 24 W480 1.37 823 723 2041.67 613.37 25 W480 0.87 824 724 2042.54 613.09 26 W760 1.05 825 725 2043.58 613.02 27 W840 1.59 826 726 2045.17 613.11 28 W760 CHILAKO RIVER CROSS-SECTION 30 15+890 PROJECT 9330F043 SEPT 22 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.18 827 727 2047.35 613.03 29 . 1.52 828 728 2048.87 612.47 30 W1380 1.90 829 729 2050.77 613.03 31 W8300 2.95 830 730 2053.72 613.29 32 W560 1.70 831 731 2055.42 613.33 33 W530 1.72 832 732 2057.14 613.92 34 . 1.67 833 733 2058.80 613.55 35 W300 1.46 834 734 2060.27 613.59 36 W2600 0.52 835 735 2060.79 613.83 37 WL RB 1.69 836 736 2062.48 614.33 38 . 0.63 837 737 2063.10 614.72 39 . 0.12 838 738 2063.22 615.88 40 TOP 1.83 839 739 2065.05 615.87 41 . 2.69 840 740 2067.75 615.89 42 G/L BOLT RB 2.12 841 741 2069.87 615.88 43 FENCE LINE 4.61 842 742 2074.48 615.90 44 . 2.97 843 743 2077.46 615.56 45 . 4.57 844 744 2082.02 615.56 46 . 5.11 845 745 2087.13 615.50 47 . JOIN 799-845 N63 56 18E 2087.132 CHILAKO RIVER CROSS-SECTION 31 16+546 PROJECT 9330F043 SEPT 22 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 616.52 1 DUMMY 2000.00 800 700 2000.00 616.52 2 . 1.58 801 701 2001.58 616.52 3 . 2.56 802 702 2004.14 616.63 4 . 1.54 803 703 2005.68 616.70 5 G/L BOLT LB 2.48 804 704 2008.16 616.56 6 . 0.84 805 705 2009.00 616.34 7 . 0.39 806 706 2009.39 616.04 8 HWM JULY93 0.44 807 707 2009.83 615.80 9 . 0.39 808 708 2010.22 615.41 10 . 0.68 809 709 2010.90 615.02 11 . 0.87 810 710 2011.77 614.12 12 . 1.46 811 711 2013.24 614.19 13 . 1.43 812 712 2014.66 614.14 14 . 1.05 813 713 2015.71 614.13 15 . 1.28 814 714 2016.99 614.50 16 . 0.75 815 715 2017.73 614.82 17 . 1.48 816 716 2019.22 614.98 18 . 1.29 817 717 2020.51 614.98 19 . 0.92 818 718 2021.42 614.93 20 . 2.17 819 719 2023.59 614.59 21 WL LB 1330HRS 4.19 820 720 2027.79 614.47 22 W1200 1.45 821 721 2029.24 614.15 23 W430 1.60 822 722 2030.84 614.12 24 W500 1.95 823 723 2032.79 614.41 25 W2300 1.17 824 724 2033.96 614.44 26 W1300 2.33 825 725 2036.29 614.30 27 W1900 2.44 826 726 2038.73 614.34 28 W1300 CHILAKO RIVER CROSS-SECTION 31 16+546 PROJECT 9330F043 SEPT 22 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.17 827 727 2041.90 614.16 29 W3200 1.97 828 728 2043.87 614.15 30 W3400 2.61 829 729 2046.48 614.22 31 W2500 1.61 830 730 2048.08 614.07 32 W3800 0.94 831 731 2049.02 613.99 33 W460 0.07 832 732 2049.09 614.47 34 WL RB 0.49 833 733 2049.58 615.04 35 . 0.53 834 734 2050.11 615.94 36 HWM 0.48 835 735 2050.59 616.32 37 TOP 1.69 836 736 2052.28 616.55 38 G/L BOLT RB 1.22 837 737 2053.50 616.16 39 . 1.62 838 738 2055.12 615.98 40 . 2.46 839 739 2057.58 616.42 41 . 3.61 840 740 2061.20 616.45 42 . 2.25 841 741 2063.45 616.26 43 . 0.53 842 742 2063.98 616.13 44 . 5.36 843 743 2069.34 615.87 45 . 2.16 844 744 2071.50 616.12 46 . 1.22 845 745 2072.71 615.75 47 ADD .5 HWM 0.71 846 746 2073.42 615.83 48 . 4.43 847 747 2077.85 616.93 49 TOP 4.71 848 748 2082.56 616.94 50 . JOIN 799-848 S84 27 54E 2082.556 CHILAKO RIVER CROSS-SECTION 32 16+591 PROJECT 9330F043 SEPT 22 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 616.48 1 DUMMY 2000.00 800 700 2000.00 616.48 2 . 4.52 801 701 2004.52 616.50 3 . 3.86 802 702 2008.37 616.78 4 . 4.01 803 703 2012.38 616.71 5 . 3.05 804 704 2015.44 616.75 6 . 2.72 805 705 2018.16 616.86 7 G/L BOLT LB 1.54 806 706 2019.70 616.81 8 . 0.99 807 707 2020.69 616.46 9 TOP 0.78 808 708 2021.47 615.78 10 . 0.74 809 709 2022.21 615.54 11 . 0.57 810 710 2022.78 615.44 12 . 0.21 811 711 2022.99 615.21 13 . 0.63 812 712 2023.62 615.08 14 . 0.38 813 713 2024.00 614.65 15 WWL LB 1140HRS 0.26 814 714 2024.25 614.15 16 W520 0.91 815 715 2025.17 613.70 17 W970 1.05 816 716 2026.21 613.53 18 W1130 1.51 817 717 2027.73 613.22 19 W1440 1.06 818 718 2028.78 613.00 20 W1670 0.64 819 719 2029.42 612.82 21 W1850 2.54 820 720 2031.96 612.40 22 W2270 2.77 821 721 2034.73 612.59 23 W2080 2.99 822 722 2037.72 613.01 24 W1660 2.10 823 723 2039.83 613.47 25 W1210 2.10 824 724 2041.92 613.85 26 W1780 1.59 825 725 2043.52 614.19 27 W490 1.33 826 726 2044.84 614.66 28 WL RB CHILAKO RIVER CROSS-SECTION 32 16+591 PROJECT 9330F043 SEPT 22 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.65 827 727 2045.50 614.72 29 . 2.35 828 728 2047.84 616.12 30 HWM JULY93 0.91 829 729 2048.75 616.32 31 . 1.08 830 730 2049.84 616.97 32 TOP 3.26 831 731 2053.10 616.93 33 . 1.14 832 732 2054.24 616.85 34 . 5.15 833 733 2059.39 617.00 35 G/L BOLT RB 9.86 834 734 2069.24 616.94 36 . JOIN 799-834 S36 19 22E 2069.243 CHILAKO RIVER CROSS-SECTION 33 16+960 PROJECT 9330F043 SEPT 22 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 617.10 1 DUMMY 2000.00 800 700 2000.00 617.10 2 FIELD 3.67 801 701 2003.67 617.06 3 . 2.42 802 702 2006.10 616.53 4 . 4.65 803 703 2010.74 616.73 5 . 2.57 804 704 2013.31 616.17 6 . 3.34 805 705 2016.65 616.19 7 . 3.32 806 706 2019.98 616.41 8 . 3.26 807 707 2023.23 616.41 9 . 2.60 808 708 2025.83 616.36 10 . 1.83 809 709 2027.66 616.85 11 . 2.10 810 710 2029.77 616.89 12 G/L BOLT LB 1.12 811 711 2030.88 616.82 13 TOP 1.09 812 712 2031.97 616.53 14 HWM JULY93 0.98 813 713 2032.95 616.02 15 . 0.54 814 714 2033.49 615.80 16 . 0.86 815 715 2034.35 615.27 17 . 0.79 816 716 2035.14 614.66 18 WL LB 1030HRS 0.43 817 717 2035.57 614.35 19 W3100 1.05 818 718 2036.62 613.81 20 W870 2.14 819 719 2038.76 613.70 21 W960 3.92 820 720 2042.68 613.57 22 W1090 2.78 821 721 2045.46 613.53 23 W1140 1.86 822 722 2047.32 613.38 24 W1280 2.66 823 723 2049.98 612.84 25 W1800 0.77 824 724 2050.75 612.74 26 W1940 0.79 825 725 2051.54 612.93 27 W1740 1.31 826 726 2052.85 613.15 28 W1500 CHILAKO RIVER CROSS-SECTION 33 16+960 PROJECT 9330F043 SEPT 22 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.11 827 727 2053.96 613.33 29 W1340 0.87 828 728 2054.82 614.08 30 W590 0.94 829 729 2055.76 614.14 31 W5300 0.10 830 730 2055.86 614.67 32 WL RB 0.66 831 731 2056.52 615.84 33 . 0.58 832 732 2057.10 616.23 34 . 0.32 833 733 2057.42 616.72 35 TOP 0.87 834 734 2058.29 616.88 36 . 2.97 835 735 2061.26 616.99 37 . 1.19 836 736 2062.45 616.91 38 . 3.88 837 737 2066.33 616.73 39 . 0.90 838 738 2067.23 616.80 40 . 1.67 839 739 2068.90 617.11 41 TOE 1.45 840 740 2070.35 617.50 42 . 0.97 841 741 2071.32 618.18 43 . 3.55 842 742 2074.87 619.52 44 TOP 0.73 843 743 2075.60 619.56 45 G/L BOLT RB 2.65 844 744 2078.25 619.42 46 . 2.67 845 745 2080.91 619.32 47 . 3.75 846 746 2084.66 619.39 48 FIELD JOIN 799-846 N40 14 09E 2084.665 CHILAKO RIVER CROSS-SECTION 34 17+318 PROJECT 9330F043 SEPT 21 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 617.40 1 DUMMY 2000.00 800 700 2000.00 617.40 2 . 4.07 801 701 2004.07 617.38 3 . 12.27 802 702 2016.34 616.71 4 . 3.44 803 703 2019.78 616.79 5 . 2.77 804 704 2022.55 616.41 6 . 6.83 805 705 2029.38 616.77 7 . 1.78 806 706 2031.16 617.11 8 . 2.99 807 707 2034.15 617.12 9 . 1.79 808 708 2035.94 617.21 10 G/L BOLT LB 4.23 809 709 2040.17 616.94 11 . 1.32 810 710 2041.49 616.88 12 . 4.16 811 711 2045.65 616.99 13 TOP CUT BANK 0.23 812 712 2045.88 616.19 14 . 0.81 813 713 2046.69 614.68 15 WL LB 1600HRS 0.43 814 714 2047.12 614.17 16 W5200 0.53 815 715 2047.65 613.73 17 W950 0.66 816 716 2048.31 613.39 18 W1300 1.70 817 717 2050.01 613.23 19 W1420 1.12 818 718 2051.13 612.87 20 W1800 0.50 819 719 2051.62 612.70 21 W1960 2.22 820 720 2053.85 613.07 22 W1620 2.25 821 721 2056.09 613.16 23 W1530 2.22 822 722 2058.31 613.37 24 W1310 2.52 823 723 2060.83 613.57 25 W1100 0.70 824 724 2061.53 613.64 26 W1040 2.76 825 725 2064.29 613.86 27 W810 2.44 826 726 2066.73 614.02 28 W660 CHILAKO RIVER CROSS-SECTION 34 17+318 PROJECT 9330F043 SEPT 21 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.90 827 727 2069.63 614.11 29 W560 1.15 828 728 2070.78 614.58 30 W1200 1.61 829 729 2072.39 614.67 31 WL RB 0.91 830 730 2073.30 614.81 32 . 2.75 831 731 2076.05 615.29 33 . 0.90 832 732 2076.95 615.62 34 . 0.48 833 733 2077.43 615.85 35 . 1.68 834 734 2079.11 615.94 36 . 1.35 835 735 2080.46 616.43 37 . 2.85 836 736 2083.31 616.41 38 . 1.90 837 737 2085.21 616.08 39 . 0.88 838 738 2086.09 616.02 40 . 0.94 839 739 2087.03 616.13 41 . 1.55 840 740 2088.58 616.27 42 . 1.41 841 741 2089.99 616.30 43 . 0.56 842 742 2090.54 616.14 44 . 1.54 843 743 2092.08 616.29 45 . 1.91 844 744 2093.99 616.78 46 . 1.25 845 745 2095.25 617.12 47 . 2.03 846 746 2097.28 617.24 48 . 2.88 847 747 2100.16 617.08 49 . 3.07 848 748 2103.22 616.90 50 . 3.27 849 749 2106.49 616.78 51 . 2.15 850 750 2108.64 616.78 52 G/L BOLT RB 9.14 851 751 2117.78 616.69 53 . 8.40 852 752 2126.18 617.05 54 FIELD LEVEL JOIN 799-852 N75 23 32E 2126.177 CHILAKO RIVER CROSS-SECTION 35 18+265 PROJECT 9330F043 SEPT 21 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 617.35 1 DUMMY 2000.00 800 700 2000.00 617.35 2 FIELD 5.41 801 701 2005.41 617.62 3 . 2.22 802 702 2007.63 617.16 4 . 5.14 803 703 2012.77 617.47 5 . 2.08 804 704 2014.84 617.20 6 . 4.15 805 705 2018.99 616.99 7 . 3.04 806 706 2022.02 617.17 8 . 1.68 807 707 2023.70 617.32 9 . 1.64 808 708 2025.34 617.52 10 . 1.13 809 709 2026.47 617.59 11 G/L BOLT LB 2.99 810 710 2029.46 617.63 12 . 1.58 811 711 2031.03 617.35 13 . 0.70 812 712 2031.74 617.25 14 HWM JULY93 0.78 813 713 2032.51 616.75 15 . 0.68 814 714 2033.20 616.38 16 . 1.94 815 715 2035.14 615.87 17 . 2.87 816 716 2038.01 615.29 18 . 1.35 817 717 2039.36 614.70 19 WL LB 1400HRS 1.13 818 718 2040.49 614.23 20 W480 1.85 819 719 2042.34 614.02 21 W700 1.06 820 720 2043.40 613.66 22 W1040 1.32 821 721 2044.72 613.57 23 W1130 1.60 822 722 2046.32 613.64 24 W1060 2.13 823 723 2048.45 613.63 25 W1080 1.43 824 724 2049.88 613.55 26 W1160 0.86 825 725 2050.74 613.45 27 w1140 1.64 826 726 2052.38 613.23 28 W1460 CHILAKO RIVER CROSS-SECTION 35 18+265 PROJECT 9330F043 SEPT 21 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.89 827 727 2054.27 613.13 29 W1580 1.41 828 728 2055.68 612.98 30 W1730 0.58 829 729 2056.25 612.95 31 W1760 1.67 830 730 2057.93 613.29 32 W1430 0.80 831 731 2058.73 613.48 33 W1210 1.54 832 732 2060.26 614.69 34 WL RB 0.64 833 733 2060.91 615.43 35 . 1.80 834 734 2062.71 615.93 36 . 0.76 835 735 2063.47 616.94 37 HWM 0.79 836 736 2064.26 617.40 38 TOP 1.40 837 737 2065.66 617.42 39 . 1.69 838 738 2067.35 617.46 40 . 3.13 839 739 2070.48 617.52 41 . 2.32 840 740 2072.80 617.40 42 . 2.41 841 741 2075.20 616.57 43 . 1.17 842 742 2076.37 616.24 44 . 3.09 843 743 2079.46 616.32 45 TOE HWY 3.59 844 744 2083.05 617.53 46 . 3.61 845 745 2086.66 619.75 47 . 1.31 846 746 2087.97 620.22 48 G/L BOLT RB 6.13 847 747 2094.10 620.70 49 CL HWY JOIN 799-847 S13 56 29E 2094.096 CHILAKO RIVER CROSS-SECTION 36 18+668 PROJECT 9330F043 SEPT 21 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 699 599 0.00 622.20 1 DUMMY 2000.00 700 600 2000.00 622.20 2 TOP EDGE ROAD 21.16 701 601 2021.16 621.57 3 . 7.77 702 602 2028.93 621.36 4 G/L BOLT LB 1.24 703 603 2030.17 621.27 5 . 0.45 704 604 2030.62 621.16 6 TOE WING WALL 0.01 705 605 2030.63 621.65 7 TOP WALL 0.35 706 606 2030.98 621.64 8 TOP WALL 0.02 707 607 2031.01 620.70 9 GL WALL 1.30 708 608 2032.31 620.09 10 . 1.18 709 609 2033.49 619.62 11 . 1.37 710 610 2034.85 618.64 12 . 0.53 711 611 2035.39 618.08 13 . 1.44 712 612 2036.82 617.19 14 HWM JULY93 1.75 713 613 2038.58 616.10 15 . 1.06 714 614 2039.63 615.43 16 . 0.68 715 615 2040.31 614.77 17 WL LB 1330HRS 0.70 716 616 2041.01 614.24 18 W470 1.24 717 617 2042.25 613.72 19 W1010 1.79 718 618 2044.04 613.52 20 W1200 1.15 719 619 2045.19 613.29 21 W1450 0.74 720 620 2045.93 612.80 22 OPP EDGE PIER 0.60 721 621 2046.53 612.47 23 OPP EDGE PIER 1.32 722 622 2047.85 611.84 24 W2900 2.08 723 623 2049.93 612.20 25 W2540 2.24 724 624 2052.17 612.61 26 W2130 2.62 725 625 2054.80 613.10 27 W1650 2.00 726 626 2056.80 613.33 28 W1400 CHILAKO RIVER CROSS-SECTION 36 18+668 PROJECT 9330F043 SEPT 21 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.19 727 627 2058.99 613.50 29 W1250 0.73 728 628 2059.72 613.70 30 W1050 1.44 729 629 2061.15 614.37 31 OPP EDGE PIER 0.75 730 630 2061.90 614.60 32 OPP EDGE PIER 0.06 731 631 2061.97 614.72 33 WL RB 0.57 732 632 2062.54 614.93 34 . 0.91 733 633 2063.45 615.40 35 . 2.37 734 634 2065.81 615.88 36 . 0.67 735 635 2066.49 616.46 37 . 1.73 736 636 2068.22 616.92 38 . 1.85 737 637 2070.07 617.15 39 . 2.47 738 638 2072.54 618.69 40 . 2.77 739 639 2075.31 620.06 41 . 1.45 740 640 2076.76 620.61 42 TOE WALL 0.01 741 641 2076.77 621.43 43 TOP WALL 0.36 742 642 2077.13 621.44 44 TOP WALL 0.02 743 643 2077.15 620.89 45 GL WALL 1.74 744 644 2078.89 620.94 46 G/L BOLT RB 5.44 745 645 2084.33 620.92 47 . 21.50 746 646 2105.83 621.01 48 TOP EDGE HWY JOIN 699-746 S82 48 13E 2105.832 CHILAKO RIVER HWY 16 CL PROFILE 18+675 PROJECT 9330F043 SEPT 21 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 818 218 0.00 624.30 1 CENTRE LINE 19.92 817 217 19.92 623.35 2 CENTRE LINE 19.93 816 216 39.86 622.66 3 CENTRE LINE 19.90 815 215 59.76 621.96 4 CENTRE LINE 9.03 814 214 68.79 621.64 5 CENTRE LINE 10.86 813 213 79.65 621.41 6 CENTRE LINE 1.69 812 212 81.34 621.38 7 EDGE ABUT 0.39 811 211 81.72 621.39 8 EDGE ABUT 15.27 810 210 96.99 621.33 9 CL PIER 15.26 809 209 112.25 621.27 10 CL PIER 15.34 808 208 127.59 621.19 11 EDGE ABUT 0.33 807 207 127.92 621.19 12 EDGE ABUT 11.56 806 206 139.48 621.18 13 CENTRE LINE 19.90 805 205 159.38 621.22 14 CENTRE LINE 19.92 804 204 179.30 621.15 15 CENTRE LINE 19.99 803 203 199.29 621.06 16 CENTRE LINE 19.97 802 202 219.26 620.96 17 CENTRE LINE 19.92 801 201 239.18 620.86 18 CL 19.90 800 200 259.09 620.75 19 CL HWY 16 CHILAKO RIVER CROSS-SECTION 37 18+680 PROJECT 9330F043 SEPT 20 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 446 346 0.00 622.28 1 DUMMY 2000.00 445 345 2000.00 622.28 2 TOP EDGE HWY 11.66 444 344 2011.66 621.91 3 . 19.07 443 343 2030.73 621.27 4 G/L BOLT LB 4.90 442 342 2035.63 621.15 5 G/L WALL 0.00 441 341 2035.63 621.62 6 TOP WALL 0.38 440 340 2036.01 621.63 7 TOP WALL 0.01 439 339 2036.02 620.41 8 GL WALL 2.18 438 338 2038.20 619.71 9 . 1.83 437 337 2040.03 619.31 10 . 0.55 436 336 2040.58 618.63 11 . 1.75 435 335 2042.33 618.08 12 . 1.86 434 334 2044.20 617.07 13 HWM 0.70 433 333 2044.90 616.67 14 . 1.05 432 332 2045.95 615.89 15 . 1.06 431 331 2047.00 615.38 16 . 0.80 430 330 2047.80 614.73 17 WL LB 1300HRS 2.41 429 329 2050.21 613.82 18 W9000 0.54 428 328 2050.75 613.56 19 W1200 1.12 427 327 2051.87 613.12 20 W1620 0.35 426 326 2052.22 612.82 21 W1910 2.34 425 325 2054.56 612.00 22 W2720 2.23 424 324 2056.79 612.16 23 W2600 3.30 423 323 2060.09 612.74 24 W2000 2.28 422 322 2062.37 613.01 25 W1710 2.24 421 321 2064.61 612.52 26 W2200 1.72 420 320 2066.33 612.21 27 OPP EDGE PIR 0.65 419 319 2066.98 612.17 28 EDGE PIER CHILAKO RIVER CROSS-SECTION 37 18+680 PROJECT 9330F043 SEPT 20 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.56 418 318 2068.54 612.55 29 W2170 1.18 417 317 2069.72 612.77 30 W1940 1.81 416 316 2071.53 613.46 31 W1250 0.57 415 315 2072.10 614.07 32 W650 0.33 414 314 2072.42 614.73 33 WL RB 1.53 413 313 2073.95 615.83 34 . 0.62 412 312 2074.57 616.35 35 . 0.96 411 311 2075.52 617.07 36 HWM JULY93 1.54 410 310 2077.06 617.98 37 . 0.72 409 309 2077.78 618.27 38 . 2.16 408 308 2079.93 619.50 39 . 1.77 407 307 2081.71 620.21 40 GL WALL 0.06 406 306 2081.77 621.47 41 TOP WALL 0.33 405 305 2082.09 621.48 42 TOP WALL 0.00 404 304 2082.10 620.60 43 GL WALL 1.36 403 303 2083.46 621.08 44 . 1.40 402 302 2084.86 621.10 45 G/L BOLT RB 18.89 401 301 2103.75 621.14 46 . 28.79 400 300 2132.53 621.13 47 TOP EDGE HWY JOIN 446-400 S82 52 49E 2132.528 CHILAKO RIVER CROSS-SECTION 37.1 18+897 PROJECT 9330F043 SEPT 20 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 752 652 0.00 619.35 1 DUMMY 2000.00 751 651 2000.00 619.35 2 CL OLD HWY 20.85 750 650 2020.85 619.57 3 CL OLD HWY 28.06 749 649 2048.91 619.59 4 G/L BOLT LB 7.44 748 648 2056.36 619.62 5 CL OLD HWY 9.70 747 647 2066.05 619.68 6 TOP ABUT 0.44 746 646 2066.49 619.69 7 TOP CONC ABUT 0.04 745 645 2066.54 618.91 8 SEAT 0.29 744 644 2066.82 618.93 9 SEAT 0.07 743 643 2066.89 618.50 10 . 1.72 742 642 2068.61 617.78 11 . 1.55 741 641 2070.16 617.34 12 . 1.65 740 640 2071.81 617.21 13 . 1.31 739 639 2073.12 616.88 14 . 1.69 738 638 2074.82 616.21 15 . 1.52 737 637 2076.34 616.09 16 EDGE BENT 0.00 736 636 2076.34 617.69 17 TOP BEAM 1.45 735 635 2077.79 617.70 18 TOP BEAM 0.02 734 634 2077.81 614.73 19 WL LB 0.21 733 633 2078.02 614.45 20 EDGE BENT 350 1.23 732 632 2079.25 614.41 21 W340 0.86 731 631 2080.12 614.18 22 W620 1.10 730 630 2081.21 614.20 23 W580 0.43 729 629 2081.64 614.46 24 W340 0.28 728 628 2081.92 614.48 25 W300 1.45 727 627 2083.37 614.00 26 W750 0.66 726 626 2084.03 613.66 27 W1060 1.33 725 625 2085.36 613.40 28 W1370 CHILAKO RIVER CROSS-SECTION 37.1 18+897 PROJECT 9330F043 SEPT 20 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.97 724 624 2088.33 612.80 29 W1980 1.48 723 623 2089.81 612.39 30 W2390 1.79 722 622 2091.59 612.18 31 W2600 1.51 721 621 2093.10 612.36 32 W2420 1.19 720 620 2094.29 613.10 33 EDGE BENT 1650 0.28 719 619 2094.57 617.96 34 TOP BEAM 1.15 718 618 2095.72 617.97 35 TOP BEAM 0.28 717 617 2096.01 613.70 36 EDGE BENT1050 0.78 716 616 2096.79 614.09 37 W680 0.44 715 615 2097.23 614.29 38 . 1.72 714 614 2098.95 614.76 39 WL RB 1515HRS 0.66 713 613 2099.61 614.87 40 . 0.73 712 612 2100.35 615.31 41 . 0.34 711 611 2100.68 616.24 42 . 0.89 710 610 2101.57 617.01 43 HWM JULY93 1.41 709 609 2102.98 617.66 44 . 0.76 708 608 2103.74 617.70 45 . 0.65 707 607 2104.40 617.81 46 . 1.00 706 606 2105.40 618.24 47 G/L SEAT 0.09 705 605 2105.49 618.81 48 TOP SEAT 0.40 704 604 2105.89 618.85 49 SEAT 0.13 703 603 2106.02 619.64 50 TOP CONC ABUT 8.98 702 602 2115.00 619.64 51 G/L BOLT RB 8.49 701 601 2123.49 619.54 52 CL 16.74 700 600 2140.23 619.47 53 CL OLD HWY JOIN 752-700 S58 47 59E 2140.234 CHILAKO RIVER CROSS-SECTION 38 19+082 PROJECT 9330F043 SEPT 201993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 838 738 0.00 618.44 1 DUMMY 2000.00 837 737 2000.00 618.44 2 . 8.56 836 736 2008.56 618.21 3 . 7.61 835 735 2016.17 617.63 4 . 14.83 834 734 2031.00 617.51 5 . 5.22 833 733 2036.22 617.55 6 . 1.46 832 732 2037.68 617.84 7 FIELD 1.83 831 731 2039.51 617.91 8 G/L BOLT LB 2.65 830 730 2042.16 617.71 9 . 3.18 829 729 2045.34 617.37 10 . 1.76 828 728 2047.10 617.37 11 TOP 0.67 827 727 2047.77 617.13 12 HWM 0.49 826 726 2048.26 616.80 13 . 1.08 825 725 2049.34 616.50 14 . 0.90 824 724 2050.24 615.61 15 . 0.29 823 723 2050.52 614.76 16 WL LB 0.48 822 722 2051.00 613.62 17 W1120 1.12 821 721 2052.13 613.55 18 W1200 1.29 820 720 2053.41 613.16 19 W1600 2.24 819 719 2055.65 612.95 20 W1820 1.61 818 718 2057.26 612.89 21 W1900 1.41 817 717 2058.67 612.39 22 W2400 1.89 816 716 2060.55 611.81 23 W2980 4.00 815 715 2064.56 611.81 24 W2990 2.40 814 714 2066.96 611.91 25 W2860 1.15 813 713 2068.11 612.33 26 W2460 1.21 812 712 2069.32 612.93 27 W1850 1.00 811 711 2070.31 613.69 28 W1090 CHILAKO RIVER CROSS-SECTION 38 19+082 PROJECT 9330F043 SEPT 201993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.46 810 710 2071.77 613.81 29 W960 0.71 809 709 2072.48 614.25 30 W.540 0.94 808 708 2073.43 614.77 31 WL RB 1330HRS 0.83 807 707 2074.26 616.04 32 . 0.49 806 706 2074.75 616.98 33 . 0.77 805 705 2075.52 617.48 34 HWM JULY93 0.99 804 704 2076.51 617.70 35 . 0.89 803 703 2077.39 617.86 36 . 1.43 802 702 2078.82 617.90 37 G/L BOLT RB 1.18 801 701 2080.01 617.78 38 . 2.80 800 700 2082.80 617.55 39 . JOIN 838-800 N80 55 00E 2082.805 CHILAKO RIVER CROSS-SECTION 39 20+067 PROJECT 9330F043 SEPT 18 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 851 751 0.00 617.65 1 DUMMY 2000.00 850 750 2000.00 617.65 2 . 3.77 849 749 2003.77 617.51 3 . 4.07 848 748 2007.85 617.09 4 . 3.53 847 747 2011.37 616.89 5 . 1.67 846 746 2013.05 617.13 6 . 3.10 845 745 2016.15 617.45 7 . 1.97 844 744 2018.12 617.59 8 . 3.69 843 743 2021.81 617.53 9 . 3.92 842 742 2025.72 617.25 10 . 1.83 841 741 2027.55 617.30 11 . 1.35 840 740 2028.90 617.79 12 . 1.01 839 739 2029.91 617.60 13 . 1.43 838 738 2031.34 617.62 14 . 3.25 837 737 2034.60 617.50 15 . 2.56 836 736 2037.15 617.26 16 . 2.26 835 735 2039.42 617.24 17 . 1.24 834 734 2040.65 616.53 18 . 0.81 833 733 2041.46 616.45 19 . 1.06 832 732 2042.52 616.67 20 . 0.87 831 731 2043.38 617.12 21 . 4.18 830 730 2047.56 617.69 22 . 3.39 829 729 2050.95 617.45 23 . 3.05 828 728 2054.00 616.83 24 . 1.96 827 727 2055.96 616.59 25 CL DITCH 2.97 826 726 2058.94 616.53 26 TOE DITCH 1.89 825 725 2060.83 617.12 27 . 1.14 824 724 2061.97 617.56 28 . CHILAKO RIVER CROSS-SECTION 39 20+067 PROJECT 9330F043 SEPT 18 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.56 823 723 2065.53 617.52 29 G/L BOLT LB 0.97 822 722 2066.50 617.61 30 . 1.01 821 721 2067.51 617.57 31 HWM 1.22 820 720 2068.73 617.19 32 . 1.04 819 719 2069.77 616.31 33 . 1.27 818 718 2071.04 615.01 34 WL LB 0.69 817 717 2071.73 614.71 35 .30 1.09 816 716 2072.83 614.51 36 .48 0.57 815 715 2073.40 614.31 37 .70 1.88 814 714 2075.28 614.33 38 .68 2.33 813 713 2077.61 614.31 39 .70 3.03 812 712 2080.64 614.24 40 .78 2.68 811 711 2083.32 614.05 41 .95 1.59 810 710 2084.91 613.85 42 1.150 1.08 809 709 2085.99 614.25 43 .74 1.42 808 708 2087.41 614.98 44 WL RB 1530HRS 0.20 807 707 2087.61 615.13 45 . 0.66 806 706 2088.27 616.96 46 . 0.73 805 705 2089.00 617.35 47 . 1.09 804 704 2090.09 617.54 48 HWM JULY 93 0.63 803 703 2090.72 617.62 49 . 0.52 802 702 2091.24 617.88 50 . 2.01 801 701 2093.25 618.00 51 G/L BOLT RB 3.90 800 700 2097.15 617.70 52 . 2.67 799 699 2099.82 617.18 53 . 3.24 798 698 2103.06 616.93 54 . 3.61 797 697 2106.67 616.96 55 . JOIN 851-797 S43 00 59E 2106.673 CHILAKO RIVER CROSS-SECTION 39.1 PROJECT 9330F043 SEPT 18 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 843 743 0.00 619.61 1 DUMMY 2000.00 842 742 2000.00 619.61 2 G/L BOLT LB 8.38 841 741 2008.38 619.96 3 . 10.85 840 740 2019.23 619.82 4 FIELD 9.61 839 739 2028.84 619.73 5 FENCE LINE 9.14 838 738 2037.97 619.57 6 . 1.09 837 737 2039.06 619.05 7 . 1.31 836 736 2040.37 618.91 8 . 0.59 835 735 2040.97 618.73 9 . 0.76 834 734 2041.73 618.74 10 . 1.17 833 733 2042.90 619.04 11 . 1.82 832 732 2044.72 619.40 12 . 2.85 831 731 2047.57 619.38 13 . 3.57 830 730 2051.14 619.05 14 . 3.85 829 729 2054.99 619.01 15 . 18.37 828 728 2073.35 619.14 16 . 20.41 827 727 2093.76 618.80 17 . 11.05 826 726 2104.82 618.70 18 . 2.52 825 725 2107.34 618.78 19 . 1.18 824 724 2108.52 618.43 20 . 1.52 823 723 2110.04 618.00 21 . 1.51 822 722 2111.55 617.53 22 . 2.08 821 721 2113.63 617.47 23 . 2.62 820 720 2116.25 617.61 24 . 0.57 819 719 2116.82 617.56 25 . 0.77 818 718 2117.59 617.36 26 . 0.73 817 717 2118.31 617.15 27 . 2.47 816 716 2120.78 617.09 28 . CHILAKO RIVER CROSS-SECTION 39.1 PROJECT 9330F043 SEPT 18 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.00 815 715 2122.78 616.73 29 . 0.53 814 714 2123.31 616.56 30 . 1.74 813 713 2125.05 616.39 31 . 2.45 812 712 2127.49 616.25 32 . 2.06 811 711 2129.55 616.12 33 . 1.28 810 710 2130.83 616.17 34 . 1.44 809 709 2132.27 616.52 35 . 0.91 808 708 2133.18 616.91 36 . 1.24 807 707 2134.42 617.27 37 . 3.42 806 706 2137.84 617.41 38 . 2.45 805 705 2140.30 617.56 39 . 1.41 804 704 2141.71 617.60 40 HWM JULY93 0.95 803 703 2142.66 617.74 41 . 0.64 802 702 2143.30 617.90 42 . 2.13 801 701 2145.43 617.91 43 G/L BOLT RB 1.75 800 700 2147.18 617.97 44 . JOIN 843-800 S22 39 56E 2147.181 CHILAKO RIVER CROSS-SECTION 40 20+695 PROJECT 9330F043 SEPT 18 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 618.17 1 DUMMY 2000.00 800 700 2000.00 618.17 2 G/L BOLT LB 1.34 801 701 2001.34 618.06 3 . 1.64 802 702 2002.97 617.72 4 . 2.87 803 703 2005.84 617.91 5 . 3.94 804 704 2009.78 617.95 6 HWM JULY 93 3.50 805 705 2013.28 617.78 7 . 3.39 806 706 2016.66 617.81 8 . 3.48 807 707 2020.14 617.66 9 TOP 0.52 808 708 2020.66 617.30 10 TOE 1.90 809 709 2022.56 617.00 11 . 7.42 810 710 2029.98 616.50 12 . 5.92 811 711 2035.90 615.97 13 . 2.01 812 712 2037.92 615.46 14 . 2.35 813 713 2040.27 615.40 15 . 2.10 814 714 2042.36 615.26 16 WL LB 1420HRS 2.67 815 715 2045.03 615.11 17 .14 1.68 816 716 2046.71 614.91 18 .35 3.49 817 717 2050.21 614.72 19 .56 2.57 818 718 2052.78 614.38 20 .90 1.77 819 719 2054.55 614.13 21 1.12 1.19 820 720 2055.74 614.13 22 W1.1 1.01 821 721 2056.74 614.26 23 .98 0.87 822 722 2057.62 614.43 24 .85 0.96 823 723 2058.58 615.26 25 WL RB 1.18 824 724 2059.75 616.05 26 . 0.78 825 725 2060.54 617.21 27 . 0.43 826 726 2060.96 617.95 28 HWM CHILAKO RIVER CROSS-SECTION 40 20+695 PROJECT 9330F043 SEPT 18 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.53 827 727 2061.49 618.09 29 TOP 4.49 828 728 2065.98 618.09 30 . 5.61 829 729 2071.58 618.02 31 G/L BOLT RB 21.71 830 730 2093.29 618.19 32 FIELD LEVEL JOIN 799-830 S76 06 48E 2093.292 CHILAKO RIVER CROSS-SECTION 41 21+143 PROJECT 9330F043 SEPT 18 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 832 732 0.00 617.72 1 DUMMY 2000.00 831 731 2000.00 617.72 2 SLOW RISE 6.83 830 730 2006.83 617.49 3 . 7.48 829 729 2014.31 617.74 4 . 4.23 828 728 2018.55 617.90 5 . 5.44 827 727 2023.99 618.19 6 . 7.44 826 726 2031.44 618.29 7 . 1.90 825 725 2033.34 618.35 8 . 2.22 824 724 2035.55 618.56 9 G/L BOLT LB 0.93 823 723 2036.48 618.66 10 . 2.18 822 722 2038.66 618.60 11 TOP 0.90 821 721 2039.56 618.24 12 . 0.31 820 720 2039.87 618.00 13 HWM 1.88 819 719 2041.74 616.60 14 . 0.57 818 718 2042.31 615.45 15 TOE 1.27 817 717 2043.58 615.44 16 . 1.18 816 716 2044.75 615.52 17 . 1.25 815 715 2046.00 615.39 18 WL LB 2.98 814 714 2048.98 615.08 19 .34 2.52 813 713 2051.50 614.91 20 .52 2.69 812 712 2054.19 614.76 21 .65 3.27 811 711 2057.45 614.78 22 .64 2.47 810 710 2059.92 614.76 23 .66 1.74 809 709 2061.67 614.82 24 .61 2.47 808 708 2064.14 615.01 25 .40 0.81 807 707 2064.95 615.41 26 WL RB 1230HRS 1.25 806 706 2066.20 616.62 27 . 1.33 805 705 2067.53 617.51 28 . CHILAKO RIVER CROSS-SECTION 41 21+143 PROJECT 9330F043 SEPT 18 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.86 804 704 2068.39 617.84 29 . 0.84 803 703 2069.24 618.08 30 HWM JULY 93 0.50 802 702 2069.74 618.41 31 TOP 3.67 801 701 2073.41 618.55 32 G/L BOLT RB 3.66 800 700 2077.07 618.51 33 . JOIN 832-800 N89 57 51E 2077.069 CHILAKO RIVER CROSS-SECTION 42 21+594 PROJECT 9330F043 SEPT 18 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 618.41 1 DUMMY 2000.00 800 700 2000.00 618.41 2 G/L BOLT LB 9.42 801 701 2009.42 618.51 3 . 17.43 802 702 2026.85 618.24 4 . 6.14 803 703 2032.99 618.68 5 . 17.29 804 704 2050.28 618.72 6 . 14.04 805 705 2064.32 618.56 7 . 8.77 806 706 2073.09 618.36 8 . 5.27 807 707 2078.36 618.64 9 . 14.41 808 708 2092.77 618.60 10 . 16.44 809 709 2109.21 618.65 11 . 12.31 810 710 2121.52 618.47 12 . 4.95 811 711 2126.47 618.58 13 . 0.02 812 712 2126.49 618.57 14 TOP CUT BANK 0.60 813 713 2127.09 617.01 15 . 0.91 814 714 2128.00 616.14 16 . 1.09 815 715 2129.09 615.57 17 WL LB 1100HRS 0.73 816 716 2129.82 615.05 18 .550 1.14 817 717 2130.97 614.63 19 .950 1.90 818 718 2132.87 614.59 20 .96 1.45 819 719 2134.32 614.80 21 .78 2.10 820 720 2136.43 615.00 22 .58 1.32 821 721 2137.75 615.14 23 .45 1.87 822 722 2139.62 615.08 24 .5 1.87 823 723 2141.49 615.30 25 .30 1.97 824 724 2143.46 615.47 26 .14 2.25 825 725 2145.71 615.57 27 WL RB 2.19 826 726 2147.90 615.88 28 . CHILAKO RIVER CROSS-SECTION 42 21+594 PROJECT 9330F043 SEPT 18 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.80 827 727 2149.70 616.22 29 . 5.22 828 728 2154.92 616.45 30 . 2.96 829 729 2157.88 616.81 31 . 3.24 830 730 2161.12 617.23 32 . 2.84 831 731 2163.96 617.13 33 . 0.88 832 732 2164.84 617.24 34 . 5.10 833 733 2169.94 617.07 35 . 0.68 834 734 2170.62 616.96 36 . 1.70 835 735 2172.32 617.05 37 . 1.18 836 736 2173.50 617.18 38 . 1.78 837 737 2175.28 618.14 39 HWM JULY 93 1.30 838 738 2176.58 618.55 40 TOP 8.97 839 739 2185.55 618.61 41 . 7.99 840 740 2193.54 618.28 42 G/L BOLT RB 4.38 841 741 2197.92 618.09 43 . 11.28 842 742 2209.19 618.25 44 EDGE BUSH JOIN 799-842 S88 09 23E 2209.195 CHILAKO RIVER CROSS-SECTION 43 22+674 PROJECT 9330F043 SEPT 18 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 619.16 1 DUMMY 2000.00 800 700 2000.00 619.16 2 FIELD 17.90 801 701 2017.90 619.33 3 . 3.77 802 702 2021.66 619.06 4 . 3.73 803 703 2025.40 619.09 5 G/L BOLT LB 0.98 804 704 2026.38 619.04 6 TOP CUT BANK 0.41 805 705 2026.79 618.13 7 . 1.04 806 706 2027.82 616.91 8 . 1.08 807 707 2028.91 616.24 9 . 0.53 808 708 2029.44 616.06 10 WL LB 0.74 809 709 2030.18 615.90 11 .1600 0.61 810 710 2030.79 615.07 12 .98 1.62 811 711 2032.41 615.26 13 .78 1.56 812 712 2033.97 615.49 14 .55 1.51 813 713 2035.48 615.56 15 . 2.58 814 714 2038.06 615.55 16 .57 2.77 815 715 2040.83 615.67 17 .39 4.36 816 716 2045.19 615.78 18 .36 3.08 817 717 2048.27 616.03 19 WL RB 1040HRS 6.86 818 718 2055.14 616.52 20 . 1.67 819 719 2056.81 617.00 21 . 3.28 820 720 2060.09 617.74 22 . 2.97 821 721 2063.05 617.81 23 . 0.72 822 722 2063.77 618.07 24 . 0.84 823 723 2064.61 617.98 25 . 1.51 824 724 2066.12 618.14 26 . 1.56 825 725 2067.68 618.51 27 . 0.89 826 726 2068.57 618.67 28 HWM JULY 93 CHILAKO RIVER CROSS-SECTION 43 22+674 PROJECT 9330F043 SEPT 18 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 4.95 827 727 2073.52 618.57 29 . 7.57 828 728 2081.09 618.97 30 . 3.73 829 729 2084.82 619.02 31 . 12.07 830 730 2096.89 619.42 32 . 13.54 831 731 2110.43 619.30 33 FIELD 15.42 832 732 2125.85 619.43 34 . 7.09 833 733 2132.93 618.84 35 . 4.88 834 734 2137.81 618.71 36 . 8.68 835 735 2146.49 618.29 37 . 7.55 836 736 2154.04 617.89 38 . 4.53 837 737 2158.57 617.91 39 . 2.92 838 738 2161.49 618.23 40 . 5.26 839 739 2166.75 619.43 41 . 6.16 840 740 2172.91 619.29 42 . 5.57 841 741 2178.47 619.07 43 . 5.24 842 742 2183.72 619.35 44 TOE ROAD 4.86 843 743 2188.58 622.58 45 . 3.62 844 744 2192.20 623.02 46 TOP 6.90 845 745 2199.09 622.76 47 . 0.37 846 746 2199.46 622.60 48 G/L BOLT RB JOIN 799-846 S84 47 47E 2199.463 CHILAKO RIVER CROSS-SECTION 44 23+630 PROJECT 9330F043 SEPT 17 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 699 599 0.00 619.80 1 DUMMY 2000.00 700 600 2000.00 619.80 2 FIELD LEVEL 12.31 701 601 2012.31 619.75 3 . 6.67 702 602 2018.98 619.54 4 . 6.44 703 603 2025.41 619.34 5 . 3.25 704 604 2028.67 618.95 6 . 7.96 705 605 2036.63 618.95 7 . 8.40 706 606 2045.03 619.28 8 . 5.41 707 607 2050.45 619.70 9 . 4.00 708 608 2054.44 620.15 10 . 1.48 709 609 2055.92 620.39 11 G/L BOLT LB 0.81 710 610 2056.73 620.29 12 . 1.87 711 611 2058.59 619.69 13 . 0.59 712 612 2059.18 619.45 14 END BRDG 0.39 713 613 2059.57 618.92 15 CL PIER 1.46 714 614 2061.03 618.59 16 . 0.64 715 615 2061.67 618.65 17 TOP 2.77 716 616 2064.44 617.76 18 . 1.13 717 617 2065.57 617.04 19 EDGE PIER 0.42 718 618 2065.98 616.49 20 WL CL PIERS 0.28 719 619 2066.26 615.98 21 0.54 0.83 720 620 2067.08 615.58 22 W.93 0.82 721 621 2067.91 615.41 23 W1.11 0.61 722 622 2068.52 615.57 24 W0.97 1.47 723 623 2069.98 615.41 25 W1.1 1.27 724 624 2071.25 615.51 26 W1.1 1.22 725 625 2072.47 615.45 27 W1.1 1.34 726 626 2073.82 614.98 28 W1.5 CHILAKO RIVER CROSS-SECTION 44 23+630 PROJECT 9330F043 SEPT 17 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.55 727 627 2075.36 614.60 29 W1.9 1.63 728 628 2076.99 614.27 30 W2.2 1.62 729 629 2078.61 614.18 31 W2.4 1.46 730 630 2080.07 614.35 32 EDGE PIER 0.88 731 631 2080.95 614.75 33 CL PIERS 0.20 732 632 2081.14 615.03 34 . 0.48 733 633 2081.63 615.53 35 . 1.12 734 634 2082.75 616.18 36 . 0.41 735 635 2083.16 616.50 37 WL RB 0.42 736 636 2083.58 617.08 38 . 0.78 737 637 2084.36 617.47 39 . 0.55 738 638 2084.91 618.14 40 . 1.00 739 639 2085.90 618.55 41 . 0.63 740 640 2086.53 618.54 42 GL WALL 0.11 741 641 2086.65 619.33 43 HWM JULY 93 0.04 742 642 2086.68 621.19 44 END BRDG 2.98 743 643 2089.66 621.18 45 . 3.96 744 644 2093.62 622.18 46 G/L BOLT RB 7.57 745 645 2101.19 623.16 47 . 13.94 746 646 2115.13 624.31 48 . 8.23 747 647 2123.36 624.72 49 . 8.58 748 648 2131.95 625.22 50 . JOIN 699-748 S70 21 46E 2131.946 CHILAKO RIVER CL RD PROFILE FARM BRIDGE 23+633 PROJECT 9330F043 SEPT 17 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 816 716 0.00 619.45 1 FIELD LEVEL 19.44 815 715 19.44 618.95 2 CL 11.57 814 714 31.01 619.49 3 CL 7.96 813 713 38.97 620.31 4 CL ROAD 2.97 812 712 41.93 620.66 5 LB END BRDG 6.24 811 711 48.18 621.18 6 . 0.35 810 710 48.53 621.15 7 CL PIERS 9.88 809 709 58.41 621.18 8 . 5.06 808 708 63.48 621.22 9 CL PIERS 6.09 807 707 69.57 621.29 10 RB END BRDG 3.11 806 706 72.68 621.39 11 CL 2.90 805 705 75.58 621.66 12 CL 9.12 804 704 84.70 622.82 13 CL 9.17 803 703 93.86 623.89 14 CL 5.51 802 702 99.38 624.29 15 CL 6.10 801 701 105.48 624.67 16 CL 9.34 800 700 114.82 625.03 17 CL ROAD CHILAKO RIVER CROSS-SECTION 45 23+637 PROJECT 9330F043 SEPT 17 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 445 345 0.00 619.83 1 DUMMY 2000.00 444 344 2000.00 619.83 2 FIELD 15.26 443 343 2015.26 619.56 3 FIELD LEVEL 18.74 442 342 2034.00 618.91 4 . 9.32 441 341 2043.32 619.31 5 . 5.78 440 340 2049.10 619.87 6 . 4.91 439 339 2054.01 620.36 7 G/L BOLT LB 1.03 438 338 2055.05 620.35 8 . 1.21 437 337 2056.26 620.63 9 TOP END BRDG 0.09 436 336 2056.34 619.99 10 . 0.10 435 335 2056.45 619.09 11 HW JULY 93 0.30 434 334 2056.75 618.58 12 . 1.00 433 333 2057.75 618.29 13 . 1.18 432 332 2058.93 618.24 14 . 1.67 431 331 2060.60 618.04 15 . 1.44 430 330 2062.05 617.82 16 OPP PIERS 0.32 429 329 2062.37 617.77 17 . 1.13 428 328 2063.50 616.82 18 . 0.90 427 327 2064.40 616.52 19 WL LB 1.17 426 326 2065.57 616.20 20 . 1.69 425 325 2067.26 616.17 21 . 1.20 424 324 2068.46 615.85 22 . 1.40 423 323 2069.87 615.40 23 . 1.37 422 322 2071.24 615.44 24 W1.1 1.01 421 321 2072.25 614.91 25 . 1.10 420 320 2073.35 614.52 26 . 0.94 419 319 2074.29 614.20 27 . 1.13 418 318 2075.42 614.09 28 . CHILAKO RIVER CROSS-SECTION 45 23+637 PROJECT 9330F043 SEPT 17 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.12 417 317 2076.54 613.95 29 . 1.07 416 316 2077.62 613.99 30 CL TWIN PIERS 1.24 415 315 2078.85 615.49 31 . 0.89 414 314 2079.74 616.14 32 . 0.59 413 313 2080.34 616.52 33 WL RB 1610HRS 0.33 412 312 2080.67 616.74 34 . 0.08 411 311 2080.75 617.12 35 . 0.59 410 310 2081.34 617.34 36 . 0.73 409 309 2082.07 618.07 37 . 1.13 408 308 2083.20 618.51 38 OPP PIER 0.00 407 307 2083.20 618.62 39 GL 0.32 406 306 2083.53 621.17 40 TOP END BRDG 3.35 405 305 2086.88 621.31 41 . 5.64 404 304 2092.52 621.83 42 . 3.42 403 303 2095.94 622.64 43 . 1.62 402 302 2097.56 623.06 44 . 7.65 401 301 2105.21 623.88 45 . 9.25 400 300 2114.47 624.47 46 G/L BOLT LB JOIN 445-400 S70 21 16E 2114.466 CHILAKO RIVER CROSS-SECTION 46 24+260 PROJECT 9330F043 SEPT 17 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 620.03 1 DUMMY 2000.00 800 700 2000.00 620.03 2 FIELD LEVEL 15.85 801 701 2015.85 619.92 3 . 7.12 802 702 2022.97 620.26 4 . 3.35 803 703 2026.32 620.39 5 G/L BOLT LB 1.87 804 704 2028.19 619.90 6 . 1.80 805 705 2029.99 619.91 7 . 1.22 806 706 2031.21 619.57 8 . 1.30 807 707 2032.50 619.24 9 HWM JULY 93 1.19 808 708 2033.69 618.49 10 . 0.69 809 709 2034.39 617.85 11 . 0.77 810 710 2035.16 616.76 12 WL LB 1500HRS 0.15 811 711 2035.31 616.39 13 0.42 2.40 812 712 2037.70 616.54 14 0.26 2.17 813 713 2039.88 616.38 15 0.40 1.90 814 714 2041.78 616.28 16 0.50 3.39 815 715 2045.17 616.31 17 0.50 3.29 816 716 2048.46 616.40 18 0.38 3.22 817 717 2051.68 616.46 19 0.24 2.37 818 718 2054.05 616.41 20 0.28 1.74 819 719 2055.79 616.21 21 0.58 0.45 820 720 2056.24 616.76 22 WL RB 0.51 821 721 2056.75 617.56 23 . 1.03 822 722 2057.78 618.62 24 . 0.64 823 723 2058.42 619.11 25 HWM JULY 93 0.37 824 724 2058.79 619.67 26 . 1.98 825 725 2060.77 620.21 27 TOP 1.24 826 726 2062.01 620.12 28 . CHILAKO RIVER CROSS-SECTION 46 24+260 PROJECT 9330F043 SEPT 17 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 7.54 827 727 2069.55 619.57 29 FIELD 4.46 828 728 2074.01 619.53 30 . 5.21 829 729 2079.22 620.00 31 . 7.25 830 730 2086.48 619.93 32 . 4.38 831 731 2090.86 620.27 33 . 7.36 832 732 2098.22 620.34 34 . 6.70 833 733 2104.92 620.09 35 . 7.01 834 734 2111.93 620.12 36 FENCE LINE 2.48 835 735 2114.41 619.99 37 . 2.49 836 736 2116.90 621.27 38 . 1.04 837 737 2117.94 621.54 39 G/L BOLT RB 1.03 838 738 2118.97 621.84 40 EDGE ROAD 4.20 839 739 2123.17 621.96 41 CL ROAD JOIN 799-839 N76 52 26E 2123.165 CHILAKO RIVER CROSS-SECTION 47 25+006 PROJECT 9330F043 SEPT 17 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 620.70 1 DUMMY 2000.00 800 700 2000.00 620.70 2 . 6.26 801 701 2006.26 620.67 3 . 2.78 802 702 2009.05 620.45 4 . 2.74 803 703 2011.78 620.57 5 . 5.92 804 704 2017.70 620.94 6 G/L BOLT LB 6.50 805 705 2024.20 621.10 7 TOP CUT BANK 0.60 806 706 2024.81 619.84 8 . 0.30 807 707 2025.11 619.49 9 HWM 1.18 808 708 2026.28 618.28 10 . 0.98 809 709 2027.26 617.60 11 . 1.48 810 710 2028.75 617.14 12 WL LB 1400 2.16 811 711 2030.91 616.67 13 0.49 2.81 812 712 2033.72 616.78 14 0.38 2.88 813 713 2036.60 616.82 15 0.32 3.72 814 714 2040.32 616.71 16 0.44 3.90 815 715 2044.22 616.67 17 0.47 2.71 816 716 2046.93 616.90 18 0.25 2.63 817 717 2049.56 617.14 19 WL RB 0.68 818 718 2050.24 617.54 20 . 1.46 819 719 2051.70 618.03 21 . 0.92 820 720 2052.62 618.11 22 . 1.48 821 721 2054.10 618.94 23 . 1.45 822 722 2055.55 619.04 24 . 1.03 823 723 2056.57 619.46 25 HWL JULY93 0.85 824 724 2057.42 619.53 26 . 1.69 825 725 2059.11 619.54 27 . 0.84 826 726 2059.95 619.72 28 . CHILAKO RIVER CROSS-SECTION 47 25+006 PROJECT 9330F043 SEPT 17 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.57 827 727 2061.52 619.82 29 . 0.78 828 728 2062.31 620.12 30 TOP 2.10 829 729 2064.41 620.12 31 EDGE FIELD 3.93 830 730 2068.34 619.87 32 G/L BOLT RB 5.48 831 731 2073.82 619.69 33 . 18.50 832 732 2092.32 619.68 34 LAWN LEVEL JOIN 799-832 S75 34 07E 2092.324 CHILAKO RIVER CROSS-SECTION 48 25+320 PROJECT 9330F043 SEPT 17 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 620.83 1 DUMMY 2000.00 800 700 2000.00 620.83 2 FLAT 17.18 801 701 2017.18 620.84 3 . 15.10 802 702 2032.27 620.93 4 G/L BOLT LB 8.53 803 703 2040.80 620.57 5 . 3.11 804 704 2043.91 620.76 6 . 5.61 805 705 2049.52 620.56 7 . 9.83 806 706 2059.35 620.79 8 . 6.78 807 707 2066.13 620.97 9 TOP CUT 0.70 808 708 2066.83 619.92 10 . 0.61 809 709 2067.44 619.38 11 . 1.24 810 710 2068.69 618.85 12 . 0.97 811 711 2069.66 617.88 13 . 0.76 812 712 2070.42 617.53 14 WL LB 1.42 813 713 2071.84 616.94 15 .61 1.00 814 714 2072.83 616.74 16 .8 2.20 815 715 2075.03 616.86 17 .68 2.84 816 716 2077.88 616.80 18 .72 2.83 817 717 2080.71 616.94 19 .6 3.73 818 718 2084.44 617.19 20 .36 3.17 819 719 2087.61 617.35 21 .2 3.59 820 720 2091.20 617.54 22 WL RB 1.48 821 721 2092.69 617.74 23 . 1.46 822 722 2094.15 617.74 24 . 0.89 823 723 2095.04 618.04 25 . 3.54 824 724 2098.58 618.99 26 . 2.01 825 725 2100.59 619.17 27 . 0.59 826 726 2101.18 619.40 28 . CHILAKO RIVER CROSS-SECTION 48 25+320 PROJECT 9330F043 SEPT 17 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.92 827 727 2104.10 619.23 29 . 0.69 828 728 2104.79 619.56 30 . 2.73 829 729 2107.52 619.80 31 HWM JULY93 1.98 830 730 2109.50 619.51 32 . 2.09 831 731 2111.59 619.39 33 . 1.14 832 732 2112.73 619.36 34 . 0.89 833 733 2113.63 618.79 35 . 0.54 834 734 2114.17 618.76 36 TOE 0.45 835 735 2114.62 619.76 37 HWM 1.23 836 736 2115.85 619.81 38 . 0.82 837 737 2116.67 620.17 39 . 0.48 838 738 2117.15 620.98 40 TOP BANK 0.74 839 739 2117.89 621.00 41 . 0.70 840 740 2118.59 621.52 42 . 1.19 841 741 2119.78 621.96 43 G/L BOLT RB 1.53 842 742 2121.31 622.16 44 EDGE PAVEMENT 3.86 843 743 2125.17 622.40 45 CL 4.02 844 744 2129.18 622.37 46 EDGE PAVEMENT 1.48 845 745 2130.66 622.09 47 . 2.84 846 746 2133.50 621.65 48 TOE DITCH 1.98 847 747 2135.49 623.13 49 . 2.51 848 748 2138.00 623.31 50 . 1.69 849 749 2139.69 624.57 51 ON SLOPE JOIN 799-849 S44 14 44E 2139.689 CHILAKO RIVER CROSS-SECTION 49 25+665 PROJECT 9330F043 SEPT 17 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 799 699 0.00 623.97 1 DUMMY 2000.00 800 700 2000.00 623.97 2 TOP 4.08 801 701 2004.08 622.29 3 . 3.41 802 702 2007.49 620.74 4 TOE 2.66 803 703 2010.15 620.38 5 . 7.61 804 704 2017.76 620.48 6 . 4.48 805 705 2022.24 620.49 7 . 4.91 806 706 2027.15 620.77 8 . 1.53 807 707 2028.68 620.92 9 G/L BOLT LB 2.65 808 708 2031.33 620.63 10 . 1.30 809 709 2032.63 620.29 11 . 4.30 810 710 2036.93 620.40 12 . 4.85 811 711 2041.78 620.23 13 . 4.20 812 712 2045.98 620.27 14 . 3.75 813 713 2049.73 620.25 15 . 1.31 814 714 2051.03 619.90 16 TOP CUT BANK 0.34 815 715 2051.38 619.85 17 HW JULY93 0.45 816 716 2051.82 619.03 18 . 1.38 817 717 2053.20 617.74 19 WL LB 1200HRS 1.02 818 718 2054.23 617.41 20 .34 0.80 819 719 2055.03 616.54 21 1.32 2.05 820 720 2057.07 616.82 22 0.9 1.44 821 721 2058.51 616.54 23 1.2 2.03 822 722 2060.55 616.70 24 1.05 2.02 823 723 2062.57 617.04 25 0.70 1.98 824 724 2064.55 617.45 26 0.30 2.46 825 725 2067.01 617.54 27 0.2 1.94 826 726 2068.95 617.54 28 0.2 CHILAKO RIVER CROSS-SECTION 49 25+665 PROJECT 9330F043 SEPT 17 1993 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.77 827 727 2069.72 617.35 29 0.38 1.42 828 728 2071.14 617.44 30 0.30 0.85 829 729 2071.99 617.65 31 0.08 1.60 830 730 2073.59 617.73 32 WL RB 1.84 831 731 2075.43 617.75 33 WL 2.89 832 732 2078.32 617.68 34 0.08 3.47 833 733 2081.79 617.62 35 0.14 3.09 834 734 2084.88 617.31 36 0.44 0.41 835 735 2085.30 617.76 37 WL RB 1.58 836 736 2086.88 617.79 38 . 1.33 837 737 2088.21 617.93 39 . 2.51 838 738 2090.72 619.05 40 . 0.78 839 739 2091.51 619.74 41 . 2.31 840 740 2093.82 619.90 42 HW RB 1.78 841 741 2095.60 620.15 43 . 1.07 842 742 2096.66 619.84 44 . 4.00 843 743 2100.67 619.75 45 . 5.68 844 744 2106.35 619.98 46 . 4.56 845 745 2110.90 619.95 47 G/L BOLT RB 10.70 846 746 2121.60 619.95 48 . 47.50 847 747 2169.10 620.19 49 FIELD LEVEL JOIN 799-847 S02 52 50W 2169.100