THIS INFORMATION IS CONSIDERED HISTORICAL AS IT REPRESENTS CHANNEL CONDITIONS AND CONFIGURATION AT THE TIME OF THE SURVEY ONLY. USER MUST ACCEPT RESPONSIBILITY OF ENSURING THAT THE ACCURACY AND COMPLETENESS OF PROVIDED DATA IS SUITABLE FOR THE NEEDS OF THE PROJECT OR STUDY. IT IS PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND, WHETHER EXPRESS OR IMPLIED. UNDER NO CIRCUMSTANCES WILL THE GOVERNMENT OF BRITISH COLUMBIA BE LIABLE TO ANY PERSON OR BUSINESS ENTITY FOR ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR OTHER DAMAGES BASED ON ANY USE OF THIS INFORMATION. DUNCAN RIVER CROSS SECTION 19 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 299 0.00 550.02 1 DUMMY 2000.00 600 300 2000.00 550.02 2 FLAT BEYOND 21.02 601 301 2021.02 548.53 3 . 13.33 602 302 2034.36 547.06 4 . 9.97 603 303 2044.33 546.56 5 . 10.39 604 304 2054.72 545.79 6 . 5.48 605 305 2060.20 545.51 7 TOP BANK (XS REF 2.16 606 306 2062.36 544.47 8 W/L LB 1.13 607 307 2063.49 543.90 9 . 1.82 608 308 2065.31 543.05 10 . 1.34 609 309 2066.65 542.65 11 TOE 0.54 610 310 2067.19 542.61 12 FIX 500 2.06 611 311 2069.26 542.16 13 SUND BP 0.88 612 312 2070.14 542.16 14 FIX 501 2.46 613 313 2072.61 542.16 15 FIX 502 2.64 614 314 2075.25 542.16 16 FIX 503 1.52 615 315 2076.76 542.05 17 SUND BP 2.27 616 316 2079.04 541.86 18 FIX 504 3.05 617 317 2082.09 541.55 19 FIX 505 3.56 618 318 2085.66 541.25 20 FIX 506 3.77 619 319 2089.43 541.16 21 FIX 507 3.85 620 320 2093.27 541.16 22 FIX 508 4.15 621 321 2097.42 540.95 23 FIX 509 3.53 622 322 2100.95 541.05 24 FIX 510 2.23 623 323 2103.18 541.16 25 SUND BP 1.49 624 324 2104.67 541.45 26 FIX 511 2.65 625 325 2107.32 542.66 27 FIX 512 0.65 626 326 2107.97 542.82 28 . DUNCAN RIVER CROSS SECTION 19 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.99 627 327 2109.96 543.78 29 . 1.22 628 328 2111.18 544.44 30 W/L RB 3.97 629 329 2115.15 546.01 31 TOP BANK 6.12 630 330 2121.28 546.09 32 EDGE ROAD/HWY 1.02 631 331 2122.30 546.08 33 G/L BOLT RB 2.15 632 332 2124.46 546.10 34 EDGE ROAD/HWY 2.37 633 333 2126.83 546.15 35 TOE 5.33 634 334 2132.15 546.83 36 . 6.57 635 335 2138.72 548.25 37 . 3.51 636 336 2142.23 548.86 38 . 3.84 637 337 2146.07 549.19 39 TOP 9.99 638 338 2156.06 549.90 40 . 3.53 639 339 2159.59 549.13 41 TOP 6.11 640 340 2165.70 548.14 42 . 4.14 641 341 2169.84 547.40 43 . 3.09 642 342 2172.93 546.98 44 TOE 4.10 643 343 2177.03 546.46 45 UNDULATING BYOND JOIN 599-643 S83 40 37W 2177.032 DUNCAN RIVER CROSS SECTION 20 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 499 299 0.00 545.57 1 DUMMY 2000.00 500 300 2000.00 545.57 2 FLAT BEYOND 14.93 501 301 2014.93 545.70 3 . (XS REF PT) 12.81 502 302 2027.74 545.82 4 . 8.95 503 303 2036.69 545.93 5 . 6.89 504 304 2043.58 545.57 6 . 4.82 505 305 2048.40 544.49 7 . 1.00 506 306 2049.41 544.37 8 TOP 0.33 507 307 2049.74 544.15 9 W/L LB 0.65 508 308 2050.39 543.74 10 TOE 2.16 509 309 2052.56 543.04 11 . 2.28 510 310 2054.84 542.99 12 . 3.79 511 311 2058.63 542.89 13 . 3.10 512 312 2061.73 542.81 14 . 3.80 513 313 2065.53 542.76 15 . 3.62 514 314 2069.15 542.77 16 . 3.40 515 315 2072.55 542.92 17 . 6.96 516 316 2079.51 542.79 18 . 5.73 517 317 2085.24 543.07 19 . 3.95 518 318 2089.19 543.19 20 . 6.15 519 319 2095.34 543.30 21 . 7.26 520 320 2102.60 543.35 22 . 9.02 521 321 2111.62 543.17 23 . 7.79 522 322 2119.41 543.10 24 . 7.40 523 323 2126.81 543.05 25 . 7.05 524 324 2133.86 543.01 26 . 9.24 525 325 2143.11 542.86 27 . 6.59 526 326 2149.70 542.71 28 . DUNCAN RIVER CROSS SECTION 20 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 7.24 527 327 2156.94 542.49 29 . 5.36 528 328 2162.30 542.38 30 . 6.09 529 329 2168.39 542.27 31 . 4.60 530 330 2172.99 542.03 32 . 3.41 531 331 2176.40 542.38 33 TOE 1.72 532 332 2178.11 543.33 34 . 1.59 533 333 2179.70 544.25 35 W/L RB 2.59 534 334 2182.30 545.94 36 TOP BANK 6.65 535 335 2188.95 545.97 37 G/L BOLT RB 3.10 536 336 2192.04 545.98 38 EDGE ROAD/HWY 7.21 537 337 2199.25 546.15 39 . 8.32 538 338 2207.57 546.53 40 . 6.48 539 339 2214.05 546.64 41 . 2.12 540 340 2216.17 546.33 42 . 9.87 541 341 2226.03 546.46 43 . 11.15 542 342 2237.19 546.62 44 . 6.15 543 343 2243.34 545.98 45 TOE 2.26 544 344 2245.59 545.99 46 TOE 0.97 545 345 2246.57 546.38 47 TOP 10.92 546 346 2257.49 546.27 48 . 2.35 547 347 2259.84 545.81 49 . 3.57 548 348 2263.41 545.58 50 . 3.83 549 349 2267.24 544.95 51 . 6.44 550 350 2273.68 543.71 52 . 2.20 551 351 2275.88 544.18 53 . 8.88 552 352 2284.76 544.76 54 . 10.65 553 353 2295.41 544.02 55 . 15.34 554 354 2310.75 544.51 56 UNDULATING BYOND JOIN 499-554 N87 26 26W 2310.751 DUNCAN RIVER CROSS SECTION 21 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 651 351 0.00 549.69 1 DUMMY 2000.00 650 350 2000.00 549.69 2 TOE VERT.CLIFF 5.44 649 349 2005.44 546.51 3 TOE 4.72 648 348 2010.16 546.55 4 G/L BOLT LB 1.99 647 347 2012.15 544.94 5 . 1.93 646 346 2014.08 543.46 6 W/L LB 1.51 645 345 2015.59 542.58 7 . 0.71 644 344 2016.29 541.59 8 TOE 1.61 643 343 2017.90 541.66 9 FIX 515 0.66 642 342 2018.56 541.66 10 SUND BP 0.44 641 341 2019.00 540.96 11 SUND BP 1.10 640 340 2020.10 541.06 12 FIX 514 2.55 639 339 2022.66 541.26 13 FIX 513 3.43 638 338 2026.09 540.96 14 FIX 512 3.37 637 337 2029.46 540.96 15 FIX 511 4.12 636 336 2033.57 540.76 16 FIX 510 3.03 635 335 2036.61 540.66 17 FIX 509 3.81 634 334 2040.41 540.16 18 FIX 508 4.71 633 333 2045.12 540.26 19 FIX 507 2.45 632 332 2047.58 540.06 20 SUND BP 1.64 631 331 2049.21 540.16 21 FIX 506 2.26 630 330 2051.47 540.16 22 SUND BP 0.97 629 329 2052.44 540.36 23 FIX 505 0.26 628 328 2052.70 540.26 24 SUND BP 2.07 627 327 2054.77 540.26 25 SUND BP 0.26 626 326 2055.03 540.36 26 FIX 504 1.62 625 325 2056.65 540.76 27 SUND BP 1.62 624 324 2058.27 541.66 28 FIX 503 DUNCAN RIVER CROSS SECTION 21 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.27 623 323 2058.54 541.66 29 SUND BP 0.54 622 322 2059.08 540.76 30 SUND BP 0.54 621 321 2059.62 541.06 31 SUND BP 0.27 620 320 2059.89 540.86 32 SUND BP 1.08 619 319 2060.97 541.06 33 FIX 502 0.38 618 318 2061.35 541.06 34 SUND BP 0.26 617 317 2061.61 541.76 35 SUND BP 0.38 616 316 2061.99 541.86 36 SUND BP 0.26 615 315 2062.25 541.56 37 FIX 501 0.19 614 314 2062.44 541.46 38 SUND BP 0.29 613 313 2062.72 541.66 39 FIX 500 0.57 612 312 2063.29 541.67 40 . 1.30 611 311 2064.59 542.45 41 . 2.12 610 310 2066.71 542.67 42 . 1.30 609 309 2068.01 542.55 43 . 1.07 608 308 2069.08 542.61 44 TOE 0.14 607 307 2069.22 543.46 45 W/L RB 0.44 606 306 2069.66 544.55 46 . 0.72 605 305 2070.38 545.33 47 TOP BANK 2.33 604 304 2072.71 545.77 48 . (XS REF PT) 6.19 603 303 2078.90 545.42 49 . 2.66 602 302 2081.56 545.63 50 . 7.82 601 301 2089.38 545.70 51 . 11.19 600 300 2100.57 545.36 52 UNDULATING BYOND JOIN 600-651 S81 31 10E 2100.566 DUNCAN RIVER CROSS SECTION 22 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 654 354 0.00 545.17 1 DUMMY 2000.00 653 353 2000.00 545.17 2 MOOSEHOLE BEYON 2.25 652 352 2002.25 545.33 3 EDGE ROAD/HWY 4.11 651 351 2006.36 545.39 4 C/L ROAD 5.86 650 350 2012.22 545.08 5 EDGE ROAD/HWY 0.75 649 349 2012.98 544.91 6 . 6.02 648 348 2018.99 545.00 7 . 1.06 647 347 2020.05 544.80 8 TOP BANK 0.66 646 346 2020.71 543.32 9 TOE CUT 0.48 645 345 2021.19 542.82 10 W/L LB 0.42 644 344 2021.61 542.18 11 . 1.29 643 343 2022.90 541.86 12 . 2.38 642 342 2025.28 541.54 13 . 2.40 641 341 2027.68 541.59 14 . 1.68 640 340 2029.36 541.69 15 . 5.61 639 339 2034.97 542.03 16 . 3.53 638 338 2038.50 542.27 17 . 1.78 637 337 2040.28 541.66 18 . 4.26 636 336 2044.53 542.17 19 . 2.02 635 335 2046.55 542.27 20 . 1.12 634 334 2047.67 542.79 21 WL BAR 0.71 633 333 2048.39 542.98 22 TOP BAR 2.58 632 332 2050.97 543.01 23 G/L BOLT LB 3.42 631 331 2054.39 542.80 24 WL BAR 1.90 630 330 2056.28 542.01 25 . 1.20 629 329 2057.49 541.33 26 . 1.03 628 328 2058.52 540.92 27 . 3.10 627 327 2061.61 540.57 28 . DUNCAN RIVER CROSS SECTION 22 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.12 626 326 2063.73 540.49 29 . 7.19 625 325 2070.92 540.42 30 FIX 511 1.64 624 324 2072.56 540.32 31 FIX 510 2.82 623 323 2075.37 540.22 32 FIX 509 2.51 622 322 2077.88 540.02 33 FIX 508 2.48 621 321 2080.36 539.82 34 FIX 507 2.93 620 320 2083.29 539.82 35 FIX 506 3.63 619 319 2086.92 539.82 36 FIX 505 2.93 618 318 2089.85 539.82 37 FIX 504 3.62 617 317 2093.47 539.82 38 FIX 503 2.27 616 316 2095.74 539.82 39 FIX 502 1.44 615 315 2097.19 539.92 40 SUND BP 0.36 614 314 2097.55 539.82 41 FIX 501 1.74 613 313 2099.29 539.82 42 FIX 500 4.58 612 312 2103.87 540.13 43 . 1.11 611 311 2104.98 540.41 44 . 1.70 610 310 2106.68 540.89 45 . 2.48 609 309 2109.16 541.75 46 . 0.72 608 308 2109.89 542.83 47 W/L RB 0.08 607 307 2109.96 543.23 48 . 1.08 606 306 2111.04 543.57 49 TOE CUT 0.85 605 305 2111.89 544.88 50 TOP BANK (REF PT 4.32 604 304 2116.21 544.95 51 . 7.39 603 303 2123.61 544.92 52 . 9.03 602 302 2132.64 544.81 53 . 5.80 601 301 2138.44 544.54 54 . 6.53 600 300 2144.97 544.41 55 UNDULATING BYOND JOIN 600-654 S68 19 07E 2144.966 DUNCAN RIVER CROSS SECTION 23 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 659 359 0.00 545.68 1 DUMMY 2000.00 658 358 2000.00 545.68 2 TOE VERT 11.68 657 357 2011.68 545.25 3 TOP SHOULDER 2.64 656 356 2014.32 541.95 4 TOE ROAD 9.52 655 355 2023.84 544.62 5 TOP DITCH 14.28 654 354 2038.12 544.71 6 . 6.77 653 353 2044.89 543.70 7 TOP BANK 2.96 652 352 2047.85 542.37 8 TOE 3.37 651 351 2051.22 542.30 9 . 13.93 650 350 2065.15 541.90 10 . 3.59 649 349 2068.74 541.51 11 CL CRIC 2.54 648 348 2071.28 541.70 12 TOE 4.27 647 347 2075.55 542.85 13 . 2.53 646 346 2078.08 543.15 14 . 2.60 645 345 2080.68 544.18 15 TOP BANK 4.21 644 344 2084.89 544.30 16 . 4.71 643 343 2089.60 543.61 17 TOE 2.79 642 342 2092.39 543.62 18 TOE (XS REF PT) 1.99 641 341 2094.38 544.02 19 TOP 10.53 640 340 2104.91 544.01 20 . 13.04 639 339 2117.95 544.37 21 . 11.48 638 338 2129.43 544.29 22 TOP 1.91 637 337 2131.34 543.64 23 . 1.03 636 336 2132.37 542.72 24 TOE 2.84 635 335 2135.22 542.40 25 . 1.43 634 334 2136.65 541.88 26 W/L LB 2.37 633 333 2139.02 541.55 27 . 3.02 632 332 2142.03 541.21 28 . DUNCAN RIVER CROSS SECTION 23 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 4.25 631 331 2146.28 541.07 29 FIX 518 3.49 630 330 2149.78 540.97 30 FIX 517 4.06 629 329 2153.84 540.77 31 FIX 516 3.90 628 328 2157.73 540.57 32 FIX 515 2.88 627 327 2160.61 540.47 33 SUND BP 1.23 626 326 2161.84 540.57 34 FIX 514 4.35 625 325 2166.20 540.57 35 FIX 513 2.43 624 324 2168.62 540.67 36 FIX 512 5.96 623 323 2174.58 540.67 37 FIX 511 3.83 622 322 2178.41 540.57 38 FIX 510 3.49 621 321 2181.90 540.47 39 FIX 509 4.53 620 320 2186.43 540.27 40 FIX 508 3.92 619 319 2190.35 540.07 41 FIX 507 5.00 618 318 2195.35 539.87 42 FIX 506 3.35 617 317 2198.70 539.67 43 FIX 505 5.09 616 316 2203.79 539.57 44 FIX 504 5.07 615 315 2208.86 539.47 45 FIX 503 8.06 614 314 2216.92 539.47 46 FIX 502 3.50 613 313 2220.43 539.37 47 SUND BP 2.34 612 312 2222.76 539.47 48 FIX 501 2.39 611 311 2225.15 540.17 49 FIX 500 2.37 610 310 2227.53 540.77 50 TOE 0.93 609 309 2228.46 541.20 51 . 1.23 608 308 2229.69 541.86 52 W/L RB 0.62 607 307 2230.30 544.21 53 TOP CUT 1.02 606 306 2231.33 544.55 54 G/L BOLT RB 5.27 605 305 2236.60 544.74 55 . 5.84 604 304 2242.44 544.49 56 . DUNCAN RIVER CROSS SECTION 23 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 10.89 603 303 2253.33 544.30 57 . 11.32 602 302 2264.65 544.11 58 . 11.72 601 301 2276.37 544.45 59 . 13.02 600 300 2289.40 544.20 60 UNDULATING BYOND JOIN 600-659 S76 17 00E 2289.396 DUNCAN RIVER CROSS SECTION 24 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 299 0.00 543.14 1 DUMMY 2000.00 600 300 2000.00 543.14 2 FIELD LEVEL FLAT 20.88 601 301 2020.88 543.30 3 EDGE FIELD 4.37 602 302 2025.25 543.73 4 . 7.97 603 303 2033.22 543.79 5 . 5.96 604 304 2039.18 543.53 6 . 6.03 605 305 2045.21 543.66 7 . 5.85 606 306 2051.06 543.46 8 TOP BANK (REF PT 1.41 607 307 2052.47 541.10 9 W/L LB 1.81 608 308 2054.28 540.39 10 . 1.73 609 309 2056.01 539.78 11 . 2.05 610 310 2058.06 539.38 12 . 0.51 611 311 2058.57 539.43 13 FIX 500 1.64 612 312 2060.21 539.13 14 FIX 501 1.55 613 313 2061.76 539.03 15 FIX 502 0.34 614 314 2062.10 538.93 16 SUND BP 1.38 615 315 2063.48 539.13 17 FIX 503 0.51 616 316 2063.99 539.33 18 SUND BP 1.26 617 317 2065.25 539.73 19 SUND BP 0.76 618 318 2066.01 539.83 20 FIX 504 4.71 619 319 2070.72 539.93 21 FIX 505 2.83 620 320 2073.56 539.93 22 SUND BP 2.83 621 321 2076.39 540.03 23 FIX 506 5.04 622 322 2081.43 540.13 24 FIX 507 5.60 623 323 2087.03 540.33 25 FIX 508 6.38 624 324 2093.41 540.53 26 FIX 509 8.09 625 325 2101.50 540.63 27 FIX 510 7.68 626 326 2109.18 540.53 28 FIX 511 DUNCAN RIVER CROSS SECTION 24 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.36 627 327 2111.53 540.33 29 SUND BP 5.50 628 328 2117.04 540.43 30 FIX 512 7.29 629 329 2124.32 540.43 31 FIX 513 6.10 630 330 2130.43 540.23 32 FIX 514 7.48 631 331 2137.91 540.03 33 FIX 515 7.21 632 332 2145.12 539.83 34 FIX 516 10.86 633 333 2155.98 539.43 35 FIX 517 3.47 634 334 2159.45 539.33 36 SUND BP 3.47 635 335 2162.93 539.13 37 FIX 518 3.73 636 336 2166.65 538.93 38 SUND BP 1.60 637 337 2168.25 539.03 39 FIX 519 4.77 638 338 2173.02 539.33 40 FIX 520 4.33 639 339 2177.35 539.63 41 FIX 521 2.97 640 340 2180.31 540.27 42 TOE 2.28 641 341 2182.60 541.17 43 W/L RB 1.56 642 342 2184.16 542.12 44 TOP BANK 0.97 643 343 2185.13 542.18 45 G/L BOLT RB 4.03 644 344 2189.17 542.42 46 . 7.08 645 345 2196.25 542.62 47 . 2.66 646 346 2198.91 542.30 48 . 9.59 647 347 2208.50 542.27 49 . 10.26 648 348 2218.76 542.14 50 . 1.92 649 349 2220.69 542.68 51 . 3.43 650 350 2224.12 542.70 52 TOP EDGE GR.PIT JOIN 599-650 S83 28 17W 2224.117 DUNCAN RIVER CROSS SECTION 25 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 299 0.00 541.99 1 DUMMY 2000.00 600 300 2000.00 541.99 2 UNDULATING BYOND 5.82 601 301 2005.82 542.13 3 . 3.22 602 302 2009.04 542.23 4 TOP 1.18 603 303 2010.23 541.62 5 TOE 2.48 604 304 2012.71 541.59 6 TOE 1.71 605 305 2014.42 542.00 7 TOP 7.42 606 306 2021.84 542.05 8 . 11.41 607 307 2033.25 541.87 9 . 7.27 608 308 2040.52 542.15 10 TOP 0.86 609 309 2041.39 541.51 11 . 2.42 610 310 2043.80 540.60 12 TOE BACKCHANNEL 4.05 611 311 2047.85 540.66 13 TOE BACKCHANNEL 0.35 612 312 2048.20 541.14 14 TOP CUT 1.84 613 313 2050.05 541.45 15 . 1.38 614 314 2051.43 541.70 16 TOP 4.69 615 315 2056.12 541.81 17 TOP 3.03 616 316 2059.15 541.09 18 . 1.69 617 317 2060.84 541.01 19 . 1.11 618 318 2061.95 540.61 20 TOP CUT 0.58 619 319 2062.53 540.06 21 WL BACKCHANNEL 2.28 620 320 2064.80 539.56 22 TOE 1.81 621 321 2066.61 539.53 23 TOE 1.99 622 322 2068.60 539.66 24 . 1.41 623 323 2070.02 539.87 25 . 0.45 624 324 2070.47 539.98 26 . 0.52 625 325 2070.99 540.07 27 WL BAR 2.19 626 326 2073.18 540.16 28 . DUNCAN RIVER CROSS SECTION 25 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.88 627 327 2075.06 540.31 29 TOE 1.43 628 328 2076.49 541.13 30 TOP BANK (REF PT 6.34 629 329 2082.84 541.23 31 TOP BAR 9.22 630 330 2092.06 541.02 32 . 8.48 631 331 2100.53 540.83 33 . 5.17 632 332 2105.70 540.69 34 TOP 1.21 633 333 2106.91 540.45 35 . 0.79 634 334 2107.70 540.13 36 WL SIDECHAN 0.51 635 335 2108.21 539.98 37 . 1.20 636 336 2109.41 539.96 38 . 1.61 637 337 2111.02 540.12 39 WL BAR 1.43 638 338 2112.45 540.18 40 TOE 1.32 639 339 2113.77 540.56 41 . 1.67 640 340 2115.44 540.91 42 . 1.88 641 341 2117.33 541.10 43 TOP BAR 5.26 642 342 2122.59 541.11 44 . 4.02 643 343 2126.60 540.86 45 . 5.01 644 344 2131.62 540.98 46 . 4.20 645 345 2135.81 540.59 47 . 3.01 646 346 2138.82 540.97 48 . 9.32 647 347 2148.14 540.58 49 . 13.14 648 348 2161.28 540.54 50 . 7.80 649 349 2169.08 540.44 51 G/L BOLT LB 6.60 650 350 2175.68 540.40 52 XS BENDS 2.58 651 351 2178.26 540.21 53 W/L LB 3.86 652 352 2182.12 539.73 54 . 1.22 653 353 2183.34 539.35 55 . 1.08 654 354 2184.42 539.25 56 . DUNCAN RIVER CROSS SECTION 25 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.87 655 355 2187.29 539.07 57 FIX 500 1.44 656 356 2188.73 538.97 58 FIX 501 2.48 657 357 2191.21 538.77 59 FIX 502 2.81 658 358 2194.02 538.67 60 FIX 503 4.09 659 359 2198.11 538.47 61 FIX 504 3.20 660 360 2201.31 538.07 62 FIX 505 3.62 661 361 2204.93 537.47 63 FIX 506 4.24 662 362 2209.17 536.47 64 FIX 507 1.19 663 363 2210.36 536.07 65 SUND BP 2.77 664 364 2213.13 535.97 66 FIX 508 2.84 665 365 2215.97 535.97 67 FIX 509 1.92 666 366 2217.89 536.07 68 FIX 510 3.06 667 367 2220.95 535.97 69 FIX 511 2.19 668 368 2223.14 535.97 70 FIX 512 2.78 669 369 2225.92 536.11 71 . 0.94 670 370 2226.86 538.53 72 . 1.24 671 371 2228.10 538.52 73 . 0.55 672 372 2228.65 539.37 74 . 0.81 673 373 2229.47 540.32 75 WL ISLAND 0.36 674 374 2229.83 540.41 76 TOE 0.87 675 375 2230.70 541.02 77 TOP 5.75 676 376 2236.45 540.91 78 . 4.59 677 377 2241.04 540.86 79 TOP (RB REF PT) 0.52 678 378 2241.56 540.51 80 TOE CUT 0.80 679 379 2242.36 540.26 81 TOE 0.85 680 380 2243.21 540.15 82 . 0.68 681 381 2243.89 540.33 83 . 0.49 682 382 2244.38 540.39 84 TOE DUNCAN RIVER CROSS SECTION 25 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.30 683 383 2245.68 540.65 85 TOP 4.92 684 384 2250.60 540.71 86 . 2.75 685 385 2253.35 540.72 87 . 2.34 686 386 2255.69 540.60 88 TOP 0.83 687 387 2256.52 540.39 89 . 0.52 688 388 2257.04 540.34 90 . 0.74 689 389 2257.78 540.09 91 TOE 3.40 690 390 2261.18 540.03 92 . 2.89 691 391 2264.07 539.98 93 TOE 0.96 692 392 2265.03 540.18 94 . 0.44 693 393 2265.47 540.38 95 . 1.09 694 394 2266.56 540.76 96 TOP 5.96 695 395 2272.52 540.71 97 . 5.47 696 396 2277.99 540.57 98 . 1.72 697 397 2279.71 540.84 99 . 6.71 698 398 2286.42 540.87 100 . 3.01 699 399 2289.43 540.56 101 . 10.15 700 400 2299.58 540.51 102 . 6.03 701 401 2305.61 540.60 103 . 5.64 702 402 2311.25 540.20 104 . 5.03 703 403 2316.28 540.12 105 . 8.08 704 404 2324.36 540.40 106 . 9.71 705 405 2334.07 540.45 107 . 2.28 706 406 2336.35 540.31 108 . 3.74 707 407 2340.09 540.72 109 . 2.39 708 408 2342.48 540.59 110 . 0.62 709 409 2343.10 540.72 111 . 3.62 710 410 2346.72 540.93 112 . DUNCAN RIVER CROSS SECTION 25 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 4.61 711 411 2351.33 540.88 113 . 5.51 712 412 2356.84 540.57 114 TOP ISLAND 1.43 713 413 2358.27 540.37 115 . 5.14 714 414 2363.41 539.89 116 . 4.39 715 415 2367.80 540.00 117 . 2.54 716 416 2370.34 540.30 118 TOP SANDBAR 8.34 717 417 2378.68 540.06 119 . 5.43 718 418 2384.11 539.87 120 WL ISLAND 4.29 719 419 2388.40 539.53 121 . 3.24 720 420 2391.64 539.55 122 . 3.33 721 421 2394.97 539.19 123 . 2.34 722 422 2397.31 539.03 124 . 2.07 723 423 2399.38 539.74 125 . 4.90 724 424 2404.28 539.35 126 . 1.86 725 425 2406.14 539.44 127 . 1.68 726 426 2407.82 539.86 128 WL SANDBAR 0.28 727 427 2408.10 540.11 129 TOP BAR 2.38 728 428 2410.48 540.18 130 . 0.17 729 429 2410.65 539.86 131 WL LB 1.25 730 430 2411.90 539.71 132 . 0.76 731 431 2412.66 539.69 133 . 1.74 732 432 2414.40 538.63 134 TOE 1.91 733 433 2416.31 537.73 135 . 1.62 734 434 2417.93 537.54 136 . 0.07 735 435 2418.00 537.49 137 . 3.37 736 436 2421.37 537.23 138 . 1.40 737 437 2422.77 537.30 139 . 1.71 738 438 2424.48 537.65 140 . DUNCAN RIVER CROSS SECTION 25 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.36 739 439 2426.84 538.11 141 . 2.10 740 440 2428.94 538.53 142 . 1.60 741 441 2430.54 538.97 143 . 2.08 742 442 2432.61 539.45 144 TOE 0.13 743 443 2432.74 539.83 145 W/L RB 0.99 744 444 2433.73 541.71 146 TOP BANK 4.07 745 445 2437.80 541.75 147 . 6.78 746 446 2444.58 541.77 148 . 7.71 747 447 2452.29 542.27 149 . 2.44 748 448 2454.74 542.00 150 . 5.20 749 449 2459.94 541.79 151 . 6.65 750 450 2466.58 542.05 152 FLAT BEYOND JOIN 599-628 N80 11 58W 2076.494 JOIN 628-750 N69 48 53W 388.104 DUNCAN RIVER CROSS SECTION 26 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 299 0.00 541.29 1 DUMMY 2000.00 600 300 2000.00 541.29 2 FLAT BEYOND 14.74 601 301 2014.74 541.24 3 . 14.59 602 302 2029.33 541.19 4 . 7.80 603 303 2037.13 541.13 5 . 5.92 604 304 2043.05 541.24 6 . (XS REF PT) 3.13 605 305 2046.18 541.04 7 TOP BANK 0.51 606 306 2046.68 540.03 8 TOE CUT 0.83 607 307 2047.52 539.52 9 W/L LB 0.72 608 308 2048.24 539.16 10 . 1.01 609 309 2049.25 538.87 11 TOE 2.31 610 310 2051.56 538.68 12 . 1.80 611 311 2053.36 538.00 13 . 1.90 612 312 2055.26 537.79 14 BP 1.25 613 313 2056.51 537.49 15 BP 2.47 614 314 2058.98 537.29 16 BP 3.17 615 315 2062.15 538.29 17 BP 5.07 616 316 2067.21 537.99 18 BP 6.40 617 317 2073.61 538.09 19 BP 4.99 618 318 2078.60 538.09 20 BP 4.55 619 319 2083.14 537.89 21 BP 5.46 620 320 2088.61 537.69 22 BP 5.20 621 321 2093.80 537.59 23 BP 5.12 622 322 2098.92 537.49 24 BP 3.93 623 323 2102.84 537.39 25 BP 3.58 624 324 2106.43 537.19 26 BP 2.72 625 325 2109.15 537.19 27 BP 2.73 626 326 2111.88 537.39 28 BP DUNCAN RIVER CROSS SECTION 26 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.70 627 327 2114.58 538.49 29 BP 1.85 628 328 2116.44 538.85 30 . 1.10 629 329 2117.53 539.23 31 . 0.03 630 330 2117.56 539.19 32 TOE CUT 0.56 631 331 2118.11 539.51 33 W/L RB 0.34 632 332 2118.45 539.94 34 . 1.24 633 333 2119.69 540.42 35 TOP ISLAND 0.89 634 334 2120.58 540.49 36 G/L BOLT RB 3.20 635 335 2123.78 540.41 37 XS BENDS 5.09 636 336 2128.87 540.13 38 . 3.02 637 337 2131.89 540.32 39 . 7.59 638 338 2139.48 540.60 40 . 4.86 639 339 2144.34 540.45 41 TOP ISLAND 3.47 640 340 2147.81 540.35 42 TOP BANK 0.77 641 341 2148.58 539.63 43 . 0.73 642 342 2149.31 539.30 44 WL ISLAND 1.33 643 343 2150.65 539.12 45 TOE 5.02 644 344 2155.67 539.06 46 . 3.98 645 345 2159.65 539.07 47 . 2.67 646 346 2162.33 538.58 48 . 0.18 647 347 2162.51 538.57 49 . 2.73 648 348 2165.24 538.48 50 . 2.38 649 349 2167.62 538.36 51 . 1.59 650 350 2169.21 537.77 52 . 6.13 651 351 2175.34 538.23 53 . 1.76 652 352 2177.09 538.49 54 . 2.77 653 353 2179.86 538.32 55 . 2.31 654 354 2182.17 537.99 56 . DUNCAN RIVER CROSS SECTION 26 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.61 655 355 2183.77 538.50 57 TOE 0.02 656 356 2183.79 539.29 58 W/L RB 0.71 657 357 2184.50 540.65 59 . 0.63 658 358 2185.13 540.85 60 TOP BANK (REF PT 7.03 659 359 2192.17 540.94 61 . 6.46 660 360 2198.63 540.88 62 TOP 1.85 661 361 2200.48 540.22 63 TOE DRY CHAN 2.77 662 362 2203.25 540.19 64 TOE 1.17 663 363 2204.41 541.16 65 TOP 9.12 664 364 2213.53 541.51 66 FLAT BYON JOIN 599-634 S77 09 55W 2120.584 JOIN 634-664 S71 26 55W 92.948 DUNCAN RIVER CROSS SECTION 27 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 655 355 0.00 541.58 1 DUMMY 2000.00 654 354 2000.00 541.58 2 FLAT BEYOND 6.66 653 353 2006.66 541.31 3 TOP 9.42 652 352 2016.08 540.21 4 . 14.29 651 351 2030.37 539.86 5 TOP BACKCHANNEL 0.87 650 350 2031.24 538.82 6 TOE 12.91 649 349 2044.14 538.16 7 . 3.77 648 348 2047.91 538.36 8 TOE CHAN 2.43 647 347 2050.34 539.79 9 TOP 4.73 646 346 2055.07 540.53 10 . 3.81 645 345 2058.87 540.41 11 . 4.81 644 344 2063.68 540.31 12 . 1.42 643 343 2065.11 540.92 13 . 2.68 642 342 2067.78 541.25 14 . 5.11 641 341 2072.89 541.51 15 . 9.21 640 340 2082.10 541.25 16 . 8.78 639 339 2090.88 541.08 17 . 6.59 638 338 2097.47 540.77 18 . 8.26 637 337 2105.73 540.78 19 . 8.94 636 336 2114.67 541.02 20 TOP BANK 1.00 635 335 2115.67 540.31 21 G/L BOLT LB 1.05 634 334 2116.72 539.96 22 . 1.12 633 333 2117.85 539.51 23 TOP CUT 0.31 632 332 2118.16 538.58 24 W/L LB 0.00 631 331 2118.16 538.43 25 TOE CUT 2.96 630 330 2121.12 537.58 26 . 0.49 629 329 2121.61 537.59 27 BP 2.72 628 328 2124.33 537.29 28 BP DUNCAN RIVER CROSS SECTION 27 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 4.72 627 327 2129.05 537.09 29 BP 6.00 626 326 2135.06 537.19 30 BP 5.89 625 325 2140.94 536.89 31 BP 5.07 624 324 2146.02 536.59 32 BP 4.85 623 323 2150.87 536.59 33 BP 5.91 622 322 2156.78 536.59 34 BP 4.31 621 321 2161.09 536.69 35 BP 5.76 620 320 2166.85 535.99 36 BP 6.01 619 319 2172.86 535.89 37 BP 4.90 618 318 2177.76 535.49 38 BP 5.93 617 317 2183.68 535.79 39 BP 5.08 616 316 2188.76 536.29 40 BP 4.27 615 315 2193.03 536.69 41 BP 3.53 614 314 2196.56 536.99 42 BP 1.40 613 313 2197.96 537.09 43 BP 0.19 612 312 2198.16 537.19 44 . 3.38 611 311 2201.54 537.50 45 . 1.80 610 310 2203.34 537.71 46 . 0.38 609 309 2203.73 538.20 47 . 0.15 608 308 2203.88 538.60 48 W/L RB 0.02 607 307 2203.90 539.26 49 TOP CUT 0.56 606 306 2204.46 539.57 50 TOP BANK (REF PT 2.27 605 305 2206.73 539.82 51 . 5.34 604 304 2212.07 540.48 52 EDGE FIELD 12.11 603 303 2224.18 540.31 53 . 13.84 602 302 2238.01 539.84 54 . 10.39 601 301 2248.40 540.59 55 . 9.21 600 300 2257.61 540.93 56 FIELD LEVEL FLAT JOIN 600-655 N32 54 44E 2257.610 DUNCAN RIVER CROSS SECTION 28 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 648 348 0.00 539.91 1 DUMMY 2000.00 647 347 2000.00 539.91 2 FLAT BEYOND 12.12 646 346 2012.12 539.68 3 EDGE VEGETATION 4.04 645 345 2016.16 540.73 4 . 4.89 644 344 2021.05 540.92 5 . ( XS REF PT) 9.40 643 343 2030.45 541.15 6 TOP 4.64 642 342 2035.08 540.46 7 C/L PATH 5.96 641 341 2041.04 540.55 8 . 3.09 640 340 2044.13 540.51 9 TOP 1.51 639 339 2045.64 539.48 10 TOE 2.77 638 338 2048.41 539.09 11 . 3.76 637 337 2052.17 539.52 12 . 3.09 636 336 2055.26 539.55 13 XS BENDS 2.67 635 335 2057.93 539.42 14 G/L BOLT LB 0.87 634 334 2058.80 539.27 15 . 1.14 633 333 2059.94 538.70 16 TOE 1.94 632 332 2061.88 538.31 17 W/L LB 4.11 631 331 2066.00 537.78 18 . 2.19 630 330 2068.19 537.36 19 . 3.49 629 329 2071.68 536.85 20 FIX 515 2.02 628 328 2073.70 536.65 21 SUND BP 4.71 627 327 2078.41 536.65 22 FIX 514 1.27 626 326 2079.67 536.65 23 SUND BP 1.90 625 325 2081.57 536.45 24 FIX 513 5.46 624 324 2087.03 536.05 25 FIX 512 6.20 623 323 2093.24 535.45 26 FIX 511 6.18 622 322 2099.42 535.15 27 FIX 510 4.78 621 321 2104.19 535.55 28 FIX 509 DUNCAN RIVER CROSS SECTION 28 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.61 620 320 2105.80 535.75 29 SUND BP 3.76 619 319 2109.56 535.75 30 FIX 508 3.90 618 318 2113.45 535.75 31 FIX 507 4.91 617 317 2118.36 535.85 32 FIX 506 4.60 616 316 2122.96 536.05 33 FIX 505 5.37 615 315 2128.34 536.15 34 FIX 504 6.20 614 314 2134.54 536.35 35 FIX 503 7.56 613 313 2142.10 536.45 36 FIX 502 4.16 612 312 2146.26 536.55 37 FIX 501 0.59 611 311 2146.85 536.55 38 FIX 500 2.43 610 310 2149.28 536.84 39 . 3.05 609 309 2152.33 536.95 40 . 2.61 608 308 2154.93 537.26 41 . 1.49 607 307 2156.42 538.18 42 W/L RB 2.07 606 306 2158.49 539.33 43 . (XS REF PT) 2.69 605 305 2161.18 540.47 44 TOP BANK 3.90 604 304 2165.08 540.13 45 . 0.12 603 303 2165.20 540.14 46 . 8.27 602 302 2173.47 540.53 47 TOP 1.19 601 301 2174.66 540.32 48 COR.FENCE 16.62 600 300 2191.28 540.71 49 FLAT BEYOND JOIN 600-635 N87 05 44E 133.350 JOIN 635-648 S89 43 56E 2057.934 DUNCAN RIVER CROSS SECTION 29 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 299 0.00 541.55 1 DUMMY 2000.00 600 300 2000.00 541.55 2 C/L ROAD 26.62 601 301 2026.62 541.89 3 C/L ROAD 20.41 602 302 2047.03 542.36 4 END OLD ROAD 6.74 603 303 2053.77 542.32 5 . 5.25 604 304 2059.03 541.77 6 . 5.15 605 305 2064.17 542.52 7 TOP 3.36 606 306 2067.53 540.29 8 . 2.56 607 307 2070.09 539.50 9 TOE (XS REF PT) 6.65 608 308 2076.74 539.19 10 TOP BANK 1.78 609 309 2078.52 538.26 11 TOE 1.81 610 310 2080.33 537.91 12 W/L LB 0.96 611 311 2081.29 537.65 13 . 7.57 612 312 2088.87 537.37 14 . 2.55 613 313 2091.42 537.22 15 . 2.49 614 314 2093.90 537.08 16 . 3.77 615 315 2097.67 536.84 17 . 2.80 616 316 2100.46 536.60 18 FIX 500 2.28 617 317 2102.74 536.40 19 FIX 501 2.15 618 318 2104.89 536.30 20 FIX 502 3.49 619 319 2108.37 536.20 21 SUND BP 0.87 620 320 2109.25 536.10 22 FIX 503 5.03 621 321 2114.28 535.70 23 FIX 504 5.60 622 322 2119.88 535.60 24 FIX 505 2.78 623 323 2122.66 535.50 25 SUND BP 2.78 624 324 2125.45 534.60 26 SUND BP 3.71 625 325 2129.16 534.40 27 FIX 506 4.98 626 326 2134.14 533.70 28 FIX 507 DUNCAN RIVER CROSS SECTION 29 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 5.99 627 327 2140.13 532.90 29 FIX 508 2.02 628 328 2142.15 532.40 30 SUND BP 1.34 629 329 2143.49 532.60 31 FIX 509 3.28 630 330 2146.77 533.80 32 FIX 510 1.42 631 331 2148.19 534.50 33 FIX 511 2.52 632 332 2150.71 535.60 34 FIX 512 2.06 633 333 2152.78 536.05 35 TOE CRIBBING 0.05 634 334 2152.82 537.57 36 TOP CRIBBING 0.18 635 335 2153.00 537.88 37 W/L RB 2.49 636 336 2155.50 539.74 38 . 0.72 637 337 2156.22 540.68 39 TOP BANK 1.24 638 338 2157.46 540.58 40 G/L BOLT RB 5.43 639 339 2162.89 540.53 41 TOE 4.98 640 340 2167.87 542.78 42 TOP 20.55 641 341 2188.42 542.73 43 C/L ROAD 26.11 642 342 2214.53 543.03 44 CL.RD.FLAT BYOND JOIN 599-642 S80 03 14W 2214.435 DUNCAN RIVER CROSS SECTION 30 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 643 343 0.00 540.32 1 DUMMY 2000.00 642 342 2000.00 540.32 2 FLAT FIELD BYOND 14.57 641 341 2014.57 539.94 3 . 1.35 640 340 2015.92 540.56 4 TOP HUMMOCK 2.22 639 339 2018.14 540.59 5 . 2.20 638 338 2020.34 540.01 6 EDGE FIELD 3.70 637 337 2024.04 540.17 7 . 2.48 636 336 2026.52 540.40 8 . 9.68 635 335 2036.20 540.12 9 . 7.61 634 334 2043.81 539.63 10 TOP BANK 1.27 633 333 2045.08 538.54 11 TOE 2.04 632 332 2047.12 538.23 12 G/L BOLT LB 0.70 631 331 2047.81 538.08 13 TOP CUT 0.55 630 330 2048.37 537.50 14 W/L LB 0.34 629 329 2048.70 537.26 15 . 0.49 628 328 2049.19 537.13 16 . 2.29 627 327 2051.48 536.69 17 . 0.92 626 326 2052.41 536.16 18 . 4.08 625 325 2056.48 536.02 19 FIX 513 3.74 624 324 2060.23 535.32 20 FIX 512 3.57 623 323 2063.80 535.02 21 FIX 511 4.66 622 322 2068.46 534.62 22 FIX 510 4.42 621 321 2072.87 534.52 23 FIX 509 5.35 620 320 2078.22 534.42 24 FIX 508 6.70 619 319 2084.91 534.22 25 FIX 507 4.75 618 318 2089.67 534.32 26 FIX 506 6.77 617 317 2096.44 534.32 27 FIX 505 3.96 616 316 2100.40 534.32 28 SUND BP DUNCAN RIVER CROSS SECTION 30 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.64 615 315 2103.04 534.22 29 FIX 504 4.62 614 314 2107.65 534.82 30 FIX 503 1.29 613 313 2108.95 534.62 31 SUND BP 1.94 612 312 2110.89 535.32 32 FIX 502 1.13 611 311 2112.02 535.52 33 FIX 501 0.33 610 310 2112.35 535.52 34 FIX 500 2.39 609 309 2114.74 536.27 35 . 3.66 608 308 2118.40 537.55 36 W/L RB 1.44 607 307 2119.85 538.13 37 TOE 0.73 606 306 2120.57 538.77 38 TOP CUT 2.09 605 305 2122.66 539.71 39 TOP BANK (REF PT 1.29 604 304 2123.94 539.84 40 . 0.90 603 303 2124.84 539.46 41 . 16.62 602 302 2141.46 539.97 42 . 5.90 601 301 2147.36 540.55 43 . 9.87 600 300 2157.23 540.53 44 SLOW RISE BEYOND JOIN 600-643 N84 17 23E 2157.227 DUNCAN RIVER CROSS SECTION 31 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 489 289 0.00 548.39 1 DUMMY 2000.00 490 290 2000.00 548.39 2 C/L ROAD 26.66 491 291 2026.66 548.08 3 C/L ROAD 34.75 492 292 2061.41 547.74 4 C/L ROAD 36.42 493 293 2097.83 547.25 5 C/L ROAD 35.41 494 294 2133.24 546.59 6 C/L ROAD 36.01 495 295 2169.26 546.13 7 C/L ROAD 38.26 496 296 2207.51 545.44 8 C/L ROAD 35.99 497 297 2243.51 545.05 9 C/L ROAD 35.75 498 298 2279.25 544.78 10 C/L ROAD 33.80 499 299 2313.05 544.83 11 C/L ROAD 15.27 500 300 2328.32 544.63 12 TOP ABUTMENT 0.20 501 301 2328.52 542.91 13 TOP SEAT 0.39 502 302 2328.91 542.92 14 BOT.CORD TOPSEAT 0.05 503 303 2328.96 540.50 15 TOE SEAT 5.02 504 304 2333.98 539.87 16 . 2.12 505 305 2336.11 539.15 17 TOE 0.5 PILE 0.04 506 306 2336.15 542.80 18 TOP 0.5 PILE 0.44 507 307 2336.59 542.80 19 TOP 0.5 PILE 0.04 508 308 2336.63 542.20 20 TOP 0.5 PILE 0.44 509 309 2337.07 542.20 21 TOP 0.5 PILE 0.01 510 310 2337.08 539.00 22 TOE 0.5 PILE 2.45 511 311 2339.53 538.88 23 TOP BANK 0.53 512 312 2340.06 538.08 24 . 1.61 513 313 2341.67 537.13 25 W/L LB 1.77 514 314 2343.44 535.58 26 . 1.69 515 315 2345.13 535.40 27 BP 1.32 516 316 2346.45 534.20 28 BP DUNCAN RIVER CROSS SECTION 31 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.13 517 317 2348.57 533.80 29 BP 1.96 518 318 2350.53 533.70 30 BP 2.17 519 319 2352.70 533.44 31 BP 2.96 520 320 2355.66 533.44 32 BP 2.55 521 321 2358.21 533.60 33 BP 2.60 522 322 2360.81 533.90 34 BP 3.27 523 323 2364.09 534.56 35 TOE PILE 0.04 524 324 2364.13 541.82 36 TOP PILE 0.55 525 325 2364.68 541.82 37 TOP PILE 0.07 526 326 2364.74 534.52 38 TOE PILE 2.16 527 327 2366.91 534.00 39 BP 0.19 528 328 2367.10 534.20 40 BP 2.30 529 329 2369.40 534.10 41 BP 3.33 530 330 2372.73 534.50 42 BP 2.78 531 331 2375.51 534.70 43 BP 4.08 532 332 2379.59 534.80 44 BP 3.07 533 333 2382.66 534.90 45 BP 1.92 534 334 2384.58 535.00 46 BP 2.66 535 335 2387.24 535.10 47 BP 2.09 536 336 2389.33 535.10 48 BP 2.46 537 337 2391.79 535.98 49 TOE PILE 0.04 538 338 2391.83 541.40 50 TOP PILE 0.47 539 339 2392.30 541.40 51 TOP PILE 0.04 540 340 2392.34 541.60 52 TOP PILE 0.46 541 341 2392.80 541.60 53 TOP PILE 0.17 542 342 2392.96 535.93 54 TOE PILE 1.11 543 343 2394.07 536.15 55 . 1.87 544 344 2395.94 536.30 56 . DUNCAN RIVER CROSS SECTION 31 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.97 545 345 2398.91 536.46 57 . 0.94 546 346 2399.84 536.63 58 . 1.10 547 347 2400.94 537.08 59 W/L RB 0.88 548 348 2401.82 538.36 60 . 1.04 549 349 2402.86 538.79 61 TOP RIP 3.25 550 350 2406.11 539.37 62 TOE SEAT 0.17 551 351 2406.28 541.44 63 TOP SEAT 0.43 552 352 2406.71 541.42 64 BOT.CORD TOPSEAT 0.08 553 353 2406.79 543.49 65 TOP ABUTMENT 12.40 554 354 2419.19 543.34 66 C/L ROAD 19.70 555 355 2438.89 542.83 67 C/L ROAD 31.09 556 356 2469.98 542.08 68 C/L ROAD 35.48 557 357 2505.47 541.20 69 OPP.NO.SO.DWY. 34.33 558 358 2539.80 540.80 70 C/L ROAD 34.96 559 359 2574.76 540.70 71 OPP.SOUTH DRVWY 17.72 560 360 2592.48 540.80 72 C/L ROAD 43.28 561 361 2635.76 541.30 73 C/L ROAD 35.06 562 362 2670.82 542.20 74 C/L ROAD 34.83 563 363 2705.66 543.25 75 C/L ROAD 35.29 564 364 2740.94 544.29 76 C/L ROAD 34.85 565 365 2775.79 545.40 77 C/L ROAD 35.41 566 366 2811.21 546.43 78 OPP.CL DRVWY. 33.92 567 367 2845.12 547.29 79 C/L ROAD 34.26 568 368 2879.38 548.13 80 . 36.44 569 369 2915.82 548.43 81 C/L ROAD 31.04 570 370 2946.86 548.54 82 EDGE PAVEMENT 4.22 571 371 2951.08 548.49 83 C/L-C/L JOIN 489-493 S28 27 58W 2097.834 JOIN 493-496 S53 15 49W 109.678 JOIN 496-558 S75 00 50W 332.120 JOIN 558-571 S88 55 56W 411.277 DUNCAN RIVER CROSS SECTION 32 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 663 363 0.00 538.17 1 DUMMY 2000.00 662 362 2000.00 538.17 2 FLAT BEYOND 9.56 661 361 2009.56 538.18 3 . 19.59 660 360 2029.14 537.95 4 . 3.07 659 359 2032.21 538.37 5 . 13.36 658 358 2045.57 538.26 6 . 7.49 657 357 2053.06 538.26 7 C/L PATH 2.58 656 356 2055.64 538.45 8 . 8.09 655 355 2063.73 538.54 9 . 4.97 654 354 2068.70 538.82 10 . 1.94 653 353 2070.65 538.47 11 BOLT LB 0.86 652 352 2071.51 538.39 12 TOP BANK 0.95 651 351 2072.46 536.92 13 W/L LB 0.51 650 350 2072.96 536.30 14 . 2.15 649 349 2075.11 535.42 15 . 2.78 648 348 2077.89 534.78 16 BP 3.01 647 347 2080.89 534.58 17 BP 5.22 646 346 2086.12 534.48 18 BP 5.95 645 345 2092.07 534.48 19 BP 5.73 644 344 2097.81 534.58 20 BP 7.94 643 343 2105.75 534.58 21 BP 8.24 642 342 2113.99 534.68 22 BP 8.20 641 341 2122.19 534.98 23 BP 1.93 640 340 2124.12 534.98 24 BP 3.59 639 339 2127.71 535.28 25 BP 6.49 638 338 2134.20 535.58 26 BP 2.88 637 337 2137.08 535.68 27 BP 3.56 636 336 2140.64 535.68 28 BP DUNCAN RIVER CROSS SECTION 32 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.13 635 335 2142.77 535.78 29 BP 2.33 634 334 2145.10 535.88 30 BP 1.49 633 333 2146.59 535.98 31 BP 0.83 632 332 2147.42 535.98 32 BP 2.24 631 331 2149.66 536.05 33 . 5.42 630 330 2155.07 536.22 34 . 6.31 629 329 2161.38 536.71 35 W/L RB 2.96 628 328 2164.35 537.00 36 . 5.50 627 327 2169.85 537.33 37 . 9.08 626 326 2178.93 538.05 38 . (XS REF PT) 5.73 625 325 2184.66 538.29 39 . 6.32 624 324 2190.98 538.26 40 . 5.71 623 323 2196.69 537.92 41 . 5.60 622 322 2202.29 537.74 42 . 5.65 621 321 2207.93 537.36 43 . 2.39 620 320 2210.32 537.43 44 . 4.40 619 319 2214.72 537.35 45 . 10.91 618 318 2225.63 537.09 46 . 2.17 617 317 2227.80 536.77 47 . 3.76 616 316 2231.56 536.44 48 . 2.20 615 315 2233.76 536.48 49 . 2.78 614 314 2236.54 536.71 50 TOE 2.15 613 313 2238.69 536.98 51 . 4.42 612 312 2243.11 537.01 52 . 8.36 611 311 2251.47 537.20 53 TOP 1.02 610 310 2252.50 536.76 54 WL BACKCHANNEL 0.60 609 309 2253.10 536.59 55 TOP CUT 0.43 608 308 2253.53 536.27 56 TOE DUNCAN RIVER CROSS SECTION 32 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.26 607 307 2255.79 536.13 57 . 3.27 606 306 2259.06 536.08 58 . 3.30 605 305 2262.36 536.39 59 TOE 1.66 604 304 2264.02 536.72 60 WL RB BCHAN 1.95 603 303 2265.97 537.01 61 TOE 0.36 602 302 2266.33 538.56 62 TOP CUT 1.60 601 301 2267.94 539.23 63 TOP BANK 5.59 600 300 2273.53 539.42 64 FLAT BEYOND JOIN 600-662 S83 56 55E 273.527 DUNCAN RIVER CROSS SECTION 33 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 299 0.00 537.41 1 DUMMY 2000.00 600 300 2000.00 537.41 2 FLAT BEYOND 7.79 601 301 2007.79 537.28 3 . 7.69 602 302 2015.48 536.59 4 . 6.32 603 303 2021.80 535.85 5 . 2.76 604 304 2024.56 535.86 6 TOE DRY CHAN 3.26 605 305 2027.81 536.32 7 TOP 8.12 606 306 2035.93 536.28 8 . 2.58 607 307 2038.51 536.09 9 . 3.06 608 308 2041.58 535.84 10 . 5.41 609 309 2046.99 535.77 11 . 3.31 610 310 2050.30 536.30 12 . 9.88 611 311 2060.18 536.36 13 . 8.50 612 312 2068.68 536.25 14 . 8.83 613 313 2077.51 536.44 15 . 5.99 614 314 2083.50 536.54 16 . 4.76 615 315 2088.26 536.39 17 . (XS REF PT) 4.36 616 316 2092.62 536.18 18 TOP 0.78 617 317 2093.41 536.05 19 W/L LB 1.48 618 318 2094.89 535.86 20 . 3.04 619 319 2097.93 535.45 21 . 1.70 620 320 2099.63 535.06 22 . 1.31 621 321 2100.94 534.81 23 BP 0.08 622 322 2101.01 534.91 24 BP 1.19 623 323 2102.20 534.61 25 BP 2.18 624 324 2104.38 534.41 26 BP 2.59 625 325 2106.97 534.21 27 BP 5.15 626 326 2112.11 534.11 28 BP DUNCAN RIVER CROSS SECTION 33 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6.20 627 327 2118.31 534.01 29 BP 6.67 628 328 2124.98 533.91 30 BP 6.48 629 329 2131.46 533.71 31 BP 6.50 630 330 2137.96 533.61 32 BP 6.80 631 331 2144.76 533.11 33 BP 5.96 632 332 2150.72 533.01 34 BP 4.87 633 333 2155.59 532.71 35 BP 6.95 634 334 2162.54 533.21 36 BP 3.65 635 335 2166.19 534.01 37 BP 2.24 636 336 2168.43 534.77 38 . 1.84 637 337 2170.27 535.39 39 TOE CUT 0.02 638 338 2170.30 536.17 40 W/L RB 0.95 639 339 2171.24 537.42 41 TOP BANK 1.27 640 340 2172.52 537.36 42 G/L BOLT RB 6.75 641 341 2179.26 537.39 43 . 10.12 642 342 2189.38 537.42 44 . 8.72 643 343 2198.10 537.11 45 . 4.72 644 344 2202.83 536.12 46 TOE 2.18 645 345 2205.01 536.25 47 . 5.23 646 346 2210.24 538.32 48 TOP 10.09 647 347 2220.33 538.32 49 . 8.52 648 348 2228.85 538.23 50 UNDULATING BYOND JOIN 599-648 S69 15 12W 2228.805 DUNCAN RIVER CROSS SECTION 34 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 299 0.00 536.91 1 DUMMY 2000.00 600 300 2000.00 536.91 2 FLAT BEYOND 18.02 601 301 2018.02 536.84 3 . 12.38 602 302 2030.40 536.80 4 G/L BOLT LB 1.25 603 303 2031.65 536.78 5 TOP CUT 0.13 604 304 2031.78 535.95 6 TOE CUT 1.80 605 305 2033.58 535.13 7 . 0.18 606 306 2033.75 534.81 8 W/L LB 1.03 607 307 2034.79 534.40 9 . 1.53 608 308 2036.32 533.83 10 . 1.82 609 309 2038.13 533.48 11 BP 1.31 610 310 2039.44 533.38 12 BP 0.84 611 311 2040.28 533.38 13 BP 2.84 612 312 2043.12 533.17 14 BP 4.00 613 313 2047.13 532.17 15 BP 3.82 614 314 2050.95 531.67 16 BP 6.61 615 315 2057.56 531.88 17 BP 8.17 616 316 2065.73 532.48 18 BP 12.51 617 317 2078.24 532.88 19 BP 8.15 618 318 2086.38 533.17 20 BP 6.06 619 319 2092.45 533.48 21 BP 9.08 620 320 2101.53 533.67 22 BP 6.06 621 321 2107.59 533.88 23 BP 4.42 622 322 2112.01 534.08 24 BP 5.32 623 323 2117.33 533.93 25 . 5.46 624 324 2122.78 533.93 26 . 5.23 625 325 2128.01 533.95 27 . 5.25 626 326 2133.27 533.82 28 . DUNCAN RIVER CROSS SECTION 34 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.97 627 327 2137.24 533.85 29 . 2.23 628 328 2139.47 534.01 30 . 4.99 629 329 2144.46 534.54 31 WL BAR 1.57 630 330 2146.03 534.65 32 TOP BAR 0.45 631 331 2146.48 534.64 33 . 1.16 632 332 2147.64 534.48 34 . 1.99 633 333 2149.63 534.56 35 . 2.13 634 334 2151.76 534.55 36 . 0.52 635 335 2152.28 534.61 37 . 1.84 636 336 2154.13 534.87 38 . 3.78 637 337 2157.91 535.00 39 EDGE BUSH 8.72 638 338 2166.63 534.92 40 . 11.51 639 339 2178.14 534.80 41 . 6.18 640 340 2184.31 534.48 42 . 1.51 641 341 2185.82 534.32 43 TOE 1.44 642 342 2187.26 534.34 44 TOE 3.99 643 343 2191.25 534.75 45 TOP 9.57 644 344 2200.82 534.83 46 . 8.06 645 345 2208.88 534.86 47 . 1.79 646 346 2210.67 534.57 48 TOP 0.49 647 347 2211.15 534.40 49 TOE 1.09 648 348 2212.24 534.40 50 TOE 1.07 649 349 2213.32 534.64 51 TOP 4.44 650 350 2217.76 534.78 52 . 7.89 651 351 2225.65 534.72 53 . 3.53 652 352 2229.18 535.05 54 . 12.57 653 353 2241.75 535.31 55 . 11.65 654 354 2253.40 535.24 56 . DUNCAN RIVER CROSS SECTION 34 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6.18 655 355 2259.58 535.13 57 TOP 4.35 656 356 2263.94 534.10 58 TOE SWAMP 5.65 657 357 2269.59 534.10 59 TOP SMALL ISLAN 3.56 658 358 2273.15 534.13 60 WL SWAMP 0.61 659 359 2273.76 534.07 61 TOE 2.64 660 360 2276.39 533.68 62 CL SIDE CHAN 3.39 661 361 2279.79 533.94 63 TOE 1.18 662 362 2280.97 534.10 64 WL SIDE CHAN 1.47 663 363 2282.44 534.23 65 TOE CUT 0.54 664 364 2282.98 534.58 66 TOP BANK 7.29 665 365 2290.27 534.59 67 . 2.15 666 366 2292.42 534.82 68 . 5.76 667 367 2298.18 535.82 69 . 10.50 668 368 2308.69 535.87 70 BP 12.10 669 369 2320.79 536.07 71 . 15.88 670 370 2336.67 535.80 72 . 17.18 671 371 2353.85 536.07 73 . 12.85 672 372 2366.70 535.98 74 . 4.19 673 373 2370.89 535.48 75 . 2.74 674 374 2373.63 534.89 76 TOE 2.14 675 375 2375.77 535.61 77 . 6.49 676 376 2382.26 535.59 78 . 2.23 677 377 2384.49 535.10 79 TOP CUT 0.42 678 378 2384.91 535.22 80 WL BACKCHANNEL 0.88 679 379 2385.79 534.19 81 TOE 1.42 680 380 2387.21 534.47 82 . 2.01 681 381 2389.22 534.59 83 . 3.29 682 382 2392.51 533.93 84 BCHAN AT 45 DEG. DUNCAN RIVER CROSS SECTION 34 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 24.05 683 383 2416.56 534.08 85 MID POINT 5.83 684 384 2422.39 534.01 86 TOE 0.67 685 385 2423.06 534.88 87 WL BACKCHANNEL 1.21 686 386 2424.27 535.38 88 TOP CUT (REF PT) 7.56 687 387 2431.83 535.33 89 TOE 2.36 688 388 2434.19 536.05 90 . 5.30 689 389 2439.49 536.21 91 TOE 0.83 690 390 2440.32 536.93 92 TOP 7.48 691 391 2447.80 536.90 93 TOP 1.90 692 392 2449.70 536.18 94 . 7.65 693 393 2457.35 535.83 95 . 6.39 694 394 2463.74 536.09 96 . 7.14 695 395 2470.88 535.72 97 TOP 3.29 696 396 2474.17 535.28 98 TOP CUT 0.48 697 397 2474.65 534.80 99 WL BACKCHANNEL 4.33 698 398 2478.98 533.62 100 . 9.68 699 399 2488.66 533.63 101 . 8.26 700 400 2496.92 534.16 102 . 1.68 701 401 2498.60 534.85 103 WL BACKCHANNEL 1.76 702 402 2500.36 534.80 104 TOE 2.99 703 403 2503.35 536.60 105 TOP FLAT BYOND JOIN 599-703 S60 03 19W 2503.346 DUNCAN RIVER CROSS SECTION 35 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 299 0.00 536.39 1 DUMMY 2000.00 600 300 2000.00 536.39 2 FLAT BEYOND 3.37 601 301 2003.37 534.61 3 . 1.09 602 302 2004.46 533.14 4 TOE 2.31 603 303 2006.77 532.75 5 . 2.90 604 304 2009.67 533.10 6 . 4.36 605 305 2014.03 533.75 7 TOE 0.56 606 306 2014.59 534.30 8 . 1.97 607 307 2016.56 535.09 9 TOP 2.85 608 308 2019.41 535.05 10 . 10.32 609 309 2029.73 535.01 11 . 9.31 610 310 2039.04 534.59 12 . 11.79 611 311 2050.83 534.17 13 TOP (XS REF PT) 1.86 612 312 2052.69 533.79 14 . 4.38 613 313 2057.07 533.56 15 . 8.54 614 314 2065.61 533.07 16 . 2.48 615 315 2068.09 533.29 17 . 8.48 616 316 2076.57 533.18 18 . 2.19 617 317 2078.76 533.49 19 . 11.11 618 318 2089.87 533.49 20 . 7.35 619 319 2097.22 533.92 21 . 5.85 620 320 2103.07 534.09 22 . 6.03 621 321 2109.10 534.13 23 . 14.65 622 322 2123.75 533.64 24 . 4.55 623 323 2128.30 533.52 25 . 4.45 624 324 2132.75 533.16 26 TOP BACKCHANNEL 0.81 625 325 2133.57 532.76 27 TOE 1.96 626 326 2135.53 532.47 28 . DUNCAN RIVER CROSS SECTION 35 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.68 627 327 2139.21 532.67 29 . 3.74 628 328 2142.94 532.98 30 . 2.88 629 329 2145.82 532.97 31 TOP BACKCHANNEL 0.43 630 330 2146.26 532.89 32 WL BACKCHANNEL 3.91 631 331 2150.17 532.55 33 . 3.26 632 332 2153.43 532.74 34 . 4.13 633 333 2157.56 532.55 35 . 5.94 634 334 2163.50 532.54 36 . 6.83 635 335 2170.33 532.87 37 WL BACKCHANNEL 0.43 636 336 2170.76 532.99 38 TOP BAR 10.20 637 337 2180.95 533.09 39 TOE 4.56 638 338 2185.51 533.44 40 . 9.50 639 339 2195.01 533.38 41 . 12.97 640 340 2207.98 533.39 42 . 9.25 641 341 2217.23 533.49 43 . 5.74 642 342 2222.98 533.10 44 . 7.87 643 343 2230.85 533.05 45 . 3.22 644 344 2234.07 532.86 46 TOP BANK 1.35 645 345 2235.42 532.56 47 W/L LB 2.55 646 346 2237.97 532.15 48 . 6.03 647 347 2244.01 532.10 49 . 7.72 648 348 2251.72 532.29 50 . 7.72 649 349 2259.44 532.09 51 . 5.59 650 350 2265.04 531.95 52 . 3.40 651 351 2268.44 531.84 53 . 5.81 652 352 2274.25 531.72 54 . 2.37 653 353 2276.61 532.01 55 TOE 1.99 654 354 2278.60 532.51 56 . DUNCAN RIVER CROSS SECTION 35 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.88 655 355 2279.48 532.62 57 WL ISLAND 1.48 656 356 2280.96 532.73 58 . 2.76 657 357 2283.72 533.23 59 TOP 12.76 658 358 2296.48 533.29 60 . 2.92 659 359 2299.39 533.46 61 . 9.08 660 360 2308.47 533.54 62 . 4.30 661 361 2312.77 533.84 63 . 7.99 662 362 2320.76 533.61 64 . 13.69 663 363 2334.46 533.49 65 . 2.41 664 364 2336.87 533.13 66 . 7.24 665 365 2344.11 533.45 67 . 6.09 666 366 2350.20 533.16 68 . 6.92 667 367 2357.12 533.29 69 . 4.78 668 368 2361.90 533.39 70 . 5.61 669 369 2367.51 533.20 71 WL ISLAND 5.48 670 370 2373.00 532.57 72 . 5.79 671 371 2378.79 532.53 73 . 4.83 672 372 2383.62 532.44 74 . 1.68 673 373 2385.31 532.18 75 BP 0.42 674 374 2385.73 532.18 76 BP 1.06 675 375 2386.79 531.98 77 BP 2.00 676 376 2388.79 531.88 78 BP 3.32 677 377 2392.11 531.68 79 BP 3.91 678 378 2396.02 531.58 80 BP 4.35 679 379 2400.37 531.48 81 BP 5.08 680 380 2405.46 531.38 82 BP 6.13 681 381 2411.58 531.28 83 BP 6.18 682 382 2417.76 531.28 84 BP DUNCAN RIVER CROSS SECTION 35 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6.75 683 383 2424.51 531.28 85 BP 6.79 684 384 2431.30 531.18 86 BP 6.89 685 385 2438.19 531.08 87 BP 4.82 686 386 2443.01 530.88 88 BP 3.93 687 387 2446.94 530.28 89 BP 3.03 688 388 2449.97 529.88 90 BP 4.34 689 389 2454.31 531.09 91 . 1.31 690 390 2455.63 531.70 92 . 1.17 691 391 2456.80 532.59 93 TOE 0.11 692 392 2456.91 533.18 94 W/L RB 0.85 693 393 2457.75 534.67 95 TOP BANK 0.83 694 394 2458.58 534.85 96 G/L BOLT RB 10.71 695 395 2469.29 534.85 97 . 11.82 696 396 2481.11 534.95 98 . 13.48 697 397 2494.59 535.09 99 FLAT BEYOND JOIN 599-697 S81 59 38W 2494.586 DUNCAN RIVER CROSS SECTION 35A PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 299 0.00 534.79 1 DUMMY 2000.00 600 300 2000.00 534.79 2 FLAT BEYOND 24.25 601 301 2024.25 534.89 3 REF PT LB 1.81 602 302 2026.06 534.95 4 TOP CUT 0.77 603 303 2026.82 532.27 5 TOE CUT 0.44 604 304 2027.26 531.81 6 W/L LB 1.01 605 305 2028.27 530.91 7 TOE 3.08 606 306 2031.35 530.31 8 . 3.21 607 307 2034.56 530.23 9 . 4.55 608 308 2039.11 530.20 10 . 4.45 609 309 2043.55 530.22 11 . 4.76 610 310 2048.32 530.33 12 . 6.11 611 311 2054.42 530.16 13 . 4.57 612 312 2059.00 530.30 14 TOE 0.99 613 313 2059.99 531.39 15 . 0.82 614 314 2060.81 531.82 16 WL AT TOE CUT 0.49 615 315 2061.30 533.20 17 TOP CUT 6.77 616 316 2068.07 533.27 18 TOE 3.60 617 317 2071.66 534.31 19 TOP 7.83 618 318 2079.50 534.49 20 FLAT BYND REF PT JOIN 599-618 S84 50 08W 2079.495 DUNCAN RIVER CROSS SECTION 36 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 299 0.00 541.30 1 DUMMY 2000.00 600 300 2000.00 541.30 2 FLAT BEYOND 29.74 601 301 2029.74 541.31 3 . 20.25 602 302 2049.98 541.49 4 TOP BENCH 5.01 603 303 2055.00 540.83 5 . (XS REF PT) 8.46 604 304 2063.46 541.06 6 TOP BANK 1.75 605 305 2065.20 540.33 7 . 2.94 606 306 2068.15 539.81 8 . 1.34 607 307 2069.48 539.37 9 TOE 4.97 608 308 2074.45 539.43 10 TOP CUT 0.61 609 309 2075.06 538.84 11 W/L LB 0.06 610 310 2075.12 538.46 12 TOE 0.67 611 311 2075.79 538.15 13 . 2.92 612 312 2078.71 538.00 14 . 1.15 613 313 2079.87 538.12 15 . 2.17 614 314 2082.04 538.21 16 . 3.26 615 315 2085.30 538.27 17 . 2.16 616 316 2087.47 538.80 18 TOP MUD BAR 1.67 617 317 2089.14 538.73 19 . 1.47 618 318 2090.61 538.46 20 . 1.08 619 319 2091.69 538.59 21 . 0.62 620 320 2092.31 538.83 22 WL BAR 0.76 621 321 2093.07 539.06 23 . 1.54 622 322 2094.60 539.37 24 TOP BAR 1.71 623 323 2096.31 539.38 25 TOP 3.13 624 324 2099.45 538.83 26 WL BACKCHANNEL 1.01 625 325 2100.46 538.52 27 . 1.95 626 326 2102.40 538.53 28 . DUNCAN RIVER CROSS SECTION 36 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.85 627 327 2103.25 538.82 29 W/L RB 0.98 628 328 2104.24 539.19 30 TOP BANK 5.09 629 329 2109.33 539.20 31 TOE ROAD 6.42 630 330 2115.75 542.49 32 TOP SHOULDER 2.10 631 331 2117.85 544.19 33 GL SPIKE 0.80 632 332 2118.65 544.27 34 EDGE PAVEMENT 6.78 633 333 2125.43 544.43 35 EDGE ROAD/HWY 2.10 634 334 2127.53 544.57 36 TOE 1.09 635 335 2128.62 546.09 37 STEEP RISE BYND JOIN 599-635 S69 46 15W 2128.625 DUNCAN RIVER CROSS SECTION 37 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 299 0.00 541.47 1 DUMMY 2000.00 600 300 2000.00 541.47 2 C/L ROAD 14.31 601 301 2014.31 541.16 3 C/L ROAD 19.41 602 302 2033.71 541.36 4 C/L ROAD 16.49 603 303 2050.21 541.75 5 C/L ROAD 12.09 604 304 2062.30 542.04 6 C/L ROAD 5.10 605 305 2067.39 542.06 7 CL END DECK 0.02 606 306 2067.41 541.56 8 TOP ABUTMENT 0.37 607 307 2067.78 541.55 9 TOP ABUTMENT 0.08 608 308 2067.87 541.05 10 TOE ABUTMENT 2.60 609 309 2070.46 540.65 11 TOP SEAT 0.63 610 310 2071.09 538.83 12 W/L LB 0.04 611 311 2071.14 537.95 13 . 1.94 612 312 2073.08 537.87 14 . 2.08 613 313 2075.16 537.73 15 . 1.64 614 314 2076.80 537.71 16 . 1.63 615 315 2078.43 537.49 17 . 1.62 616 316 2080.06 537.38 18 TOE 0.03 617 317 2080.09 538.84 19 W/L RB 0.51 618 318 2080.60 540.73 20 TOP SEAT 1.02 619 319 2081.62 540.75 21 TOE ABUTMENT 0.11 620 320 2081.73 541.40 22 TOP ABUTMENT 0.26 621 321 2081.99 541.41 23 TOP ABUTMENT 0.08 622 322 2082.08 541.90 24 CL END DECK 10.77 623 323 2092.85 542.53 25 EDGE ROAD/HWY 10.92 624 324 2103.77 543.00 26 EDGE PAVEMENT 8.11 625 325 2111.88 543.07 27 G/L SPIKE 2.17 626 326 2114.05 543.14 28 TOE STEEP DUNCAN RIVER CROSS SECTION 37 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.56 627 327 2114.61 544.30 29 STEEP RISE BYND JOIN 599-627 S60 43 37W 2114.478 DUNCAN RIVER CROSS SECTION 38 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 299 0.00 541.57 1 DUMMY 2000.00 600 300 2000.00 541.57 2 UNDULATING BYOND 3.82 601 301 2003.82 541.55 3 . 2.06 602 302 2005.88 540.97 4 . 2.30 603 303 2008.18 541.04 5 TOP BACKCHANNEL 1.43 604 304 2009.61 540.12 6 TOE 4.26 605 305 2013.87 539.64 7 . 1.37 606 306 2015.24 539.32 8 . 2.71 607 307 2017.95 539.53 9 . 1.36 608 308 2019.31 539.23 10 TOE 4.01 609 309 2023.31 538.93 11 TOE 1.85 610 310 2025.16 539.23 12 . 7.66 611 311 2032.82 539.17 13 TOE 1.66 612 312 2034.48 539.81 14 . 1.12 613 313 2035.59 540.69 15 TOP CUT 0.83 614 314 2036.43 541.15 16 . 3.58 615 315 2040.01 541.41 17 . 5.36 616 316 2045.37 541.40 18 . 7.77 617 317 2053.14 541.40 19 TOP BACKCHANNEL 0.87 618 318 2054.01 540.97 20 . 0.62 619 319 2054.63 540.06 21 TOE CUT 2.63 620 320 2057.26 539.23 22 . 2.93 621 321 2060.19 539.22 23 . 3.31 622 322 2063.50 539.47 24 . 2.87 623 323 2066.37 539.92 25 TOP 1.15 624 324 2067.52 539.41 26 . 2.27 625 325 2069.78 538.82 27 TOE 3.50 626 326 2073.28 538.87 28 . DUNCAN RIVER CROSS SECTION 38 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 4.08 627 327 2077.36 538.61 29 TOE 2.17 628 328 2079.53 539.81 30 . 1.96 629 329 2081.49 541.45 31 TOP 2.24 630 330 2083.73 541.36 32 . 1.49 631 331 2085.22 540.89 33 TOE 4.64 632 332 2089.86 540.94 34 TOE 1.52 633 333 2091.38 541.35 35 . 7.74 634 334 2099.12 541.70 36 TOP 1.16 635 335 2100.29 540.98 37 TOE 3.06 636 336 2103.35 540.44 38 . 8.42 637 337 2111.77 540.04 39 . 2.61 638 338 2114.38 540.19 40 TOP 4.91 639 339 2119.29 539.78 41 . 3.58 640 340 2122.87 539.68 42 TOE 2.12 641 341 2124.99 539.16 43 .(XS REF PT) 3.27 642 342 2128.26 539.57 44 TOP 1.72 643 343 2129.99 538.79 45 W/L LB 1.65 644 344 2131.63 538.53 46 TOE 3.73 645 345 2135.37 537.98 47 . 8.28 646 346 2143.64 537.79 48 . 12.51 647 347 2156.15 537.43 49 . 13.21 648 348 2169.36 537.64 50 . 11.78 649 349 2181.14 537.82 51 . 6.83 650 350 2187.97 537.91 52 . 4.73 651 351 2192.70 538.86 53 W/L RB 2.08 652 352 2194.79 539.52 54 TOE CUT 0.41 653 353 2195.19 540.88 55 TOP 2.79 654 354 2197.99 540.65 56 G/L BOLT RB DUNCAN RIVER CROSS SECTION 38 PROJECT 9413F036 OCT.1994 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.29 655 355 2201.27 540.39 57 FENCELINE 23.04 656 356 2224.31 540.52 58 . 24.90 657 357 2249.21 541.39 59 FLAT BEYOND JOIN 599-657 S39 29 07W 2249.214