THIS INFORMATION IS CONSIDERED HISTORICAL AS IT REPRESENTS CHANNEL CONDITIONS AND CONFIGURATION AT THE TIME OF THE SURVEY ONLY. USER MUST ACCEPT RESPONSIBILITY OF ENSURING THAT THE ACCURACY AND COMPLETENESS OF PROVIDED DATA IS SUITABLE FOR THE NEEDS OF THE PROJECT OR STUDY. IT IS PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND, WHETHER EXPRESS OR IMPLIED. UNDER NO CIRCUMSTANCES WILL THE GOVERNMENT OF BRITISH COLUMBIA BE LIABLE TO ANY PERSON OR BUSINESS ENTITY FOR ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR OTHER DAMAGES BASED ON ANY USE OF THIS INFORMATION. FRASER RIVER XS 1 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 661 261 0.00 470.39 1 DUMMY 2000.00 660 260 2000.00 470.39 2 . 14.51 659 259 2014.51 469.81 3 . 1.38 658 258 2015.89 468.79 4 . 7.09 657 257 2022.98 468.17 5 . 1.71 656 256 2024.69 468.79 6 . 12.34 655 255 2037.03 467.52 7 . 7.75 654 254 2044.77 467.89 8 . 3.02 653 253 2047.80 466.85 9 . 1.55 652 252 2049.34 466.73 10 . 1.22 651 251 2050.56 466.52 11 . 2.52 650 250 2053.08 466.47 12 . 2.91 649 249 2055.99 466.60 13 . 3.07 648 248 2059.06 466.13 14 . 15.90 647 247 2074.95 466.23 15 . 3.05 646 246 2078.00 465.93 16 . 2.48 645 245 2080.48 466.13 17 . 11.07 644 244 2091.55 466.27 18 . 8.44 643 243 2100.00 466.11 19 . 3.88 642 242 2103.88 465.93 20 . 8.60 641 241 2112.48 466.01 21 . 2.00 640 240 2114.48 466.51 22 . 7.18 639 239 2121.66 466.25 23 . 7.24 638 238 2128.91 466.61 24 . 6.06 637 237 2134.97 466.22 25 TOP 6.43 636 236 2141.40 465.13 26 NB 5.08 635 235 2146.48 464.57 27 . 13.74 634 234 2160.22 464.24 28 . FRASER RIVER XS 1 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 19.49 633 233 2179.70 463.85 29 GL BOLT LB 8.40 632 232 2188.10 463.34 30 . 7.97 631 231 2196.07 462.77 31 . 3.41 630 230 2199.47 462.52 32 WL LB 6.17 629 229 2205.65 462.25 33 FIX 517 6.16 628 228 2211.81 461.85 34 FIX 516 9.23 627 227 2221.04 461.65 35 FIX 515 8.30 626 226 2229.34 461.25 36 FIX 514 3.95 625 225 2233.29 460.85 37 SUND BP 2.96 624 224 2236.25 460.50 38 SUND BP 0.99 623 223 2237.24 460.65 39 SUND BP 2.96 622 222 2240.20 460.45 40 FIX 513 11.61 621 221 2251.82 459.85 41 FIX 512 17.18 620 220 2268.99 459.30 42 FIX 511 15.84 619 219 2284.83 458.75 43 FIX 510 14.55 618 218 2299.38 458.15 44 FIX 509 16.92 617 217 2316.30 457.45 45 FIX 508 17.94 616 216 2334.24 456.65 46 FIX 507 20.60 615 215 2354.84 455.85 47 FIX 506 2.08 614 214 2356.92 455.85 48 SUND BP 2.08 613 213 2359.00 455.85 49 SUND BP 16.63 612 212 2375.62 456.25 50 FIX 505 15.77 611 211 2391.39 457.50 51 FIX 504 13.02 610 210 2404.41 458.55 52 FIX 503 11.94 609 209 2416.35 459.75 53 FIX 502 10.65 608 208 2427.00 460.95 54 FIX 501 1.77 607 207 2428.77 461.50 55 SUND BP 1.57 606 206 2430.35 461.45 56 FIX 500 FRASER RIVER XS 1 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6.49 605 205 2436.84 461.99 57 .61 1.48 604 204 2438.32 462.18 58 .41 2.15 603 203 2440.47 462.57 59 WL RB 6.02 602 202 2446.49 464.24 60 NB 1.49 601 201 2447.97 464.74 61 GL BOLT RB 6.52 600 200 2454.50 468.98 62 ON SLOPE JOIN 661-600 S63 24 50W 2454.497 FRASER RIVER XS 2 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 199 0.00 472.01 1 DUMMY 2000.00 600 200 2000.00 472.01 2 CL OLD RD 8.79 601 201 2008.79 471.58 3 . 4.72 602 202 2013.51 471.24 4 . 7.83 603 203 2021.34 471.11 5 GL BOLT LB 1.14 604 204 2022.47 471.01 6 . 4.18 605 205 2026.65 470.24 7 TOP CUT BANK 2.39 606 206 2029.04 466.45 8 ON SLOPE 2.18 607 207 2031.22 464.94 9 NB 5.20 608 208 2036.42 462.83 10 WL LB 2.14 609 209 2038.56 462.49 11 .35 2.63 610 210 2041.19 462.20 12 .63 1.74 611 211 2042.93 462.04 13 .79 3.19 612 212 2046.13 462.20 14 FIX 500 2.38 613 213 2048.51 461.35 15 FIX 501 11.54 614 214 2060.05 459.15 16 FIX 502 17.96 615 215 2078.01 457.45 17 FIX 503 23.43 616 216 2101.44 458.05 18 FIX 504 6.75 617 217 2108.18 458.15 19 SUND BP 3.00 618 218 2111.18 458.05 20 SUND BP 8.25 619 219 2119.43 458.65 21 FIX 505 9.10 620 220 2128.52 458.65 22 SUND BP 11.12 621 221 2139.64 458.25 23 FIX 506 14.36 622 222 2154.00 458.25 24 SUND BP 8.08 623 223 2162.08 458.45 25 FIX 507 3.04 624 224 2165.12 458.35 26 SUND BP 12.16 625 225 2177.28 458.70 27 FIX 508 17.10 626 226 2194.38 459.35 28 FIX 509 FRASER RIVER XS 2 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 4.65 627 227 2199.02 459.55 29 SUND BP 7.55 628 228 2206.57 459.55 30 FIX 510 14.15 629 229 2220.73 459.45 31 FIX 511 2.21 630 230 2222.94 459.20 32 SUND BP 6.64 631 231 2229.58 459.15 33 SUND BP 2.21 632 232 2231.80 458.85 34 FIX 512 7.62 633 233 2239.41 458.20 35 SUND BP 6.93 634 234 2246.34 458.65 36 FIX 513 6.50 635 235 2252.84 459.90 37 SUND BP 5.77 636 236 2258.61 459.95 38 SUND BP 3.61 637 237 2262.22 460.25 39 FIX 514 5.72 638 238 2267.94 460.25 40 SUND BP 6.35 639 239 2274.29 460.65 41 FIX 515 3.42 640 240 2277.71 460.85 42 SUND BP 4.10 641 241 2281.81 460.95 43 FIX 516 3.07 642 242 2284.88 460.85 44 SUND BP 4.44 643 243 2289.32 461.35 45 FIX 517 4.19 644 244 2293.51 461.95 46 SUND BP 1.95 645 245 2295.46 462.05 47 FIX 518 1.27 646 246 2296.73 462.35 48 .72 0.97 647 247 2297.70 463.06 49 WL RB 1.51 648 248 2299.22 464.20 50 WASH LINE 1.10 649 249 2300.32 465.55 51 TOP BANK 2.46 650 250 2302.78 465.78 52 GL BOLT RB 3.31 651 251 2306.09 465.73 53 TOP 2.32 652 252 2308.41 464.50 54 . 2.98 653 253 2311.39 463.58 55 TOE 1.17 654 254 2312.56 463.45 56 CL FRASER RIVER XS 2 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.68 655 255 2314.24 463.64 57 TOE 2.40 656 256 2316.64 464.70 58 . 1.53 657 257 2318.18 464.94 59 . 2.26 658 258 2320.44 465.87 60 . 0.61 659 259 2321.04 466.41 61 TOP 4.43 660 260 2325.47 466.78 62 . 4.74 661 261 2330.21 466.96 63 . 5.02 662 262 2335.23 466.91 64 FIELD LEVEL JOIN 599-662 N84 23 35W 2335.228 FRASER RIVER XS 3 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 199 0.00 466.31 1 DUMMY 2000.00 600 200 2000.00 466.31 2 ON SLOPE 3.17 601 201 2003.17 463.50 3 WL LB 1.95 602 202 2005.12 462.44 4 FIX 500 0.57 603 203 2005.69 462.44 5 SUND BP 0.57 604 204 2006.26 461.64 6 FIX 501 2.81 605 205 2009.07 461.19 7 FIX 502 3.22 606 206 2012.29 460.34 8 SUND BP 4.64 607 207 2016.93 460.24 9 FIX 503 7.42 608 208 2024.35 460.24 10 FIX 504 6.51 609 209 2030.86 460.04 11 SUND BP 3.80 610 210 2034.66 460.19 12 FIX 505 2.53 611 211 2037.19 460.64 13 SUND BP 7.58 612 212 2044.77 460.74 14 SUND BP 3.79 613 213 2048.55 459.94 15 FIX 506 15.67 614 214 2064.23 459.24 16 FIX 507 4.32 615 215 2068.54 458.44 17 SUND BP 2.88 616 216 2071.42 459.04 18 SUND BP 3.60 617 217 2075.02 456.04 19 SUND BP 2.88 618 218 2077.90 456.14 20 FIX 508 4.49 619 219 2082.39 456.94 21 SUND BP 7.19 620 220 2089.58 456.34 22 SUND BP 5.39 621 221 2094.97 456.74 23 FIX 509 9.52 622 222 2104.49 457.54 24 SUND BP 9.52 623 223 2114.02 457.74 25 FIX 510 14.69 624 224 2128.71 458.74 26 FIX 511 15.39 625 225 2144.10 459.44 27 FIX 512 3.26 626 226 2147.36 459.69 28 SUND BP FRASER RIVER XS 3 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 7.06 627 227 2154.41 459.89 29 FIX 513 10.30 628 228 2164.72 460.34 30 FIX 514 12.84 629 229 2177.56 461.19 31 FIX 515 10.55 630 230 2188.11 462.14 32 FIX 516 5.99 631 231 2194.10 462.54 33 SUND BP 2.00 632 232 2196.10 462.64 34 FIX 517 6.60 633 233 2202.70 462.84 35 FIX 518 3.26 634 234 2205.96 462.89 36 .48 10.21 635 235 2216.17 463.37 37 WL RB 7.57 636 236 2223.74 463.71 38 GL BOLT RB 19.13 637 237 2242.86 464.32 39 BAR 17.57 638 238 2260.43 464.42 40 BAR 5.47 639 239 2265.90 464.26 41 . 4.70 640 240 2270.60 464.42 42 TOE 8.39 641 241 2278.99 465.47 43 . 4.76 642 242 2283.75 466.38 44 NB 3.00 643 243 2286.75 467.23 45 TOP BANK 2.01 644 244 2288.76 467.04 46 . 1.91 645 245 2290.68 467.41 47 . 5.58 646 246 2296.25 467.30 48 . 2.87 647 247 2299.12 467.40 49 TOE 4.37 648 248 2303.50 469.00 50 TOP 7.03 649 249 2310.53 467.17 51 TOE 18.89 650 250 2329.42 467.45 52 FIELD LEVEL JOIN 599-650 N82 03 32W 2329.424 FRASER RIVER XS 4 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 648 248 0.00 471.16 1 DUMMY 2000.00 647 247 2000.00 471.16 2 YARD LEVEL 9.37 646 246 2009.37 470.89 3 TOP BANK 5.69 645 245 2015.06 467.68 4 ON SLOPE 5.34 644 244 2020.40 465.76 5 NB 1.14 643 243 2021.54 465.51 6 GL BOLT LB 8.90 642 242 2030.44 463.87 7 WL LB 3.28 641 241 2033.72 463.23 8 FIX 518 0.94 640 240 2034.66 463.33 9 SUND BP 0.51 639 239 2035.17 463.03 10 FIX 517 0.96 638 238 2036.13 463.03 11 SUND BP 4.81 637 237 2040.94 462.73 12 SUND BP 2.88 636 236 2043.82 462.73 13 FIX 516 8.66 635 235 2052.48 462.53 14 SUND BP 3.79 634 234 2056.27 462.03 15 FIX 515 4.70 633 233 2060.97 461.23 16 SUND BP 6.58 632 232 2067.54 460.93 17 FIX 514 2.41 631 231 2069.95 460.88 18 SUND BP 3.62 630 230 2073.57 460.83 19 SUND BP 8.44 629 229 2082.00 460.28 20 FIX 513 13.96 628 228 2095.96 459.48 21 FIX 512 15.04 627 227 2111.00 458.53 22 FIX 511 12.62 626 226 2123.62 457.98 23 FIX 510 12.82 625 225 2136.44 457.78 24 FIX 509 8.16 624 224 2144.60 457.63 25 SUND BP 13.59 623 223 2158.19 457.73 26 FIX 508 18.48 622 222 2176.67 457.98 27 FIX 507 12.34 621 221 2189.01 457.93 28 SUND BP FRASER RIVER XS 4 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 13.29 620 220 2202.30 458.58 29 FIX 506 2.44 619 219 2204.74 458.73 30 SUND BP 9.14 618 218 2213.87 458.83 31 FIX 505 4.21 617 217 2218.09 458.78 32 SUND BP 6.09 616 216 2224.18 459.38 33 FIX 504 4.00 615 215 2228.18 459.68 34 FIX 503 0.75 614 214 2228.93 459.78 35 SUND BP 1.88 613 213 2230.81 460.03 36 SUND BP 5.64 612 212 2236.46 461.23 37 FIX 502 9.04 611 211 2245.50 462.33 38 FIX 501 0.25 610 210 2245.75 462.13 39 FIX 500 2.89 609 209 2248.64 462.99 40 .8 1.66 608 208 2250.29 463.81 41 WL RB 4.73 607 207 2255.02 466.03 42 SCOUR LINE 2.17 606 206 2257.19 468.19 43 ON SLOPE 2.09 605 205 2259.28 469.75 44 . 0.74 604 204 2260.01 471.37 45 TOP CUT BANK 8.88 603 203 2268.89 471.64 46 . 6.82 602 202 2275.71 471.47 47 GL BOLT RB 3.89 601 201 2279.60 471.45 48 . 4.51 600 200 2284.11 470.88 49 FIELD LEVEL JOIN 648-600 S35 22 40W 2284.114 FRASER RIVER XS 5 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 199 0.00 471.76 1 DUMMY 2000.00 600 200 2000.00 471.76 2 GL BOLT LB 4.64 601 201 2004.64 471.74 3 CL ROAD 4.94 602 202 2009.57 471.74 4 TOP BANK 4.01 603 203 2013.59 468.51 5 ON SLOPE 0.49 604 204 2014.08 467.50 6 . 1.58 605 205 2015.66 466.55 7 NB 2.55 606 206 2018.21 465.67 8 . 2.09 607 207 2020.30 464.78 9 WL LB 1.78 608 208 2022.09 464.23 10 .52 1.59 609 209 2023.68 463.93 11 FIX 500 0.83 610 210 2024.51 463.88 12 SUND BP 0.45 611 211 2024.95 463.63 13 FIX 501 4.53 612 212 2029.48 462.58 14 FIX 502 6.21 613 213 2035.69 461.23 15 FIX 503 3.88 614 214 2039.58 460.68 16 SUND BP 7.77 615 215 2047.34 460.08 17 FIX 504 7.35 616 216 2054.70 459.68 18 SUND BP 1.47 617 217 2056.17 459.43 19 SUND BP 1.96 618 218 2058.13 459.58 20 FIX 505 10.10 619 219 2068.23 459.48 21 FIX 506 10.76 620 220 2078.99 459.78 22 FIX 507 9.14 621 221 2088.13 459.93 23 FIX 508 8.80 622 222 2096.93 460.08 24 FIX 509 3.99 623 223 2100.92 459.88 25 SUND BP 7.41 624 224 2108.33 459.88 26 FIX 510 5.46 625 225 2113.79 459.88 27 SUND BP 6.67 626 226 2120.46 460.08 28 FIX 511 FRASER RIVER XS 5 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 13.14 627 227 2133.60 460.58 29 FIX 512 14.88 628 228 2148.48 461.18 30 FIX 513 19.22 629 229 2167.71 461.53 31 FIX 514 14.61 630 230 2182.32 461.78 32 SUND BP 5.68 631 231 2188.00 461.73 33 FIX 515 15.07 632 232 2203.07 461.63 34 FIX 516 15.24 633 233 2218.31 461.33 35 FIX 517 13.07 634 234 2231.39 460.83 36 FIX 518 2.98 635 235 2234.37 460.78 37 SUND BP 7.95 636 236 2242.32 461.58 38 FIX 519 10.75 637 237 2253.07 463.18 39 FIX 520 4.64 638 238 2257.71 464.23 40 FIX 521 0.68 639 239 2258.39 464.28 41 FIX 522 2.31 640 240 2260.69 464.52 42 .27 1.35 641 241 2262.04 464.79 43 WL RB 4.17 642 242 2266.21 465.87 44 . 2.93 643 243 2269.15 466.88 45 SCOUR LINE 0.48 644 244 2269.63 467.77 46 TOP CUT BANK 3.40 645 245 2273.03 468.76 47 . 1.58 646 246 2274.60 469.71 48 TOP BANK 1.04 647 247 2275.64 469.87 49 GL BOLT RB 11.12 648 248 2286.76 469.83 50 FIELD LEVEL 12.42 649 249 2299.18 469.71 51 CL DIRT ROAD 31.14 650 250 2330.32 469.61 52 EDGE BUSH JOIN 599-650 S37 32 46W 2330.320 FRASER RIVER XS 6 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 199 0.00 475.82 1 DUMMY 2000.00 600 200 2000.00 475.82 2 CL TRACKS 1.69 601 201 2001.69 475.87 3 TOP BALLAST 1.44 602 202 2003.14 475.27 4 TOE BALLAST 3.37 603 203 2006.50 475.12 5 GL BOLT LB 1.41 604 204 2007.91 474.97 6 . 5.28 605 205 2013.19 473.44 7 EDGE DIRT ROAD 2.54 606 206 2015.73 473.42 8 EDGE DIRT ROAD 9.08 607 207 2024.81 473.56 9 . 19.29 608 208 2044.10 474.41 10 . 13.37 609 209 2057.47 474.59 11 . 8.24 610 210 2065.71 474.37 12 . 4.75 611 211 2070.46 473.68 13 . 4.17 612 212 2074.63 472.42 14 . 9.56 613 213 2084.19 471.78 15 TOP BANK 3.01 614 214 2087.20 469.05 16 . 2.24 615 215 2089.44 467.65 17 TOE 5.28 616 216 2094.72 467.42 18 . 7.23 617 217 2101.95 467.50 19 TOP 0.93 618 218 2102.88 466.70 20 SCOUR LINE 4.47 619 219 2107.35 465.03 21 WL LB 1.47 620 220 2108.82 464.38 22 .65 0.88 621 221 2109.70 464.10 23 .92 0.26 622 222 2109.96 464.18 24 FIX 500 2.32 623 223 2112.28 463.63 25 FIX 501 5.26 624 224 2117.53 462.63 26 FIX 502 2.36 625 225 2119.89 462.48 27 SUND BP 7.54 626 226 2127.43 462.53 28 FIX 503 FRASER RIVER XS 6 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 15.44 627 227 2142.87 462.23 29 FIX 504 17.93 628 228 2160.80 461.68 30 FIX 505 10.06 629 229 2170.86 461.53 31 SUND BP 6.71 630 230 2177.56 460.73 32 FIX 506 4.60 631 231 2182.17 460.58 33 SUND BP 3.68 632 232 2185.85 461.08 34 SUND BP 10.12 633 233 2195.97 460.83 35 FIX 507 20.10 634 234 2216.07 460.43 36 FIX 508 23.88 635 235 2239.96 459.63 37 FIX 509 13.54 636 236 2253.49 458.88 38 FIX 510 11.52 637 237 2265.01 458.13 39 SUND BP 5.38 638 238 2270.39 459.03 40 FIX 511 1.75 639 239 2272.14 458.98 41 SUND BP 10.49 640 240 2282.62 461.13 42 FIX 512 3.61 641 241 2286.24 461.23 43 SUND BP 3.61 642 242 2289.85 460.63 44 SUND BP 2.41 643 243 2292.26 460.58 45 SUND BP 3.61 644 244 2295.87 460.13 46 FIX 513 9.99 645 245 2305.85 459.13 47 FIX 514 5.81 646 246 2311.66 458.63 48 SUND BP 2.07 647 247 2313.74 458.63 49 FIX 515 8.63 648 248 2322.37 460.13 50 FIX 516 8.12 649 249 2330.49 461.98 51 FIX 517 1.78 650 250 2332.27 462.93 52 SUND BP 2.18 651 251 2334.44 463.63 53 FIX 518 0.85 652 252 2335.30 464.19 54 1.05 3.31 653 253 2338.61 465.23 55 WL RB 1.45 654 254 2340.06 465.85 56 . FRASER RIVER XS 6 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.74 655 255 2341.80 466.29 57 GL BOLT RB 2.23 656 256 2344.03 467.55 58 NB 1.13 657 257 2345.16 468.29 59 ON SLOPE 2.27 658 258 2347.43 471.47 60 ON SLOPE JOIN 599-658 S78 01 29W 2347.426 FRASER RIVER XS 7 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 673 273 0.00 475.99 1 DUMMY 2000.00 672 272 2000.00 475.99 2 CL TRACKS 1.69 671 271 2001.69 476.03 3 TOP BALLAST 1.09 670 270 2002.78 475.61 4 TOE BALLAST 1.73 669 269 2004.50 475.37 5 GL BOLT LB 1.78 668 268 2006.28 475.30 6 TOP BANK 2.43 667 267 2008.72 473.40 7 ON SLOPE 5.14 666 266 2013.86 468.97 8 TOP RIP RAP 1.84 665 265 2015.70 467.82 9 TOE 5.52 664 264 2021.22 465.45 10 WL LB 2.61 663 263 2023.83 464.99 11 FIX 521 3.16 662 262 2026.99 463.64 12 FIX 520 1.76 661 261 2028.75 463.34 13 SUND BP 2.15 660 260 2030.90 462.59 14 FIX 519 1.85 659 259 2032.74 461.99 15 SUND BP 2.00 658 258 2034.74 461.99 16 FIX 518 1.16 657 257 2035.90 461.99 17 SUND BP 6.38 656 256 2042.28 460.04 18 FIX 517 2.74 655 255 2045.02 459.44 19 SUND BP 2.99 654 254 2048.01 459.19 20 FIX 516 8.19 653 253 2056.20 459.24 21 FIX 515 4.10 652 252 2060.30 459.19 22 SUND BP 4.10 651 251 2064.40 459.44 23 FIX 514 8.20 650 250 2072.61 459.44 24 FIX 513 4.64 649 249 2077.24 459.39 25 SUND BP 3.79 648 248 2081.03 459.59 26 FIX 512 1.84 647 247 2082.88 459.79 27 SUND BP 10.14 646 246 2093.02 460.09 28 FIX 511 FRASER RIVER XS 7 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 8.33 645 245 2101.36 460.59 29 FIX 510 10.36 644 244 2111.71 461.04 30 FIX 509 13.37 643 243 2125.08 461.49 31 FIX 508 9.53 642 242 2134.61 461.79 32 SUND BP 2.98 641 241 2137.59 461.79 33 FIX 507 11.39 640 240 2148.97 461.79 34 FIX 506 5.86 639 239 2154.84 461.79 35 SUND BP 5.86 638 238 2160.70 462.14 36 FIX 505 3.33 637 237 2164.04 462.14 37 SUND BP 9.44 636 236 2173.48 462.44 38 FIX 504 15.07 635 235 2188.55 462.54 39 FIX 503 8.97 634 234 2197.52 462.94 40 FIX 502 7.07 633 233 2204.59 463.49 41 FIX 501 3.18 632 232 2207.77 463.94 42 SUND BP 1.59 631 231 2209.36 463.99 43 FIX 500 12.03 630 230 2221.39 464.92 44 .65 4.15 629 229 2225.55 465.19 45 .4 5.51 628 228 2231.05 465.23 46 .34 4.00 627 227 2235.05 465.44 47 .11 8.73 626 226 2243.78 465.54 48 WL RB 4.11 625 225 2247.89 465.65 49 . 13.99 624 224 2261.88 465.70 50 . 8.40 623 223 2270.29 465.43 51 . 8.27 622 222 2278.56 465.38 52 . 3.35 621 221 2281.91 465.83 53 . 7.73 620 220 2289.63 465.65 54 . 7.15 619 219 2296.79 465.69 55 . 8.66 618 218 2305.45 465.41 56 . FRASER RIVER XS 7 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6.24 617 217 2311.69 465.90 57 . 5.33 616 216 2317.02 465.70 58 TOE 6.19 615 215 2323.21 466.97 59 . 3.98 614 214 2327.19 467.26 60 . 2.05 613 213 2329.24 467.46 61 TRASH NB 3.71 612 212 2332.95 467.88 62 . 5.15 611 211 2338.10 468.68 63 TOE 3.34 610 210 2341.45 470.51 64 TOP BANK 11.11 609 209 2352.56 471.72 65 . 3.46 608 208 2356.02 471.60 66 . 6.69 607 207 2362.71 471.42 67 . 3.42 606 206 2366.12 472.00 68 GL BOLT RB 2.27 605 205 2368.39 472.13 69 CL DIRT ROAD 9.19 604 204 2377.58 472.11 70 TOP 6.84 603 203 2384.42 471.11 71 . 15.15 602 202 2399.57 471.00 72 TOE 4.28 601 201 2403.85 472.44 73 TOP 9.22 600 200 2413.07 472.69 74 FIELD LEVEL JOIN 673-600 N54 34 05W 2413.074 FRASER RIVER XS 8 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 199 0.00 476.32 1 DUMMY 2000.00 600 200 2000.00 476.32 2 CL TRACKS 1.65 601 201 2001.65 476.33 3 TOP BALLAST 1.76 602 202 2003.41 475.48 4 TOE BALLAST 1.99 603 203 2005.40 475.23 5 GL BOLT LB 1.55 604 204 2006.95 475.04 6 TOP 1.75 605 205 2008.70 474.12 7 . 1.26 606 206 2009.97 473.98 8 . 4.05 607 207 2014.01 472.19 9 TOP RIP RAP 7.18 608 208 2021.19 469.33 10 TOE RIP RAP 3.95 609 209 2025.14 468.89 11 . 5.51 610 210 2030.65 468.98 12 NB 4.94 611 211 2035.60 468.62 13 TRASH LINE 3.03 612 212 2038.63 468.03 14 TOP RIP RAP 4.59 613 213 2043.22 465.96 15 WL LB 1.63 614 214 2044.84 465.33 16 .65 1.56 615 215 2046.40 464.73 17 FIX 500 0.40 616 216 2046.80 464.73 18 SUND BP 0.72 617 217 2047.52 464.13 19 FIX 501 2.65 618 218 2050.18 463.03 20 FIX 502 2.93 619 219 2053.11 463.08 21 SUND BP 3.26 620 220 2056.36 462.98 22 FIX 503 7.33 621 221 2063.69 462.78 23 FIX 504 10.12 622 222 2073.81 462.28 24 FIX 505 12.67 623 223 2086.48 461.88 25 FIX 506 12.28 624 224 2098.76 461.63 26 FIX 507 10.88 625 225 2109.64 461.48 27 FIX 508 12.09 626 226 2121.73 461.08 28 FIX 509 FRASER RIVER XS 8 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 5.17 627 227 2126.91 461.03 29 SUND BP 5.17 628 228 2132.08 461.13 30 FIX 510 11.88 629 229 2143.96 461.58 31 FIX 511 12.48 630 230 2156.44 461.73 32 FIX 512 10.71 631 231 2167.15 461.73 33 FIX 513 6.52 632 232 2173.67 461.53 34 SUND BP 4.74 633 233 2178.41 461.63 35 FIX 514 10.70 634 234 2189.11 461.93 36 FIX 515 11.06 635 235 2200.17 462.13 37 FIX 516 12.33 636 236 2212.50 462.23 38 FIX 517 11.64 637 237 2224.15 462.33 39 FIX 518 9.96 638 238 2234.11 462.58 40 FIX 519 3.63 639 239 2237.73 462.58 41 SUND BP 6.73 640 240 2244.47 463.28 42 FIX 520 3.82 641 241 2248.29 463.53 43 SUND BP 7.17 642 242 2255.46 463.53 44 FIX 521 4.77 643 243 2260.24 463.53 45 SUND BP 4.38 644 244 2264.61 463.63 46 FIX 522 7.25 645 245 2271.86 464.18 47 FIX 523 5.95 646 246 2277.82 464.78 48 FIX 524 2.68 647 247 2280.49 465.23 49 FIX 525 4.15 648 248 2284.65 466.00 50 WL RB 5.26 649 249 2289.90 466.57 51 GRASS LINE 4.84 650 250 2294.75 467.16 52 BUSH LINE 9.71 651 251 2304.45 467.36 53 . 3.91 652 252 2308.36 467.48 54 . 2.09 653 253 2310.46 467.87 55 TRASH LINE 3.90 654 254 2314.36 468.35 56 NB FRASER RIVER XS 8 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 8.07 655 255 2322.42 468.91 57 . 8.83 656 256 2331.26 469.82 58 TOE 2.66 657 257 2333.92 470.80 59 TOP 2.20 658 258 2336.12 471.23 60 GL BOLT RB 4.54 659 259 2340.66 471.31 61 . 9.94 660 260 2350.60 471.49 62 END CONC ROAD 35.98 661 261 2386.58 471.86 63 ROAD INTERSECT JOIN 599-661 N53 40 35W 2386.576 FRASER RIVER XS 9 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 199 0.00 473.21 1 DUMMY 2000.00 600 200 2000.00 473.21 2 FIELD LEVEL 6.36 601 201 2006.36 472.79 3 . 7.03 602 202 2013.39 472.27 4 . 4.78 603 203 2018.17 472.27 5 GL BOLT LB 2.53 604 204 2020.70 472.21 6 TOP BANK 2.71 605 205 2023.40 470.64 7 RIP RAP SLOPE 4.14 606 206 2027.54 467.89 8 ON SLOPE 1.54 607 207 2029.09 466.51 9 WL LB 1.30 608 208 2030.39 465.54 10 .95 0.72 609 209 2031.11 465.51 11 FIX 500 3.06 610 210 2034.17 464.11 12 FIX 501 6.73 611 211 2040.90 463.16 13 SUND BP 1.35 612 212 2042.24 463.21 14 FIX 502 5.75 613 213 2047.99 463.11 15 SUND BP 8.30 614 214 2056.29 463.31 16 FIX 503 12.85 615 215 2069.14 463.36 17 FIX 504 6.25 616 216 2075.39 464.01 18 SUND BP 6.25 617 217 2081.64 465.01 19 FIX 505 7.64 618 218 2089.28 465.96 20 FIX 506 4.98 619 219 2094.26 465.81 21 SUND BP 3.32 620 220 2097.58 465.46 22 FIX 507 9.72 621 221 2107.30 463.51 23 FIX 508 1.92 622 222 2109.22 463.31 24 SUND BP 3.36 623 223 2112.57 463.46 25 SUND BP 5.27 624 224 2117.85 463.51 26 FIX 509 6.53 625 225 2124.38 463.46 27 SUND BP 7.13 626 226 2131.51 463.11 28 FIX 510 FRASER RIVER XS 9 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 15.30 627 227 2146.81 462.61 29 FIX 511 5.88 628 228 2152.68 462.81 30 SUND BP 5.88 629 229 2158.56 462.41 31 FIX 512 11.30 630 230 2169.86 461.81 32 SUND BP 6.46 631 231 2176.32 461.76 33 FIX 513 16.24 632 232 2192.55 461.76 34 FIX 514 13.38 633 233 2205.94 461.81 35 FIX 515 10.71 634 234 2216.64 461.86 36 FIX 516 13.22 635 235 2229.86 462.01 37 FIX 517 13.51 636 236 2243.38 462.66 38 FIX 518 10.68 637 237 2254.06 463.16 39 FIX 519 9.55 638 238 2263.60 463.71 40 FIX 520 8.70 639 239 2272.30 464.36 41 FIX 521 8.40 640 240 2280.70 464.86 42 FIX 522 8.33 641 241 2289.03 465.26 43 FIX 523 7.88 642 242 2296.91 465.71 44 FIX 524 4.20 643 243 2301.11 465.96 45 FIX 525 3.59 644 244 2304.70 466.15 46 .34 8.86 645 245 2313.55 466.50 47 WL RB 19.08 646 246 2332.63 467.13 48 BAR 23.83 647 247 2356.47 467.64 49 BAR 8.49 648 248 2364.96 467.71 50 BAR 10.36 649 249 2375.32 467.42 51 BAR 13.04 650 250 2388.36 467.21 52 BAR 7.14 651 251 2395.50 467.58 53 BAR 6.64 652 252 2402.14 467.59 54 . 9.81 653 253 2411.95 468.03 55 . 5.26 654 254 2417.20 468.25 56 CL DIRT ROAD FRASER RIVER XS 9 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.51 655 255 2419.71 468.17 57 TOE 2.67 656 256 2422.39 468.74 58 NB 2.45 657 257 2424.84 469.04 59 . 9.38 658 258 2434.21 469.27 60 . 5.59 659 259 2439.81 469.88 61 . 7.68 660 260 2447.49 469.89 62 EDGE ROAD 9.81 661 261 2457.30 470.01 63 . 11.05 662 262 2468.35 470.20 64 TOE 3.20 663 263 2471.54 472.20 65 TOP 5.73 664 264 2477.27 472.14 66 GL BOLT RB 10.40 665 265 2487.67 472.27 67 FIELD JOIN 599-665 N56 07 07W 2487.667 FRASER RIVER XS 10 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 666 266 0.00 479.05 1 DUMMY 2000.00 665 265 2000.00 479.05 2 GL BOLT LB 15.53 664 264 2015.53 473.28 3 ON SLOPE 2.53 663 263 2018.06 471.94 4 EDGE ROAD 14.39 662 262 2032.45 471.88 5 EDGE ROAD 5.75 661 261 2038.20 471.84 6 CL SIDEWALK 3.64 660 260 2041.84 471.60 7 OPP COR RECORD 2.05 659 259 2043.89 471.47 8 TOP BANK 4.31 658 258 2048.20 468.93 9 TOE RIP RAP 3.48 657 257 2051.69 468.30 10 NB 3.71 656 256 2055.40 467.61 11 . 1.75 655 255 2057.15 467.03 12 WL LB 1.04 654 254 2058.19 465.85 13 1.18 1.35 653 253 2059.54 466.06 14 FIX 524 0.90 652 252 2060.44 465.46 15 SUND BP 1.79 651 251 2062.23 465.06 16 SUND BP 1.12 650 250 2063.35 465.36 17 SUND BP 0.90 649 249 2064.25 465.26 18 FIX 523 3.75 648 248 2067.99 465.16 19 SUND BP 3.75 647 247 2071.74 464.46 20 FIX 522 3.89 646 246 2075.63 464.71 21 SUND BP 3.02 645 245 2078.65 464.71 22 SUND BP 2.59 644 244 2081.24 464.36 23 FIX 521 8.32 643 243 2089.56 464.21 24 SUND BP 9.01 642 242 2098.57 463.16 25 FIX 520 2.92 641 241 2101.49 463.06 26 SUND BP 5.83 640 240 2107.32 463.06 27 SUND BP 5.83 639 239 2113.16 463.26 28 FIX 519 FRASER RIVER XS 10 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 5.52 638 238 2118.68 463.46 29 SUND BP 8.68 637 237 2127.35 463.46 30 SUND BP 7.10 636 236 2134.45 463.36 31 FIX 518 4.34 635 235 2138.80 463.46 32 SUND BP 14.48 634 234 2153.28 463.21 33 FIX 517 7.74 633 233 2161.01 462.96 34 SUND BP 8.38 632 232 2169.39 462.91 35 FIX 516 14.39 631 231 2183.78 462.91 36 FIX 515 12.13 630 230 2195.91 462.96 37 FIX 514 8.26 629 229 2204.17 463.06 38 SUND BP 5.72 628 228 2209.89 463.41 39 FIX 513 6.18 627 227 2216.07 463.71 40 SUND BP 4.75 626 226 2220.82 463.66 41 FIX 512 11.10 625 225 2231.92 463.71 42 FIX 511 11.21 624 224 2243.13 463.76 43 FIX 510 9.18 623 223 2252.31 463.86 44 FIX 509 9.21 622 222 2261.52 463.96 45 FIX 508 6.67 621 221 2268.19 464.16 46 SUND BP 4.11 620 220 2272.30 464.46 47 FIX 507 6.28 619 219 2278.58 465.11 48 SUND BP 2.69 618 218 2281.27 465.21 49 FIX 506 6.98 617 217 2288.25 465.21 50 FIX 505 6.02 616 216 2294.27 465.46 51 FIX 504 5.52 615 215 2299.78 465.61 52 FIX 503 5.19 614 214 2304.97 465.96 53 FIX 502 2.90 613 213 2307.86 466.06 54 FIX 501 0.78 612 212 2308.64 466.16 55 FIX 500 3.09 611 211 2311.73 466.21 56 .72 FRASER RIVER XS 10 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.88 610 210 2313.61 466.34 57 .6 3.22 609 209 2316.83 466.48 58 .45 6.08 608 208 2322.91 466.66 59 .28 4.90 607 207 2327.81 466.91 60 WL RB 2.12 606 206 2329.93 467.22 61 TOE RIP RAP 1.58 605 205 2331.51 468.02 62 NB 3.61 604 204 2335.12 470.14 63 TOP RIP RAP 1.52 603 203 2336.64 470.89 64 TOP BANK 1.91 602 202 2338.55 471.24 65 GL BOLT RB 1.63 601 201 2340.18 471.32 66 EDGE ROAD 8.53 600 200 2348.71 471.24 67 CL ROAD JOIN 666-600 S81 10 11W 2348.708 FRASER RIVER XS 11 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 680 280 0.00 478.67 1 DUMMY 2000.00 679 279 2000.00 478.67 2 EDGE ROAD 12.63 678 278 2012.63 479.05 3 GL BOLT LB 3.32 677 277 2015.96 479.00 4 TOE ABUT 0.17 676 276 2016.13 479.52 5 TOP ABUT 0.23 675 275 2016.36 479.53 6 TOP ABUT 0.03 674 274 2016.39 478.80 7 TOE ABUT 11.08 673 273 2027.46 473.82 8 ON SLOPE 3.23 672 272 2030.69 472.03 9 TOE 15.43 671 271 2046.12 471.90 10 EDGE ROAD 6.74 670 270 2052.86 471.71 11 OPP CL PIER 1.54 669 269 2054.40 471.72 12 EDGE SIDEWALK 5.42 668 268 2059.82 471.50 13 . 1.53 667 267 2061.35 471.32 14 TOP RIP RAP 3.92 666 266 2065.27 469.25 15 . 3.35 665 265 2068.62 467.01 16 WL LB 1.19 664 264 2069.81 466.55 17 .47 1.12 663 263 2070.92 465.52 18 1.49 3.47 662 262 2074.40 464.73 19 FIX 531 6.22 661 261 2080.61 464.63 20 FIX 530 3.68 660 260 2084.29 464.63 21 SUND BP 1.96 659 259 2086.25 464.43 22 FIX 529 6.30 658 258 2092.56 463.53 23 FIX 528 3.15 657 257 2095.71 463.83 24 FIX 527 3.24 656 256 2098.95 463.78 25 SUND BP 1.08 655 255 2100.03 464.18 26 SUND BP 3.24 654 254 2103.27 464.13 27 SUND BP 2.88 653 253 2106.16 463.58 28 FIX 526 FRASER RIVER XS 11 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 5.13 652 252 2111.29 462.98 29 SUND BP 8.98 651 251 2120.28 463.08 30 FIX 525 8.78 650 250 2129.06 463.38 31 SUND BP 4.65 649 249 2133.71 463.18 32 FIX 524 10.92 648 248 2144.63 463.23 33 FIX 523 6.47 647 247 2151.11 463.08 34 FIX 522 7.05 646 246 2158.16 463.18 35 FIX 521 7.81 645 245 2165.97 463.23 36 FIX 520 11.36 644 244 2177.33 463.03 37 FIX 519 12.69 643 243 2190.03 462.98 38 FIX 518 11.18 642 242 2201.21 463.13 39 FIX 517 9.41 641 241 2210.61 463.18 40 FIX 516 7.47 640 240 2218.08 463.18 41 FIX 515 2.84 639 239 2220.92 463.18 42 SUND BP 2.66 638 238 2223.58 463.18 43 SUND BP 0.89 637 237 2224.47 462.98 44 FIX 514 5.36 636 236 2229.83 463.33 45 FIX 513 5.11 635 235 2234.95 463.48 46 FIX 512 6.46 634 234 2241.40 463.73 47 FIX 511 9.44 633 233 2250.84 463.88 48 FIX 510 8.21 632 232 2259.05 463.93 49 FIX 509 11.62 631 231 2270.68 463.98 50 FIX 508 9.24 630 230 2279.92 464.18 51 FIX 507 3.94 629 229 2283.86 464.28 52 SUND BP 2.51 628 228 2286.37 464.08 53 SUND BP 2.87 627 227 2289.24 464.08 54 FIX 506 2.60 626 226 2291.84 464.28 55 FIX 505 6.25 625 225 2298.09 464.58 56 FIX 504 FRASER RIVER XS 11 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6.59 624 224 2304.68 464.93 57 FIX 503 8.83 623 223 2313.51 465.58 58 FIX 502 2.71 622 222 2316.21 465.98 59 SUND BP 2.22 621 221 2318.43 466.18 60 FIX 501 1.91 620 220 2320.34 466.18 61 FIX 500 2.58 619 219 2322.92 466.28 62 .7 2.23 618 218 2325.15 466.64 63 .33 1.67 617 217 2326.82 466.83 64 .15 4.18 616 216 2331.00 466.96 65 WL RB 1.24 615 215 2332.24 467.34 66 . 1.58 614 214 2333.82 468.22 67 NB 2.03 613 213 2335.85 469.58 68 TOP RIP RAP 2.09 612 212 2337.94 470.35 69 TOP BANK 1.64 611 211 2339.58 470.50 70 EDGE ROAD 10.92 610 210 2350.51 470.20 71 EDGE ROAD 11.41 609 209 2361.92 473.02 72 EDGE SIDEWALK 3.66 608 208 2365.58 474.87 73 INSD COR BRG 4.29 607 207 2369.87 476.63 74 TOE ABUT 0.18 606 206 2370.05 477.39 75 TOP ABUT 0.24 605 205 2370.29 477.37 76 TOP ABUT 0.08 604 204 2370.37 477.12 77 GSC 82C293 RB 0.02 603 203 2370.38 476.97 78 TOE ABUT AT GSC 4.02 602 202 2374.40 477.15 79 . 10.15 601 201 2384.55 476.77 80 . 7.84 600 200 2392.39 476.28 81 EDGE ROAD JOIN 680-600 N89 50 33W 2392.392 FRASER RIVER XS 12 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 199 0.00 478.65 1 DUMMY 2000.00 600 200 2000.00 478.65 2 EDGE ROAD 17.96 601 201 2017.96 479.20 3 GL BOLT LB 2.88 602 202 2020.84 479.31 4 TOE ABUT 0.04 603 203 2020.88 479.52 5 TOP ABUT 0.28 604 204 2021.16 479.53 6 TOP ABUT 0.13 605 205 2021.28 478.86 7 TOE ABUT 4.18 606 206 2025.46 477.06 8 EDGE ABUT 4.87 607 207 2030.33 474.66 9 ON SLOPE 5.82 608 208 2036.14 472.43 10 TOE 1.21 609 209 2037.36 472.42 11 EDGE ROAD 14.11 610 210 2051.47 472.15 12 EDGE ROAD 6.32 611 211 2057.79 471.87 13 CL PIER 8.05 612 212 2065.84 471.56 14 CL SIDEWALK 3.64 613 213 2069.48 471.31 15 TOP 5.68 614 214 2075.16 468.02 16 NB 3.69 615 215 2078.85 467.02 17 WL LB 0.77 616 216 2079.63 466.43 18 .72 2.68 617 217 2082.30 465.50 19 FIX 500 0.91 618 218 2083.22 465.55 20 SUND BP 0.91 619 219 2084.13 465.45 21 SUND BP 0.57 620 220 2084.70 465.10 22 FIX 501 1.28 621 221 2085.98 464.70 23 SUND BP 1.28 622 222 2087.26 464.70 24 SUND BP 2.30 623 223 2089.56 465.40 25 FIX 502 2.93 624 224 2092.49 465.50 26 SUND BP 2.34 625 225 2094.83 465.20 27 FIX 503 7.23 626 226 2102.06 464.30 28 FIX 504 FRASER RIVER XS 12 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 10.85 627 227 2112.91 463.20 29 SUND BP 2.71 628 228 2115.62 463.10 30 FIX 505 9.78 629 229 2125.40 463.15 31 FIX 506 8.60 630 230 2134.00 463.30 32 FIX 507 10.43 631 231 2144.44 463.40 33 SUND BP 2.20 632 232 2146.63 463.30 34 FIX 508 10.18 633 233 2156.81 463.40 35 FIX 509 0.88 634 234 2157.69 463.30 36 SUND BP 0.88 635 235 2158.57 463.50 37 SUND BP 0.59 636 236 2159.16 463.35 38 SUND BP 0.20 637 237 2159.36 463.30 39 FIX 510 2.52 638 238 2161.87 463.45 40 FIX 511 5.32 639 239 2167.19 463.50 41 FIX 512 8.47 640 240 2175.66 463.30 42 FIX 513 10.12 641 241 2185.78 463.00 43 FIX 514 12.00 642 242 2197.77 462.95 44 FIX 515 12.42 643 243 2210.19 463.10 45 FIX 516 11.19 644 244 2221.38 463.20 46 FIX 517 9.82 645 245 2231.20 463.50 47 FIX 518 1.77 646 246 2232.97 463.75 48 SUND BP 0.59 647 247 2233.56 463.70 49 SUND BP 1.06 648 248 2234.62 463.75 50 FIX 519 9.34 649 249 2243.96 463.70 51 FIX 520 8.75 650 250 2252.71 463.80 52 FIX 521 13.78 651 251 2266.49 463.85 53 FIX 522 14.27 652 252 2280.76 464.00 54 FIX 523 5.07 653 253 2285.83 464.10 55 SUND BP 5.07 654 254 2290.90 464.55 56 FIX 524 FRASER RIVER XS 12 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 5.13 655 255 2296.03 464.90 57 FIX 525 2.53 656 256 2298.56 464.80 58 SUND BP 4.50 657 257 2303.05 464.90 59 FIX 526 8.26 658 258 2311.31 464.90 60 FIX 527 6.20 659 259 2317.51 465.30 61 FIX 528 2.72 660 260 2320.22 465.55 62 FIX 529 1.17 661 261 2321.40 465.75 63 FIX 530 4.78 662 262 2326.18 466.36 64 .67 2.96 663 263 2329.14 466.64 65 .37 4.41 664 264 2333.55 466.61 66 .38 4.73 665 265 2338.28 466.99 67 WL RB 2.59 666 266 2340.87 467.93 68 . 0.89 667 267 2341.76 468.70 69 NB TRASH LINE 2.87 668 268 2344.63 470.71 70 TOP BANK 1.91 669 269 2346.54 470.58 71 EDGE ROAD 10.93 670 270 2357.47 470.42 72 EDGE ROAD 7.12 671 271 2364.59 472.45 73 TOE 0.27 672 272 2364.85 472.92 74 TOP SIDEWALK 2.00 673 273 2366.86 473.12 75 EDGE SIDEWALK 3.60 674 274 2370.46 474.68 76 INSD BRG SEAT 4.38 675 275 2374.83 476.98 77 TOE ABUT 0.06 676 276 2374.89 477.93 78 TOP ABUT 0.29 677 277 2375.19 477.92 79 TOP ABUT 0.11 678 278 2375.30 477.44 80 TOE ABUT 0.77 679 279 2376.07 477.38 81 GL BOLT RB 37.97 680 280 2414.03 476.76 82 EDGE SIDEWALK 13.09 681 281 2427.12 476.14 83 ON SLOPE 9.40 682 282 2436.52 475.21 84 EDGE SIDEWALK FRASER RIVER XS 12 PROJECT 8912F027 JULY 1989 JOIN 599-682 N89 54 36W 2436.523 FRASER RIVER XS 13 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 199 0.00 473.16 1 DUMMY 2000.00 600 200 2000.00 473.16 2 EDGE ROAD 11.41 601 201 2011.41 473.29 3 GRASS LEVEL 8.53 602 202 2019.95 473.29 4 . 3.45 603 203 2023.40 472.05 5 EDGE SIDEWALK 2.83 604 204 2026.23 471.97 6 GL BOLT LB 0.88 605 205 2027.10 471.94 7 TOP BANK 3.36 606 206 2030.47 470.69 8 . 0.52 607 207 2030.99 469.66 9 . 0.92 608 208 2031.91 468.83 10 NB 0.68 609 209 2032.59 468.26 11 . 4.39 610 210 2036.97 467.04 12 WL LB 1.97 611 211 2038.95 466.51 13 .53 2.89 612 212 2041.83 465.67 14 FIX 500 1.08 613 213 2042.91 465.62 15 SUND BP 0.63 614 214 2043.54 465.22 16 FIX 501 7.98 615 215 2051.52 463.92 17 FIX 502 2.20 616 216 2053.72 463.52 18 SUND BP 4.95 617 217 2058.67 463.67 19 SUND BP 6.05 618 218 2064.72 463.42 20 FIX 503 13.61 619 219 2078.33 463.37 21 FIX 504 6.31 620 220 2084.65 463.07 22 SUND BP 8.84 621 221 2093.48 463.02 23 FIX 505 15.48 622 222 2108.96 463.32 24 FIX 506 6.60 623 223 2115.56 463.37 25 SUND BP 6.60 624 224 2122.17 463.27 26 FIX 507 14.64 625 225 2136.81 463.02 27 FIX 508 13.68 626 226 2150.49 462.92 28 FIX 509 FRASER RIVER XS 13 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6.95 627 227 2157.44 462.92 29 SUND BP 5.69 628 228 2163.13 463.12 30 SUND BP 1.90 629 229 2165.03 463.17 31 FIX 510 14.54 630 230 2179.57 463.62 32 FIX 511 5.73 631 231 2185.30 463.77 33 SUND BP 6.31 632 232 2191.61 463.72 34 FIX 512 14.16 633 233 2205.77 463.72 35 FIX 513 19.35 634 234 2225.12 463.92 36 FIX 514 7.73 635 235 2232.86 464.12 37 SUND BP 6.08 636 236 2238.93 464.62 38 FIX 515 14.01 637 237 2252.94 464.92 39 FIX 516 9.12 638 238 2262.06 465.22 40 FIX 517 6.98 639 239 2269.05 465.47 41 FIX 518 3.99 640 240 2273.04 465.87 42 FIX 519 2.42 641 241 2275.46 466.22 43 FIX 520 1.75 642 242 2277.21 466.50 44 .52 4.07 643 243 2281.28 466.93 45 .08 3.49 644 244 2284.77 466.84 46 .15 2.28 645 245 2287.05 466.99 47 WL RB 1.31 646 246 2288.36 467.31 48 TOE RIP RAP 1.29 647 247 2289.65 468.68 49 NB 2.91 648 248 2292.55 470.54 50 TOP BANK 2.29 649 249 2294.84 470.63 51 EDGE ROAD 10.51 650 250 2305.35 470.47 52 EDGE ROAD 6.65 651 251 2312.00 472.36 53 TOE 0.25 652 252 2312.25 472.84 54 TOP SIDEWALK 2.20 653 253 2314.45 473.06 55 EDGE SIDEWALK 9.32 654 254 2323.77 477.38 56 GL BOLT RB FRASER RIVER XS 13 PROJECT 8912F027 JULY 1989 JOIN 599-654 S83 02 46W 2323.769 FRASER RIVER XS 14 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 199 0.00 475.11 1 DUMMY 2000.00 600 200 2000.00 475.11 2 EDGE ROAD 11.62 601 201 2011.62 475.13 3 NAT GRND 2.83 602 202 2014.45 475.02 4 TOP 5.88 603 203 2020.33 473.36 5 OPP END BRG SEAT 1.05 604 204 2021.38 473.04 6 OPP ABUT FACE 2.07 605 205 2023.45 471.70 7 GL BOLT LB 2.88 606 206 2026.33 471.56 8 EDGE SIDEWALK 0.36 607 207 2026.69 471.25 9 . 2.92 608 208 2029.61 470.28 10 . 6.85 609 209 2036.46 469.56 11 . 5.99 610 210 2042.44 468.83 12 TOP BANK RIP RAP 2.59 611 211 2045.03 467.85 13 . 3.11 612 212 2048.14 466.80 14 WL LB 1.28 613 213 2049.42 466.16 15 .66 0.95 614 214 2050.38 465.80 16 FIX 500 1.44 615 215 2051.82 465.45 17 FIX 501 1.15 616 216 2052.96 465.35 18 SUND BP 1.02 617 217 2053.98 464.80 19 FIX 502 1.69 618 218 2055.68 463.85 20 SUND BP 0.61 619 219 2056.28 463.80 21 FIX 503 2.14 620 220 2058.42 463.35 22 SUND BP 0.92 621 221 2059.34 463.30 23 FIX 504 3.45 622 222 2062.78 463.40 24 FIX 505 1.33 623 223 2064.11 463.40 25 FIX 506 4.48 624 224 2068.58 463.45 26 FIX 507 2.40 625 225 2070.99 463.05 27 FIX 508 4.68 626 226 2075.67 462.85 28 FIX 509 FRASER RIVER XS 14 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 4.62 627 227 2080.30 462.45 29 FIX 510 6.36 628 228 2086.66 462.45 30 FIX 511 2.48 629 229 2089.14 462.60 31 SUND BP 4.60 630 230 2093.75 462.80 32 FIX 512 5.95 631 231 2099.70 462.80 33 FIX 513 7.69 632 232 2107.39 463.05 34 FIX 514 2.67 633 233 2110.06 463.15 35 SUND BP 3.27 634 234 2113.33 463.10 36 FIX 515 4.58 635 235 2117.91 462.85 37 FIX 516 1.72 636 236 2119.62 462.75 38 FIX 517 4.50 637 237 2124.12 462.45 39 FIX 518 1.91 638 238 2126.03 462.10 40 SUND BP 2.12 639 239 2128.15 462.50 41 FIX 519 7.03 640 240 2135.19 463.00 42 FIX 520 7.83 641 241 2143.02 463.05 43 FIX 521 10.88 642 242 2153.89 463.20 44 FIX 522 8.91 643 243 2162.81 463.30 45 FIX 523 7.03 644 244 2169.84 463.40 46 FIX 524 2.64 645 245 2172.48 463.50 47 SUND BP 1.98 646 246 2174.46 463.50 48 FIX 525 4.83 647 247 2179.29 462.55 49 FIX 526 1.72 648 248 2181.01 462.25 50 SUND BP 1.29 649 249 2182.30 462.35 51 FIX 527 7.26 650 250 2189.56 463.40 52 FIX 528 6.17 651 251 2195.73 463.70 53 FIX 529 6.60 652 252 2202.32 463.90 54 FIX 530 10.88 653 253 2213.21 464.00 55 FIX 531 8.12 654 254 2221.33 464.00 56 FIX 532 FRASER RIVER XS 14 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 7.69 655 255 2229.02 463.80 57 FIX 533 1.37 656 256 2230.39 463.80 58 FIX 534 4.34 657 257 2234.73 464.25 59 FIX 535 3.17 658 258 2237.91 464.10 60 FIX 536 2.22 659 259 2240.12 464.00 61 SUND BP 6.02 660 260 2246.14 464.35 62 FIX 537 7.59 661 261 2253.74 464.55 63 FIX 538 8.36 662 262 2262.09 465.20 64 FIX 539 3.55 663 263 2265.64 465.70 65 FIX 540 2.53 664 264 2268.17 466.35 66 .47 2.12 665 265 2270.30 466.82 67 WL RB 6.47 666 266 2276.76 467.85 68 . 2.21 667 267 2278.97 468.31 69 TRASH LINE 1.04 668 268 2280.01 468.46 70 OPP ABUT FACE 0.40 669 269 2280.41 468.65 71 TOE ABUT 0.52 670 270 2280.93 473.20 72 COR BRG SEAT 0.63 671 271 2281.56 473.34 73 EDGE W WALL 0.79 672 272 2282.35 473.40 74 . 4.57 673 273 2286.92 474.28 75 TOP 3.77 674 274 2290.69 474.24 76 GL BOLT 4.31 675 275 2294.99 473.85 77 CL SIDEWALK 11.69 676 276 2306.69 472.62 78 EDGE ROAD 5.16 677 277 2311.85 472.77 79 CL ROAD 5.75 678 278 2317.59 472.85 80 EDGE ROAD JOIN 599-678 S84 32 30W 2317.592 FRASER RIVER XS 15 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 199 0.00 475.24 1 DUMMY 2000.00 600 200 2000.00 475.24 2 EDGE ROAD 6.57 601 201 2006.57 475.28 3 GROUND LEVEL 5.09 602 202 2011.66 475.24 4 . 3.11 603 203 2014.77 474.96 5 TOP 4.58 604 204 2019.35 472.09 6 TOE 0.94 605 205 2020.29 471.88 7 OPP END BRG 1.17 606 206 2021.46 471.67 8 OPP ABUT FACE 2.48 607 207 2023.94 471.46 9 EDGE SIDEWALK 2.69 608 208 2026.63 471.39 10 GL BOLT LB 0.41 609 209 2027.05 471.37 11 TOP 2.72 610 210 2029.76 470.06 12 TOE 5.19 611 211 2034.95 469.88 13 . 8.21 612 212 2043.16 468.93 14 TOP BANK RIP 4.98 613 213 2048.14 466.82 15 WL LB 1.42 614 214 2049.57 466.14 16 .69 1.35 615 215 2050.92 465.81 17 FIX 500 1.27 616 216 2052.19 465.26 18 FIX 501 1.39 617 217 2053.58 464.51 19 FIX 502 1.95 618 218 2055.53 464.21 20 SUND BP 1.56 619 219 2057.09 463.31 21 FIX 503 1.53 620 220 2058.62 462.91 22 SUND BP 1.92 621 221 2060.53 462.71 23 FIX 504 1.04 622 222 2061.57 462.71 24 SUND BP 0.69 623 223 2062.26 462.41 25 FIX 505 1.86 624 224 2064.12 461.96 26 FIX 506 4.61 625 225 2068.73 461.71 27 FIX 507 2.39 626 226 2071.12 461.91 28 FIX 508 FRASER RIVER XS 15 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2.84 627 227 2073.96 462.11 29 FIX 509 3.23 628 228 2077.19 462.41 30 FIX 510 5.30 629 229 2082.50 462.61 31 FIX 511 5.97 630 230 2088.47 462.71 32 FIX 512 7.73 631 231 2096.20 462.56 33 FIX 513 6.03 632 232 2102.22 462.56 34 SUND BP 4.02 633 233 2106.24 462.81 35 FIX 514 3.82 634 234 2110.06 463.11 36 SUND BP 3.06 635 235 2113.12 463.11 37 FIX 515 1.08 636 236 2114.20 463.11 38 SUND BP 1.35 637 237 2115.55 462.91 39 SUND BP 2.44 638 238 2117.99 462.76 40 FIX 516 0.92 639 239 2118.91 462.26 41 SUND BP 0.63 640 240 2119.54 462.31 42 FIX 517 5.34 641 241 2124.89 461.81 43 FIX 518 2.07 642 242 2126.96 462.31 44 FIX 519 3.50 643 243 2130.46 463.01 45 FIX 520 7.17 644 244 2137.63 463.06 46 FIX 521 7.77 645 245 2145.40 463.16 47 FIX 522 10.62 646 246 2156.02 463.31 48 FIX 523 10.37 647 247 2166.39 463.46 49 FIX 524 3.92 648 248 2170.30 463.51 50 SUND BP 3.48 649 249 2173.79 463.36 51 FIX 525 0.28 650 250 2174.07 463.21 52 SUND BP 1.12 651 251 2175.18 463.11 53 FIX 526 4.42 652 252 2179.60 462.41 54 FIX 527 1.02 653 253 2180.62 462.36 55 SUND BP 1.28 654 254 2181.90 462.66 56 FIX 528 FRASER RIVER XS 15 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.92 655 255 2185.82 463.41 57 SUND BP 1.31 656 256 2187.13 463.56 58 FIX 529 7.10 657 257 2194.23 463.81 59 FIX 530 9.22 658 258 2203.45 463.96 60 FIX 531 9.55 659 259 2213.00 464.01 61 FIX 532 10.39 660 260 2223.38 464.06 62 FIX 533 4.20 661 261 2227.59 464.16 63 SUND BP 2.26 662 262 2229.85 463.96 64 SUND BP 0.65 663 263 2230.50 463.91 65 FIX 534 5.14 664 264 2235.64 463.31 66 FIX 535 1.26 665 265 2236.90 463.66 67 FIX 536 2.99 666 266 2239.89 464.21 68 SUND BP 2.49 667 267 2242.38 464.31 69 FIX 537 7.39 668 268 2249.77 464.61 70 FIX 538 10.56 669 269 2260.33 465.06 71 FIX 539 6.35 670 270 2266.68 466.01 72 FIX 540 1.52 671 271 2268.20 466.35 73 .48 1.69 672 272 2269.89 466.82 74 WL RB 2.70 673 273 2272.59 467.31 75 OLD PILE LINE 7.23 674 274 2279.82 468.76 76 NB 0.76 675 275 2280.58 468.87 77 TOE ABUT 0.30 676 276 2280.88 473.19 78 BRG SEAT 0.23 677 277 2281.11 473.42 79 ABUT 2.82 678 278 2283.93 474.02 80 GL BOLT RB 11.91 679 279 2295.84 474.04 81 TOP 12.19 680 280 2308.02 472.82 82 EDGE ROAD 12.45 681 281 2320.48 473.08 83 EDGE ROAD JOIN 599-681 S84 30 45W 2320.479 FRASER RIVER XS 16 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 199 0.00 478.84 1 DUMMY 2000.00 600 200 2000.00 478.84 2 FLAT BYND 2.18 601 201 2002.18 478.82 3 TOP BANK 3.57 602 202 2005.75 476.02 4 ON SLOPE 2.79 603 203 2008.54 473.74 5 ON SLOPE 3.37 604 204 2011.91 472.08 6 TOE GL BOLT LB 2.74 605 205 2014.65 471.80 7 CL ACCESS ROAD 2.85 606 206 2017.50 471.58 8 TOP RIP RAP 1.92 607 207 2019.43 471.09 9 . 3.17 608 208 2022.59 469.16 10 NB 3.20 609 209 2025.79 467.16 11 WL LB 1.28 610 210 2027.07 466.44 12 .71 2.72 611 211 2029.79 466.03 13 FIX 500 0.75 612 212 2030.53 465.88 14 FIX 501 1.13 613 213 2031.66 465.43 15 FIX 502 0.50 614 214 2032.16 465.13 16 SUND BP 1.00 615 215 2033.16 464.93 17 SUND BP 0.75 616 216 2033.91 464.93 18 FIX 503 1.43 617 217 2035.35 464.83 19 FIX 504 1.26 618 218 2036.61 464.68 20 SUND BP 0.75 619 219 2037.36 464.68 21 FIX 505 4.06 620 220 2041.42 464.63 22 SUND BP 0.94 621 221 2042.35 464.33 23 SUND BP 1.25 622 222 2043.60 464.23 24 FIX 506 10.68 623 223 2054.28 463.93 25 FIX 507 10.66 624 224 2064.94 463.43 26 SUND BP 3.33 625 225 2068.27 463.38 27 FIX 508 3.83 626 226 2072.10 463.38 28 SUND BP FRASER RIVER XS 16 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 11.49 627 227 2083.59 463.53 29 FIX 509 11.82 628 228 2095.41 463.63 30 FIX 510 16.83 629 229 2112.24 463.78 31 FIX 511 16.66 630 230 2128.90 463.93 32 FIX 512 16.45 631 231 2145.35 464.13 33 FIX 513 15.55 632 232 2160.90 464.28 34 FIX 514 15.52 633 233 2176.42 464.33 35 FIX 515 14.30 634 234 2190.72 464.43 36 FIX 516 15.87 635 235 2206.60 464.43 37 FIX 517 12.89 636 236 2219.49 464.43 38 FIX 518 12.55 637 237 2232.03 464.63 39 FIX 519 12.41 638 238 2244.44 465.03 40 FIX 520 8.77 639 239 2253.20 465.83 41 FIX 521 2.28 640 240 2255.48 466.38 42 SUND BP 1.86 641 241 2257.34 466.38 43 FIX 522 1.17 642 242 2258.51 466.68 44 .45 2.18 643 243 2260.69 467.10 45 WL RB 7.26 644 244 2267.96 468.80 46 TRASH LINE 4.43 645 245 2272.39 470.19 47 TOE NB 1.79 646 246 2274.18 471.75 48 TOP CUT BANK 3.97 647 247 2278.15 472.21 49 GL BOLT RB 2.98 648 248 2281.13 472.48 50 EDGE SIDEWALK 1.13 649 249 2282.27 472.47 51 EDGE SIDEWALK 0.16 650 250 2282.43 472.22 52 EDGE ROAD 8.85 651 251 2291.28 472.34 53 EDGE ROAD JOIN 599-651 S75 03 38W 2291.280 FRASER RIVER XS 17 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 655 255 0.00 476.98 1 DUMMY 2000.00 654 254 2000.00 476.98 2 CL DRVY 11.06 653 253 2011.06 476.48 3 . 20.11 652 252 2031.17 472.22 4 . 7.54 651 251 2038.71 471.33 5 . 12.32 650 250 2051.04 471.65 6 . 12.77 649 249 2063.81 471.65 7 TOP EDGE LAWN 5.32 648 248 2069.13 471.21 8 . 3.06 647 247 2072.19 470.18 9 NB 3.33 646 246 2075.53 469.79 10 GL BOLT LB 4.84 645 245 2080.37 469.02 11 TRASH LINE 4.11 644 244 2084.48 468.05 12 . 1.52 643 243 2086.00 467.64 13 WL LB 3.56 642 242 2089.56 466.95 14 FIX 518 2.32 641 241 2091.88 466.80 15 FIX 517 5.74 640 240 2097.62 466.00 16 FIX 516 3.95 639 239 2101.57 465.30 17 SUND BP 1.97 638 238 2103.54 465.30 18 SUND BP 1.97 637 237 2105.51 465.15 19 SUND BP 2.37 636 236 2107.88 465.00 20 FIX 515 7.31 635 235 2115.19 465.70 21 SUND BP 6.65 634 234 2121.84 465.45 22 FIX 514 4.28 633 233 2126.11 465.20 23 SUND BP 9.26 632 232 2135.38 465.05 24 FIX 513 12.86 631 231 2148.24 465.10 25 SUND BP 3.22 630 230 2151.45 465.05 26 FIX 512 18.51 629 229 2169.97 464.90 27 FIX 511 9.94 628 228 2179.91 464.80 28 SUND BP FRASER RIVER XS 17 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 12.43 627 227 2192.33 464.50 29 FIX 510 18.78 626 226 2211.11 464.30 30 FIX 509 5.27 625 225 2216.38 464.15 31 SUND BP 14.05 624 224 2230.43 464.05 32 FIX 508 20.37 623 223 2250.80 464.10 33 FIX 507 19.70 622 222 2270.51 464.00 34 FIX 506 19.04 621 221 2289.54 464.05 35 FIX 505 6.10 620 220 2295.64 464.05 36 SUND BP 9.15 619 219 2304.79 464.25 37 FIX 504 5.72 618 218 2310.50 464.35 38 SUND BP 4.68 617 217 2315.18 464.15 39 SUND BP 4.16 616 216 2319.34 464.55 40 FIX 503 8.28 615 215 2327.62 465.25 41 FIX 502 5.56 614 214 2333.18 465.80 42 FIX 501 1.05 613 213 2334.23 466.30 43 FIX 500 3.21 612 212 2337.44 466.99 44 .7 2.00 611 211 2339.45 467.66 45 WL RB 2.92 610 210 2342.37 468.48 46 . 1.13 609 209 2343.50 469.14 47 TOE 0.67 608 208 2344.16 469.90 48 NB 0.41 607 207 2344.57 470.86 49 ON SLOPE 2.25 606 206 2346.82 472.90 50 TOP BANK 3.02 605 205 2349.84 473.27 51 GL BOLT AT FENCE 7.77 604 204 2357.61 473.74 52 TOE 1.85 603 203 2359.46 474.38 53 ON SLOPE 1.76 602 202 2361.22 475.25 54 TOP 9.69 601 201 2370.91 475.34 55 FENCE CORNER 8.64 600 200 2379.55 475.58 56 NORMAL GROUND FRASER RIVER XS 17 PROJECT 8912F027 JULY 1989 JOIN 655-600 S75 55 42W 2379.546 FRASER RIVER XS 18 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 199 0.00 479.51 1 DUMMY 2000.00 600 200 2000.00 479.51 2 ON SLOPE 1.42 601 201 2001.42 478.29 3 GL BOLT LB 3.90 602 202 2005.32 475.43 4 ON SLOPE 4.46 603 203 2009.78 472.59 5 ON SLOPE 1.69 604 204 2011.47 471.10 6 NB 0.81 605 205 2012.29 470.16 7 WASH LINE 7.08 606 206 2019.37 468.10 8 WL LB 2.17 607 207 2021.54 467.73 9 .36 4.24 608 208 2025.78 467.29 10 FIX 500 5.41 609 209 2031.19 467.24 11 FIX 501 9.94 610 210 2041.13 467.29 12 FIX 502 11.25 611 211 2052.39 467.29 13 FIX 503 10.85 612 212 2063.24 467.09 14 SUND BP 6.20 613 213 2069.44 467.29 15 FIX 504 10.72 614 214 2080.16 467.09 16 SUND BP 8.77 615 215 2088.92 466.59 17 SUND BP 0.97 616 216 2089.90 466.59 18 FIX 505 17.21 617 217 2107.11 466.24 19 SUND BP 6.88 618 218 2113.99 466.34 20 SUND BP 11.47 619 219 2125.46 466.14 21 FIX 506 28.05 620 220 2153.51 465.94 22 FIX 507 39.70 621 221 2193.21 464.49 23 FIX 508 25.11 622 222 2218.32 463.94 24 FIX 509 18.05 623 223 2236.37 463.59 25 FIX 510 16.92 624 224 2253.29 463.74 26 FIX 511 11.37 625 225 2264.66 463.99 27 FIX 512 2.74 626 226 2267.41 464.04 28 SUND BP FRASER RIVER XS 18 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 8.68 627 227 2276.09 465.14 29 FIX 513 3.28 628 228 2279.37 465.69 30 SUND BP 0.96 629 229 2280.33 466.19 31 FIX 514 1.53 630 230 2281.86 466.94 32 SUND BP 0.82 631 231 2282.69 466.94 33 FIX 515 1.20 632 232 2283.88 467.45 34 .61 1.86 633 233 2285.74 468.16 35 WL RB 3.41 634 234 2289.15 469.75 36 SCOUR LINE 0.54 635 235 2289.69 470.14 37 NB 1.18 636 236 2290.87 471.55 38 ON SLOPE 1.28 637 237 2292.16 473.03 39 TOP BANK 0.96 638 238 2293.12 473.14 40 GL BOLT RB 3.27 639 239 2296.39 473.56 41 . 6.89 640 240 2303.28 473.42 42 . JOIN 599-640 S63 36 18W 2303.278 FRASER RIVER XS 19 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 648 248 0.00 472.93 1 DUMMY 2000.00 647 247 2000.00 472.93 2 STEEP RISE BYND 0.06 646 246 2000.06 471.11 3 . 1.63 645 245 2001.68 470.06 4 GL BOLT LB 4.60 644 244 2006.29 468.38 5 WL LB 1.02 643 243 2007.31 467.99 6 FIX 520 1.08 642 242 2008.39 467.79 7 SUND BP 0.75 641 241 2009.14 467.39 8 FIX 519 4.86 640 240 2014.00 466.44 9 FIX 518 5.91 639 239 2019.91 465.89 10 FIX 517 4.52 638 238 2024.43 465.04 11 SUND BP 3.77 637 237 2028.20 464.74 12 FIX 516 3.24 636 236 2031.44 464.19 13 SUND BP 2.77 635 235 2034.21 464.19 14 SUND BP 3.70 634 234 2037.91 463.24 15 FIX 515 2.50 633 233 2040.41 462.84 16 SUND BP 11.48 632 232 2051.89 462.89 17 FIX 514 8.42 631 231 2060.30 463.09 18 FIX 513 4.80 630 230 2065.11 463.14 19 FIX 512 4.15 629 229 2069.26 463.09 20 SUND BP 7.89 628 228 2077.15 463.29 21 SUND BP 2.91 627 227 2080.06 463.39 22 FIX 511 10.70 626 226 2090.76 463.44 23 FIX 510 5.38 625 225 2096.14 463.59 24 SUND BP 6.27 624 224 2102.41 463.59 25 SUND BP 1.65 623 223 2104.05 463.69 26 SUND BP 7.60 622 222 2111.65 463.79 27 FIX 509 17.34 621 221 2128.99 464.14 28 FIX 508 FRASER RIVER XS 19 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 16.65 620 220 2145.64 464.69 29 FIX 507 12.74 619 219 2158.38 465.09 30 FIX 506 11.26 618 218 2169.64 465.49 31 FIX 505 8.61 617 217 2178.25 465.89 32 SUND BP 2.02 616 216 2180.27 465.89 33 FIX 504 8.07 615 215 2188.34 466.19 34 FIX 503 7.04 614 214 2195.37 466.59 35 FIX 502 4.98 613 213 2200.35 466.79 36 FIX 501 0.67 612 212 2201.01 466.89 37 FIX 500 8.29 611 211 2209.31 467.91 38 .48 4.61 610 210 2213.92 468.39 39 WL RB 7.32 609 209 2221.24 469.56 40 . 3.54 608 208 2224.78 470.12 41 HWM 3.05 607 207 2227.83 470.59 42 NB 5.90 606 206 2233.74 471.40 43 . 5.39 605 205 2239.13 471.83 44 GL BOLT RB 10.06 604 204 2249.19 472.24 45 . 12.46 603 203 2261.65 472.45 46 . 9.05 602 202 2270.70 472.90 47 . 0.59 601 201 2271.29 473.40 48 . 2.42 600 200 2273.71 473.97 49 STEEP RISE BYND JOIN 648-600 S64 49 36W 2273.707 FRASER RIVER XS 20 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 663 263 0.00 477.08 1 DUMMY 2000.00 662 262 2000.00 477.08 2 CL DRIVEWAY 8.35 661 261 2008.35 477.06 3 LAWN 15.73 660 260 2024.08 476.82 4 CL DRIVEWAY 2.31 659 259 2026.38 476.77 5 GL BOLT LB 0.59 658 258 2026.98 476.72 6 TOP BANK 4.50 657 257 2031.48 473.58 7 ON SLOPE 3.23 656 256 2034.70 470.99 8 TRASH LINE 6.77 655 255 2041.48 468.65 9 WL LB 2.01 654 254 2043.48 467.88 10 FIX 518 3.84 653 253 2047.32 466.73 11 FIX 517 4.53 652 252 2051.86 465.58 12 FIX 516 4.46 651 251 2056.32 464.63 13 FIX 515 11.89 650 250 2068.20 462.63 14 FIX 514 3.71 649 249 2071.91 462.28 15 SUND BP 5.10 648 248 2077.01 462.23 16 FIX 513 2.25 647 247 2079.26 462.68 17 SUND BP 6.37 646 246 2085.63 463.03 18 FIX 512 7.16 645 245 2092.79 463.33 19 SUND BP 2.39 644 244 2095.18 463.28 20 FIX 511 1.77 643 243 2096.94 463.23 21 SUND BP 4.86 642 242 2101.80 463.58 22 SUND BP 3.53 641 241 2105.33 463.63 23 FIX 510 7.54 640 240 2112.87 463.33 24 SUND BP 5.02 639 239 2117.89 463.38 25 FIX 509 4.90 638 238 2122.80 463.63 26 SUND BP 4.90 637 237 2127.70 463.63 27 SUND BP 3.27 636 236 2130.97 463.48 28 SUND BP FRASER RIVER XS 20 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 4.08 635 235 2135.05 463.63 29 FIX 508 2.85 634 234 2137.90 463.48 30 SUND BP 5.71 633 233 2143.61 463.68 31 SUND BP 6.28 632 232 2149.89 463.58 32 FIX 507 3.27 631 231 2153.15 463.23 33 SUND BP 1.40 630 230 2154.55 463.48 34 SUND BP 5.13 629 229 2159.69 463.78 35 FIX 506 2.29 628 228 2161.97 463.88 36 SUND BP 3.20 627 227 2165.17 463.93 37 FIX 505 3.26 626 226 2168.44 464.03 38 FIX 504 4.23 625 225 2172.67 463.98 39 SUND BP 3.80 624 224 2176.47 464.33 40 SUND BP 2.54 623 223 2179.01 464.33 41 SUND BP 3.38 622 222 2182.39 464.58 42 SUND BP 3.38 621 221 2185.77 464.58 43 FIX 503 5.66 620 220 2191.43 464.58 44 SUND BP 4.04 619 219 2195.47 464.78 45 SUND BP 5.25 618 218 2200.72 465.58 46 FIX 502 3.27 617 217 2203.99 465.93 47 SUND BP 1.87 616 216 2205.86 465.93 48 IX 501 7.01 615 215 2212.88 466.78 49 FIX 501 0.44 614 214 2213.32 467.08 50 SUND BP 1.24 613 213 2214.56 467.18 51 FIX 500 2.50 612 212 2217.06 467.74 52 .89 2.90 611 211 2219.96 468.60 53 WL RB 4.01 610 210 2223.96 469.77 54 SCOUR LINE 7.00 609 209 2230.96 470.81 55 WASH LINE 6.69 608 208 2237.66 471.39 56 NB FRASER RIVER XS 20 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 9.79 607 207 2247.45 472.34 57 . 8.39 606 206 2255.84 473.07 58 GL BOLT RB 2.71 605 205 2258.55 473.08 59 . 2.82 604 204 2261.37 473.57 60 TOE 1.88 603 203 2263.24 474.53 61 TOP 4.01 602 202 2267.26 474.49 62 . 7.10 601 201 2274.36 474.62 63 TOE SLOPE 0.98 600 200 2275.34 475.36 64 RISE BEYONND JOIN 663-600 S31 43 17W 2275.340 FRASER RIVER XS 21 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 199 0.00 475.97 1 DUMMY 2000.00 600 200 2000.00 475.97 2 FIELD LEVEL 6.49 601 201 2006.49 475.92 3 GL BOLT LB TOP 8.13 602 202 2014.62 473.58 4 TOE 10.66 603 203 2025.28 473.56 5 . 11.31 604 204 2036.59 473.86 6 . 17.36 605 205 2053.95 472.59 7 . 12.36 606 206 2066.31 472.82 8 . 15.87 607 207 2082.18 472.98 9 . 10.61 608 208 2092.79 472.45 10 . 8.63 609 209 2101.41 472.24 11 WASH LINE 9.84 610 210 2111.26 471.89 12 . 5.14 611 211 2116.40 470.92 13 NB 10.73 612 212 2127.13 469.55 14 . 3.59 613 213 2130.71 469.07 15 WL LB 5.26 614 214 2135.97 468.84 16 .23 5.04 615 215 2141.01 468.53 17 .54 0.97 616 216 2141.99 468.39 18 .69 1.84 617 217 2143.83 468.09 19 FIX 500 2.34 618 218 2146.17 467.99 20 FIX 501 4.76 619 219 2150.93 467.64 21 FIX 502 5.85 620 220 2156.78 467.29 22 FIX 503 9.53 621 221 2166.31 466.79 23 FIX 504 9.98 622 222 2176.29 466.29 24 FIX 505 9.71 623 223 2185.99 465.84 25 FIX 506 12.36 624 224 2198.35 465.29 26 FIX 507 2.48 625 225 2200.83 465.39 27 SUND BP 8.06 626 226 2208.89 465.19 28 FIX 508 FRASER RIVER XS 21 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.31 627 227 2212.20 465.19 29 SUND BP 3.86 628 228 2216.07 464.99 30 SUND BP 4.97 629 229 2221.03 464.44 31 FIX 509 6.17 630 230 2227.20 463.49 32 SUND BP 6.73 631 231 2233.93 463.69 33 FIX 510 1.09 632 232 2235.01 464.44 34 SUND BP 1.63 633 233 2236.64 464.84 35 SUND BP 0.54 634 234 2237.19 465.69 36 SUND BP 1.09 635 235 2238.28 465.89 37 SUND BP 1.63 636 236 2239.91 465.79 38 SUND BP 1.09 637 237 2240.99 465.24 39 SUND BP 1.09 638 238 2242.08 465.09 40 SUND BP 0.54 639 239 2242.63 464.49 41 SUND BP 2.72 640 240 2245.34 464.84 42 FIX 511 2.52 641 241 2247.87 465.09 43 SUND BP 1.89 642 242 2249.76 464.89 44 SUND BP 0.63 643 243 2250.39 464.09 45 SUND BP 8.20 644 244 2258.58 464.39 46 FIX 512 0.94 645 245 2259.52 464.99 47 SUND BP 2.35 646 246 2261.87 464.09 48 SUND BP 2.82 647 247 2264.69 463.89 49 SUND BP 2.35 648 248 2267.04 464.34 50 SUND BP 0.47 649 249 2267.51 465.34 51 SUND BP 4.23 650 250 2271.73 465.99 52 FIX 513 6.98 651 251 2278.71 465.09 53 SUND BP 1.16 652 252 2279.88 465.44 54 FIX 514 2.19 653 253 2282.07 465.69 55 SUND BP 2.55 654 254 2284.62 465.04 56 SUND BP FRASER RIVER XS 21 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1.09 655 255 2285.71 464.99 57 SUND BP 1.46 656 256 2287.17 465.69 58 FIX 515 2.12 657 257 2289.29 465.19 59 SUND BP 3.89 658 258 2293.17 465.09 60 SUND BP 2.47 659 259 2295.65 465.39 61 FIX 516 2.22 660 260 2297.86 465.59 62 SUND BP 2.59 661 261 2300.45 465.39 63 SUND BP 2.22 662 262 2302.66 465.59 64 FIX 517 1.66 663 263 2304.33 465.69 65 SUND BP 0.55 664 264 2304.88 466.19 66 SUND BP 3.60 665 265 2308.49 466.19 67 FIX 518 1.04 666 266 2309.53 466.19 68 SUND BP 0.78 667 267 2310.31 465.99 69 SUND BP 3.38 668 268 2313.69 466.59 70 FIX 519 5.14 669 269 2318.83 467.39 71 FIX 520 2.67 670 270 2321.50 468.19 72 FIX 521 4.81 671 271 2326.32 468.74 73 .34 1.28 672 272 2327.59 469.10 74 WL RB 3.48 673 273 2331.07 469.42 75 . 1.73 674 274 2332.80 470.03 76 TRASH LINE 0.62 675 275 2333.43 470.18 77 GL BOLT RB 2.32 676 276 2335.75 471.10 78 NB 3.38 677 277 2339.12 474.32 79 RISE BYND JOIN 599-677 S19 18 54W 2339.122 FRASER RIVER XS 22 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 199 0.00 474.56 1 DUMMY 2000.00 600 200 2000.00 474.56 2 RISE 1M FIELD 9.09 601 201 2009.09 474.44 3 . 9.01 602 202 2018.09 474.29 4 GL BOLT LB 4.81 603 203 2022.91 474.13 5 . 6.24 604 204 2029.14 473.92 6 TOP CUT BANK 1.17 605 205 2030.32 472.00 7 . 1.59 606 206 2031.90 471.42 8 TRASH LINE 2.77 607 207 2034.68 469.43 9 WL LB 1.96 608 208 2036.63 469.15 10 .29 1.57 609 209 2038.21 468.84 11 .59 0.93 610 210 2039.13 468.44 12 FIX 500 1.10 611 211 2040.24 468.14 13 FIX 501 1.81 612 212 2042.04 468.04 14 SUND BP 1.63 613 213 2043.67 467.69 15 FIX 502 6.28 614 214 2049.95 467.09 16 FIX 503 8.53 615 215 2058.48 466.84 17 FIX 504 8.91 616 216 2067.39 466.19 18 SUND BP 3.82 617 217 2071.21 466.04 19 FIX 505 18.53 618 218 2089.74 465.69 20 FIX 506 7.95 619 219 2097.69 465.84 21 SUND BP 10.93 620 220 2108.63 465.84 22 FIX 507 7.23 621 221 2115.86 465.89 23 SUND BP 13.43 622 222 2129.29 466.14 24 FIX 508 21.16 623 223 2150.45 466.59 25 FIX 509 5.82 624 224 2156.28 466.74 26 SUND BP 10.48 625 225 2166.76 467.14 27 SUND BP 6.99 626 226 2173.74 467.19 28 FIX 510 FRASER RIVER XS 22 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 13.64 627 227 2187.39 467.44 29 SUND BP 6.82 628 228 2194.21 467.74 30 FIX 511 11.04 629 229 2205.25 467.74 31 SUND BP 9.03 630 230 2214.28 467.84 32 FIX 512 15.03 631 231 2229.31 467.99 33 SUND BP 9.66 632 232 2238.97 467.99 34 FIX 513 15.84 633 233 2254.81 467.84 35 SUND BP 7.31 634 234 2262.12 467.49 36 SUND BP 4.87 635 235 2266.99 467.24 37 FIX 514 5.50 636 236 2272.50 466.94 38 SUND BP 4.40 637 237 2276.90 467.19 39 SUND BP 7.70 638 238 2284.60 467.24 40 SUND BP 8.80 639 239 2293.40 467.69 41 FIX 515 6.15 640 240 2299.55 467.84 42 SUND BP 4.10 641 241 2303.65 467.69 43 SUND BP 7.17 642 242 2310.82 467.99 44 SUND BP 3.07 643 243 2313.89 467.74 45 SUND BP 4.10 644 244 2317.99 467.74 46 FIX 516 8.46 645 245 2326.45 467.39 47 SUND BP 3.17 646 246 2329.63 467.64 48 SUND BP 6.35 647 247 2335.97 467.34 49 SUND BP 5.29 648 248 2341.26 467.29 50 FIX 517 3.34 649 249 2344.61 467.14 51 SUND BP 9.20 650 250 2353.80 467.39 52 SUND BP 2.51 651 251 2356.31 467.69 53 SUND BP 5.02 652 252 2361.33 467.64 54 FIX 518 3.11 653 253 2364.43 467.19 55 SUND BP 7.77 654 254 2372.20 467.09 56 SUND BP FRASER RIVER XS 22 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 4.66 655 255 2376.86 467.34 57 SUND BP 3.11 656 256 2379.97 467.44 58 FIX 519 5.49 657 257 2385.46 467.39 59 SUND BP 5.99 658 258 2391.46 467.69 60 FIX 520 0.98 659 259 2392.44 467.64 61 SUND BP 2.95 660 260 2395.39 467.84 62 SUND BP 1.47 661 261 2396.86 468.14 63 FIX 521 3.37 662 262 2400.24 469.60 64 WL RB 2.64 663 263 2402.88 470.17 65 TOE BANK 0.66 664 264 2403.54 470.98 66 TOP 1.17 665 265 2404.71 471.36 67 NB 0.35 666 266 2405.06 471.63 68 . 1.98 667 267 2407.04 472.22 69 TOP BANK 5.27 668 268 2412.31 472.08 70 . 6.99 669 269 2419.30 472.39 71 GL BOLT RB 14.47 670 270 2433.77 472.59 72 . 15.52 671 271 2449.29 472.50 73 . 20.01 672 272 2469.30 472.58 74 . 21.68 673 273 2490.98 472.89 75 . 24.02 674 274 2514.99 472.97 76 . 15.29 675 275 2530.29 473.13 77 . 18.15 676 276 2548.44 472.68 78 . 16.44 677 277 2564.88 472.08 79 . 6.48 678 278 2571.36 472.24 80 . 2.95 679 279 2574.31 473.01 81 TOP 2.31 680 280 2576.62 473.05 82 TOP 0.98 681 281 2577.60 472.79 83 TOE 5.08 682 282 2582.68 472.18 84 . FRASER RIVER XS 22 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 10.29 683 283 2592.97 472.23 85 . 10.13 684 284 2603.11 472.62 86 . 9.61 685 285 2612.72 472.72 87 . 5.87 686 286 2618.59 473.07 88 TOE 2.08 687 287 2620.67 473.86 89 . 3.62 688 288 2624.29 473.80 90 TOE RISE BYND JOIN 599-688 N73 15 15W 2624.293 FRASER RIVER XS 23 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 761 361 0.00 475.97 1 DUMMY 2000.00 760 360 2000.00 475.97 2 ON SLOPE 4.24 759 359 2004.24 472.24 3 SCOUR LINE 2.83 758 358 2007.07 470.83 4 GL BOLT LB 2.24 757 357 2009.31 470.23 5 WL LB 0.36 756 356 2009.66 469.72 6 .48 0.84 755 355 2010.51 469.43 7 FIX 524 3.68 754 354 2014.19 468.83 8 FIX 523 5.24 753 353 2019.43 467.73 9 FIX 522 8.25 752 352 2027.68 466.53 10 FIX 521 8.08 751 351 2035.75 465.78 11 FIX 520 7.81 750 350 2043.56 465.58 12 FIX 519 6.86 749 349 2050.43 465.43 13 FIX 518 7.97 748 348 2058.40 465.53 14 FIX 517 2.15 747 347 2060.56 465.73 15 SUND BP 2.59 746 346 2063.14 465.53 16 SUND BP 2.59 745 345 2065.73 465.58 17 SUND BP 1.72 744 344 2067.45 465.43 18 FIX 516 9.92 743 343 2077.37 465.43 19 FIX 515 4.79 742 342 2082.17 465.43 20 SUND BP 5.39 741 341 2087.56 465.58 21 FIX 514 9.88 740 340 2097.44 465.98 22 FIX 513 8.55 739 339 2105.99 466.13 23 FIX 512 8.02 738 338 2114.01 466.38 24 FIX 511 8.37 737 337 2122.38 466.63 25 FIX 510 7.83 736 336 2130.21 466.88 26 FIX 509 3.58 735 335 2133.78 466.93 27 SUND BP 4.65 734 334 2138.43 467.13 28 FIX 508 FRASER RIVER XS 23 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6.46 733 333 2144.90 467.43 29 FIX 507 5.48 732 332 2150.38 467.83 30 FIX 506 6.39 731 331 2156.77 468.13 31 FIX 505 5.77 730 330 2162.54 468.38 32 FIX 504 5.34 729 329 2167.89 468.63 33 FIX 503 5.60 728 328 2173.49 468.83 34 FIX 502 5.65 727 327 2179.14 469.08 35 FIX 501 1.15 726 326 2180.28 469.08 36 FIX 500 7.87 725 325 2188.15 469.57 37 .62 2.29 724 324 2190.44 469.71 38 .5 3.66 723 323 2194.10 469.86 39 .34 6.39 722 322 2200.49 470.20 40 WL RB 8.00 721 321 2208.48 470.51 41 . 13.60 720 320 2222.09 470.89 42 . 13.17 719 319 2235.26 470.85 43 . 18.96 718 318 2254.22 470.25 44 . 15.49 717 317 2269.71 469.88 45 WL 8.29 716 316 2278.00 469.81 46 .07 5.58 715 315 2283.57 469.80 47 .08 5.65 714 314 2289.23 469.86 48 WL 29.36 713 313 2318.59 470.56 49 . 19.86 712 312 2338.45 471.10 50 . 29.82 711 311 2368.27 471.40 51 . 21.99 710 310 2390.26 470.97 52 . 23.14 709 309 2413.40 470.65 53 . 2.72 708 308 2416.12 471.65 54 . 11.11 707 307 2427.23 472.02 55 . 9.24 706 306 2436.47 471.77 56 . FRASER RIVER XS 23 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 4.36 705 305 2440.84 472.39 57 . 5.59 704 304 2446.43 472.86 58 NB 3.91 703 303 2450.34 473.01 59 . 3.93 702 302 2454.27 472.69 60 . 3.02 701 301 2457.29 472.88 61 TOE 7.13 700 300 2464.42 473.79 62 TOP 3.29 699 299 2467.71 473.92 63 GL BOLT RB 16.53 698 298 2484.24 473.82 64 . 19.86 697 297 2504.10 473.87 65 . 10.19 696 296 2514.29 473.40 66 . 9.71 695 295 2524.00 473.73 67 . 12.12 694 294 2536.12 473.21 68 . 6.34 693 293 2542.46 473.23 69 . 7.31 692 292 2549.77 473.96 70 . 6.14 691 291 2555.91 474.08 71 . 9.57 690 290 2565.48 473.98 72 . 13.96 689 289 2579.43 473.71 73 . 19.18 688 288 2598.61 473.91 74 . 23.20 687 287 2621.81 474.23 75 . 14.14 686 286 2635.95 474.32 76 . 6.91 685 285 2642.86 473.73 77 . 2.53 684 284 2645.39 474.17 78 . 4.16 683 283 2649.55 474.18 79 TOP 5.68 682 282 2655.23 473.27 80 TOE 4.42 681 281 2659.66 473.06 81 CL 3.95 680 280 2663.60 473.35 82 TOE 1.74 679 279 2665.34 473.99 83 TOP OLD B CHAN 2.69 678 278 2668.04 474.20 84 . FRASER RIVER XS 23 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.58 677 277 2671.61 473.71 85 . 3.39 676 276 2675.00 474.04 86 . 1.75 675 275 2676.75 473.54 87 . 10.33 674 274 2687.08 473.53 88 . 1.74 673 273 2688.83 473.92 89 . 2.66 672 272 2691.48 473.48 90 . 4.30 671 271 2695.78 473.92 91 . 5.50 670 270 2701.28 473.72 92 . 15.12 669 269 2716.40 473.66 93 . 5.05 668 268 2721.46 473.89 94 . 3.37 667 267 2724.82 474.32 95 . 5.61 666 266 2730.43 474.13 96 . 13.22 665 265 2743.65 474.21 97 . 11.27 664 264 2754.91 474.29 98 TOP 0.77 663 263 2755.69 474.03 99 TOE B CHAN 1.29 662 262 2756.97 474.12 100 TOE B CHAN 3.90 661 261 2760.87 474.26 101 . 11.82 660 260 2772.70 474.50 102 . 15.27 659 259 2787.96 474.96 103 . 9.45 658 258 2797.41 475.37 104 . 19.45 657 257 2816.86 475.91 105 . 9.94 656 256 2826.80 476.38 106 . 5.53 655 255 2832.33 476.52 107 . 4.83 654 254 2837.15 476.38 108 . 16.74 653 253 2853.89 476.98 109 . 11.47 652 252 2865.36 477.18 110 TOE RISE BYND JOIN 761-652 N68 26 43W 2865.361 FRASER RIVER XS 23 PROJECT 8912F027 JULY 1989 INPUT LISTING FRASER RIVER XS 24 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 688 288 0.00 478.27 1 DUMMY 2000.00 687 287 2000.00 478.27 2 STEEP RISE BYND 8.56 686 286 2008.56 472.89 3 NB 1.49 685 285 2010.05 472.08 4 GL BOLT LB 1.46 684 284 2011.51 471.59 5 . 2.05 683 283 2013.56 470.76 6 WL LB 1.00 682 282 2014.56 470.16 7 .6 1.37 681 281 2015.93 469.94 8 FIX 516 4.24 680 280 2020.17 468.44 9 FIX 515 6.09 679 279 2026.26 467.24 10 SUND BP 0.81 678 278 2027.07 467.34 11 FIX 514 1.54 677 277 2028.61 467.29 12 SUND BP 5.13 676 276 2033.74 465.74 13 SUND BP 3.59 675 275 2037.33 465.34 14 FIX 513 2.76 674 274 2040.10 465.24 15 SUND BP 4.84 673 273 2044.93 465.74 16 SUND BP 6.22 672 272 2051.15 465.84 17 FIX 512 5.88 671 271 2057.03 465.94 18 SUND BP 5.04 670 270 2062.07 465.84 19 SUND BP 5.04 669 269 2067.11 465.94 20 SUND BP 3.36 668 268 2070.47 465.79 21 FIX 511 11.07 667 267 2081.54 465.79 22 SUND BP 8.86 666 266 2090.40 465.94 23 FIX 510 18.69 665 265 2109.08 466.24 24 FIX 509 18.37 664 264 2127.45 466.69 25 FIX 508 15.76 663 263 2143.21 467.19 26 FIX 507 19.53 662 262 2162.74 467.89 27 FIX 506 14.48 661 261 2177.22 468.64 28 FIX 505 FRASER RIVER XS 24 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 13.80 660 260 2191.01 469.24 29 FIX 504 3.74 659 259 2194.75 469.44 30 SUND BP 4.99 658 258 2199.74 469.59 31 FIX 503 5.43 657 257 2205.17 469.79 32 FIX 502 4.07 656 256 2209.24 469.99 33 FIX 501 1.16 655 255 2210.40 470.04 34 FIX 501 11.12 654 254 2221.52 470.49 35 .21 3.14 653 253 2224.67 470.72 36 WL RB 21.82 652 252 2246.48 471.39 37 . 25.86 651 251 2272.34 471.70 38 . 33.88 650 250 2306.23 471.77 39 . 26.74 649 249 2332.97 472.28 40 . 28.17 648 248 2361.13 472.52 41 . 18.41 647 247 2379.55 472.67 42 . 5.82 646 246 2385.37 472.36 43 . 22.09 645 245 2407.46 472.05 44 . 8.90 644 244 2416.36 472.52 45 . 1.26 643 243 2417.62 472.91 46 . 5.83 642 242 2423.45 472.46 47 . 2.77 641 241 2426.23 473.40 48 . 1.60 640 240 2427.83 473.32 49 . 0.91 639 239 2428.73 472.82 50 . 2.03 638 238 2430.76 472.87 51 . 2.04 637 237 2432.81 473.55 52 . 2.99 636 236 2435.79 473.65 53 . 1.30 635 235 2437.09 473.46 54 . 4.54 634 234 2441.63 473.38 55 TOE 1.81 633 233 2443.44 473.75 56 NB FRASER RIVER XS 24 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 9.02 632 232 2452.46 474.28 57 TOP 0.03 631 231 2452.49 474.47 58 GL BOLT RB 7.62 630 230 2460.11 474.39 59 . 7.18 629 229 2467.29 474.14 60 . 10.15 628 228 2477.44 474.10 61 . 2.72 627 227 2480.16 474.60 62 . 2.94 626 226 2483.10 474.91 63 . 3.86 625 225 2486.97 474.76 64 . 7.14 624 224 2494.11 474.96 65 . 2.30 623 223 2496.41 474.82 66 . 5.17 622 222 2501.58 475.34 67 . 6.42 621 221 2508.00 475.99 68 . 11.33 620 220 2519.33 475.94 69 . 3.90 619 219 2523.22 475.57 70 . 8.22 618 218 2531.44 475.21 71 TOP 2.46 617 217 2533.90 474.72 72 TOE 3.70 616 216 2537.60 474.76 73 TOE 1.79 615 215 2539.39 475.35 74 TOP 3.03 614 214 2542.42 475.70 75 . 5.77 613 213 2548.19 475.72 76 . 6.76 612 212 2554.95 475.82 77 . 12.04 611 211 2566.98 475.52 78 . 0.81 610 210 2567.79 475.10 79 EDGE ROAD 2.99 609 209 2570.78 474.93 80 EDGE OLD ROAD 2.60 608 208 2573.38 475.28 81 . 1.45 607 207 2574.83 474.92 82 . 4.86 606 206 2579.69 475.27 83 . 4.52 605 205 2584.21 475.24 84 TOP B CHAN FRASER RIVER XS 24 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6.60 604 204 2590.81 473.07 85 TOE B CHAN 4.62 603 203 2595.43 472.56 86 CL 3.00 602 202 2598.43 472.73 87 TOE 3.17 601 201 2601.60 474.47 88 TOP B CHAN 4.14 600 200 2605.74 475.49 89 SLOW RISE BYND JOIN 688-600 S87 40 33W 2605.743 FRASER RIVER XS 25 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 199 0.00 477.51 1 DUMMY 2000.00 600 200 2000.00 477.51 2 STEEP RISE BYND 2.50 601 201 2002.50 474.85 3 GL BOLT LB 1.49 602 202 2003.99 473.92 4 NB 0.89 603 203 2004.88 472.93 5 SCOUR LINE 5.02 604 204 2009.90 471.10 6 WL LB 1.91 605 205 2011.81 470.48 7 .6 3.27 606 206 2015.08 469.90 8 FIX 500 1.95 607 207 2017.03 469.85 9 SUND BP 1.30 608 208 2018.34 469.50 10 FIX 501 7.22 609 209 2025.56 468.05 11 FIX 502 7.37 610 210 2032.92 466.80 12 FIX 503 3.75 611 211 2036.67 466.35 13 SUND BP 6.57 612 212 2043.24 466.15 14 FIX 504 4.52 613 213 2047.76 466.10 15 SUND BP 6.78 614 214 2054.54 466.55 16 FIX 505 13.66 615 215 2068.20 467.75 17 FIX 506 6.20 616 216 2074.40 468.20 18 SUND BP 13.96 617 217 2088.36 468.25 19 FIX 507 5.47 618 218 2093.83 468.15 20 SUND BP 7.29 619 219 2101.12 468.15 21 FIX 508 13.77 620 220 2114.89 468.15 22 FIX 509 11.04 621 221 2125.94 468.10 23 FIX 510 12.80 622 222 2138.74 468.05 24 FIX 511 13.00 623 223 2151.74 467.90 25 FIX 512 11.64 624 224 2163.38 467.80 26 FIX 513 12.84 625 225 2176.22 467.65 27 FIX 514 12.29 626 226 2188.51 467.40 28 FIX 515 FRASER RIVER XS 25 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 10.32 627 227 2198.83 467.35 29 FIX 516 8.69 628 228 2207.52 467.20 30 FIX 517 3.63 629 229 2211.15 467.20 31 FIX 518 4.85 630 230 2216.00 467.55 32 FIX 519 7.61 631 231 2223.61 469.61 33 1.38 2.06 632 232 2225.68 470.16 34 .8 3.16 633 233 2228.83 471.00 35 WL RB 5.65 634 234 2234.48 472.86 36 NB 4.10 635 235 2238.58 476.22 37 TOP BANK 3.95 636 236 2242.53 475.94 38 . 4.00 637 237 2246.52 476.26 39 . 3.86 638 238 2250.38 476.27 40 GL BOLT RB 5.01 639 239 2255.39 476.23 41 EDGE BUSH 6.12 640 240 2261.51 475.99 42 . 3.39 641 241 2264.90 475.65 43 . 3.55 642 242 2268.45 475.94 44 . 5.76 643 243 2274.21 475.34 45 . 6.34 644 244 2280.55 475.39 46 . 7.67 645 245 2288.22 475.39 47 . 6.60 646 246 2294.82 475.60 48 TOE 5.20 647 247 2300.03 477.72 49 TOP 4.97 648 248 2305.00 478.14 50 SLOW RISE JOIN 599-648 S65 02 26W 2304.998 FRASER RIVER XS 26 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 664 264 0.00 476.36 1 DUMMY 2000.00 663 263 2000.00 476.36 2 FIELD LEVEL 16.00 662 262 2016.00 476.99 3 F LINE 3.79 661 261 2019.79 476.90 4 TOP FIELD 6.37 660 260 2026.16 475.46 5 . 8.69 659 259 2034.85 474.82 6 TOP 1.72 658 258 2036.57 474.25 7 . 3.47 657 257 2040.04 474.41 8 TOE 1.62 656 256 2041.67 474.84 9 . 2.62 655 255 2044.29 474.65 10 . 4.43 654 254 2048.72 474.80 11 . 6.41 653 253 2055.13 474.98 12 . 5.49 652 252 2060.62 475.06 13 . 3.41 651 251 2064.04 475.46 14 . 5.66 650 250 2069.70 475.74 15 . 6.20 649 249 2075.90 475.53 16 TOP 4.53 648 248 2080.43 474.82 17 NB 3.67 647 247 2084.09 474.64 18 GL BOLT LB 6.59 646 246 2090.69 473.63 19 SCOUR LINE 10.53 645 245 2101.21 472.01 20 TOE 10.04 644 244 2111.26 471.61 21 . 13.18 643 243 2124.44 471.32 22 WL LB 9.16 642 242 2133.60 471.21 23 .11 8.02 641 241 2141.62 471.13 24 .19 6.83 640 240 2148.45 470.90 25 .43 9.76 639 239 2158.22 470.64 26 FIX 520 4.88 638 238 2163.09 470.59 27 FIX 519 5.81 637 237 2168.90 470.29 28 FIX 518 FRASER RIVER XS 26 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6.95 636 236 2175.85 470.19 29 FIX 517 10.92 635 235 2186.78 469.89 30 FIX 516 12.80 634 234 2199.58 469.54 31 FIX 515 15.00 633 233 2214.58 469.09 32 FIX 514 19.04 632 232 2233.62 468.14 33 FIX 513 14.15 631 231 2247.77 467.59 34 FIX 512 9.23 630 230 2257.00 467.49 35 SUND BP 9.23 629 229 2266.22 467.59 36 FIX 511 13.54 628 228 2279.76 468.09 37 FIX 510 12.49 627 227 2292.25 468.09 38 SUND BP 5.35 626 226 2297.61 468.29 39 FIX 509 17.27 625 225 2314.87 468.99 40 FIX 508 16.76 624 224 2331.64 469.74 41 FIX 507 2.52 623 223 2334.16 469.79 42 SUND BP 6.30 622 222 2340.46 469.39 43 SUND BP 4.41 621 221 2344.86 469.19 44 SUND BP 1.89 620 220 2346.75 469.24 45 FIX 506 5.54 619 219 2352.29 469.49 46 SUND BP 7.12 618 218 2359.42 469.29 47 SUND BP 3.17 617 217 2362.58 468.89 48 FIX 505 4.31 616 216 2366.89 468.14 49 SUND BP 5.74 615 215 2372.63 468.14 50 SUND BP 2.87 614 214 2375.50 468.29 51 FIX 504 10.30 613 213 2385.80 469.09 52 FIX 503 8.87 612 212 2394.67 469.79 53 FIX 502 2.02 611 211 2396.68 470.19 54 SUND BP 2.77 610 210 2399.46 470.34 55 FIX 501 1.84 609 209 2401.30 470.39 56 FIX 500 FRASER RIVER XS 26 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3.17 608 208 2404.46 470.75 57 .69 2.30 607 207 2406.76 470.96 58 .48 4.63 606 206 2411.40 471.45 59 WL RB 4.11 605 205 2415.51 472.28 60 . 2.37 604 204 2417.88 473.04 61 WASH LINE 1.52 603 203 2419.40 473.57 62 GL BOLT RB 1.79 602 202 2421.19 474.71 63 NB 2.80 601 201 2423.98 477.27 64 ON SLOPE 4.03 600 200 2428.02 480.17 65 ON SLOPE JOIN 664-600 S51 54 11W 2428.015 FRASER RIVER XS 27 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 199 0.00 478.91 1 DUMMY 2000.00 600 200 2000.00 478.91 2 FIELD LEVEL 20.86 601 201 2020.86 478.97 3 GL BOLT AT FENCE 0.95 602 202 2021.81 478.78 4 TOP CUT BANK 2.35 603 203 2024.16 476.45 5 ON SLOPE 1.43 604 204 2025.59 475.08 6 NB TOE 4.05 605 205 2029.65 473.46 7 . 4.54 606 206 2034.19 472.15 8 WL LB 2.16 607 207 2036.35 471.51 9 .64 2.48 608 208 2038.83 470.73 10 1.42 0.29 609 209 2039.12 470.84 11 FIX 500 0.34 610 210 2039.46 470.84 12 SUND BP 0.29 611 211 2039.74 470.39 13 FIX 501 1.36 612 212 2041.11 470.39 14 SUND BP 3.27 613 213 2044.38 469.98 15 FIX 502 6.84 614 214 2051.22 469.23 16 FIX 503 9.97 615 215 2061.19 468.23 17 FIX 504 12.11 616 216 2073.30 467.73 18 FIX 505 9.77 617 217 2083.08 467.39 19 FIX 506 12.13 618 218 2095.21 467.39 20 FIX 507 15.15 619 219 2110.35 467.39 21 FIX 508 13.39 620 220 2123.75 467.54 22 FIX 509 5.48 621 221 2129.23 467.59 23 SUND BP 8.61 622 222 2137.84 467.89 24 FIX 510 12.82 623 223 2150.67 468.54 25 FIX 511 13.37 624 224 2164.04 469.09 26 FIX 512 12.61 625 225 2176.65 469.54 27 FIX 513 9.14 626 226 2185.79 469.98 28 FIX 514 FRASER RIVER XS 27 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 10.11 627 227 2195.90 470.69 29 FIX 515 5.47 628 228 2201.38 470.94 30 FIX 516 8.28 629 229 2209.65 471.34 31 FIX 517 5.00 630 230 2214.65 471.79 32 FIX 518 9.01 631 231 2223.66 472.20 33 WL RB 10.45 632 232 2234.11 472.62 34 . 16.66 633 233 2250.76 473.45 35 . 10.43 634 234 2261.19 473.96 36 BAR 6.59 635 235 2267.78 473.73 37 TOP BAR 9.55 636 236 2277.34 472.62 38 . 6.97 637 237 2284.30 472.64 39 . 8.74 638 238 2293.04 473.38 40 . 5.71 639 239 2298.75 474.23 41 NB 4.76 640 240 2303.51 474.54 42 . 4.74 641 241 2308.25 474.69 43 . 5.25 642 242 2313.50 475.43 44 GL BOLT RB 6.75 643 243 2320.24 476.32 45 TOP 5.04 644 244 2325.29 476.31 46 . 4.24 645 245 2329.53 475.74 47 . 12.30 646 246 2341.83 475.89 48 . 11.57 647 247 2353.40 476.10 49 . 10.18 648 248 2363.58 475.80 50 . 8.70 649 249 2372.28 476.19 51 . 6.14 650 250 2378.42 476.00 52 . 8.29 651 251 2386.71 475.10 53 . 2.84 652 252 2389.54 474.78 54 . 3.26 653 253 2392.81 475.25 55 . 7.89 654 254 2400.70 474.50 56 . FRASER RIVER XS 27 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 10.50 655 255 2411.20 474.61 57 . 6.97 656 256 2418.17 474.25 58 . 6.73 657 257 2424.90 474.05 59 NB 5.49 658 258 2430.39 473.90 60 . 4.16 659 259 2434.56 473.05 61 . 12.79 660 260 2447.34 472.82 62 . 3.31 661 261 2450.65 473.10 63 . 14.09 662 262 2464.75 472.88 64 . 11.33 663 263 2476.07 471.99 65 . 11.38 664 264 2487.45 471.51 66 WL B CHAN 4.78 665 265 2492.23 471.18 67 .3 5.07 666 266 2497.30 471.05 68 .46 5.64 667 267 2502.94 470.91 69 .61 5.48 668 268 2508.42 471.48 70 WL B CHAN 2.96 669 269 2511.38 472.15 71 . 2.21 670 270 2513.59 473.03 72 SCOUR LINE 1.29 671 271 2514.89 474.31 73 ON SLOPE 1.31 672 272 2516.20 475.29 74 NB 0.95 673 273 2517.15 475.61 75 TOP BANK 2.44 674 274 2519.59 476.45 76 ON SLOPE 2.38 675 275 2521.97 477.69 77 ON SLOPE JOIN 599-675 S72 29 19W 2521.974 FRASER RIVER XS 28 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 599 199 0.00 480.45 1 DUMMY 2000.00 600 200 2000.00 480.45 2 FIELD LEVEL 24.75 601 201 2024.75 479.82 3 GL BOLT LB 4.03 602 202 2028.78 479.81 4 TOP CUT BANK 0.62 603 203 2029.40 478.11 5 ON SLOPE 3.28 604 204 2032.68 475.47 6 NB 0.84 605 205 2033.52 474.55 7 WASH LINE 4.70 606 206 2038.22 472.86 8 WL LB 1.53 607 207 2039.75 472.20 9 .63 0.97 608 208 2040.72 472.02 10 .84 2.43 609 209 2043.15 471.60 11 FIX 500 3.55 610 210 2046.70 470.75 12 FIX 501 6.22 611 211 2052.92 470.55 13 FIX 502 9.10 612 212 2062.03 470.45 14 FIX 503 11.17 613 213 2073.20 470.40 15 FIX 504 9.35 614 214 2082.56 470.45 16 FIX 505 8.47 615 215 2091.03 470.90 17 FIX 506 5.11 616 216 2096.14 471.45 18 FIX 507 4.73 617 217 2100.87 471.85 19 FIX 508 3.70 618 218 2104.57 472.10 20 FIX 509 2.35 619 219 2106.91 472.25 21 FIX 510 3.10 620 220 2110.02 472.47 22 .3 7.21 621 221 2117.22 472.77 23 WL RB 3.80 622 222 2121.02 472.86 24 GL BOLT BAR 5.50 623 223 2126.52 472.70 25 WL LB 3.27 624 224 2129.79 472.33 26 .38 6.64 625 225 2136.43 471.30 27 FIX 500 5.91 626 226 2142.34 470.75 28 FIX 501 FRASER RIVER XS 28 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 7.06 627 227 2149.40 470.15 29 FIX 502 6.02 628 228 2155.42 470.05 30 FIX 503 11.55 629 229 2166.97 470.45 31 FIX 504 4.75 630 230 2171.72 470.50 32 SUND BP 2.77 631 231 2174.50 470.65 33 SUND BP 6.74 632 232 2181.23 470.55 34 SUND BP 2.77 633 233 2184.00 470.60 35 SUND BP 0.40 634 234 2184.40 470.50 36 FIX 505 3.09 635 235 2187.49 470.75 37 SUND BP 2.83 636 236 2190.31 471.05 38 FIX 506 3.27 637 237 2193.59 471.55 39 SUND BP 1.64 638 238 2195.23 471.55 40 FIX 507 3.88 639 239 2199.10 471.35 41 FIX 508 4.18 640 240 2203.28 471.35 42 FIX 509 2.09 641 241 2205.37 471.25 43 SUND BP 0.97 642 242 2206.34 471.05 44 SUND BP 1.95 643 243 2208.29 471.15 45 FIX 510 1.85 644 244 2210.14 471.05 46 FIX 511 4.89 645 245 2215.03 470.65 47 FIX 512 4.48 646 246 2219.51 470.20 48 SUND BP 4.93 647 247 2224.43 470.35 49 FIX 513 12.55 648 248 2236.98 470.05 50 FIX 514 7.13 649 249 2244.11 469.85 51 SUND BP 4.28 650 250 2248.39 469.90 52 FIX 515 12.19 651 251 2260.58 470.00 53 FIX 516 11.22 652 252 2271.79 469.95 54 FIX 517 21.08 653 253 2292.87 470.10 55 FIX 518 15.01 654 254 2307.88 470.30 56 FIX 519 FRASER RIVER XS 28 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 19.81 655 255 2327.70 470.55 57 FIX 520 17.58 656 256 2345.28 470.55 58 FIX 521 3.17 657 257 2348.45 470.55 59 SUND BP 12.66 658 258 2361.11 470.70 60 FIX 522 13.82 659 259 2374.92 471.05 61 FIX 523 6.82 660 260 2381.75 471.75 62 FIX 524 1.82 661 261 2383.57 472.15 63 FIX 525 2.89 662 262 2386.46 472.83 64 WL RB 3.85 663 263 2390.32 474.11 65 WASH LINE 1.02 664 264 2391.34 474.68 66 ON SLOPE 1.48 665 265 2392.82 477.24 67 TOP CUT BANK 8.99 666 266 2401.81 477.38 68 . 5.69 667 267 2407.49 477.58 69 GL BOLT RB ISLD 6.84 668 268 2414.34 477.36 70 TOP 2.87 669 269 2417.21 475.81 71 TOE 3.01 670 270 2420.22 475.69 72 . 1.79 671 271 2422.01 475.34 73 NB 4.63 672 272 2426.64 475.15 74 . 2.72 673 273 2429.36 475.41 75 . 6.52 674 274 2435.88 475.40 76 . 5.97 675 275 2441.85 474.79 77 NB 1.97 676 276 2443.82 474.48 78 . 12.68 677 277 2456.50 474.02 79 . 7.80 678 278 2464.30 473.24 80 . 13.32 679 279 2477.62 473.30 81 WL B CHAN 11.93 680 280 2489.55 473.15 82 .2 6.53 681 281 2496.08 472.95 83 .4 9.02 682 282 2505.10 473.36 84 WL B CHAN FRASER RIVER XS 28 PROJECT 8912F027 JULY 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 0.54 683 283 2505.64 473.73 85 TOE 0.83 684 284 2506.47 474.32 86 TOP 1.19 685 285 2507.66 474.43 87 . 1.67 686 286 2509.33 475.34 88 NB 3.33 687 287 2512.66 476.94 89 ON SLOPE 2.09 688 288 2514.75 478.29 90 RISE BYND JOIN 599-688 S88 12 52W 2514.749 FRASER RIVER THALWEG PROFILE 8912F027 JULY 28 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 286 486 0.00 456.82 1 XS1 183.05 285 485 183.05 457.32 2 126.24 284 484 309.29 455.38 3 100.99 283 483 410.28 454.44 4 63.12 282 482 473.40 455.67 5 63.12 281 481 536.52 454.01 6 37.87 280 480 574.39 456.63 7 113.62 279 479 688.01 458.49 8 100.99 278 478 789.00 457.84 9 XS2 81.35 277 477 870.35 458.68 10 58.11 276 476 928.46 457.91 11 34.86 275 475 963.32 459.73 12 34.86 274 474 998.19 458.95 13 58.11 273 473 1056.30 459.58 14 23.24 272 472 1079.54 458.59 15 69.73 271 471 1149.27 458.03 16 34.86 270 470 1184.14 456.85 17 69.73 269 469 1253.86 459.88 18 162.70 268 468 1416.57 458.77 19 104.59 267 467 1521.16 459.72 20 69.73 266 466 1590.89 460.76 21 46.49 265 465 1637.38 457.58 22 11.62 264 464 1649.00 459.09 23 XS3 89.00 263 463 1738.00 459.13 24 71.20 262 462 1809.20 457.96 25 35.60 261 461 1844.80 455.67 26 35.60 260 460 1880.40 456.19 27 53.40 259 459 1933.80 457.71 28 FRASER RIVER THALWEG PROFILE 8912F027 JULY 28 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 53.40 258 458 1987.20 457.73 29 71.20 257 457 2058.40 458.76 30 35.60 256 456 2094.00 458.27 31 160.20 255 455 2254.20 459.14 32 124.60 254 454 2378.80 459.29 33 71.20 253 453 2450.00 458.92 34 XS4 76.05 252 452 2526.05 458.50 35 27.66 251 451 2553.71 458.03 36 96.79 250 450 2650.50 457.63 37 69.14 249 449 2719.64 456.00 38 82.97 248 448 2802.61 459.19 39 96.79 247 447 2899.40 459.49 40 69.14 246 446 2968.54 459.07 41 82.97 245 445 3051.51 459.75 42 82.97 244 444 3134.48 459.14 43 82.97 243 443 3217.44 461.83 44 110.62 242 442 3328.07 461.45 45 165.93 241 441 3494.00 461.42 46 XS5 73.06 240 440 3567.06 460.76 47 48.71 239 439 3615.77 459.89 48 109.60 238 438 3725.37 457.15 49 85.24 237 437 3810.61 452.29 50 73.06 236 436 3883.68 451.03 51 36.53 235 435 3920.21 450.85 52 24.35 234 434 3944.56 453.26 53 36.53 233 433 3981.10 453.78 54 48.71 232 432 4029.81 452.31 55 60.89 231 431 4090.69 459.34 56 FRASER RIVER THALWEG PROFILE 8912F027 JULY 28 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 60.89 230 430 4151.58 459.08 57 48.71 229 429 4200.29 459.40 58 48.71 228 428 4249.00 460.23 59 XS6 56.74 227 427 4305.74 460.76 60 129.69 226 426 4435.44 460.42 61 129.69 225 425 4565.13 460.58 62 226.96 224 424 4792.09 459.79 63 48.64 223 423 4840.73 460.21 64 97.27 222 422 4938.00 459.76 65 XS7 106.77 221 421 5044.77 460.12 66 28.47 220 420 5073.25 459.74 67 99.66 219 419 5172.90 460.40 68 128.13 218 418 5301.03 461.78 69 71.18 217 417 5372.22 461.92 70 227.78 216 416 5600.00 461.56 71 XS8 115.77 215 415 5715.77 461.25 72 128.64 214 414 5844.41 461.34 73 192.95 213 413 6037.36 461.88 74 25.73 212 412 6063.09 462.60 75 102.91 211 411 6166.00 461.98 76 XS9 30.71 210 410 6196.71 462.31 77 138.18 209 409 6334.88 462.04 78 76.76 208 408 6411.65 462.32 79 76.76 207 407 6488.41 463.19 80 46.06 206 406 6534.47 462.83 81 92.12 205 405 6626.59 463.72 82 30.71 204 404 6657.29 463.75 83 30.71 203 403 6688.00 463.37 84 C/L NEW BR. FRASER RIVER THALWEG PROFILE 8912F027 JULY 28 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 7.06 202 402 6695.06 463.67 85 70.59 201 401 6765.65 463.47 86 42.35 200 400 6808.00 462.17 87 C/L OLD BR. 6.64 199 399 6814.64 463.17 88 53.15 198 398 6867.79 463.30 89 66.44 197 397 6934.23 463.14 90 358.77 196 396 7293.00 464.05 91 XS16 295.93 195 395 7588.93 464.64 92 218.73 194 394 7807.67 464.58 93 257.33 193 393 8065.00 463.95 94 XS17 70.39 192 392 8135.39 463.90 95 84.47 191 391 8219.86 463.25 96 42.24 190 390 8262.10 463.38 97 168.94 189 389 8431.04 463.59 98 70.39 188 388 8501.43 463.54 99 28.16 187 387 8529.59 463.35 100 70.39 186 386 8599.98 463.50 101 84.47 185 385 8684.45 463.86 102 98.55 184 384 8783.00 464.92 103 XS18 83.52 183 383 8866.52 465.77 104 64.25 182 382 8930.77 465.11 105 89.95 181 381 9020.72 465.06 106 89.95 180 380 9110.66 464.91 107 321.24 179 379 9431.90 463.80 108 77.10 178 378 9509.00 463.35 109 XS19 67.19 177 377 9576.19 462.97 110 40.32 176 376 9616.51 462.39 111 215.02 175 375 9831.53 460.46 112 FRASER RIVER THALWEG PROFILE 8912F027 JULY 28 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 26.88 174 374 9858.40 459.96 113 13.44 173 373 9871.84 460.97 114 80.63 172 372 9952.47 461.69 115 26.88 171 371 9979.35 461.50 116 174.70 170 370 10154.05 463.56 117 120.95 169 369 10275.00 463.60 118 XS20 66.44 168 368 10341.44 463.25 119 59.06 167 367 10400.49 462.39 120 88.58 166 366 10489.08 461.96 121 59.06 165 365 10548.13 464.10 122 103.35 164 364 10651.48 464.48 123 206.70 163 363 10858.18 464.83 124 73.82 162 362 10932.00 465.19 125 XS21 86.00 161 361 11018.00 465.84 126 215.00 160 360 11233.00 466.28 127 100.33 159 359 11333.33 466.24 128 28.67 158 358 11362.00 463.96 129 129.00 157 357 11491.00 466.24 130 43.00 156 356 11534.00 466.47 131 86.00 155 355 11620.00 466.22 132 XS22 14.89 154 354 11634.89 466.13 133 163.78 153 353 11798.67 466.25 134 253.11 152 352 12051.78 466.13 135 148.89 151 351 12200.67 465.73 136 208.44 150 350 12409.11 465.78 137 148.89 149 349 12558.00 465.49 138 XS23 41.14 148 348 12599.14 465.32 139 123.43 147 347 12722.57 465.60 140 FRASER RIVER THALWEG PROFILE 8912F027 JULY 28 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 20.57 146 346 12743.14 465.31 141 20.57 145 345 12763.71 465.63 142 82.29 144 344 12846.00 465.68 143 61.71 143 343 12907.71 465.92 144 96.00 142 342 13003.71 465.48 145 89.14 141 341 13092.86 465.34 146 13.71 140 340 13106.57 465.05 147 82.29 139 339 13188.86 465.11 148 48.00 138 338 13236.86 465.34 149 185.14 137 337 13422.00 465.76 150 XS24 71.64 136 336 13493.64 465.79 151 97.69 135 335 13591.33 464.82 152 97.69 134 334 13689.02 464.86 153 84.66 133 333 13773.68 464.59 154 71.64 132 332 13845.32 464.92 155 78.15 131 331 13923.47 466.15 156 97.69 130 330 14021.16 467.08 157 117.23 129 329 14138.39 467.63 158 58.61 128 328 14197.00 467.65 159 XS25 83.88 127 327 14280.88 467.58 160 69.90 126 326 14350.79 467.71 161 83.88 125 325 14434.67 467.64 162 97.87 124 324 14532.54 466.87 163 RP4 90.88 123 323 14623.41 466.21 164 76.89 122 322 14700.31 467.24 165 118.84 121 321 14819.14 467.98 166 104.86 120 320 14924.00 468.02 167 XS26 43.38 119 319 14967.38 468.16 168 FRASER RIVER THALWEG PROFILE 8912F027 JULY 28 1989 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 26.70 118 318 14994.08 467.79 169 100.12 117 317 15094.20 468.30 170 93.44 116 316 15187.64 468.19 171 46.72 115 315 15234.36 468.44 172 46.72 114 314 15281.09 468.49 173 33.37 113 313 15314.46 468.32 174 RP3 46.72 112 312 15361.18 468.37 175 120.14 111 311 15481.32 467.70 176 140.16 110 310 15621.49 467.14 177 106.79 109 309 15728.28 467.25 178 46.72 108 308 15775.00 467.50 179 XS27 85.65 107 307 15860.65 468.27 180 210.84 106 306 16071.50 469.96 181 72.48 105 305 16143.97 470.12 182 RP2 92.24 104 304 16236.21 470.40 183 98.83 103 303 16335.05 470.68 184 65.89 102 302 16400.93 470.74 185 79.07 101 301 16480.00 470.61 186 XS28 JOIN 301-486 SOUTH 16480.000