THIS INFORMATION IS CONSIDERED HISTORICAL AS IT REPRESENTS CHANNEL CONDITIONS AND CONFIGURATION AT THE TIME OF THE SURVEY ONLY. USER MUST ACCEPT RESPONSIBILITY OF ENSURING THAT THE ACCURACY AND COMPLETENESS OF PROVIDED DATA IS SUITABLE FOR THE NEEDS OF THE PROJECT OR STUDY. IT IS PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND, WHETHER EXPRESS OR IMPLIED. UNDER NO CIRCUMSTANCES WILL THE GOVERNMENT OF BRITISH COLUMBIA BE LIABLE TO ANY PERSON OR BUSINESS ENTITY FOR ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR OTHER DAMAGES BASED ON ANY USE OF THIS INFORMATION. KETTLE RIVER X/S 1 PROJ#9510F080 SEPT 29 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 1826 0.00 572.20 1 DUMMY 2000.00 1825 2000.00 572.20 2 . 3.82 1824 2003.82 572.25 3 TOP EDGE FIELD 1.30 1823 2005.13 571.82 4 GL BOLT LB 3.40 1822 2008.53 571.57 5 FENCE LINE 1.13 1821 2009.66 571.30 6 TOP BANK 1.15 1820 2010.81 570.67 7 . 1.26 1819 2012.07 569.92 8 TOP CUT BANK 0.27 1818 2012.34 569.31 9 TOE CUT BANK 0.46 1817 2012.80 569.16 10 WL LB BACKCHAN 1.14 1816 2013.94 569.00 11 W0.15 2.01 1815 2015.95 568.63 12 W0.43 1.01 1814 2016.96 568.63 13 W0.52 1.99 1813 2018.94 568.87 14 W0.29 2.42 1812 2021.36 569.14 15 WL LB 3.09 1811 2024.45 568.99 16 W0.15 4.09 1810 2028.54 568.89 17 W0.72 6.34 1809 2034.87 568.67 18 W0.49 4.79 1808 2039.66 568.64 19 W0.53 4.29 1807 2043.96 568.66 20 W0.51 5.95 1806 2049.91 568.77 21 W0.40 6.46 1805 2056.37 568.85 22 W0.31 6.90 1804 2063.27 568.95 23 W0.22 8.14 1803 2071.41 569.16 24 WL RB 4.62 1802 2076.04 569.38 25 TOE BANK 0.90 1801 2076.94 570.08 26 . 0.90 1800 2077.84 570.81 27 TOP BANK 0.12 1799 2077.96 570.79 28 NAT BOUNDARY 0.62 1798 2078.58 571.06 29 . 0.68 1797 2079.26 571.44 30 FENCE CORNER 11.38 1796 2090.64 572.09 31 GL BOLT RB 6.10 1795 2096.75 571.79 32 . 7.36 1794 2104.10 571.73 33 . 7.14 1793 2111.24 571.44 34 . 7.38 1792 2118.62 572.34 35 . 7.31 1791 2125.93 573.45 36 . 7.23 1790 2133.16 574.01 37 . 9.50 1789 2142.66 574.09 38 . 11.19 1788 2153.85 574.53 39 . 4.01 1787 2157.86 575.37 40 . 8.30 1786 2166.16 575.69 41 . 10.40 1785 2176.55 575.75 42 . 4.64 1784 2181.19 575.67 43 . 5.22 1783 2186.42 575.63 44 . 11.24 1782 2197.66 575.49 45 . 11.17 1781 2208.83 575.39 46 . 8.78 1780 2217.60 575.66 47 TOE SLOPE 1.01 1779 2218.61 576.03 48 . 4.88 1778 2223.49 577.97 49 . 6.22 1777 2229.71 581.65 50 RISE BEYOND END KETTLE RIVER X/S 2 PROJ#9510F080 SEPT 29 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 2876 0.00 574.10 1 DUMMY 2000.00 2875 2000.00 574.10 2 FLAT BEYOND 1.88 2874 2001.88 574.13 3 EDGE DRIVEWAY 3.56 2873 2005.44 573.96 4 EDGE DRIVEWAY 5.86 2872 2011.30 573.55 5 GL BOLT LB 0.76 2871 2012.06 573.29 6 TOP BANK 0.85 2870 2012.91 572.58 7 . 2.87 2869 2015.78 570.48 8 NAT BYND 1.53 2868 2017.31 569.58 9 TOE SLOPE 0.68 2867 2017.99 569.35 10 SPIKE 0.65 2866 2018.64 569.29 11 WL LB 1.21 2865 2019.85 568.94 12 W0.34 1.30 2864 2021.15 568.66 13 W0.62 TOE 1.19 2863 2022.34 568.65 14 W0.62 1.97 2862 2024.31 568.59 15 W0.70 1.88 2861 2026.19 568.72 16 W0.56 2.45 2860 2028.64 568.79 17 W0.50 4.88 2859 2033.52 568.84 18 W0.46 7.32 2858 2040.84 568.87 19 W0.42 6.99 2857 2047.84 569.02 20 W0.26 9.85 2856 2057.68 569.02 21 W0.25 8.57 2855 2066.26 569.27 22 WL RB 5.67 2854 2071.93 569.41 23 TOE BANK 1.12 2853 2073.05 570.06 24 . 1.53 2852 2074.57 571.84 25 TOP CUT BANK 0.85 2851 2075.43 572.20 26 TOP BANK 1.70 2850 2077.12 572.30 27 FENCE LINE 3.58 2849 2080.70 572.47 28 . 2.59 2848 2083.29 572.38 29 GL BOLT RB 4.26 2847 2087.54 572.55 30 . 5.33 2846 2092.87 572.31 31 . 8.46 2845 2101.33 572.55 32 . 23.74 2844 2125.07 572.21 33 . 2.76 2843 2127.83 572.18 34 . 6.65 2842 2134.48 572.57 35 . 13.64 2841 2148.12 572.43 36 . 14.81 2840 2162.93 572.54 37 FENCE 1.28 2839 2164.21 572.87 38 . 7.31 2838 2171.52 573.17 39 . 5.95 2837 2177.47 573.27 40 . 14.69 2836 2192.16 574.29 41 . 6.44 2835 2198.60 574.59 42 . 4.67 2834 2203.27 575.35 43 . 2.39 2833 2205.66 575.36 44 EDGE ROAD 2.76 2832 2208.41 575.30 45 CL ROAD 4.51 2831 2212.92 575.35 46 EDGE ROAD 16.54 2830 2229.46 575.36 47 . 19.29 2829 2248.75 575.64 48 . 20.89 2828 2269.64 575.20 49 . 17.99 2827 2287.64 576.82 50 TOE SLOPE 7.12 2826 2294.76 580.32 51 RISE BEYOND END KETTLE RIVER X/S 3 PROJ#9510F080 SEPT 29 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 3399 0.00 575.12 1 DUMMY 2000.00 3400 2000.00 575.12 2 FL-H30V.5 TOE 9.24 3401 2009.24 574.65 3 . 12.20 3402 2021.44 574.67 4 BOLT LB 3.68 3403 2025.12 574.67 5 TOP BANK 5.71 3404 2030.83 572.17 6 . 3.02 3405 2033.86 571.58 7 . 4.56 3406 2038.41 569.65 8 TOE BANK 3.42 3407 2041.83 569.42 9 WL LB 6.75 3408 2048.57 569.16 10 IN CHANNEL 5.33 3409 2053.90 569.35 11 IN CHANNEL 7.28 3410 2061.18 569.26 12 IN CHANNEL 2.56 3411 2063.75 569.37 13 WET BAR 2.71 3412 2066.46 568.99 14 IN CHANNEL 5.71 3413 2072.17 568.90 15 IN CHANNEL 6.03 3414 2078.20 568.95 16 IN CHANNEL 5.61 3415 2083.81 568.68 17 IN CHANNEL 4.23 3416 2088.04 568.77 18 IN CHANNEL 2.46 3417 2090.50 569.16 19 IN CHANNEL 1.39 3418 2091.89 569.40 20 WL RB 3.72 3419 2095.62 570.47 21 TOE CUT 0.35 3420 2095.97 571.37 22 TOP CUT 4.07 3421 2100.04 572.01 23 . 4.19 3422 2104.23 572.28 24 TOE ABUT 0.03 3423 2104.26 575.67 25 TOP ABUTMENT 4.06 3424 2108.32 575.28 26 BOLT RB 39.69 3425 2148.01 573.88 27 CL INT END KETTLE RIVER X/S 4 PROJ#9510F080 SEPT 29 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 4519 0.00 576.38 1 DUMMY 2000.00 4520 2000.00 576.38 2 TOE ABUTMENT 0.01 4521 2000.01 576.77 3 TOP ABUTMENT 0.30 4522 2000.31 576.76 4 TOP ABUTMENT 0.07 4523 2000.38 575.65 5 CORD ELEV LB 0.00 4524 2000.38 575.45 6 TOP SEAT 0.54 4525 2000.93 575.43 7 TOP SEAT 0.02 4526 2000.94 575.01 8 TOE SEAT 4.66 4527 2005.61 572.83 9 . 0.32 4528 2005.93 572.06 10 . 2.30 4529 2008.23 571.55 11 . 1.62 4530 2009.85 571.54 12 . 1.78 4531 2011.63 570.66 13 . 1.36 4532 2012.99 569.98 14 OPP CL PIER 1.87 4533 2014.86 569.51 15 TOE 3.30 4534 2018.16 569.42 16 WL LB 1.80 4535 2019.96 569.27 17 IN CHANNEL 3.99 4536 2023.95 569.20 18 IN CHANNEL 4.38 4537 2028.33 569.27 19 IN CHANNEL 5.26 4538 2033.58 569.43 20 WL BAR 6.80 4539 2040.38 569.71 21 TOP BAR 2.45 4540 2042.83 569.57 22 TOP BAR 0.26 4541 2043.09 569.48 23 WL BAR 0.40 4542 2043.49 569.34 24 OPP CL PIER 2.15 4543 2045.64 569.25 25 IN CHANNEL 5.39 4544 2051.04 569.28 26 IN CHANNEL 3.53 4545 2054.56 569.19 27 IN CHANNEL 0.91 4546 2055.47 569.06 28 IN CHANNEL 1.91 4547 2057.38 568.87 29 IN CHANNEL 3.51 4548 2060.89 568.90 30 IN CHANNEL 2.24 4549 2063.14 569.08 31 IN CHANNEL 1.59 4550 2064.72 569.34 32 IN CHANNEL 3.83 4551 2068.56 569.29 33 IN CHANNEL 0.85 4552 2069.41 569.46 34 WL RB 2.21 4553 2071.62 570.18 35 . 2.31 4554 2073.93 571.61 36 OPP CL PIER 2.01 4555 2075.93 571.99 37 TOP BANK 10.06 4556 2085.99 572.63 38 TOE SEAT 0.18 4557 2086.18 574.22 39 TOP SEAT 0.35 4558 2086.53 574.22 40 TOP SEAT 0.02 4559 2086.54 574.45 41 CORD ELEV RB 0.06 4560 2086.60 575.42 42 TOP ABUTMENT 0.33 4561 2086.93 575.41 43 TOP ABUTMENT 5.04 4562 2091.97 575.23 44 BOLT RB END KETTLE RIVER X/S 5 PROJ#9510F080 SEPT 29 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 5569 0.00 576.59 1 DUMMY 2000.00 5570 2000.00 576.59 2 GL BOLT LB 1.83 5571 2001.83 576.43 3 . 4.59 5572 2006.42 574.79 4 TOP BANK 3.23 5573 2009.65 572.29 5 TOE 4.04 5574 2013.70 571.50 6 . 2.25 5575 2015.94 570.49 7 . 2.47 5576 2018.41 569.75 8 . 4.26 5577 2022.67 569.43 9 WL LB 1.47 5578 2024.14 569.28 10 IN CHANNEL 2.62 5579 2026.76 569.17 11 IN CHANNEL 5.03 5580 2031.79 569.42 12 WL BAR 2.43 5581 2034.22 569.52 13 TOP BAR 7.94 5582 2042.16 569.60 14 TOP BAR 3.47 5583 2045.63 569.59 15 WL BAR 4.71 5584 2050.34 569.43 16 IN CHANNEL 7.46 5585 2057.80 569.32 17 IN CHANNEL 6.82 5586 2064.62 569.20 18 IN CHANNEL 5.27 5587 2069.89 569.24 19 IN CHANNEL 3.21 5588 2073.10 569.22 20 TOE CHANNEL 1.34 5589 2074.44 569.57 21 WL RB 1.04 5590 2075.48 570.07 22 . 1.78 5591 2077.25 571.93 23 TOP CUT 2.02 5592 2079.28 572.95 24 TOP BANK 10.52 5593 2089.80 573.27 25 BOLT RB 0.67 5594 2090.47 573.34 26 FENCELINE 18.95 5595 2109.42 573.91 27 EDGE HSE-FLAT END KETTLE RIVER X/S 6 PROJ#9510F080 SEPT 29 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 6843 0.00 577.10 1 DUMMY 2000.00 6842 2000.00 577.10 2 FLAT BEYOND 46.10 6841 2046.10 575.72 3 . 11.85 6840 2057.95 575.18 4 EDGE FIELD 2.60 6839 2060.55 574.82 5 . 2.87 6838 2063.42 574.51 6 GL BOLT LB 3.09 6837 2066.51 574.23 7 TOP BANK 3.50 6836 2070.01 572.71 8 TOE BANK 1.91 6835 2071.92 572.32 9 . 1.53 6834 2073.45 572.43 10 TOP BENCH 1.72 6833 2075.17 571.75 11 TOP CUT 0.96 6832 2076.13 570.70 12 TOE CUT 0.65 6831 2076.78 570.50 13 WL LB 1.32 6830 2078.10 570.41 14 IN CHANNEL 3.73 6829 2081.83 570.42 15 IN CHANNEL 4.95 6828 2086.79 570.24 16 IN CHANNEL 6.80 6827 2093.59 570.16 17 IN CHANNEL 7.33 6826 2100.91 570.10 18 IN CHANNEL 6.87 6825 2107.78 570.08 19 IN CHANNEL 6.97 6824 2114.74 570.08 20 IN CHANNEL 6.62 6823 2121.36 570.16 21 IN CHANNEL 6.76 6822 2128.12 570.15 22 IN CHANNEL 5.72 6821 2133.84 570.29 23 IN CHANNEL 4.19 6820 2138.03 570.36 24 IN CHANNEL 4.08 6819 2142.11 570.25 25 IN CHANNEL 2.89 6818 2145.00 570.10 26 IN CHANNEL 2.14 6817 2147.14 570.04 27 IN CHANNEL 1.55 6816 2148.69 570.27 28 IN CHANNEL 1.72 6815 2150.41 570.43 29 WL RB 1.43 6814 2151.84 570.63 30 TOE CUT 0.47 6813 2152.31 572.06 31 TOP CUT 6.03 6812 2158.34 572.62 32 TOE 3.79 6811 2162.14 573.91 33 BOLT RB 0.91 6810 2163.05 574.10 34 TOP BANK 8.79 6809 2171.84 574.19 35 . 10.39 6808 2182.23 574.23 36 . 11.34 6807 2193.57 574.22 37 . 12.98 6806 2206.55 574.21 38 . 6.67 6805 2213.22 574.03 39 FENCELINE 3.10 6804 2216.32 573.70 40 TOE 2.12 6803 2218.44 574.07 41 EDG ROAD 7.57 6802 2226.01 574.16 42 EDG ROAD 1.03 6801 2227.03 573.92 43 TOE BANK 1.92 6800 2228.96 574.49 44 STEEP RISE BYND END KETTLE RIVER X/S 7 PROJ#9510F080 SEPT 29 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 7784 0.00 576.81 1 DUMMY 2000.00 7783 2000.00 576.81 2 FLINE-FLAT 3.92 7782 2003.92 576.58 3 EDGE LAWN 51.22 7781 2055.13 576.21 4 GL BOLT LB 6.12 7780 2061.25 576.20 5 EDGE DRIVEWAY 2.91 7779 2064.15 576.31 6 CL 2.40 7778 2066.55 576.25 7 EDG DRIVEWAY 11.52 7777 2078.07 576.19 8 . 12.93 7776 2091.00 576.16 9 NE COR GARAGE 6.02 7775 2097.02 576.09 10 . 1.15 7774 2098.17 575.89 11 . 1.30 7773 2099.47 575.48 12 . 6.84 7772 2106.31 575.22 13 . 6.60 7771 2112.91 575.13 14 ON LAWN 1.41 7770 2114.32 574.81 15 . 2.85 7769 2117.17 572.88 16 . 2.76 7768 2119.93 572.85 17 TOP BANK 1.65 7767 2121.58 571.46 18 TOP CUT 0.67 7766 2122.24 570.68 19 TOE 0.55 7765 2122.79 570.51 20 WL LB 0.65 7764 2123.44 570.33 21 IN CHANNEL 1.72 7763 2125.16 570.39 22 IN CHANNEL 2.18 7762 2127.34 570.13 23 IN CHANNEL 2.01 7761 2129.34 569.64 24 TOE CHANNEL 1.58 7760 2130.92 569.58 25 IN CHANNEL 3.40 7759 2134.32 569.52 26 IN CHANNEL 4.34 7758 2138.67 569.57 27 IN CHANNEL 4.52 7757 2143.19 569.57 28 IN CHANNEL 4.13 7756 2147.32 569.52 29 IN CHANNEL 3.21 7755 2150.53 569.48 30 IN CHANNEL 4.18 7754 2154.71 569.44 31 IN CHANNEL 3.36 7753 2158.07 569.38 32 IN CHANNEL 3.14 7752 2161.21 569.30 33 IN CHANNEL 2.40 7751 2163.61 569.35 34 IN CHANNEL 3.17 7750 2166.78 569.68 35 IN CHANNEL 4.06 7749 2170.84 570.15 36 IN CHANNEL 1.90 7748 2172.74 570.49 37 WL RB 0.63 7747 2173.37 570.57 38 TOE CUT 0.13 7746 2173.51 571.26 39 TOP CUT 1.81 7745 2175.31 572.89 40 TOP BANK 0.52 7744 2175.84 573.06 41 FENCELINE 4.99 7743 2180.82 572.90 42 . 8.91 7742 2189.73 572.76 43 . 11.34 7741 2201.08 572.70 44 . 6.29 7740 2207.37 573.11 45 TOE BANK 4.45 7739 2211.82 575.17 46 TOP BANK 3.53 7738 2215.35 575.79 47 BOLT RB 1.33 7737 2216.68 576.08 48 FENCELINE 0.79 7736 2217.47 576.52 49 TOP BANK 1.32 7735 2218.79 576.14 50 . 0.62 7734 2219.41 576.13 51 ED ROAD 5.92 7733 2225.33 576.17 52 TOP ROAD 0.75 7732 2226.08 576.04 53 TOE CUT 1.94 7731 2228.02 578.59 54 TOP CUT 2.10 7730 2230.12 579.07 55 STEEP RISE BYND END KETTLE RIVER X/S 8 PROJ#9510F080 SEPT 29 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 8728 0.00 576.86 1 DUMMY 2000.00 8727 2000.00 576.86 2 FLAT BEYOND 14.99 8726 2014.99 576.12 3 . 21.83 8725 2036.83 575.55 4 . 16.31 8724 2053.14 575.67 5 TOP FIELD 2.77 8723 2055.91 575.42 6 GL BOLT LB 1.27 8722 2057.19 575.28 7 FENCELINE 6.13 8721 2063.32 574.88 8 . 7.91 8720 2071.23 574.16 9 TOP BANK 0.53 8719 2071.76 573.75 10 TOP CUT 1.19 8718 2072.96 573.02 11 TOE CUT 1.19 8717 2074.15 572.67 12 . 1.69 8716 2075.84 572.60 13 . 1.49 8715 2077.33 571.84 14 . 0.69 8714 2078.01 571.77 15 . 2.20 8713 2080.22 571.09 16 EDGE BAR-TOE 2.35 8712 2082.57 570.91 17 WL LB 4.53 8711 2087.10 570.66 18 IN CHANNEL 4.68 8710 2091.77 570.45 19 IN CHANNEL 5.46 8709 2097.23 570.25 20 IN CHANNEL 4.96 8708 2102.19 570.15 21 IN CHANNEL 4.51 8707 2106.70 570.05 22 IN CHANNEL 3.95 8706 2110.65 569.86 23 IN CHANNEL 2.38 8705 2113.03 569.74 24 IN CHANNEL 2.43 8704 2115.47 569.90 25 IN CHANNEL 3.66 8703 2119.13 570.08 26 IN CHANNEL 1.84 8702 2120.97 570.26 27 TOE CHANNEL 2.35 8701 2123.32 570.91 28 WL RB 1.19 8700 2124.51 571.24 29 EDGE BAR 0.94 8699 2125.45 571.52 30 TOE BANK 1.79 8698 2127.23 572.83 31 . 0.83 8697 2128.06 573.63 32 ON SLOPE 2.20 8696 2130.26 575.03 33 . 1.08 8695 2131.34 576.60 34 ON SLOPE 1.91 8694 2133.25 577.87 35 TOP BANK 0.87 8693 2134.12 577.89 36 GL BOLT RB 4.59 8692 2138.71 577.92 37 TOP ROAD 0.87 8691 2139.57 577.70 38 TOE BANK 1.15 8690 2140.73 578.91 39 STEEP RISE BYND END KETTLE RIVER X/S 9 PROJ#9510F080 SEPT 29 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 9689 0.00 577.93 1 DUMMY 2000.00 9688 2000.00 577.93 2 FLINE-FLAT 5.58 9687 2005.58 577.26 3 . 2.93 9686 2008.51 577.37 4 . 2.14 9685 2010.65 577.78 5 TOE RAILROAD 2.79 9684 2013.45 578.82 6 TOP BALLAST 4.00 9683 2017.45 578.80 7 TOP BALLAST 3.22 9682 2020.67 577.67 8 TOE RAILROAD 2.10 9681 2022.77 577.41 9 . 7.17 9680 2029.94 577.40 10 . 2.04 9679 2031.98 577.79 11 FENCELINE 46.84 9678 2078.82 577.88 12 . 37.86 9677 2116.68 577.76 13 GL BOLT LB 5.14 9676 2121.82 577.70 14 . 3.59 9675 2125.41 577.76 15 FENCELINE 1.32 9674 2126.73 577.72 16 TOP BANK 1.23 9673 2127.96 577.36 17 . 2.39 9672 2130.36 576.15 18 . 3.34 9671 2133.70 574.32 19 TOE BANK 1.81 9670 2135.51 574.01 20 TOP CUT 1.75 9669 2137.26 573.06 21 . 1.22 9668 2138.48 572.35 22 TOE 5.09 9667 2143.57 572.38 23 . 9.45 9666 2153.02 572.26 24 . 4.04 9665 2157.06 572.03 25 . 6.51 9664 2163.57 571.80 26 . 4.40 9663 2167.97 571.61 27 WL LB 2.97 9662 2170.94 571.43 28 IN CHANNEL 4.31 9661 2175.25 571.29 29 IN CHANNEL 2.23 9660 2177.47 571.15 30 IN CHANNEL 1.04 9659 2178.51 571.18 31 IN CHANNEL 4.66 9658 2183.17 571.12 32 IN CHANNEL 5.00 9657 2188.17 571.16 33 IN CHANNEL 4.78 9656 2192.95 571.28 34 IN CHANNEL 3.62 9655 2196.57 571.48 35 IN CHANNEL 2.75 9654 2199.32 571.62 36 WL RB 1.41 9653 2200.72 571.64 37 . 2.52 9652 2203.24 571.83 38 TOE BANK 1.04 9651 2204.28 572.16 39 . 1.11 9650 2205.39 572.93 40 TOE CUT 0.83 9649 2206.22 574.58 41 TOP CUT 3.03 9648 2209.24 576.07 42 TOP BANK 2.54 9647 2211.78 576.41 43 . 6.12 9646 2217.90 576.35 44 BOLT RB 7.76 9645 2225.66 576.42 45 . 19.76 9644 2245.41 577.83 46 . 24.26 9643 2269.67 578.19 47 . 10.97 9642 2280.65 579.16 48 . 7.00 9641 2287.64 579.48 49 . 13.64 9640 2301.28 579.70 50 FLAT BEYOND END KETTLE RIVER X/S 10 PROJ#9510F080 SEPT 29 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 10632 0.00 580.23 1 DUMMY 2000.00 10631 2000.00 580.23 2 FL H30V-.5 3.52 10630 2003.52 580.29 3 . 2.00 10629 2005.52 579.88 4 . 5.37 10628 2010.89 580.05 5 TOE RAILROAD 2.17 10627 2013.06 580.51 6 GL BOLT LB 3.32 10626 2016.38 580.52 7 TOP BALLAST 3.90 10625 2020.28 578.79 8 FENCELINE 1.23 10624 2021.51 578.09 9 . 2.14 10623 2023.64 576.56 10 . 1.53 10622 2025.17 575.84 11 . 1.33 10621 2026.50 575.31 12 . 1.93 10620 2028.44 573.48 13 . 1.66 10619 2030.10 573.19 14 TOP CUT 0.33 10618 2030.42 572.56 15 TOE CUT 1.66 10617 2032.08 572.29 16 WL LB 2.11 10616 2034.19 571.96 17 IN CHANNEL 4.88 10615 2039.07 571.72 18 IN CHANNEL 4.08 10614 2043.16 571.48 19 IN CHANNEL 2.70 10613 2045.86 571.56 20 IN CHANNEL 4.40 10612 2050.26 571.59 21 IN CHANNEL 4.93 10611 2055.19 571.69 22 IN CHANNEL 4.86 10610 2060.05 571.77 23 IN CHANNEL 5.15 10609 2065.20 571.87 24 IN CHANNEL 5.10 10608 2070.30 571.95 25 IN CHANNEL 3.02 10607 2073.32 572.08 26 IN CHANNEL 2.09 10606 2075.41 572.29 27 WL RB 2.02 10605 2077.44 572.51 28 . 5.39 10604 2082.82 572.78 29 TOE BANK 5.51 10603 2088.33 574.91 30 TOP BANK 6.53 10602 2094.86 574.97 31 . 6.02 10601 2100.88 575.44 32 . 9.11 10600 2110.00 576.41 33 GL UTIL POLE 0.27 10599 2110.27 576.41 34 BOLT RB 17.66 10598 2127.93 577.00 35 . 16.60 10597 2144.53 577.24 36 . 19.09 10596 2163.62 579.06 37 . 20.51 10595 2184.13 579.49 38 . 18.46 10594 2202.58 579.25 39 . 19.91 10593 2222.49 579.12 40 . 20.27 10592 2242.76 579.10 41 . 15.07 10591 2257.83 579.71 42 FENCELINE 4.01 10590 2261.83 579.91 43 SAME RISE BYND END KETTLE RIVER X/S 11 PROJ#9510F080 SEPT 28 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 11549 0.00 579.56 1 DUMMY 2000.00 11550 2000.00 579.56 2 FLAT BEYOND 13.75 11551 2013.75 578.93 3 . 6.83 11552 2020.58 578.74 4 GL BOLT LB 4.50 11553 2025.08 578.59 5 TOP BANK 4.42 11554 2029.50 576.09 6 . 0.92 11555 2030.42 575.82 7 TOP CUT 0.82 11556 2031.24 574.10 8 TOE CUT 1.60 11557 2032.84 572.92 9 WL LB 3.31 11558 2036.15 572.42 10 IN CHANNEL 4.35 11559 2040.50 572.30 11 IN CHANNEL 5.49 11560 2046.00 572.32 12 IN CHANNEL 3.27 11561 2049.27 572.74 13 IN CHANNEL 2.56 11562 2051.83 572.88 14 IN CHANNEL 1.99 11563 2053.82 572.72 15 IN CHANNEL 2.07 11564 2055.88 572.85 16 IN CHANNEL 1.04 11565 2056.92 572.94 17 WL BAR 2.96 11566 2059.88 573.30 18 . 3.76 11567 2063.64 573.46 19 . 12.75 11568 2076.39 573.58 20 TOP BAR 5.19 11569 2081.58 573.35 21 . 5.89 11570 2087.47 573.25 22 . 2.69 11571 2090.16 573.49 23 . 4.04 11572 2094.20 573.36 24 . 1.32 11573 2095.51 573.14 25 . 2.77 11574 2098.29 573.06 26 . 1.16 11575 2099.44 572.83 27 WL BAR 2.93 11576 2102.37 572.45 28 IN CHANNEL 3.27 11577 2105.64 572.51 29 TOE CHANNEL 1.61 11578 2107.25 572.83 30 WL RB 0.92 11579 2108.17 573.05 31 TOE CUT 0.61 11580 2108.78 573.79 32 TOP CUT 3.34 11581 2112.12 575.50 33 ON SLOPE 3.23 11582 2115.35 578.52 34 . 1.00 11583 2116.35 578.99 35 TOP BANK 4.43 11584 2120.78 579.13 36 BOLT RB 21.65 11585 2142.42 579.65 37 . 28.60 11586 2171.02 579.65 38 . 34.68 11587 2205.70 580.00 39 FL-RISING END KETTLE RIVER X/S 12 PROJ#9510F080 SEPT 28 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 12449 0.00 577.12 1 DUMMY 2000.00 12450 2000.00 577.12 2 FLAT BEYOND 12.03 12451 2012.03 577.03 3 . 3.77 12452 2015.80 576.99 4 BOLT LB 1.22 12453 2017.02 576.72 5 TOP CRIBBING 0.43 12454 2017.45 574.36 6 TOE CRIBBING 0.52 12455 2017.97 574.13 7 WL LB 2.28 12456 2020.26 573.46 8 TOE CHANNEL 3.80 12457 2024.06 573.43 9 IN CHANNEL 3.61 12458 2027.67 573.74 10 IN CHANNEL 1.92 12459 2029.59 573.93 11 WET BAR 5.06 12460 2034.65 573.65 12 WET BAR 2.66 12461 2037.31 573.55 13 WET BAR 3.17 12462 2040.48 573.45 14 IN CHANNEL 4.45 12463 2044.93 573.44 15 IN CHANNEL 4.33 12464 2049.26 573.71 16 IN CHANNEL 1.48 12465 2050.74 573.83 17 WL BAR 4.18 12466 2054.92 573.96 18 SPIKE-BAR 3.74 12467 2058.66 574.02 19 TOP BAR 2.88 12468 2061.54 573.95 20 WL BAR 4.66 12469 2066.20 573.79 21 IN CHANNEL 5.12 12470 2071.32 573.70 22 IN CHANNEL 3.00 12471 2074.32 573.57 23 IN CHANNEL 2.42 12472 2076.74 573.78 24 TOE CHANNEL 1.45 12473 2078.19 573.96 25 WL RB 2.68 12474 2080.87 574.94 26 TOE CUT 0.39 12475 2081.26 575.63 27 TOP CUT 2.90 12476 2084.17 576.53 28 ON SLOPE 1.94 12477 2086.10 577.77 29 ON SLOPE 3.32 12478 2089.42 581.15 30 TOP BANK 9.37 12479 2098.79 581.68 31 BOLT RB 10.81 12480 2109.60 583.72 32 SAME RISE BYND END KETTLE RIVER X/S 13 PROJ#9510F080 SEPT 28 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 13536 0.00 580.14 1 DUMMY 2000.00 13535 2000.00 580.14 2 BOLT LB 0.53 13534 2000.53 580.15 3 TOP BANK 8.69 13533 2009.22 576.72 4 . 4.48 13532 2013.70 575.56 5 TOE BANK 9.41 13531 2023.11 575.10 6 . 6.25 13530 2029.36 574.67 7 . 4.00 13529 2033.35 574.44 8 . 7.36 13528 2040.71 574.99 9 . 4.98 13527 2045.69 575.21 10 SPIKE-BAR 2.13 13526 2047.83 575.25 11 . 4.93 13525 2052.76 575.39 12 . 6.04 13524 2058.80 575.78 13 TOP BAR 5.64 13523 2064.44 575.33 14 . 7.38 13522 2071.82 575.23 15 . 11.29 13521 2083.11 574.90 16 . 11.02 13520 2094.13 574.38 17 WL LB 5.31 13519 2099.45 574.14 18 IN CHANNEL 4.36 13518 2103.80 573.99 19 IN CHANNEL 6.75 13517 2110.55 573.85 20 IN CHANNEL 6.03 13516 2116.58 573.74 21 IN CHANNEL 4.46 13515 2121.04 573.64 22 IN CHANNEL 2.67 13514 2123.71 573.63 23 IN CHANNEL 0.91 13513 2124.62 573.71 24 TOE CHANNEL 1.51 13512 2126.13 574.37 25 WL RB 1.31 13511 2127.44 575.22 26 TOE CUT 0.47 13510 2127.91 576.91 27 TOP CUT 1.26 13509 2129.16 577.11 28 TOP BANK 4.88 13508 2134.05 577.13 29 . 7.18 13507 2141.22 576.84 30 . 10.39 13506 2151.61 576.67 31 BOLT RB 8.85 13505 2160.46 576.80 32 . 9.90 13504 2170.36 576.77 33 . 5.54 13503 2175.90 576.88 34 . 8.02 13502 2183.92 576.91 35 . 7.14 13501 2191.06 578.02 36 TOP CHANNEL 3.34 13500 2194.41 577.18 37 TOE CHANNEL 3.63 13499 2198.03 577.29 38 TOE CHANNEL 2.35 13498 2200.39 577.93 39 TOP CHANNEL 6.26 13497 2206.64 578.08 40 . 2.21 13496 2208.86 578.01 41 . 8.78 13495 2217.64 578.04 42 . 7.94 13494 2225.58 577.64 43 TOP CHANNEL 1.33 13493 2226.91 577.46 44 TOE CHANNEL 2.12 13492 2229.03 577.51 45 TOE CHANNEL 2.25 13491 2231.28 576.31 46 . 6.91 13490 2238.19 576.71 47 UNDULATING END KETTLE RIVER X/S 14 PROJ#9510F080 SEPT 28 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 14399 0.00 581.92 1 DUMMY 2000.00 14400 2000.00 581.92 2 LOGSORT-FLAT 10.21 14401 2010.21 581.95 3 TOP SORT BANK 8.68 14402 2018.90 578.97 4 TOE 6.94 14403 2025.84 577.71 5 TOE BANK 7.89 14404 2033.73 577.92 6 . 6.31 14405 2040.04 577.90 7 BOLT LB 3.95 14406 2044.00 577.98 8 TOP BANK 2.26 14407 2046.26 577.33 9 . 3.76 14408 2050.02 576.73 10 TOE BANK 7.66 14409 2057.68 576.89 11 . 7.72 14410 2065.40 576.98 12 . 8.11 14411 2073.51 576.94 13 . 8.66 14412 2082.17 577.15 14 . 6.76 14413 2088.94 577.32 15 TOP CUT 0.85 14414 2089.79 576.60 16 TOE CUT 6.21 14415 2095.99 575.13 17 . 8.42 14416 2104.42 574.81 18 WL LB 8.91 14417 2113.32 574.54 19 IN CHANNEL 8.21 14418 2121.53 574.40 20 IN CHANNEL 5.58 14419 2127.10 574.05 21 IN CHANNEL 2.81 14420 2129.91 574.11 22 IN CHANNEL 3.77 14421 2133.68 574.22 23 IN CHANNEL 3.73 14422 2137.42 574.22 24 IN CHANNEL 1.82 14423 2139.24 574.41 25 IN CHANNEL 1.82 14424 2141.06 574.43 26 IN CHANNEL 1.75 14425 2142.81 574.70 27 IN CHANNEL 0.23 14426 2143.04 574.81 28 WL RB 1.50 14427 2144.53 575.04 29 . 2.73 14428 2147.26 575.36 30 . 1.29 14429 2148.55 575.55 31 SPIKE 0.76 14430 2149.31 575.72 32 TOE BANK 0.85 14431 2150.16 576.05 33 . 1.08 14432 2151.24 576.44 34 . 3.34 14433 2154.58 576.99 35 TOE CUT 0.07 14434 2154.65 577.50 36 TOP CUT 1.10 14435 2155.75 577.81 37 . 0.78 14436 2156.53 578.33 38 . 0.94 14437 2157.47 579.49 39 TOP BANK 2.20 14438 2159.67 579.86 40 BOLT RB 4.66 14439 2164.33 580.34 41 TOE ROAD 0.95 14440 2165.28 580.69 42 TOP ROADD 4.31 14441 2169.60 580.73 43 C/L ROAD 3.11 14442 2172.70 580.63 44 TOP ROAD 0.59 14443 2173.29 580.39 45 TOE BANK 1.07 14444 2174.37 581.40 46 TOP BANK END KETTLE RIVER X/S 15 PROJ#9510F080 SEPT 28 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 15800 0.00 583.65 1 DUMMY 2000.00 15801 2000.00 583.65 2 FL-RISE BYND 7.56 15802 2007.56 583.47 3 TOP BANK 2.27 15803 2009.83 582.89 4 TOE BANK 1.75 15804 2011.58 583.20 5 TOE RAILROAD 1.67 15805 2013.25 583.51 6 TOP BALLAST 4.63 15806 2017.88 583.60 7 TOP BALLAST 5.63 15807 2023.51 582.13 8 TOE RAILROAD 3.71 15808 2027.22 581.93 9 . 1.74 15809 2028.96 581.96 10 . 4.48 15810 2033.44 582.07 11 FENCELINE 1.73 15811 2035.17 582.60 12 TOP FIELD 17.19 15812 2052.36 582.41 13 . 16.41 15813 2068.77 582.39 14 . 1.99 15814 2070.76 582.33 15 GL CABLE ANCHR 8.09 15815 2078.86 582.27 16 BOLT LB 3.80 15816 2082.66 582.49 17 . 3.80 15817 2086.46 582.15 18 TOP BANK 5.09 15818 2091.55 580.38 19 TOP CUT 3.37 15819 2094.91 578.04 20 TOE BANK 2.95 15820 2097.86 577.13 21 TOP CUT 0.15 15821 2098.01 576.58 22 TOE CUT 2.40 15822 2100.42 576.08 23 WL LB 2.95 15823 2103.36 575.65 24 IN CHANNEL 5.71 15824 2109.08 575.59 25 IN CHANNEL 5.71 15825 2114.79 575.24 26 IN CHANNEL 5.25 15826 2120.04 575.13 27 IN CHANNEL 5.48 15827 2125.52 575.40 28 IN CHANNEL 6.75 15828 2132.27 575.58 29 IN CHANNEL 8.29 15829 2140.55 575.83 30 IN CHANNEL 8.32 15830 2148.87 575.90 31 IN CHANNEL 7.10 15831 2155.98 576.06 32 WL RB 1.12 15832 2157.10 576.19 33 TOE CUT 0.80 15833 2157.90 577.67 34 TOP CUT 0.96 15834 2158.86 578.37 35 TOP BANK 3.94 15835 2162.80 578.48 36 FL GL SUSP SUPP 3.94 15836 2166.75 578.27 37 . 1.98 15837 2168.72 578.41 38 GL BOLT RB 8.38 15838 2177.10 578.71 39 . 13.90 15839 2191.00 578.38 40 . 9.41 15840 2200.41 578.37 41 GL CABLE ANCHR 10.08 15841 2210.49 578.09 42 . 9.22 15842 2219.70 578.92 43 . 19.77 15843 2239.47 578.87 44 . 18.69 15844 2258.16 578.46 45 TOP BANK 30.42 15845 2288.58 578.03 46 TOE BANK 20.75 15846 2309.33 581.54 47 FL TOP FLAT END KETTLE RIVER X/S 16 PROJ#9510F080 SEPT 27 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 16679 0.00 580.19 1 DUMMY 2000.00 16678 2000.00 580.19 2 . 2.35 16677 2002.35 580.71 3 TOP BALLAST 2.87 16676 2005.22 580.86 4 . 1.49 16675 2006.71 580.75 5 BOLT LB 2.20 16674 2008.91 580.75 6 TOP BALLAST 3.86 16673 2012.77 578.80 7 TOE RAILROAD 4.19 16672 2016.96 578.40 8 . 4.48 16671 2021.44 579.00 9 FENCELINE 15.28 16670 2036.71 579.29 10 . 1.76 16669 2038.47 579.04 11 . 7.10 16668 2045.57 579.13 12 . 2.00 16667 2047.58 578.89 13 SPIKE 2.09 16666 2049.66 578.89 14 . 1.80 16665 2051.47 578.97 15 TOP BANK 0.26 16664 2051.73 578.48 16 TOE CUT 1.49 16663 2053.22 577.96 17 TOP BAR 4.14 16662 2057.35 576.74 18 . 2.28 16661 2059.63 576.46 19 WL LB 2.12 16660 2061.75 575.99 20 IN CHANNEL 3.23 16659 2064.98 575.43 21 TOE CHANNEL 2.23 16658 2067.21 575.29 22 IN CHANNEL 1.56 16657 2068.77 575.29 23 IN CHANNEL 4.53 16656 2073.30 575.77 24 IN CHANNEL 4.67 16655 2077.97 576.00 25 IN CHANNEL 7.00 16654 2084.97 576.13 26 IN CHANNEL 8.05 16653 2093.02 576.46 27 WL RB 3.24 16652 2096.26 576.59 28 . 4.54 16651 2100.80 576.67 29 . 7.33 16650 2108.13 577.24 30 . 5.61 16649 2113.73 577.44 31 TOE 5.17 16648 2118.90 578.57 32 TOE CUT 0.44 16647 2119.34 579.11 33 TOP BANK 1.64 16646 2120.98 579.22 34 BOLT RB 1.21 16645 2122.19 579.38 35 FENCELINE 29.03 16644 2151.22 579.27 36 . 10.77 16643 2162.00 578.64 37 . 8.73 16642 2170.72 578.91 38 FLAT BEYOND END KETTLE RIVER X/S 17 PROJ#9510F080 SEPT 27 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 17585 0.00 580.19 1 DUMMY 2000.00 17586 2000.00 580.19 2 UNDULATING 8.87 17587 2008.87 579.62 3 TOP DRY BCHAN 0.41 17588 2009.28 579.07 4 . 1.21 17589 2010.49 578.57 5 TOE 3.98 17590 2014.47 578.14 6 TOE 2.35 17591 2016.82 578.09 7 TOE CHANNEL 0.85 17592 2017.67 579.01 8 TOP BCHANNEL 5.15 17593 2022.82 578.98 9 TOP CHANNEL 4.53 17594 2027.35 578.27 10 . 6.00 17595 2033.34 578.53 11 . 3.64 17596 2036.98 577.97 12 . 0.83 17597 2037.81 578.90 13 . 8.41 17598 2046.22 578.92 14 . 3.52 17599 2049.75 578.76 15 . 2.85 17600 2052.60 579.22 16 . 6.85 17601 2059.45 579.61 17 . 16.76 17602 2076.21 579.96 18 BOLT LB 5.28 17603 2081.49 579.94 19 . 2.48 17604 2083.97 579.47 20 . 1.71 17605 2085.68 579.79 21 . 17.73 17606 2103.41 579.76 22 . 2.77 17607 2106.18 579.51 23 . 14.77 17608 2120.95 579.43 24 . 5.78 17609 2126.73 579.27 25 . 3.37 17610 2130.10 579.02 26 . 1.34 17611 2131.44 579.35 27 . 2.25 17612 2133.69 579.43 28 . 15.78 17613 2149.47 579.16 29 . 1.35 17614 2150.83 578.80 30 . 3.68 17615 2154.51 578.90 31 . 1.80 17616 2156.30 579.78 32 . 5.66 17617 2161.97 579.74 33 . 8.10 17618 2170.06 579.93 34 . 5.46 17619 2175.52 580.04 35 SPIKE 1.10 17620 2176.63 580.01 36 TOP BANK 3.30 17621 2179.93 578.06 37 TOE BANK 1.59 17622 2181.52 577.89 38 . 4.86 17623 2186.38 578.00 39 . 5.13 17624 2191.51 577.94 40 . 2.46 17625 2193.97 577.65 41 . 6.34 17626 2200.31 577.69 42 . 4.71 17627 2205.02 577.47 43 WL LB 5.47 17628 2210.49 577.00 44 IN CHANNEL 1.86 17629 2212.35 576.90 45 IN CHANNEL 4.36 17630 2216.71 576.94 46 IN CHANNEL 2.47 17631 2219.18 577.05 47 IN CHANNEL 4.69 17632 2223.86 577.17 48 IN CHANNEL 4.19 17633 2228.05 577.17 49 TOE CHANNEL 1.84 17634 2229.89 577.50 50 WL RB 6.42 17635 2236.31 578.49 51 TOE BANK 3.01 17636 2239.32 580.09 52 . 4.15 17637 2243.48 583.32 53 TOE CUT 0.76 17638 2244.24 586.32 54 TOP BANK 4.94 17639 2249.18 586.76 55 . 6.51 17640 2255.69 586.72 56 BOLT RB 11.64 17641 2267.33 586.27 57 TOP BENCH END KETTLE RIVER X/S 18 PROJ#9510F080 SEPT 27 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 18586 0.00 580.40 1 DUMMY 2000.00 18585 2000.00 580.40 2 BOLT LB 6.97 18584 2006.97 580.44 3 . 5.24 18583 2012.21 580.34 4 TOP OLD BCHAN 1.39 18582 2013.61 579.64 5 TOE 2.58 18581 2016.19 579.64 6 TOE 0.95 18580 2017.14 580.37 7 TOP OLD BCHAN 6.35 18579 2023.49 580.37 8 . 10.56 18578 2034.05 580.54 9 TOP BANK 0.59 18577 2034.63 580.39 10 TOP CUT 0.37 18576 2035.00 579.70 11 TOE CUT 1.91 18575 2036.91 578.47 12 TOE BANK 8.07 18574 2044.98 578.90 13 TOE 2.99 18573 2047.97 579.79 14 . 1.99 18572 2049.96 580.54 15 TOP DRY BCHAN 5.63 18571 2055.59 580.50 16 . 6.60 18570 2062.19 580.57 17 SPIKE 2.63 18569 2064.82 580.65 18 TOP BANK 0.76 18568 2065.58 579.39 19 TOE CUT 1.32 18567 2066.90 578.69 20 WL LB 4.04 18566 2070.94 578.44 21 IN CHANNEL 3.46 18565 2074.40 577.96 22 TOE CHANNEL 3.63 18564 2078.03 578.10 23 IN CHANNEL 2.71 18563 2080.74 578.57 24 IN CHANNEL 3.55 18562 2084.29 578.60 25 IN CHANNEL 6.70 18561 2090.99 578.54 26 IN CHANNEL 4.82 18560 2095.81 578.51 27 IN CHANNEL 5.77 18559 2101.58 578.59 28 IN CHANNEL 9.20 18558 2110.78 578.71 29 IN CHANNEL 2.41 18557 2113.19 578.82 30 WL RB 3.95 18556 2117.14 578.91 31 . 8.49 18555 2125.63 579.33 32 . 12.46 18554 2138.09 579.79 33 TOP BAR 10.96 18553 2149.05 579.65 34 EDGE BAR 0.91 18552 2149.96 579.97 35 . 2.75 18551 2152.71 579.89 36 . 1.12 18550 2153.83 580.15 37 . 2.56 18549 2156.39 579.22 38 . 5.04 18548 2161.43 579.29 39 . 4.40 18547 2165.83 579.13 40 . 1.17 18546 2167.00 579.24 41 TOE CUT 0.94 18545 2167.95 579.91 42 TOP CUT 0.81 18544 2168.76 580.66 43 TOP BANK 10.09 18543 2178.85 580.74 44 BOLT RB 17.96 18542 2196.81 580.45 45 . 19.20 18541 2216.01 580.51 46 FLAT BEYOND END KETTLE RIVER X/S 19 PROJ#9510F080 SEPT 27 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 19541 0.00 583.86 1 DUMMY 2000.00 19540 2000.00 583.86 2 SLOW RISE BYND 11.07 19539 2011.07 583.68 3 . 5.58 19538 2016.65 583.32 4 . 6.01 19537 2022.66 583.69 5 TOE RAILROAD 2.48 19536 2025.14 583.99 6 TOP BALLAST 3.41 19535 2028.55 583.97 7 TOP BALLAST 0.71 19534 2029.26 583.79 8 BOLT LB 0.90 19533 2030.17 583.64 9 . 4.22 19532 2034.39 581.00 10 TOE RAILROAD 9.91 19531 2044.30 581.22 11 FENCELINE 1.15 19530 2045.44 581.30 12 . 2.03 19529 2047.47 580.92 13 . 7.93 19528 2055.40 581.00 14 . 2.03 19527 2057.42 581.58 15 TOP 2.36 19526 2059.78 580.62 16 TOE BENCH 5.41 19525 2065.20 580.53 17 . 4.72 19524 2069.91 580.95 18 . 3.80 19523 2073.71 580.61 19 . 13.07 19522 2086.78 581.04 20 . 5.52 19521 2092.30 581.42 21 TOP CUT 0.26 19520 2092.56 580.73 22 TOE CUT 1.16 19519 2093.71 580.02 23 . 1.54 19518 2095.25 579.55 24 EDGE BAR-TOE BNK 7.39 19517 2102.65 579.49 25 ON BAR 6.32 19516 2108.97 579.32 26 SPIKE-BAR 2.77 19515 2111.73 579.24 27 WL LB 3.55 19514 2115.29 579.15 28 IN CHANNEL 3.53 19513 2118.81 578.82 29 IN CHANNEL 6.70 19512 2125.51 578.71 30 IN CHANNEL 5.49 19511 2131.00 578.50 31 IN CHANNEL 4.71 19510 2135.70 578.32 32 IN CHANNEL 4.48 19509 2140.18 578.26 33 IN CHANNEL 5.23 19508 2145.42 578.33 34 IN CHANNEL 3.95 19507 2149.37 578.34 35 IN CHANNEL 2.82 19506 2152.19 578.81 36 IN CHANNEL 1.92 19505 2154.11 578.92 37 TOE CHANNEL 1.26 19504 2155.37 579.24 38 WL RB 0.90 19503 2156.26 579.58 39 . 1.22 19502 2157.48 580.32 40 TOE CUT 0.31 19501 2157.79 581.25 41 TOP CUT 0.85 19500 2158.64 581.53 42 TOP BANK 13.61 19499 2172.25 581.33 43 . 10.56 19498 2182.81 581.16 44 BOLT RB 21.44 19497 2204.25 581.11 45 FLAT BEYOND END KETTLE RIVER X/S 20 PROJ#9510F080 SEPT 27 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 20497 0.00 585.95 1 DUMMY 2000.00 20496 2000.00 585.95 2 SAME RISE BYND 24.23 20495 2024.23 585.00 3 . 24.86 20494 2049.09 584.73 4 TOE RAILROAD 1.57 20493 2050.66 585.02 5 TOP BALLAST 4.22 20492 2054.88 584.92 6 GL BOLT LB 4.88 20491 2059.77 583.71 7 TOE RAILROAD 3.71 20490 2063.47 583.61 8 . 3.46 20489 2066.93 583.93 9 . 15.57 20488 2082.49 583.48 10 . 12.93 20487 2095.42 583.28 11 . 9.60 20486 2105.02 582.91 12 TOP BANK 1.57 20485 2106.59 582.67 13 . 0.73 20484 2107.32 582.32 14 . 2.66 20483 2109.98 581.99 15 TOP CUT 0.73 20482 2110.71 580.99 16 TOE CUT 0.78 20481 2111.49 580.70 17 TOP BAR 3.10 20480 2114.58 580.28 18 WL LB 2.47 20479 2117.05 579.94 19 IN CHANNEL 3.78 20478 2120.83 580.03 20 IN CHANNEL 6.71 20477 2127.54 580.25 21 IN CHANNEL 6.74 20476 2134.29 580.28 22 IN CHANNEL 7.15 20475 2141.44 580.25 23 IN CHANNEL 7.45 20474 2148.88 580.19 24 IN CHANNEL 6.60 20473 2155.48 580.21 25 IN CHANNEL 7.61 20472 2163.09 580.17 26 IN CHANNEL 6.09 20471 2169.17 580.19 27 IN CHANNEL 5.20 20470 2174.37 580.09 28 IN CHANNEL 3.57 20469 2177.94 580.07 29 IN CHANNEL 5.24 20468 2183.18 580.45 30 WL RB 2.05 20467 2185.23 581.11 31 TOE CUT 0.40 20466 2185.64 581.66 32 TOP CUT 1.42 20465 2187.05 582.47 33 TOP 6.72 20464 2193.77 583.05 34 TOE 2.12 20463 2195.89 583.73 35 TOP BANK 5.22 20462 2201.11 583.83 36 BOLT RB 11.29 20461 2212.40 583.64 37 . 17.83 20460 2230.23 583.16 38 . 19.08 20459 2249.31 583.27 39 . 16.92 20458 2266.23 583.98 40 FLAT BEYOND END KETTLE RIVER X/S 21 PROJ#9510F080 SEPT 27 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 21458 0.00 582.90 1 DUMMY 2000.00 21457 2000.00 582.90 2 TOP 3.30 21456 2003.30 582.55 3 TOE 31.70 21455 2035.01 582.73 4 FENCELINE 8.64 21454 2043.65 583.50 5 TOE RAILROAD 3.98 21453 2047.64 585.32 6 TOP BALLAST 4.24 21452 2051.88 585.30 7 GL BOLT LB 0.64 21451 2052.52 585.32 8 TOP BALLAST 4.63 21450 2057.15 583.02 9 TOE RAILROAD 7.77 21449 2064.91 582.98 10 FENCELINE 10.89 21448 2075.80 583.46 11 . 8.94 21447 2084.75 583.43 12 . 11.97 21446 2096.72 583.35 13 . 4.21 21445 2100.92 582.98 14 . 2.40 21444 2103.33 582.39 15 . 0.59 21443 2103.92 582.04 16 . 1.90 21442 2105.82 581.79 17 . 2.25 21441 2108.07 582.24 18 . 3.71 21440 2111.78 582.32 19 . 3.58 21439 2115.36 582.06 20 . 0.72 21438 2116.08 581.73 21 . 2.27 21437 2118.35 581.77 22 . 1.18 21436 2119.53 582.17 23 . 1.32 21435 2120.84 582.35 24 . 4.97 21434 2125.82 582.33 25 . 3.33 21433 2129.14 581.90 26 . 4.46 21432 2133.60 581.98 27 . 2.63 21431 2136.23 582.64 28 . 8.85 21430 2145.09 582.62 29 . 3.12 21429 2148.20 582.47 30 . 2.83 21428 2151.03 582.73 31 . 7.36 21427 2158.39 582.91 32 . 8.20 21426 2166.59 582.93 33 . 2.59 21425 2169.18 582.80 34 . 4.69 21424 2173.86 583.05 35 TOP BANK 0.48 21423 2174.34 582.85 36 TOP CUT 0.69 21422 2175.03 582.02 37 TOE CUT 1.65 21421 2176.68 581.54 38 . 4.19 21420 2180.87 580.84 39 WL LB 3.92 21419 2184.79 580.54 40 IN CHANNEL 6.23 21418 2191.02 580.34 41 IN CHANNEL 5.57 21417 2196.59 580.33 42 IN CHANNEL 5.81 21416 2202.40 580.35 43 IN CHANNEL 5.13 21415 2207.54 580.45 44 IN CHANNEL 4.95 21414 2212.49 580.56 45 IN CHANNEL 5.83 21413 2218.31 580.68 46 IN CHANNEL 6.65 21412 2224.96 580.52 47 IN CHANNEL 6.41 21411 2231.36 580.63 48 IN CHANNEL 2.46 21410 2233.83 580.71 49 WL RB 1.56 21409 2235.38 580.97 50 TOP SANDBAR 2.46 21408 2237.84 580.82 51 TOP 0.36 21407 2238.20 580.71 52 TOE 0.94 21406 2239.14 580.73 53 TOE 0.32 21405 2239.45 580.96 54 TOP BCHANNEL 2.86 21404 2242.31 581.39 55 SPK RB 1.77 21403 2244.08 581.68 56 TOE BANK 2.94 21402 2247.01 582.74 57 . 2.38 21401 2249.40 584.45 58 TOP BANK 8.46 21400 2257.85 587.67 59 BOLT RB 9.01 21399 2266.86 589.57 60 STEEP RISE BYND END KETTLE RIVER X/S 22 PROJ#9510F080 SEPT 27 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 22399 0.00 585.40 1 DUMMY 2000.00 22398 2000.00 585.40 2 FLAT BEYOND 53.14 22397 2053.14 584.02 3 EDGE FIELD 1.41 22396 2054.55 584.10 4 TOE RAILROAD 4.01 22395 2058.56 585.43 5 TOP BALLAST 3.77 22394 2062.33 585.56 6 GL BOLT LB 0.53 22393 2062.86 585.57 7 TOP BALLAST 1.75 22392 2064.61 584.86 8 ON SLOPE 4.95 22391 2069.56 583.77 9 TOE RAILROAD 2.16 22390 2071.71 583.84 10 TOE 1.66 22389 2073.37 584.64 11 TOP BANK 2.35 22388 2075.72 584.80 12 FENCELINE 4.88 22387 2080.60 584.87 13 . 6.19 22386 2086.79 584.70 14 TOP BENCH 6.08 22385 2092.86 583.56 15 . 9.86 22384 2102.73 583.81 16 . 8.29 22383 2111.02 584.10 17 TOP BANK 0.94 22382 2111.96 583.93 18 TOP CUT 0.71 22381 2112.66 583.00 19 . 2.38 22380 2115.04 582.19 20 TOE CUT 3.04 22379 2118.08 581.97 21 . 2.26 22378 2120.34 582.09 22 . 2.52 22377 2122.86 582.41 23 TOE DYKE 3.90 22376 2126.76 584.67 24 TOP DYKE 4.78 22375 2131.54 584.63 25 TOP DYKE 4.57 22374 2136.11 583.24 26 . 4.01 22373 2140.11 582.36 27 TOE DYKE 8.34 22372 2148.45 582.11 28 WL LB 8.73 22371 2157.18 581.84 29 IN CHANNEL 4.44 22370 2161.62 581.80 30 IN CHANNEL 6.77 22369 2168.39 581.76 31 IN CHANNEL 7.12 22368 2175.50 581.77 32 IN CHANNEL 4.69 22367 2180.20 581.86 33 IN CHANNEL 7.16 22366 2187.35 581.94 34 IN CHANNEL 8.07 22365 2195.43 581.96 35 IN CHANNEL 6.34 22364 2201.76 581.80 36 IN CHANNEL 4.19 22363 2205.95 581.67 37 IN CHANNEL 3.22 22362 2209.17 581.85 38 IN CHANNEL 1.82 22361 2210.98 582.14 39 WL RB 0.72 22360 2211.71 582.35 40 TOE CUT 0.72 22359 2212.43 583.44 41 TOP CUT 1.24 22358 2213.66 584.03 42 TOP BANK 0.64 22357 2214.31 584.22 43 TOE SPOIL 1.72 22356 2216.03 584.68 44 TOP SPOIL 2.88 22355 2218.91 584.66 45 BOLT RB 4.69 22354 2223.60 584.50 46 TOP SPOIL 2.39 22353 2225.98 583.88 47 TOE SPOIL 7.34 22352 2233.32 583.47 48 . 9.20 22351 2242.51 583.97 49 . 11.78 22350 2254.30 584.12 50 FLAT BEYOND END KETTLE RIVER X/S 23 PROJ#9510F080 SEPT 27 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 23881 0.00 587.56 1 DUMMY 2000.00 23880 2000.00 587.56 2 SLOW RISE BYND 36.60 23879 2036.60 586.69 3 EDGE FIELD 1.65 23878 2038.24 586.72 4 TOE RAILROAD 1.23 23877 2039.48 587.16 5 TOP BALLAST 0.90 23876 2040.37 587.24 6 GL BOLT LB 3.82 23875 2044.20 587.23 7 TOP BALLAST 1.47 23874 2045.67 586.70 8 . 3.59 23873 2049.26 585.68 9 TOE RAILROAD 3.02 23872 2052.28 585.26 10 . 2.62 23871 2054.90 585.20 11 . 2.69 23870 2057.59 585.61 12 FENCELINE 4.66 23869 2062.24 585.69 13 . 4.04 23868 2066.29 584.88 14 . 2.41 23867 2068.70 584.82 15 TOP DITCH 1.68 23866 2070.38 583.91 16 TOE 0.63 23865 2071.00 583.92 17 TOE 0.22 23864 2071.22 584.07 18 TOP DITCH 4.42 23863 2075.64 584.14 19 TOE 3.19 23862 2078.82 584.90 20 . 11.84 23861 2090.67 585.16 21 . 10.12 23860 2100.79 584.93 22 TOP BANK 4.00 23859 2104.79 583.84 23 . 2.46 23858 2107.25 582.88 24 WL LB 0.89 23857 2108.14 582.70 25 IN CHANNEL 2.26 23856 2110.40 582.75 26 IN CHANNEL 5.16 23855 2115.56 582.52 27 IN CHANNEL 3.01 23854 2118.57 582.72 28 IN CHANNEL 2.67 23853 2121.24 582.90 29 IN CHANNEL 4.70 23852 2125.94 582.72 30 IN CHANNEL 4.65 23851 2130.58 582.36 31 IN CHANNEL 5.34 23850 2135.92 582.15 32 IN CHANNEL 4.28 23849 2140.20 582.21 33 IN CHANNEL 3.59 23848 2143.79 582.25 34 IN CHANNEL 6.23 23847 2150.02 582.34 35 IN CHANNEL 6.56 23846 2156.58 582.42 36 IN CHANNEL 6.87 23845 2163.45 582.47 37 IN CHANNEL 2.33 23844 2165.77 582.61 38 IN CHANNEL 2.34 23843 2168.12 582.87 39 WL RB 1.10 23842 2169.21 583.04 40 TOE BANK 3.33 23841 2172.54 584.85 41 TOE CUT 0.25 23840 2172.80 585.61 42 TOP CUT 2.95 23839 2175.75 585.66 43 BOLT RB 13.47 23838 2189.22 585.58 44 . 13.83 23837 2203.05 585.14 45 . 16.88 23836 2219.93 585.57 46 . 25.01 23835 2244.94 585.97 47 . 15.01 23834 2259.95 585.53 48 . 15.12 23833 2275.07 585.85 49 . 20.56 23832 2295.63 586.02 50 . 20.68 23831 2316.30 585.98 51 FENCELINE END KETTLE RIVER X/S 24 PROJ#9510F080 SEPT 25 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 24831 0.00 597.21 1 DUMMY 2000.00 24830 2000.00 597.21 2 GL BOLT LB 2.90 24829 2002.90 597.09 3 TOP BALLAST 9.64 24828 2012.55 592.60 4 ON SLOPE 5.65 24827 2018.20 589.27 5 TOE HWY 6.57 24826 2024.76 589.00 6 TOP RAILROAD 2.43 24825 2027.19 587.86 7 . 2.11 24824 2029.30 587.73 8 . 3.77 24823 2033.08 585.43 9 TOE BANK 4.48 24822 2037.56 585.37 10 . 1.86 24821 2039.43 584.93 11 TOP CUT 1.10 24820 2040.53 583.92 12 TOE CUT 1.92 24819 2042.46 583.66 13 WL LB 4.71 24818 2047.16 583.37 14 IN CHANNEL 4.49 24817 2051.66 583.10 15 IN CHANNEL 3.42 24816 2055.08 582.79 16 IN CHANNEL 5.81 24815 2060.88 582.75 17 IN CHANNEL 3.46 24814 2064.34 582.84 18 IN CHANNEL 3.91 24813 2068.26 582.89 19 IN CHANNEL 5.32 24812 2073.58 583.09 20 IN CHANNEL 3.02 24811 2076.60 583.45 21 IN CHANNEL 5.57 24810 2082.17 583.31 22 IN CHANNEL 5.94 24809 2088.11 583.27 23 IN CHANNEL 5.44 24808 2093.55 583.33 24 IN CHANNEL 9.64 24807 2103.19 583.46 25 IN CHANNEL 7.70 24806 2110.89 583.60 26 WL RB 4.64 24805 2115.54 583.70 27 TOE CUT 0.38 24804 2115.91 584.02 28 TOE BANK 4.01 24803 2119.92 585.43 29 TOP BANK 6.50 24802 2126.42 585.69 30 . 7.35 24801 2133.77 585.59 31 . 7.71 24800 2141.48 585.41 32 . 8.79 24799 2150.28 585.99 33 BOLT RB 5.12 24798 2155.40 585.95 34 . 6.80 24797 2162.20 585.91 35 TOE BANK 11.03 24796 2173.23 589.22 36 TOP BANK END KETTLE RIVER X/S 24.5 PROJ#9510F080 SEPT 25 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 24790 0.00 597.21 1 DUMMY 2000.00 24789 2000.00 597.21 2 GL BOLT LB 3.83 24788 2003.83 597.26 3 TOE ABUTMENT 0.05 24787 2003.88 597.54 4 TOP ABUTMENT 0.30 24786 2004.18 597.54 5 TOP ABUTMENT 0.06 24785 2004.24 596.41 6 CORD ELEV LB 0.01 24784 2004.25 596.35 7 TOP SEAT 0.53 24783 2004.78 596.34 8 TOP SEAT 0.18 24782 2004.96 596.00 9 TOE SEAT 2.23 24781 2007.19 595.88 10 TOP BANK 1.96 24780 2009.15 595.43 11 . 9.62 24779 2018.77 590.81 12 TOE PIER 0.38 24778 2019.15 596.39 13 TOP PIER-CORD 0.67 24777 2019.82 596.38 14 TOP PIER-CORD 0.08 24776 2019.90 590.47 15 TOE PIER 2.98 24775 2022.88 589.52 16 TOE ROAD 3.45 24774 2026.33 589.39 17 . 0.84 24773 2027.17 588.86 18 . 2.18 24772 2029.35 588.85 19 . 1.71 24771 2031.06 589.18 20 . 3.09 24770 2034.15 587.70 21 TOE PIER 0.02 24769 2034.18 589.85 22 TOP PIER 1.83 24768 2036.01 589.80 23 TOP PIER 0.17 24767 2036.18 586.80 24 TOE PIER 0.50 24766 2036.68 586.16 25 . 1.77 24765 2038.45 585.83 26 . 2.89 24764 2041.33 585.79 27 . 5.29 24763 2046.63 584.53 28 . 0.19 24762 2046.81 584.30 29 . 3.29 24761 2050.10 584.05 30 . 0.76 24760 2050.86 583.84 31 . 2.17 24759 2053.03 583.65 32 WL LB 3.18 24758 2056.21 583.07 33 IN CHANNEL 4.35 24757 2060.56 582.63 34 TOE CHANNEL 3.36 24756 2063.92 582.42 35 IN CHANNEL 1.50 24755 2065.42 582.54 36 IN CHANNEL 3.52 24754 2068.94 582.67 37 IN CHANNEL 2.94 24753 2071.88 582.78 38 IN CHANNEL 4.66 24752 2076.54 582.70 39 IN CHANNEL 1.48 24751 2078.02 582.70 40 IN CHANNEL 2.94 24750 2080.96 582.60 41 TOE PIER 0.76 24749 2081.72 589.75 42 TOP PIER 2.94 24748 2084.67 589.77 43 TOP PIER 0.02 24747 2084.69 582.63 44 TOE PIER 1.48 24746 2086.17 582.29 45 IN CHANNEL 3.88 24745 2090.05 582.49 46 IN CHANNEL 2.82 24744 2092.87 582.82 47 IN CHANNEL 4.16 24743 2097.03 583.19 48 IN CHANNEL 5.95 24742 2102.98 583.28 49 IN CHANNEL 6.45 24741 2109.43 583.37 50 IN CHANNEL 6.27 24740 2115.70 583.35 51 TOE CHANNEL 2.02 24739 2117.73 583.63 52 WL RB 1.53 24738 2119.26 583.95 53 . 0.74 24737 2119.99 584.40 54 . 5.32 24736 2125.32 586.09 55 TOP BANK 3.49 24735 2128.80 586.48 56 . 3.85 24734 2132.65 587.84 57 TOE PIER 0.01 24733 2132.66 589.85 58 TOP PIER 1.75 24732 2134.41 589.86 59 TOP PIER 0.04 24731 2134.45 588.81 60 TOE PIER 5.69 24730 2140.15 590.98 61 ON SLOPE 4.10 24729 2144.24 594.11 62 . 3.92 24728 2148.16 595.91 63 TOP BANK 3.63 24727 2151.79 596.04 64 TOE SEAT 0.02 24726 2151.81 596.19 65 TOP SEAT 0.50 24725 2152.31 596.28 66 TOP SEAT 0.03 24724 2152.34 596.35 67 CORD ELEV RB 0.05 24723 2152.39 597.64 68 TOP ABUTMENT 0.28 24722 2152.67 597.63 69 TOP ABUTMENT 0.01 24721 2152.69 597.39 70 TOE ABUTMENT 2.67 24720 2155.36 597.25 71 BOLT RB END KETTLE RIVER X/S 25 PROJ#9510F080 SEPT 25 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 25710 0.00 589.13 1 DUMMY 2000.00 25709 2000.00 589.13 2 FL-STEEP RISE 0.79 25708 2000.79 588.77 3 . 2.48 25707 2003.26 588.19 4 TOE 3.93 25706 2007.20 588.06 5 TOE RAILROAD 3.52 25705 2010.72 589.93 6 TOP BALLAST 1.80 25704 2012.52 590.21 7 GL BOLT LB 3.09 25703 2015.61 590.12 8 TOP RAILROAD 3.25 25702 2018.85 589.56 9 TOP BALLAST 2.68 25701 2021.53 587.76 10 . 1.92 25700 2023.45 586.85 11 FENCELINE 1.04 25699 2024.48 586.07 12 TOP CUT 1.11 25698 2025.60 585.33 13 TOE CUT 2.19 25697 2027.79 584.58 14 . 3.60 25696 2031.39 584.09 15 WL LB 2.50 25695 2033.89 583.98 16 WET BAR 4.29 25694 2038.18 584.02 17 WET BAR 3.70 25693 2041.87 584.06 18 WET BAR 7.40 25692 2049.27 583.99 19 WET BAR 7.47 25691 2056.74 583.87 20 IN CHANNEL 6.90 25690 2063.65 583.85 21 IN CHANNEL 6.38 25689 2070.02 583.81 22 IN CHANNEL 3.70 25688 2073.72 583.70 23 IN CHANNEL 6.18 25687 2079.90 583.72 24 IN CHANNEL 2.36 25686 2082.26 583.79 25 IN CHANNEL 3.03 25685 2085.29 583.73 26 IN CHANNEL 2.38 25684 2087.66 583.81 27 TOE CHANNEL 1.47 25683 2089.14 584.06 28 WL RB 1.13 25682 2090.27 584.19 29 . 1.85 25681 2092.12 584.43 30 TOE BANK 1.74 25680 2093.86 584.84 31 TOE CUT 1.09 25679 2094.95 585.62 32 TOP CUT 1.44 25678 2096.39 586.40 33 FENCELINE 1.53 25677 2097.92 586.58 34 BOLT RB 11.93 25676 2109.85 586.65 35 . 12.68 25675 2122.53 586.43 36 . 5.49 25674 2128.02 586.00 37 . 4.45 25673 2132.47 586.05 38 TOE BANK 7.10 25672 2139.57 588.77 39 . 1.55 25671 2141.12 588.86 40 . 1.90 25670 2143.02 589.55 41 TOP BANK 16.15 25669 2159.17 589.69 42 FLAT BEYOND END KETTLE RIVER X/S 26 PROJ#9510F080 SEPT 25 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 26669 0.00 594.47 1 DUMMY 2000.00 26668 2000.00 594.47 2 SAME RISE BYND 28.79 26667 2028.79 592.85 3 TOP BANK 18.33 26666 2047.12 588.55 4 EDGE TRAIL 2.79 26665 2049.91 588.59 5 EDGE TRAIL 4.02 26664 2053.93 588.33 6 TOP 1.75 26663 2055.68 586.91 7 TOE 7.59 26662 2063.27 586.72 8 FENCELINE 1.62 26661 2064.89 586.87 9 TOE 1.59 26660 2066.47 587.96 10 . 2.25 26659 2068.72 588.56 11 ON SLOPE 2.30 26658 2071.03 589.69 12 TOP BALLAST 1.33 26657 2072.36 589.98 13 TOP RAILROAD 2.99 26656 2075.35 589.96 14 GL BOLT LB 0.75 26655 2076.10 589.84 15 TOP BALLAST 3.53 26654 2079.63 588.19 16 TOE RAILROAD 3.44 26653 2083.08 588.02 17 FENCELINE 3.28 26652 2086.36 587.77 18 TOP BANK 2.03 26651 2088.39 586.78 19 TOP CUT 0.44 26650 2088.84 586.45 20 TOE CUT 1.51 26649 2090.35 586.15 21 . 2.11 26648 2092.46 585.29 22 . 0.72 26647 2093.18 584.77 23 TOE 1.06 26646 2094.24 584.61 24 WL LB 3.98 26645 2098.22 584.00 25 TOE CHANNEL 1.69 26644 2099.91 584.06 26 IN CHANNEL 3.26 26643 2103.17 584.12 27 IN CHANNEL 6.26 26642 2109.43 584.15 28 IN CHANNEL 6.43 26641 2115.86 584.24 29 IN CHANNEL 6.76 26640 2122.61 584.30 30 IN CHANNEL 6.71 26639 2129.33 584.30 31 IN CHANNEL 6.33 26638 2135.66 584.50 32 IN CHANNEL 2.05 26637 2137.71 584.62 33 WL RB 1.31 26636 2139.02 584.69 34 . 6.84 26635 2145.86 584.87 35 . 1.88 26634 2147.74 585.12 36 TOE BANK 2.36 26633 2150.10 586.51 37 TOE CUT 0.82 26632 2150.92 587.37 38 TOP CUT 2.05 26631 2152.98 587.45 39 BOLT RB 1.51 26630 2154.49 587.42 40 FENCELINE 3.57 26629 2158.06 587.43 41 E EDGE UTIL POLE 7.08 26628 2165.14 586.97 42 . 6.53 26627 2171.67 587.29 43 . 3.18 26626 2174.85 587.77 44 . 2.88 26625 2177.73 588.16 45 FENCELINE 10.23 26624 2187.96 588.27 46 . 14.19 26623 2202.14 588.13 47 . 16.98 26622 2219.12 587.69 48 FL-FLAT BYND END KETTLE RIVER X/S 27 PROJ#9510F080 SEPT 25 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 27622 0.00 592.79 1 DUMMY 2000.00 27621 2000.00 592.79 2 SW COR SHED 10.67 27620 2010.67 592.41 3 EDGE DRIVEWAY 7.23 27619 2017.89 592.42 4 EDGE DRIVEWAY 3.79 27618 2021.68 592.28 5 TOP BANK 6.28 27617 2027.97 591.72 6 FENCELINE 12.86 27616 2040.83 588.92 7 TOE BANK 16.75 27615 2057.58 588.58 8 . 6.79 27614 2064.37 588.25 9 . 9.58 27613 2073.95 588.78 10 FENCELINE 3.40 27612 2077.36 588.35 11 . 4.09 27611 2081.45 588.18 12 TOE 2.33 27610 2083.77 589.20 13 . 2.41 27609 2086.18 589.50 14 TOP BALLAST 0.91 27608 2087.09 589.65 15 TOP 2.95 27607 2090.04 589.71 16 TOP 0.87 27606 2090.91 589.61 17 GL BOLT LB 0.86 27605 2091.76 589.47 18 TOP BALLAST 3.88 27604 2095.64 588.30 19 TOE RR 1.06 27603 2096.70 588.82 20 TOP 3.76 27602 2100.46 589.02 21 FENCELINE 2.94 27601 2103.40 588.67 22 . 2.06 27600 2105.46 588.25 23 . 2.31 27599 2107.77 588.24 24 . 2.99 27598 2110.75 587.77 25 . 2.78 27597 2113.54 587.33 26 TOP BANK 2.78 27596 2116.32 585.64 27 TOE BANK 1.52 27595 2117.85 585.62 28 WL LB 5.51 27594 2123.36 585.38 29 IN CHANNEL 9.38 27593 2132.73 585.21 30 IN CHANNEL 8.08 27592 2140.81 585.17 31 IN CHANNEL 7.72 27591 2148.53 585.17 32 IN CHANNEL 8.29 27590 2156.81 585.22 33 IN CHANNEL 6.47 27589 2163.28 585.36 34 IN CHANNEL 5.09 27588 2168.37 585.62 35 WL RB 1.84 27587 2170.21 585.96 36 TOE CUT 1.00 27586 2171.21 586.71 37 . 1.47 27585 2172.68 587.42 38 . 0.80 27584 2173.48 588.36 39 TOP CUT-FL 1.59 27583 2175.07 589.21 40 BOLT RB 0.44 27582 2175.51 589.38 41 FENCELINE 6.50 27581 2182.01 589.49 42 . 13.39 27580 2195.40 588.99 43 . 9.17 27579 2204.57 589.06 44 FENCELINE 1.06 27578 2205.62 588.74 45 . 1.90 27577 2207.52 588.75 46 TOE 4.03 27576 2211.56 589.61 47 TOP BALLAST 1.46 27575 2213.02 589.72 48 EDGE PAVEMENT 10.60 27574 2223.62 589.47 49 EDGE PAVEMENT 1.31 27573 2224.93 589.35 50 TOP BALLAST 1.44 27572 2226.37 589.16 51 TOE BANK 2.77 27571 2229.14 591.71 52 STEEP RISE BYND END KETTLE RIVER X/S 28 PROJ#9510F080 SEPT 25 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 28571 0.00 597.61 1 DUMMY 2000.00 28570 2000.00 597.61 2 FIELD-FLAT BYND 6.19 28569 2006.19 597.54 3 FENCELINE 1.89 28568 2008.08 597.37 4 TOP BANK 7.06 28567 2015.14 594.12 5 ON SLOPE 6.89 28566 2022.03 590.33 6 TOE 0.61 28565 2022.64 590.47 7 TOP BALLAST 1.45 28564 2024.09 590.50 8 GL BOLT LB 1.82 28563 2025.91 590.54 9 . 1.53 28562 2027.44 590.24 10 TOP BALLAST 0.88 28561 2028.32 589.83 11 . 2.00 28560 2030.32 589.11 12 . 1.26 28559 2031.58 588.58 13 TOE RR 1.48 28558 2033.07 588.60 14 TOE 2.47 28557 2035.53 589.46 15 . 4.99 28556 2040.52 589.86 16 TOP 4.20 28555 2044.72 589.72 17 TOP BENCH 2.21 28554 2046.93 588.96 18 . 1.93 28553 2048.86 588.52 19 TOE 2.32 28552 2051.18 588.43 20 TOP CUT 0.94 28551 2052.11 587.49 21 TOE CUT 2.13 28550 2054.25 586.79 22 . 1.17 28549 2055.41 586.42 23 TOE 2.99 28548 2058.40 586.38 24 TOP BAR 0.72 28547 2059.12 586.25 25 WL LB 3.04 28546 2062.16 585.63 26 TOE CHANNEL 4.99 28545 2067.15 585.51 27 IN CHANNEL 5.37 28544 2072.52 585.49 28 IN CHANNEL 5.52 28543 2078.05 585.48 29 IN CHANNEL 5.58 28542 2083.62 585.43 30 IN CHANNEL 5.08 28541 2088.70 585.37 31 IN CHANNEL 5.68 28540 2094.39 585.50 32 IN CHANNEL 6.33 28539 2100.72 586.02 33 IN CHANNEL 1.22 28538 2101.94 586.15 34 IN CHANNEL 2.80 28537 2104.74 586.26 35 WL RB 0.38 28536 2105.12 586.39 36 TOE BANK 0.62 28535 2105.74 587.22 37 TOE CUT 0.08 28534 2105.81 588.16 38 TOP CUT 0.41 28533 2106.22 588.60 39 TOP BANK 3.11 28532 2109.33 588.85 40 BOLT RB 2.71 28531 2112.04 589.13 41 EDGE FIELD 1.68 28530 2113.72 589.07 42 TOE 11.27 28529 2124.99 589.93 43 FIELD-FLAT BYND END KETTLE RIVER X/S 29 PROJ#9510F080 SEPT 23 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 29496 0.00 594.21 1 DUMMY 2000.00 29497 2000.00 594.21 2 FLAT BEYOND 5.96 29498 2005.96 594.06 3 TOP 2.54 29499 2008.51 593.51 4 . 4.87 29500 2013.37 591.95 5 . 5.20 29501 2018.58 591.10 6 TOE 3.49 29502 2022.07 590.89 7 . 14.81 29503 2036.88 591.34 8 . 9.57 29504 2046.44 591.74 9 . 15.49 29505 2061.93 591.18 10 FENCELINE 1.25 29506 2063.18 591.04 11 BOLT LB 3.72 29507 2066.90 589.63 12 TOP CUT 0.39 29508 2067.29 589.10 13 TOE CUT 2.96 29509 2070.25 587.99 14 . 1.01 29510 2071.27 587.21 15 WL LB 1.97 29511 2073.24 586.96 16 IN CHANNEL 5.23 29512 2078.47 586.83 17 IN CHANNEL 6.60 29513 2085.07 586.85 18 IN CHANNEL 7.20 29514 2092.27 586.89 19 IN CHANNEL 7.08 29515 2099.35 586.91 20 IN CHANNEL 6.85 29516 2106.20 586.93 21 IN CHANNEL 3.95 29517 2110.15 586.90 22 IN CHANNEL 6.52 29518 2116.67 586.87 23 IN CHANNEL 4.98 29519 2121.65 586.93 24 IN CHANNEL 1.77 29520 2123.42 587.21 25 WL RB 1.27 29521 2124.70 587.32 26 SPIKE-GL 3.80 29522 2128.50 587.45 27 TOE CUT 0.94 29523 2129.43 588.45 28 . 0.51 29524 2129.94 589.39 29 TOP CUT 0.57 29525 2130.51 589.62 30 FENCELINE 1.27 29526 2131.78 589.95 31 BOLT RB 3.31 29527 2135.09 591.37 32 TOP BANK 8.20 29528 2143.29 591.81 33 FLAT BEYOND END KETTLE RIVER X/S 30 PROJ#9510F080 SEPT 23 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 30497 0.00 592.42 1 DUMMY 2000.00 30496 2000.00 592.42 2 FLAT BEYOND 20.28 30495 2020.28 590.66 3 . 21.33 30494 2041.61 590.81 4 IN FIELD 11.53 30493 2053.14 591.22 5 FENCELINE 0.95 30492 2054.09 591.36 6 BOLT LB 1.52 30491 2055.61 591.76 7 TOP CUT 4.11 30490 2059.72 589.55 8 TOE CUT 1.67 30489 2061.39 588.63 9 . 0.57 30488 2061.96 588.22 10 WL LB 3.02 30487 2064.97 587.94 11 IN CHANNEL 2.87 30486 2067.85 587.90 12 IN CHANNEL 5.87 30485 2073.72 588.04 13 IN CHANNEL 10.90 30484 2084.62 588.09 14 IN CHANNEL 7.74 30483 2092.36 588.07 15 IN CHANNEL 8.93 30482 2101.29 587.97 16 IN CHANNEL 5.81 30481 2107.10 587.86 17 IN CHANNEL 4.37 30480 2111.47 587.69 18 IN CHANNEL 4.70 30479 2116.16 587.58 19 IN CHANNEL 4.77 30478 2120.93 587.56 20 IN CHANNEL 3.71 30477 2124.64 588.03 21 WL RB 2.21 30476 2126.85 588.14 22 TOE CUT 2.38 30475 2129.23 589.93 23 SPIKE 1.87 30474 2131.10 590.52 24 TOP CUT 1.26 30473 2132.36 590.76 25 FENCELINE 3.32 30472 2135.68 590.71 26 . 6.91 30471 2142.59 590.76 27 . 5.20 30470 2147.79 590.28 28 TOE BANK 5.04 30469 2152.83 591.65 29 BOLT RB 2.10 30468 2154.93 593.27 30 ON SLOPE 3.44 30467 2158.37 595.37 31 ON SLOPE 3.25 30466 2161.63 597.38 32 TOP BANK 0.81 30465 2162.44 597.72 33 TOP-EDGE GARACE END KETTLE RIVER X/S 31 PROJ#9510F080 SEPT 23 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 31418 0.00 596.72 1 DUMMY 2000.00 31419 2000.00 596.72 2 FENCELINE 6.11 31420 2006.11 596.56 3 TOP BANK 1.73 31421 2007.84 596.09 4 . 1.45 31422 2009.29 595.93 5 . 2.26 31423 2011.55 594.48 6 TOE BANK 1.28 31424 2012.82 594.51 7 EDGE ROAD 3.74 31425 2016.56 594.46 8 EDGE ROAD 0.40 31426 2016.96 594.43 9 BOLT LB 0.53 31427 2017.50 594.37 10 TOP BANK 2.71 31428 2020.20 593.82 11 . 2.72 31429 2022.92 592.70 12 . 2.49 31430 2025.40 592.25 13 . 4.36 31431 2029.76 591.03 14 FENCELINE 2.20 31432 2031.96 590.74 15 . 3.73 31433 2035.69 589.24 16 TOE BANK 3.00 31434 2038.69 589.27 17 . 0.57 31435 2039.26 589.04 18 EDGE BAR 1.53 31436 2040.79 588.87 19 SPIKE-BAR 1.66 31437 2042.45 588.83 20 WL LB 3.97 31438 2046.42 588.68 21 IN CHANNEL 5.87 31439 2052.29 588.74 22 IN CHANNEL 4.84 31440 2057.12 588.76 23 IN CHANNEL 2.08 31441 2059.20 588.82 24 WL BAR 4.51 31442 2063.71 588.97 25 . 3.84 31443 2067.55 589.27 26 TOE 2.74 31444 2070.29 590.32 27 TOP 2.13 31445 2072.42 590.35 28 TOP 3.31 31446 2075.73 589.05 29 WL BAR 2.31 31447 2078.04 588.79 30 IN CHANNEL 2.88 31448 2080.92 588.98 31 IN CHANNEL 5.67 31449 2086.59 588.85 32 IN CHANNEL 5.79 31450 2092.37 588.70 33 IN CHANNEL 6.07 31451 2098.44 588.77 34 IN CHANNEL 5.78 31452 2104.22 588.82 35 IN CHANNEL 4.91 31453 2109.13 588.84 36 IN CHANNEL 5.38 31454 2114.52 589.19 37 WL RB 2.95 31455 2117.46 589.40 38 TOE BANK 9.45 31456 2126.91 591.77 39 . 10.36 31457 2137.27 593.06 40 ON LAWN 4.94 31458 2142.20 593.58 41 ON LAWN 14.21 31459 2156.41 595.97 42 TOP BANK 9.02 31460 2165.43 596.40 43 . 5.99 31461 2171.42 597.59 44 TOP 3.07 31462 2174.49 597.70 45 BOLT RB 6.21 31463 2180.70 597.44 46 . 7.12 31464 2187.82 597.17 47 FL-FLAT BYND END KETTLE RIVER X/S 32 PROJ#9510F080 SEPT 23 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 32419 0.00 603.67 1 DUMMY 2000.00 32418 2000.00 603.67 2 STEEP RISE BYND 7.71 32417 2007.71 601.51 3 FL RR RW 3.78 32416 2011.49 601.10 4 TOP BANK 6.81 32415 2018.30 596.79 5 TOE BANK 1.57 32414 2019.86 596.56 6 EDGE ROAD 4.25 32413 2024.11 596.49 7 EDGE ROAD 5.60 32412 2029.71 596.24 8 GL BOLT LB 3.94 32411 2033.65 596.24 9 TOP BANK 3.78 32410 2037.43 594.40 10 FENCELINE 0.79 32409 2038.22 593.92 11 TOE BANK 4.29 32408 2042.51 593.24 12 . 4.78 32407 2047.29 592.34 13 . 1.66 32406 2048.94 591.84 14 . 3.75 32405 2052.70 590.97 15 . 4.98 32404 2057.68 590.55 16 TOP CUT 0.45 32403 2058.12 589.99 17 TOE CUT 1.55 32402 2059.67 589.72 18 WL LB 1.70 32401 2061.37 589.45 19 IN CHANNEL 2.06 32400 2063.43 589.08 20 IN CHANNEL 2.18 32399 2065.61 588.93 21 IN CHANNEL 4.51 32398 2070.12 588.06 22 IN CHANNEL 2.86 32397 2072.97 587.46 23 IN CHANNEL 5.37 32396 2078.34 587.54 24 IN CHANNEL 3.99 32395 2082.33 587.69 25 IN CHANNEL 3.75 32394 2086.08 587.79 26 IN CHANNEL 3.84 32393 2089.92 588.14 27 IN CHANNEL 1.49 32392 2091.42 588.55 28 IN CHANNEL 2.37 32391 2093.79 589.71 29 WL RB 0.72 32390 2094.51 589.92 30 TOE CUT 1.13 32389 2095.64 591.81 31 TOP CUT 6.39 32388 2102.03 595.38 32 BOLT RB 2.89 32387 2104.93 597.38 33 TOP BANK 7.25 32386 2112.18 597.39 34 IN FIELD-FLAT END KETTLE RIVER X/S 33 PROJ#9510F080 SEPT 22 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 33851 0.00 596.06 1 DUMMY 2000.00 33852 2000.00 596.06 2 BOLT LB 9.63 33853 2009.63 596.17 3 TOP ABUTMENT 0.09 33854 2009.72 595.45 4 CORD ELEV LB 0.13 33855 2009.85 595.34 5 TOP SEAT 0.42 33856 2010.28 595.34 6 TOP SEAT 0.36 33857 2010.64 592.98 7 TOE SEAT 1.76 33858 2012.40 592.79 8 . 1.73 33859 2014.13 591.50 9 . 2.55 33860 2016.68 591.22 10 . 1.83 33861 2018.51 590.50 11 . 3.00 33862 2021.50 590.07 12 . 1.42 33863 2022.92 589.84 13 WL LB 1.65 33864 2024.57 589.66 14 IN CHANNEL 3.10 33865 2027.67 589.32 15 IN CHANNEL 3.71 33866 2031.38 589.28 16 IN CHANNEL 3.25 33867 2034.63 589.03 17 IN CHANNEL 1.29 33868 2035.92 589.30 18 IN CHANNEL 1.87 33869 2037.79 589.83 19 WL BAR 1.26 33870 2039.05 590.72 20 TOE PIER 0.25 33871 2039.30 593.21 21 TOP BUTTRESS 0.85 33872 2040.15 594.75 22 TOP PIER 0.79 33873 2040.94 594.87 23 TOP PIER 0.57 33874 2041.51 593.17 24 TOP BUTTRESS 0.18 33875 2041.69 589.95 25 TOE PIER 1.05 33876 2042.74 589.87 26 WL BAR 1.08 33877 2043.82 589.57 27 IN CHANNEL 1.47 33878 2045.29 589.12 28 IN CHANNEL 3.91 33879 2049.21 589.12 29 IN CHANNEL 3.62 33880 2052.83 589.15 30 IN CHANNEL 3.60 33881 2056.43 589.17 31 IN CHANNEL 2.78 33882 2059.21 589.41 32 IN CHANNEL 1.84 33883 2061.05 589.69 33 IN CHANNEL 1.11 33884 2062.16 589.84 34 WL RB 1.22 33885 2063.38 590.17 35 . 2.00 33886 2065.38 590.34 36 . 1.42 33887 2066.80 590.53 37 TOE BANK 1.76 33888 2068.56 591.66 38 . 1.33 33889 2069.89 592.72 39 TOE SEAT 0.34 33890 2070.23 595.33 40 TOP SEAT 0.63 33891 2070.85 595.36 41 TOP SEAT 0.11 33892 2070.96 595.42 42 CORD ELEV RB 0.06 33893 2071.02 596.16 43 TOP ABUTMENT 6.28 33894 2077.30 596.28 44 GL BOLT RB END KETTLE RIVER X/S 34 PROJ#9510F080 SEPT 22 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 34852 0.00 596.14 1 DUMMY 2000.00 34851 2000.00 596.14 2 BOLT LB 9.55 34850 2009.55 596.16 3 TOP ABUTMENT 0.14 34849 2009.69 595.45 4 CORD ELEV LB 0.13 34848 2009.82 595.30 5 TOP SEAT 0.39 34847 2010.21 595.34 6 TOP SEAT 0.61 34846 2010.82 593.03 7 TOE SEAT 1.74 34845 2012.56 592.58 8 . 0.28 34844 2012.84 591.91 9 . 1.64 34843 2014.48 591.56 10 . 2.23 34842 2016.71 591.40 11 . 1.98 34841 2018.69 590.54 12 . 0.66 34840 2019.34 590.53 13 . 1.41 34839 2020.76 590.16 14 . 2.06 34838 2022.82 589.85 15 WL LB 2.54 34837 2025.36 589.55 16 IN CHANNEL 3.43 34836 2028.79 589.38 17 IN CHANNEL 5.77 34835 2034.56 589.21 18 IN CHANNEL 2.00 34834 2036.56 589.26 19 IN CHANNEL 1.21 34833 2037.77 589.85 20 WL BAR 1.34 34832 2039.11 590.18 21 TOE PIER 0.12 34831 2039.23 593.42 22 TOP BUTTRESS 0.23 34830 2039.46 594.90 23 TOP PIER 2.01 34829 2041.47 594.88 24 TOP PIER 0.24 34828 2041.71 593.43 25 TOP BUTTRESS 0.02 34827 2041.73 590.18 26 TOE PIER 0.79 34826 2042.52 589.85 27 WL BAR 1.61 34825 2044.12 589.52 28 IN CHANNEL 2.65 34824 2046.78 588.79 29 IN CHANNEL 3.52 34823 2050.30 589.03 30 IN CHANNEL 4.94 34822 2055.24 589.25 31 IN CHANNEL 4.35 34821 2059.59 589.47 32 IN CHANNEL 2.76 34820 2062.35 589.83 33 WL RB 4.43 34819 2066.78 590.56 34 TOE RIP-RAP 0.10 34818 2066.88 591.04 35 . 1.26 34817 2068.14 591.74 36 . 1.93 34816 2070.07 592.81 37 TOE SEAT 0.26 34815 2070.33 595.33 38 TOP SEAT 0.62 34814 2070.95 595.36 39 TOP SEAT 0.00 34813 2070.96 595.44 40 CORD ELEV RB 0.04 34812 2071.00 596.14 41 TOP ABUTMENT 5.66 34811 2076.66 596.19 42 BOLT RB END KETTLE RIVER X/S 35 PROJ#9510F080 SEPT 22 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 35811 0.00 600.77 1 DUMMY 2000.00 35810 2000.00 600.77 2 SE COR HSE-FLAT 2.98 35809 2002.98 600.85 3 FENCELINE 1.49 35808 2004.47 600.86 4 TOP BANK 2.22 35807 2006.70 600.02 5 . 11.88 35806 2018.58 594.40 6 . 1.88 35805 2020.46 593.98 7 TOE BANK 7.91 35804 2028.37 594.13 8 BOLT LB 2.17 35803 2030.54 594.17 9 TOP BANK 1.87 35802 2032.41 593.09 10 . 0.70 35801 2033.11 592.86 11 . 1.29 35800 2034.40 592.11 12 . 0.93 35799 2035.34 591.69 13 SPIKE 0.65 35798 2035.99 591.64 14 . 0.89 35797 2036.87 591.17 15 TOP CUT 0.18 35796 2037.05 590.89 16 TOE CUT 1.75 35795 2038.80 590.66 17 WL LB 3.64 35794 2042.44 590.35 18 IN CHANNEL 2.01 35793 2044.45 590.35 19 IN CHANNEL 5.98 35792 2050.43 590.38 20 IN CHANNEL 5.40 35791 2055.83 590.32 21 IN CHANNEL 4.61 35790 2060.43 590.28 22 IN CHANNEL 3.91 35789 2064.34 590.33 23 IN CHANNEL 5.60 35788 2069.93 590.41 24 IN CHANNEL 6.81 35787 2076.74 590.55 25 IN CHANNEL 2.24 35786 2078.97 590.67 26 WL BAR 4.51 35785 2083.49 590.72 27 TOP BAR 3.74 35784 2087.23 590.59 28 WL BAR 1.97 35783 2089.19 590.49 29 IN CHANNEL 2.22 35782 2091.42 590.53 30 IN CHANNEL 1.12 35781 2092.54 590.61 31 WL RB 2.24 35780 2094.78 590.67 32 . 1.90 35779 2096.68 590.94 33 EDGE BAR 1.65 35778 2098.33 591.62 34 TOE CUT 0.60 35777 2098.93 593.06 35 TOP CUT 1.08 35776 2100.01 593.64 36 TOP BANK 11.94 35775 2111.94 593.76 37 BOLT RB 49.61 35774 2161.55 593.40 38 NE COR HSE-RISE END KETTLE RIVER X/S 36 PROJ#9510F080 SEPT 22 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 36774 0.00 599.88 1 DUMMY 2000.00 36773 2000.00 599.88 2 IN FIELD-FLAT 47.17 36772 2047.17 597.94 3 FENCELINE 11.01 36771 2058.18 598.04 4 . 5.67 36770 2063.85 598.15 5 BOLT LB 2.48 36769 2066.32 598.01 6 . 14.46 36768 2080.78 595.34 7 TOP BANK 1.82 36767 2082.60 594.63 8 . 0.66 36766 2083.26 594.08 9 TOE BANK 2.48 36765 2085.74 593.55 10 . 3.03 36764 2088.77 592.83 11 . 1.78 36763 2090.55 592.31 12 TOP CUT 1.07 36762 2091.62 591.70 13 TOE CUT 1.86 36761 2093.48 591.57 14 WL LB 2.40 36760 2095.88 591.49 15 IN CHANNEL 3.17 36759 2099.05 591.31 16 IN CHANNEL 4.98 36758 2104.03 591.24 17 IN CHANNEL 5.12 36757 2109.15 591.09 18 IN CHANNEL 5.82 36756 2114.97 591.01 19 IN CHANNEL 6.01 36755 2120.98 590.89 20 IN CHANNEL 4.97 36754 2125.95 590.78 21 IN CHANNEL 2.05 36753 2128.00 590.68 22 IN CHANNEL 3.77 36752 2131.77 590.55 23 IN CHANNEL 2.55 36751 2134.32 590.50 24 IN CHANNEL 1.61 36750 2135.93 591.04 25 IN CHANNEL 2.24 36749 2138.17 591.04 26 IN CHANNEL 1.69 36748 2139.85 591.03 27 IN CHANNEL 2.03 36747 2141.88 591.57 28 WL RB 1.93 36746 2143.81 592.35 29 TOE BANK 1.04 36745 2144.85 593.32 30 H.W.M. 0.86 36744 2145.71 593.47 31 SPIKE 0.74 36743 2146.45 593.84 32 . 6.43 36742 2152.87 596.00 33 TOP BANK 9.18 36741 2162.06 596.34 34 BOLT RB 0.92 36740 2162.97 596.44 35 . 8.01 36739 2170.99 596.57 36 . 7.86 36738 2178.84 596.46 37 FENCELINE 11.21 36737 2190.05 598.05 38 TOE BANK 7.51 36736 2197.56 600.15 39 . 4.65 36735 2202.21 603.06 40 ON SLOPE 5.11 36734 2207.32 605.84 41 ON SLOPE 6.74 36733 2214.06 609.10 42 TOP BANK END KETTLE RIVER X/S 37 PROJ#9510F080 SEPT 22 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 37733 0.00 599.46 1 DUMMY 2000.00 37732 2000.00 599.46 2 FLAT BEYOND 9.57 37731 2009.57 599.14 3 . 9.22 37730 2018.80 598.18 4 . 7.40 37729 2026.19 597.64 5 BOLT LB 1.36 37728 2027.55 597.37 6 TOP BANK 2.53 37727 2030.08 596.61 7 . 5.49 37726 2035.57 593.97 8 TOE BANK 5.23 37725 2040.80 592.88 9 . 2.51 37724 2043.31 591.96 10 . 1.63 37723 2044.94 591.66 11 WL LB 3.97 37722 2048.91 591.47 12 IN CHANNEL 4.54 37721 2053.44 591.15 13 IN CHANNEL 2.27 37720 2055.71 591.08 14 IN CHANNEL 2.02 37719 2057.73 591.17 15 IN CHANNEL 4.47 37718 2062.20 591.13 16 IN CHANNEL 3.99 37717 2066.19 591.16 17 IN CHANNEL 4.09 37716 2070.28 591.31 18 IN CHANNEL 4.83 37715 2075.11 591.45 19 IN CHANNEL 2.02 37714 2077.13 591.67 20 WL RB 1.06 37713 2078.19 591.73 21 SPIKE-BAR 1.13 37712 2079.32 591.80 22 . 2.11 37711 2081.43 592.10 23 EDGE BAR 1.04 37710 2082.47 592.37 24 . 2.34 37709 2084.81 593.09 25 TOE 0.94 37708 2085.75 593.52 26 TOP CUT 3.12 37707 2088.87 594.04 27 . 3.95 37706 2092.82 594.90 28 . 5.17 37705 2097.99 595.13 29 TOE BANK 5.26 37704 2103.25 596.96 30 TOP BANK 2.45 37703 2105.70 597.16 31 BOLT RB 3.94 37702 2109.64 597.16 32 . 5.51 37701 2115.16 597.50 33 EDGE PAVEMENT 2.67 37700 2117.83 597.60 34 CL EEK ROAD END KETTLE RIVER X/S 38 PROJ#9510F080 SEPT 22 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 38700 0.00 599.64 1 DUMMY 2000.00 38699 2000.00 599.64 2 SLOW RISE BYND 27.31 38698 2027.31 597.64 3 . 13.51 38697 2040.82 597.47 4 FENCELINE 1.39 38696 2042.21 597.44 5 TOP 13.20 38695 2055.41 595.30 6 . 3.33 38694 2058.74 595.48 7 BOLT LB 1.35 38693 2060.09 595.44 8 TOP BANK 3.03 38692 2063.12 594.66 9 . 1.72 38691 2064.84 594.07 10 FENCELINE 1.41 38690 2066.25 593.45 11 TOE BANK 3.75 38689 2070.00 593.26 12 WL LB 4.78 38688 2074.78 593.01 13 IN CHANNEL 6.98 38687 2081.76 592.83 14 IN CHANNEL 7.21 38686 2088.97 592.70 15 IN CHANNEL 7.27 38685 2096.24 592.65 16 IN CHANNEL 5.76 38684 2102.00 592.63 17 IN CHANNEL 4.04 38683 2106.04 592.36 18 IN CHANNEL 4.13 38682 2110.17 592.37 19 IN CHANNEL 3.60 38681 2113.77 592.53 20 IN CHANNEL 4.63 38680 2118.40 592.80 21 IN CHANNEL 1.11 38679 2119.51 592.95 22 IN CHANNEL 0.77 38678 2120.28 593.24 23 WL RB 0.72 38677 2121.00 593.50 24 SPIKE 1.41 38676 2122.41 594.27 25 TOE CUT 2.27 38675 2124.68 596.68 26 TOP CUT 3.40 38674 2128.09 598.80 27 TOP BANK 1.03 38673 2129.12 598.94 28 BOLT RB 3.68 38672 2132.80 599.22 29 EDGE PAVEMENT 2.84 38671 2135.64 599.38 30 CL EEK ROAD END KETTLE RIVER X/S 39 PROJ#9510F080 SEPT 22 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 39610 0.00 606.33 1 DUMMY 2000.00 39611 2000.00 606.33 2 STEEP RISE BYND 16.01 39612 2016.01 600.62 3 . 4.02 39613 2020.03 599.17 4 TOE 3.28 39614 2023.31 599.10 5 FENCELINE 8.61 39615 2031.92 599.30 6 TOE RR 2.99 39616 2034.91 600.98 7 EDGE PAVEMENT 6.87 39617 2041.78 601.23 8 EDGE PAVEMENT 0.80 39618 2042.58 601.08 9 TOP BALLAST 2.69 39619 2045.27 599.68 10 FENCELINE 5.33 39620 2050.61 597.69 11 TOE 3.39 39621 2054.00 597.73 12 FENCELINE 18.95 39622 2072.94 598.97 13 . 3.81 39623 2076.75 598.91 14 FENCELINE 12.87 39624 2089.62 598.72 15 FENCELINE 7.22 39625 2096.84 598.83 16 TOP 0.46 39626 2097.30 598.51 17 TOE 1.34 39627 2098.64 598.66 18 EDGE PAVEMENT 6.51 39628 2105.15 598.85 19 EDGE PAVEMENT 2.57 39629 2107.72 598.66 20 FENCELINE 24.20 39630 2131.92 597.62 21 FENCELINE 0.89 39631 2132.81 597.58 22 BOLT LB 0.18 39632 2132.99 597.58 23 TOP BANK 1.21 39633 2134.20 596.77 24 TOE BANK 2.02 39634 2136.22 596.06 25 . 5.68 39635 2141.89 595.65 26 TOP CUT 2.03 39636 2143.92 594.76 27 TOE 7.35 39637 2151.27 594.60 28 WL LB 2.54 39638 2153.81 594.45 29 IN CHANNEL 8.02 39639 2161.83 594.43 30 IN CHANNEL 6.14 39640 2167.97 594.34 31 IN CHANNEL 4.87 39641 2172.84 594.24 32 IN CHANNEL 5.14 39642 2177.99 594.18 33 IN CHANNEL 4.86 39643 2182.85 594.21 34 IN CHANNEL 5.31 39644 2188.16 594.22 35 IN CHANNEL 3.79 39645 2191.94 594.31 36 IN CHANNEL 3.45 39646 2195.39 594.28 37 IN CHANNEL 1.20 39647 2196.59 594.49 38 IN CHANNEL 1.45 39648 2198.04 594.59 39 WL RB 0.95 39649 2199.00 594.77 40 . 0.48 39650 2199.48 595.05 41 TOE CUT 0.41 39651 2199.88 595.47 42 TOP CUT 2.53 39652 2202.41 596.63 43 . 1.79 39653 2204.20 597.00 44 . 2.36 39654 2206.56 598.90 45 TOP BANK 3.95 39655 2210.51 599.33 46 . 2.74 39656 2213.25 599.49 47 GL BOLT RB 4.02 39657 2217.27 599.89 48 . 1.37 39658 2218.65 600.10 49 EDGE PAVEMENT 10.43 39659 2229.07 600.45 50 EDGE PAVEMENT 1.20 39660 2230.27 600.45 51 TOP BALLAST 4.81 39661 2235.08 599.07 52 TOE 6.97 39662 2242.05 600.15 53 . 6.05 39663 2248.10 600.64 54 TOE RET WLL 0.08 39664 2248.18 601.84 55 TOP 0.12 39665 2248.30 601.84 56 TOP 0.04 39666 2248.34 601.53 57 GL PARKNG LOT 25.26 39667 2273.60 602.48 58 TOE 4.14 39668 2277.74 604.46 59 TOP 5.47 39669 2283.20 604.90 60 TOE 6.43 39670 2289.64 609.51 61 TOP BANK END KETTLE RIVER X/S 40 PROJ#9510F080 SEPT 22 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 40566 0.00 601.82 1 DUMMY 2000.00 40567 2000.00 601.82 2 FLAT BEYOND 14.55 40568 2014.55 601.62 3 IN FIELD 13.79 40569 2028.34 600.09 4 TOP BANK 1.61 40570 2029.95 599.41 5 TOE ROAD 0.82 40571 2030.77 599.57 6 TOP ROAD 0.37 40572 2031.15 599.59 7 EDGE PAVEMENT 5.56 40573 2036.70 599.53 8 BOLT LB 0.61 40574 2037.31 599.48 9 EDGE PAVEMENT 1.45 40575 2038.76 599.26 10 TOP BANK 2.79 40576 2041.55 597.42 11 TOE BANK 0.48 40577 2042.04 597.26 12 TOP CUT 1.24 40578 2043.28 596.52 13 TOE CUT 2.20 40579 2045.49 596.19 14 . 2.82 40580 2048.30 595.31 15 . 1.38 40581 2049.68 595.13 16 WL LB 3.63 40582 2053.31 594.76 17 IN CHANNEL 4.25 40583 2057.55 594.44 18 IN CHANNEL 3.48 40584 2061.04 594.60 19 IN CHANNEL 6.70 40585 2067.74 594.60 20 IN CHANNEL 2.28 40586 2070.02 594.67 21 IN CHANNEL 7.49 40587 2077.50 594.85 22 IN CHANNEL 7.04 40588 2084.55 594.98 23 IN CHANNEL 3.47 40589 2088.02 594.96 24 IN CHANNEL 2.11 40590 2090.12 595.13 25 WL RB 1.61 40591 2091.73 595.49 26 TOE CUT 0.67 40592 2092.40 596.34 27 TOP CUT 4.39 40593 2096.79 598.18 28 TOE CUT 0.48 40594 2097.27 598.68 29 TOP BANK 0.98 40595 2098.25 598.91 30 SPIKE 3.16 40596 2101.40 599.38 31 EDGE DRIVEWAY 2.98 40597 2104.38 599.55 32 EDGE DRIVEWAY 0.75 40598 2105.13 600.16 33 TOP 4.86 40599 2110.00 600.61 34 BOLT LB 1.50 40600 2111.50 600.85 35 . 1.63 40601 2113.13 601.51 36 EDGE DRIVEWAY 2.71 40602 2115.84 601.50 37 EDGE DRIVEWAY 0.96 40603 2116.80 601.35 38 . 4.41 40604 2121.21 602.34 39 TOE HWY 4.31 40605 2125.53 604.40 40 TOP BALLAST 2.03 40606 2127.56 604.52 41 EDGE PAVEMENT 10.38 40607 2137.93 604.59 42 EDGE PAVEMENT 1.68 40608 2139.61 604.48 43 TOP 0.95 40609 2140.56 604.20 44 TOE 2.09 40610 2142.65 605.24 45 SAME RISE BYND END KETTLE RIVER X/S 41 PROJ#9510F080 SEPT 21 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 41530 0.00 601.44 1 DUMMY 2000.00 41531 2000.00 601.44 2 FLAT BEYOND 9.10 41532 2009.10 601.01 3 . 6.64 41533 2015.73 600.77 4 TOP BANK 0.95 41534 2016.69 600.18 5 TOE BANK 0.90 41535 2017.58 600.31 6 TOP ROAD 0.43 41536 2018.01 600.37 7 EDGE PAVEMENT 2.67 41537 2020.69 600.45 8 C/L ROAD 3.42 41538 2024.11 600.31 9 BOLT LB 1.67 41539 2025.78 600.08 10 TOP BANK 2.27 41540 2028.05 598.41 11 . 2.30 41541 2030.35 596.93 12 TOE BANK 6.08 41542 2036.43 596.30 13 EDGE BAR 5.93 41543 2042.36 595.84 14 . 5.01 41544 2047.37 595.66 15 SPIKE-BAR 2.28 41545 2049.65 595.66 16 WL LB 6.28 41546 2055.93 595.42 17 IN CHANNEL 4.63 41547 2060.56 595.17 18 IN CHANNEL 3.81 41548 2064.37 595.02 19 IN CHANNEL 3.58 41549 2067.95 595.05 20 IN CHANNEL 2.71 41550 2070.66 595.16 21 IN CHANNEL 1.75 41551 2072.41 595.53 22 IN CHANNEL 2.03 41552 2074.44 595.66 23 WL RB 2.65 41553 2077.09 595.90 24 . 1.45 41554 2078.54 596.40 25 TOE BANK 2.99 41555 2081.52 598.20 26 . 2.30 41556 2083.82 598.96 27 . 1.71 41557 2085.54 599.30 28 . 3.71 41558 2089.25 600.96 29 TOE HWY FILL 4.26 41559 2093.51 604.01 30 TOP BALLAST 0.74 41560 2094.25 604.11 31 BOLT RB 0.25 41561 2094.50 604.18 32 EDGE PAVEMENT 3.58 41562 2098.08 604.22 33 . 8.83 41563 2106.91 604.13 34 EDGE PAVEMENT 1.40 41564 2108.31 604.00 35 TOP BALLAST 1.81 41565 2110.12 603.58 36 TOE BANK 2.37 41566 2112.49 605.51 37 SAME RISE BEYOND END KETTLE RIVER X/S 41.1 PROJ#9510F080 SEPT 21 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 41531 0.00 602.91 1 DUMMY 2000.00 41530 2000.00 602.91 2 FLAT BEYOND 13.84 41529 2013.84 602.05 3 FENCELINE 0.54 41528 2014.39 601.95 4 TOP BANK 2.03 41527 2016.41 600.64 5 TOE BANK 1.43 41526 2017.84 600.73 6 EDGE PAVEMENT 4.96 41525 2022.80 600.70 7 GL BOLT LB 2.52 41524 2025.33 600.41 8 TOP BANK 2.36 41523 2027.69 598.35 9 TOE ROADD 2.86 41522 2030.55 597.32 10 TOP CUT 1.14 41521 2031.69 596.74 11 WL LB 2.45 41520 2034.14 596.10 12 IN CHANNEL 2.19 41519 2036.33 596.00 13 IN CHANNEL 2.56 41518 2038.90 595.96 14 IN CHANNEL 3.32 41517 2042.22 596.06 15 IN CHANNEL 4.30 41516 2046.52 596.19 16 IN CHANNEL 4.40 41515 2050.92 596.33 17 IN CHANNEL 5.45 41514 2056.37 596.49 18 IN CHANNEL 3.12 41513 2059.49 596.59 19 IN CHANNEL 1.40 41512 2060.88 596.75 20 WL RB 11.70 41511 2072.59 597.14 21 . 5.58 41510 2078.17 597.29 22 . 3.34 41509 2081.50 597.68 23 . 1.66 41508 2083.16 597.55 24 . 2.13 41507 2085.28 597.86 25 TOE-EDGE BAR 2.29 41506 2087.58 598.70 26 TOP CUT 4.63 41505 2092.21 599.04 27 TOE BANK 2.18 41504 2094.38 600.51 28 TOP BANK 6.22 41503 2100.60 601.37 29 . 2.21 41502 2102.81 601.81 30 BOLT RB 0.18 41501 2102.99 601.84 31 EDGE PAVEMENT 6.17 41500 2109.17 601.66 32 EDGE PAVEMENT 1.18 41499 2110.35 601.48 33 TOE RD FILL 1.40 41498 2111.75 601.92 34 TOP 9.97 41497 2121.72 602.09 35 FLAT BEYOND END KETTLE RIVER X/S 42 PROJ#9510F080 SEPT 21 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 42497 0.00 605.12 1 DUMMY 2000.00 42496 2000.00 605.12 2 GL BLDG-FLAT 1.16 42495 2001.16 604.92 3 TOP AT FLINE 2.78 42494 2003.95 603.44 4 TOE BANK 11.10 42493 2015.05 603.31 5 EDGE PAVEMENT 7.08 42492 2022.13 603.28 6 EDGE PAVEMENT 1.41 42491 2023.54 603.09 7 TOE ROAD 2.10 42490 2025.64 603.27 8 . 19.65 42489 2045.28 603.44 9 . 21.93 42488 2067.21 603.41 10 . 14.10 42487 2081.31 603.51 11 TOP SPOIL 1.65 42486 2082.96 603.25 12 TOP 2.13 42485 2085.09 602.04 13 TOE 2.22 42484 2087.31 602.26 14 BOLT LB EDGEPVMT 4.58 42483 2091.89 602.37 15 CNAIL 2.39 42482 2094.27 602.26 16 EDGE PAVEMENT 3.79 42481 2098.06 602.23 17 TOP 1.02 42480 2099.08 601.88 18 FENCELINE 6.22 42479 2105.29 601.15 19 TOP AT FLINE 3.37 42478 2108.66 599.48 20 . 2.50 42477 2111.17 598.08 21 TOE BANK 1.64 42476 2112.80 597.66 22 . 3.76 42475 2116.57 597.05 23 WL LB 2.67 42474 2119.24 596.55 24 IN CHANNEL 1.97 42473 2121.21 596.16 25 IN CHANNEL 1.68 42472 2122.89 595.90 26 IN CHANNEL 7.70 42471 2130.59 595.76 27 IN CHANNEL 4.55 42470 2135.13 596.20 28 IN CHANNEL 4.89 42469 2140.02 596.41 29 IN CHANNEL 4.13 42468 2144.15 597.08 30 WL RB 3.63 42467 2147.78 597.72 31 . 3.44 42466 2151.22 598.47 32 . 8.49 42465 2159.71 599.26 33 EDGE BAR 6.43 42464 2166.15 600.13 34 BOLT RB 9.34 42463 2175.49 600.68 35 . 10.75 42462 2186.24 600.95 36 . 11.74 42461 2197.97 600.67 37 . 7.36 42460 2205.34 600.85 38 . 11.20 42459 2216.53 601.36 39 . 15.51 42458 2232.04 601.78 40 . 9.48 42457 2241.52 602.56 41 . 8.20 42456 2249.73 602.55 42 FLAT BEYOND END KETTLE RIVER X/S 43 PROJ#9510F080 SEPT 21 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 43856 0.00 600.49 1 DUMMY 2000.00 43855 2000.00 600.49 2 GL HSE FL BEYOND 13.37 43854 2013.37 599.91 3 . 16.06 43853 2029.43 599.83 4 . 11.03 43852 2040.45 600.37 5 . 16.69 43851 2057.14 600.42 6 . 15.44 43850 2072.59 600.25 7 GL BOLT LB 1.04 43849 2073.62 600.37 8 TOE SPOIL 1.57 43848 2075.19 600.97 9 TOP SPOIL 2.64 43847 2077.83 599.64 10 . 2.08 43846 2079.91 599.05 11 TOE SPOIL 2.91 43845 2082.82 598.68 12 ON BAR 6.73 43844 2089.55 598.54 13 ON BAR 3.92 43843 2093.47 598.60 14 ON BAR 10.22 43842 2103.69 598.37 15 ON BAR 13.86 43841 2117.55 598.13 16 ON BAR 11.16 43840 2128.71 597.97 17 ON BAR 4.42 43839 2133.13 597.79 18 WL LB 3.27 43838 2136.40 597.71 19 IN CHANNEL 6.21 43837 2142.61 597.64 20 IN CHANNEL 4.29 43836 2146.90 597.53 21 IN CHANNEL 5.68 43835 2152.57 597.64 22 IN CHANNEL 3.83 43834 2156.40 597.33 23 IN CHANNEL 1.57 43833 2157.97 597.25 24 IN CHANNEL 2.01 43832 2159.98 597.47 25 IN CHANNEL 2.61 43831 2162.59 597.82 26 WL RB 0.96 43830 2163.54 598.03 27 . 1.41 43829 2164.95 598.49 28 TOE CUT 0.14 43828 2165.10 598.75 29 . 0.99 43827 2166.08 599.17 30 TOP CUT 3.50 43826 2169.58 599.92 31 BOLT RB 2.09 43825 2171.67 600.36 32 TOE BANK 3.29 43824 2174.96 602.20 33 TOP EDGE LAWN 27.35 43823 2202.32 603.18 34 FL FLAT BEYOND END KETTLE RIVER X/S 44 PROJ#9510F080 SEPT 21 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 44385 0.00 605.03 1 DUMMY 2000.00 44384 2000.00 605.03 2 GL BOLT LB 11.01 44383 2011.01 605.32 3 COR BRIDGE 0.02 44382 2011.02 605.11 4 TOP ABUTMENT 0.10 44381 2011.13 605.14 5 TOP ABUTMENT 0.03 44380 2011.15 603.32 6 CORD ELEV LB 0.24 44379 2011.39 603.10 7 TOP SEAT 0.92 44378 2012.32 603.11 8 TOP SEAT 0.05 44377 2012.36 602.41 9 TOE SEAT 4.20 44376 2016.57 600.35 10 . 2.75 44375 2019.32 599.43 11 . 1.15 44374 2020.47 598.61 12 TOE RIP-RAP 3.47 44373 2023.94 598.17 13 . 7.00 44372 2030.95 598.01 14 WL LB 5.65 44371 2036.60 597.66 15 IN CHANNEL 4.94 44370 2041.54 597.31 16 IN CHANNEL 2.12 44369 2043.66 596.96 17 IN CHANNEL 0.61 44368 2044.27 596.90 18 TOE PIER 2.20 44367 2046.47 596.99 19 IN CHANNEL 3.22 44366 2049.69 596.79 20 IN CHANNEL 4.08 44365 2053.77 596.85 21 IN CHANNEL 4.47 44364 2058.24 596.77 22 IN CHANNEL 3.39 44363 2061.63 596.60 23 IN CHANNEL 2.85 44362 2064.48 596.82 24 IN CHANNEL 2.14 44361 2066.62 596.96 25 TOE RIP-RAP 1.13 44360 2067.75 597.99 26 WL RB 1.87 44359 2069.62 599.46 27 . 2.22 44358 2071.83 600.05 28 . 3.57 44357 2075.41 601.79 29 TOE SEAT 0.30 44356 2075.71 605.03 30 TOP SEAT 0.77 44355 2076.48 605.04 31 TOP SEAT 0.00 44354 2076.49 605.28 32 CORD ELEV RB 0.09 44353 2076.57 607.08 33 TOP ABUTMENT 0.27 44352 2076.84 607.07 34 TOP ABUTMENT 0.01 44351 2076.86 607.30 35 COR DECK 6.29 44350 2083.15 607.48 36 CNAIL RB END KETTLE RIVER X/S 45 PROJ#9510F080 SEPT 21 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 45895 0.00 606.02 1 DUMMY 2000.00 45894 2000.00 606.02 2 VERT RISE 0.15 45893 2000.15 604.18 3 TOE 1.47 45892 2001.62 604.44 4 EDGE PAVEMENT 3.39 45891 2005.01 604.72 5 C/L ROAD 3.52 45890 2008.52 604.83 6 EDGE PAVEMENT 1.04 45889 2009.57 604.74 7 TOP 0.95 45888 2010.52 604.43 8 TOE ROAD 0.76 45887 2011.28 604.30 9 GL BOLT LB 1.34 45886 2012.62 604.39 10 TOP BANK 1.78 45885 2014.40 602.85 11 . 2.12 45884 2016.52 601.38 12 . 2.01 45883 2018.53 599.22 13 WL LB 1.79 45882 2020.31 598.58 14 IN CHANNEL 2.59 45881 2022.90 597.64 15 IN CHANNEL 2.49 45880 2025.40 596.22 16 IN CHANNEL 5.22 45879 2030.61 594.87 17 IN CHANNEL 0.16 45878 2030.77 595.87 18 IN CHANNEL 7.39 45877 2038.16 596.81 19 IN CHANNEL 0.77 45876 2038.93 596.90 20 IN CHANNEL 5.30 45875 2044.23 597.56 21 IN CHANNEL 3.04 45874 2047.27 597.82 22 IN CHANNEL 2.66 45873 2049.93 597.99 23 IN CHANNEL 1.91 45872 2051.84 598.40 24 IN CHANNEL 2.21 45871 2054.05 598.55 25 TOE CHAN 1.19 45870 2055.24 599.07 26 IN CHANNEL 0.30 45869 2055.54 599.32 27 WL RB 2.86 45868 2058.40 599.51 28 . 0.78 45867 2059.18 600.24 29 . 1.25 45866 2060.43 600.57 30 TOE CUT 0.29 45865 2060.71 601.09 31 TOP BANK 3.57 45864 2064.28 601.25 32 . 1.43 45863 2065.71 601.68 33 . 4.41 45862 2070.12 601.77 34 BOLT RB 3.45 45861 2073.57 601.88 35 FENCELINE 36.46 45860 2110.02 600.87 36 IN FIELD FLAT END KETTLE RIVER X/S 46 PROJ#9510F080 SEPT 21 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 46860 0.00 609.04 1 DUMMY 2000.00 46859 2000.00 609.04 2 SLOW RISE BEYOND 4.40 46858 2004.40 607.75 3 FL RR RW E 0.74 46857 2005.15 607.15 4 . 0.65 46856 2005.80 607.05 5 ON SLOPE 1.18 46855 2006.98 605.56 6 ON SLOPE 4.04 46854 2011.02 603.32 7 TOE BANK 1.94 46853 2012.96 603.09 8 . 5.22 46852 2018.18 603.41 9 TOP BALLAST 3.37 46851 2021.56 603.59 10 TOP BALLAST 0.86 46850 2022.42 603.41 11 . 1.92 46849 2024.34 602.47 12 TOE BALLST 10.70 46848 2035.04 602.44 13 FENCELINE 1.14 46847 2036.18 602.02 14 . 1.02 46846 2037.20 601.58 15 . 1.45 46845 2038.65 601.72 16 BOLT LB 3.37 46844 2042.02 601.69 17 TOP BANK 4.24 46843 2046.26 600.88 18 H.W.M. 2.86 46842 2049.12 600.36 19 TOP CUT 0.39 46841 2049.52 599.71 20 TOE CUT 4.02 46840 2053.53 599.81 21 SPIKE-BAR 3.73 46839 2057.27 599.79 22 . 7.55 46838 2064.82 599.45 23 WL LB 7.17 46837 2071.99 599.26 24 IN CHANNEL 5.40 46836 2077.39 599.23 25 IN CHANNEL 5.90 46835 2083.29 599.15 26 IN CHANNEL 5.02 46834 2088.31 599.13 27 IN CHANNEL 4.84 46833 2093.16 599.09 28 IN CHANNEL 4.38 46832 2097.54 599.18 29 IN CHANNEL 4.58 46831 2102.12 599.30 30 IN CHANNEL 3.71 46830 2105.83 599.46 31 WL RB 3.11 46829 2108.94 599.53 32 . 3.32 46828 2112.26 599.65 33 TOE CUT 0.22 46827 2112.48 600.25 34 TOP CUT 2.96 46826 2115.44 601.83 35 TOP BANK 0.90 46825 2116.34 601.85 36 . 0.97 46824 2117.31 601.49 37 . 0.87 46823 2118.18 601.51 38 . 1.26 46822 2119.44 601.15 39 . 3.83 46821 2123.27 601.58 40 . 1.82 46820 2125.09 602.33 41 . 1.92 46819 2127.01 602.60 42 BOLT RB FENCELIN 1.83 46818 2128.84 602.51 43 EDGE FIELD 19.37 46817 2148.20 602.36 44 IN FIELD END KETTLE RIVER X/S 47 PROJ#9510F080 SEPT 21 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 47817 0.00 603.69 1 DUMMY 2000.00 47816 2000.00 603.69 2 FLAT BEYOND 20.28 47815 2020.28 602.35 3 IN FIELD 14.76 47814 2035.04 602.59 4 . 12.93 47813 2047.97 602.41 5 FENCELINE 1.47 47812 2049.45 602.47 6 BOLT LB 3.48 47811 2052.93 602.37 7 TOP BANK 2.03 47810 2054.96 601.82 8 . 2.05 47809 2057.01 601.71 9 . 3.54 47808 2060.55 600.93 10 TOE BANK 4.68 47807 2065.23 600.80 11 . 5.52 47806 2070.75 600.48 12 . 6.32 47805 2077.06 599.97 13 WL LB 4.78 47804 2081.84 599.69 14 IN CHANNEL 6.45 47803 2088.30 599.61 15 IN CHANNEL 5.43 47802 2093.72 599.52 16 IN CHANNEL 4.75 47801 2098.48 599.53 17 IN CHANNEL 5.70 47800 2104.17 599.67 18 IN CHANNEL 5.25 47799 2109.42 599.66 19 IN CHANNEL 5.10 47798 2114.52 599.33 20 IN CHANNEL 3.75 47797 2118.27 599.04 21 IN CHANNEL 3.41 47796 2121.68 599.31 22 IN CHANNEL 3.22 47795 2124.90 599.88 23 WL RB 0.63 47794 2125.53 600.02 24 SPIKE 1.86 47793 2127.39 600.36 25 . 2.20 47792 2129.60 601.09 26 TOE CUT 1.08 47791 2130.67 602.19 27 TOP CUT 0.76 47790 2131.44 602.31 28 . 1.69 47789 2133.13 603.06 29 . 2.40 47788 2135.52 604.86 30 TOP BANK 0.94 47787 2136.46 604.99 31 BOLT RB 2.63 47786 2139.09 605.27 32 EDGE PAVEMENT 3.77 47785 2142.86 605.50 33 C/L ROAD END KETTLE RIVER X/S 48 PROJ#9510F080 SEPT 20 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 48739 0.00 609.35 1 DUMMY 2043.54 48740 2043.54 603.05 2 TOE SLOPE 6.26 48741 2049.80 602.35 3 . 3.90 48742 2053.70 602.42 4 TOP 1.64 48743 2055.34 601.77 5 TOE 3.30 48744 2058.64 601.97 6 TOE 3.51 48745 2062.15 603.01 7 TOP 5.52 48746 2067.66 603.39 8 . 9.39 48747 2077.05 603.61 9 BOLT LB 19.65 48748 2096.70 603.85 10 TOP AT FLNE 1.38 48749 2098.08 602.88 11 TOE 2.23 48750 2100.32 602.37 12 SPIKE 4.74 48751 2105.06 601.66 13 . 3.98 48752 2109.05 601.31 14 . 1.90 48753 2110.94 601.21 15 WL LB 2.14 48754 2113.09 601.05 16 IN CHANNEL 4.23 48755 2117.32 600.86 17 IN CHANNEL 5.25 48756 2122.57 600.85 18 IN CHANNEL 5.81 48757 2128.38 600.87 19 IN CHANNEL 4.94 48758 2133.31 600.95 20 IN CHANNEL 5.72 48759 2139.03 600.94 21 IN CHANNEL 6.12 48760 2145.15 601.05 22 IN CHANNEL 3.77 48761 2148.92 601.07 23 IN CHANNEL 3.54 48762 2152.47 601.20 24 WL RB 6.41 48763 2158.87 601.44 25 . 7.46 48764 2166.33 601.55 26 EDGE BAR 0.66 48765 2167.00 601.74 27 . 2.00 48766 2169.00 601.72 28 TOE CUT 0.68 48767 2169.68 602.00 29 TOP CUT 4.41 48768 2174.09 603.12 30 TOP BANK 2.17 48769 2176.26 603.39 31 . 2.35 48770 2178.61 603.22 32 . 6.63 48771 2185.24 603.26 33 . 3.93 48772 2189.17 603.27 34 . 3.79 48773 2192.96 603.67 35 . 1.49 48774 2194.45 603.58 36 BOLT RB 6.56 48775 2201.01 603.61 37 . 9.18 48776 2210.19 604.28 38 SW COR HSE 15.04 48777 2225.23 603.95 39 E CL GARAGE 12.11 48778 2237.35 604.26 40 TOE HWY 11.35 48779 2248.70 612.05 41 TOP HWY 6.40 48780 2255.10 612.70 42 CL HWY 7.45 48781 2262.54 612.83 43 TOP BALLAST 1.41 48782 2263.96 612.17 44 TOE 2.70 48783 2266.66 612.29 45 TOE BANK 1.55 48784 2268.21 613.98 46 STEEP RISE BYND END KETTLE RIVER X/S 49 PROJ#9510F080 SEPT 20 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 49714 0.00 604.58 1 DUMMY 2000.00 49715 2000.00 604.58 2 FLAT BEYOND 7.08 49716 2007.08 604.93 3 BOLT LB 3.15 49717 2010.23 603.89 4 TOP CUT 1.54 49718 2011.77 602.22 5 TOE CUT 2.79 49719 2014.56 601.79 6 WL LB 4.92 49720 2019.48 601.49 7 IN CHANNEL 4.59 49721 2024.07 601.02 8 IN CHANNEL 4.94 49722 2029.02 601.05 9 IN CHANNEL 7.33 49723 2036.35 601.11 10 IN CHANNEL 8.75 49724 2045.10 601.23 11 IN CHANNEL 7.48 49725 2052.58 601.25 12 IN CHANNEL 5.39 49726 2057.97 601.30 13 IN CHANNEL 4.87 49727 2062.84 601.63 14 IN CHANNEL 1.54 49728 2064.38 601.78 15 WL RB 1.62 49729 2066.00 601.99 16 TOE BANK 0.60 49730 2066.60 602.34 17 . 2.43 49731 2069.03 603.38 18 SPIKE 1.47 49732 2070.50 603.98 19 TOP BANK 4.50 49733 2075.00 604.63 20 . 3.21 49734 2078.22 604.96 21 BOLT RB 0.75 49735 2078.97 605.11 22 FENCELINE 10.34 49736 2089.31 604.79 23 FLAT BEYOND END KETTLE RIVER X/S 50 PROJ#9510F080 SEPT 20 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 50681 0.00 611.92 1 DUMMY 2000.00 50682 2000.00 611.92 2 STEEP RISE BYND 1.62 50683 2001.62 611.15 3 TOP FACE 2.01 50684 2003.63 608.15 4 GSC REF LB 0.90 50685 2004.53 607.61 5 TOP BALLAST 5.94 50686 2010.47 607.84 6 TOP BALLAST 3.46 50687 2013.94 606.00 7 . 1.09 50688 2015.02 605.82 8 FL RR RW 1.81 50689 2016.83 604.70 9 TOP CUT 0.69 50690 2017.52 604.03 10 TOE CUT 1.56 50691 2019.08 603.45 11 TOE BANK 2.59 50692 2021.67 602.77 12 . 0.43 50693 2022.10 602.42 13 . 3.23 50694 2025.33 602.16 14 . 2.19 50695 2027.52 602.46 15 TOP BAR 2.21 50696 2029.73 602.10 16 . 1.02 50697 2030.75 602.09 17 SPIKE-BAR 1.21 50698 2031.96 602.06 18 WL LB 5.66 50699 2037.62 601.65 19 IN CHANNEL 5.91 50700 2043.53 601.36 20 IN CHANNEL 3.96 50701 2047.49 600.92 21 IN CHANNEL 2.64 50702 2050.13 600.79 22 IN CHANNEL 5.20 50703 2055.33 600.87 23 IN CHANNEL 5.07 50704 2060.39 601.13 24 IN CHANNEL 3.67 50705 2064.06 601.57 25 IN CHANNEL 3.47 50706 2067.53 602.06 26 WL RB 4.09 50707 2071.62 602.81 27 . 3.60 50708 2075.22 603.99 28 TOE CUT 0.23 50709 2075.45 604.36 29 TOP CUT 5.41 50710 2080.86 605.30 30 TOP BANK 4.38 50711 2085.24 605.37 31 BOLT RB 4.16 50712 2089.40 605.17 32 FENCELINE 4.71 50713 2094.11 605.18 33 IN FIELD 15.01 50714 2109.12 606.36 34 FLAT BEYOND END KETTLE RIVER X/S 51 PROJ#9510F080 SEPT 20 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 51682 0.00 610.19 1 DUMMY 2000.00 51681 2000.00 610.19 2 TOP FL BEYOND 5.88 51680 2005.88 608.91 3 ON SLOPE 2.80 51679 2008.68 608.29 4 FL RR RW 1.79 51678 2010.46 607.45 5 . 3.20 51677 2013.66 607.39 6 . 1.80 51676 2015.46 607.07 7 . 4.05 51675 2019.51 607.26 8 TOE BALLAST 3.30 51674 2022.82 608.62 9 TOP BALLAST 4.24 51673 2027.06 608.65 10 TOP BALLAST 3.10 51672 2030.16 607.13 11 TOE BALLAST 8.26 51671 2038.42 606.40 12 . 1.50 51670 2039.93 606.76 13 . 1.66 51669 2041.59 606.47 14 FL RW RR 8.37 51668 2049.96 606.09 15 . 7.74 51667 2057.70 606.22 16 . 6.67 51666 2064.37 605.99 17 . 2.00 51665 2066.37 606.40 18 . 5.16 51664 2071.53 606.37 19 . 2.20 51663 2073.73 606.00 20 . 4.10 51662 2077.83 606.12 21 . 2.02 51661 2079.85 605.85 22 . 3.63 51660 2083.47 605.73 23 . 1.32 51659 2084.80 606.09 24 . 2.10 51658 2086.89 605.76 25 . 2.32 51657 2089.22 605.97 26 . 5.97 51656 2095.19 605.90 27 . 4.67 51655 2099.85 606.40 28 . 3.19 51654 2103.04 605.68 29 . 1.20 51653 2104.25 605.85 30 BOLT LB 6.58 51652 2110.83 606.05 31 TOP BANK 1.78 51651 2112.61 605.07 32 TOE BANK 5.79 51650 2118.40 604.45 33 TOP CUT 0.50 51649 2118.90 603.90 34 TOE CUT 1.87 51648 2120.76 603.66 35 WL LB 2.67 51647 2123.43 603.35 36 IN CHANNEL 4.26 51646 2127.69 603.31 37 IN CHANNEL 5.28 51645 2132.98 603.32 38 IN CHANNEL 5.74 51644 2138.72 603.31 39 IN CHANNEL 5.52 51643 2144.24 603.29 40 IN CHANNEL 5.51 51642 2149.76 603.32 41 IN CHANNEL 5.19 51641 2154.95 603.40 42 IN CHANNEL 5.83 51640 2160.78 603.40 43 IN CHANNEL 4.81 51639 2165.59 603.39 44 IN CHANNEL 5.66 51638 2171.24 603.44 45 IN CHANNEL 5.03 51637 2176.27 603.49 46 IN CHANNEL 3.04 51636 2179.31 603.66 47 WL RB 2.81 51635 2182.12 603.86 48 EDGE BAR 0.78 51634 2182.90 604.25 49 . 2.87 51633 2185.77 604.61 50 . 0.62 51632 2186.39 605.02 51 . 0.55 51631 2186.94 605.11 52 SPIKE 1.11 51630 2188.05 605.61 53 . 1.06 51629 2189.11 605.80 54 . 1.53 51628 2190.64 606.62 55 BOLT RB 1.43 51627 2192.07 607.25 56 FL TOP BANK 5.26 51626 2197.33 607.22 57 EDGE ROAD/HWY 7.84 51625 2205.17 607.17 58 EDGE BARN END KETTLE RIVER X/S 52 PROJ#9510F080 SEPT 20 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 52597 0.00 608.00 1 DUMMY 2000.00 52598 2000.00 608.00 2 FL FLAT BEYOND 7.36 52599 2007.36 608.01 3 . 6.27 52600 2013.63 607.77 4 TOP BANK 2.57 52601 2016.20 607.22 5 . 2.14 52602 2018.35 606.49 6 BOLT LB 3.61 52603 2021.96 606.16 7 TOE BANK 1.21 52604 2023.17 604.92 8 TOE CUT 4.77 52605 2027.94 604.73 9 . 8.17 52606 2036.12 604.72 10 . 10.30 52607 2046.41 604.62 11 WL LB 7.27 52608 2053.69 604.37 12 IN CHANNEL 7.41 52609 2061.10 604.30 13 IN CHANNEL 8.39 52610 2069.49 604.22 14 IN CHANNEL 7.94 52611 2077.43 604.35 15 IN CHANNEL 5.39 52612 2082.82 604.41 16 IN CHANNEL 7.52 52613 2090.34 604.44 17 IN CHANNEL 5.50 52614 2095.85 604.38 18 IN CHANNEL 4.00 52615 2099.85 604.56 19 WL RB 1.80 52616 2101.65 604.83 20 TOE BANK 0.75 52617 2102.40 605.11 21 SPIKE 0.64 52618 2103.04 605.44 22 TOP CUT 1.30 52619 2104.35 606.02 23 H.W.M. 2.99 52620 2107.33 608.12 24 ON SLOPE 4.04 52621 2111.37 610.99 25 TOP BANK 1.31 52622 2112.68 611.09 26 BOLT RB 0.53 52623 2113.21 611.10 27 FENCELINE 5.27 52624 2118.49 611.03 28 FLAT BEYOND END KETTLE RIVER X/S 53 PROJ#9510F080 SEPT 20 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 53598 0.00 616.14 1 DUMMY 2000.00 53597 2000.00 616.14 2 TOP BLUFF 6.96 53596 2006.96 612.37 3 BOLT LB 3.69 53595 2010.65 609.99 4 ON SLOPE 3.28 53594 2013.93 607.51 5 ON SLOPE 0.66 53593 2014.59 606.67 6 . 1.74 53592 2016.33 605.82 7 TOE ROCK 2.00 53591 2018.33 605.74 8 SPIKE 1.64 53590 2019.97 605.77 9 . 0.21 53589 2020.18 605.37 10 . 1.47 53588 2021.66 604.96 11 . 1.03 53587 2022.69 604.73 12 WL LB 1.54 53586 2024.23 604.53 13 IN CHANNEL 2.76 53585 2026.99 604.46 14 IN CHANNEL 2.67 53584 2029.66 604.38 15 IN CHANNEL 0.71 53583 2030.37 603.66 16 IN CHANNEL 0.40 53582 2030.76 602.87 17 TOE CHAN 6.77 53581 2037.53 602.93 18 MIDPT1.8DP 6.09 53580 2043.62 603.93 19 IN CHANNEL 1.41 53579 2045.03 604.01 20 IN CHANNEL 4.42 53578 2049.45 604.30 21 IN CHANNEL 6.02 53577 2055.47 604.60 22 IN CHANNEL 1.31 53576 2056.78 604.73 23 WL RB 2.52 53575 2059.30 604.86 24 . 2.56 53574 2061.86 605.19 25 TOE 3.20 53573 2065.07 607.26 26 TOP CUT 0.17 53572 2065.23 607.69 27 H.W.M. 2.21 53571 2067.45 607.93 28 BOLT RB 0.88 53570 2068.33 608.18 29 TOE SPOIL 0.86 53569 2069.18 609.47 30 TOP SPOIL 4.47 53568 2073.65 609.63 31 TOP SPOIL 0.99 53567 2074.64 609.21 32 TOE SPOIL 15.53 53566 2090.18 609.61 33 EDGE FIELD-FLAT END KETTLE RIVER X/S 54 PROJ#9510F080 SEPT 19 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 54566 0.00 610.17 1 DUMMY 2000.00 54565 2000.00 610.17 2 SLOW RISE BEYOND 7.96 54564 2007.96 610.42 3 FL RW RR 2.44 54563 2010.40 609.01 4 TOE DITCH 1.86 54562 2012.26 609.00 5 CL 2.97 54561 2015.23 609.50 6 TOE DITCH 2.15 54560 2017.38 610.38 7 TOP DITCH 1.23 54559 2018.61 610.40 8 TOE BALLST 2.43 54558 2021.05 611.27 9 TOP BALLAST 1.64 54557 2022.69 611.37 10 TOP BALLAST 2.65 54556 2025.34 611.35 11 TOP BALLAST 1.93 54555 2027.28 611.13 12 . 2.06 54554 2029.34 610.33 13 TOE BALLST 0.76 54553 2030.09 610.15 14 TOP DITCH 2.14 54552 2032.23 608.93 15 TOE DITCH 3.56 54551 2035.80 608.77 16 TOE DITCH 2.02 54550 2037.82 609.91 17 TOP DITCH 2.47 54549 2040.29 609.84 18 FL RR RW 9.03 54548 2049.31 609.77 19 . 6.34 54547 2055.65 609.13 20 . 13.42 54546 2069.07 609.07 21 . 10.27 54545 2079.34 609.44 22 . 4.70 54544 2084.04 609.12 23 . 3.39 54543 2087.43 608.46 24 . 5.53 54542 2092.96 608.86 25 . 6.38 54541 2099.33 607.79 26 . 4.97 54540 2104.30 607.89 27 . 2.57 54539 2106.88 608.33 28 . 2.74 54538 2109.61 608.28 29 BOLT LB 1.56 54537 2111.18 608.46 30 . 3.45 54536 2114.63 607.31 31 . 2.16 54535 2116.79 607.82 32 . 2.20 54534 2118.99 608.15 33 . 1.84 54533 2120.82 607.87 34 . 0.79 54532 2121.62 607.41 35 TOE 1.42 54531 2123.03 607.43 36 TOE 1.16 54530 2124.19 608.21 37 TOP 1.12 54529 2125.31 608.35 38 SPIKE 1.60 54528 2126.91 608.21 39 TOP BANK 1.04 54527 2127.95 608.00 40 TOP CUT 0.30 54526 2128.25 607.19 41 TOE CUT 2.43 54525 2130.68 606.20 42 TOE BANK 1.77 54524 2132.45 606.13 43 . 0.93 54523 2133.38 606.34 44 . 2.78 54522 2136.16 606.16 45 . 0.97 54521 2137.12 605.82 46 EDGE BAR 9.23 54520 2146.35 605.46 47 WL LB 3.69 54519 2150.05 605.37 48 IN CHANNEL 7.05 54518 2157.10 605.26 49 IN CHANNEL 4.82 54517 2161.92 605.17 50 IN CHANNEL 5.77 54516 2167.69 605.00 51 IN CHANNEL 2.50 54515 2170.18 604.86 52 IN CHANNEL 4.73 54514 2174.91 604.93 53 IN CHANNEL 5.03 54513 2179.95 604.99 54 IN CHANNEL 2.86 54512 2182.80 605.43 55 WL RB 1.54 54511 2184.34 605.76 56 TOE CUT 0.53 54510 2184.87 606.11 57 . 2.20 54509 2187.07 606.72 58 . 2.16 54508 2189.23 607.40 59 TOE BANK 4.36 54507 2193.59 610.23 60 ON SLOPE 4.66 54506 2198.25 613.92 61 TOP BANK 13.66 54505 2211.91 615.78 62 BOLT RB END KETTLE RIVER X/S 55 PROJ#9510F080 SEPT 19 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 55384 0.00 612.10 1 DUMMY 2000.00 55383 2000.00 612.10 2 C/L RAILROAD 5.37 55382 2005.37 612.04 3 TOP BALLAST 1.71 55381 2007.08 611.63 4 GL BOLT LB 3.62 55380 2010.70 610.28 5 TOE END WINGWALL 2.29 55379 2012.99 609.21 6 . 3.86 55378 2016.85 607.32 7 . 3.18 55377 2020.03 606.24 8 WL LB 3.75 55376 2023.78 604.90 9 IN CHANNEL 0.91 55375 2024.69 604.20 10 IN CHANNEL 6.57 55374 2031.26 603.73 11 EST -2.50 DEPTH 5.66 55373 2036.92 604.63 12 IN CHANNEL 0.93 55372 2037.85 605.05 13 IN CHANNEL 1.13 55371 2038.98 605.47 14 IN CHANNEL 2.31 55370 2041.29 605.85 15 IN CHANNEL 2.74 55369 2044.03 605.40 16 IN CHANNEL 2.31 55368 2046.33 604.80 17 IN CHANNEL 7.82 55367 2054.15 603.98 18 EST -2.25 DEPTH 7.52 55366 2061.67 604.71 19 IN CHANNEL 1.44 55365 2063.10 605.18 20 IN CHANNEL 2.03 55364 2065.13 605.55 21 IN CHANNEL 2.63 55363 2067.76 605.83 22 IN CHANNEL 4.24 55362 2071.99 606.23 23 WL RB 3.35 55361 2075.34 606.96 24 . 4.62 55360 2079.96 607.65 25 TOE 0.37 55359 2080.33 608.71 26 TOP WALL 9.64 55358 2089.97 609.71 27 . 16.01 55357 2105.98 608.84 28 . 4.89 55356 2110.88 609.30 29 BOLT RB 6.24 55355 2117.12 609.27 30 . 11.31 55354 2128.43 608.81 31 . 5.67 55353 2134.10 608.02 32 . 4.38 55352 2138.48 608.78 33 . 21.09 55351 2159.56 608.70 34 C/L ROAD 43.49 55350 2203.06 615.76 35 TOP RIDGE END KETTLE RIVER X/S 55.5 PROJ#9510F080 SEPT 19 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 55890 0.00 611.92 1 DUMMY 2000.00 55889 2000.00 611.92 2 BOLT LB 14.05 55888 2014.05 612.14 3 TOP ABUTMENT 0.02 55887 2014.07 611.40 4 CHORD ELEV LB 0.03 55886 2014.10 611.19 5 TOP SEAT 1.08 55885 2015.18 611.17 6 TOP SEAT 0.17 55884 2015.35 607.97 7 TOE SEAT 3.32 55883 2018.67 606.98 8 . 3.28 55882 2021.95 606.29 9 WL LB 2.10 55881 2024.06 605.67 10 IN CHANNEL 1.54 55880 2025.60 605.14 11 TOE CHANNEL 2.09 55879 2027.68 604.94 12 IN CHANNEL 4.70 55878 2032.38 605.37 13 IN CHANNEL 4.48 55877 2036.86 605.27 14 IN CHANNEL 3.22 55876 2040.08 605.26 15 IN CHANNEL 2.13 55875 2042.21 606.02 16 IN CHANNEL 1.90 55874 2044.12 606.25 17 WL BAR 0.82 55873 2044.93 606.40 18 TOE PIER 0.13 55872 2045.06 610.77 19 TOP PIER 3.44 55871 2048.51 610.76 20 TOP PIER 0.09 55870 2048.60 606.63 21 TOE PIER 4.53 55869 2053.13 606.28 22 WL BAR 2.10 55868 2055.23 605.87 23 IN CHANNEL 3.73 55867 2058.96 605.61 24 IN CHANNEL 6.29 55866 2065.25 605.35 25 IN CHANNEL 4.04 55865 2069.30 605.19 26 IN CHANNEL 2.65 55864 2071.95 604.59 27 IN CHANNEL 3.15 55863 2075.10 604.87 28 IN CHANNEL 1.88 55862 2076.98 605.19 29 IN CHANNEL 2.27 55861 2079.25 606.23 30 WL RB 0.84 55860 2080.09 606.45 31 TOE RIP-RAP 1.52 55859 2081.61 607.29 32 . 2.19 55858 2083.79 608.94 33 TOP BANK 2.43 55857 2086.22 609.08 34 TOE SEAT 0.08 55856 2086.30 610.76 35 TOP SEAT 2.00 55855 2088.30 610.79 36 TOP SEAT 0.02 55854 2088.32 611.27 37 CHORD ELEV RB 0.17 55853 2088.49 612.31 38 TOP ABUTMENT 0.28 55852 2088.76 612.32 39 TOP ABUTMENT 3.41 55851 2092.17 611.90 40 BOLT RB END KETTLE RIVER X/S 56 PROJ#9510F080 SEPT 19 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 56806 0.00 615.50 1 DUMMY 2000.00 56807 2000.00 615.50 2 C/L ROAD 15.82 56808 2015.82 614.32 3 . 1.70 56809 2017.52 613.67 4 TOP BANK 0.76 56810 2018.28 611.68 5 . 2.46 56811 2020.74 610.10 6 TOE BANK 9.67 56812 2030.41 609.97 7 . 2.47 56813 2032.88 609.84 8 . 1.25 56814 2034.13 609.83 9 . 1.46 56815 2035.60 610.18 10 . 11.70 56816 2047.29 610.40 11 . 4.14 56817 2051.43 609.81 12 . 4.42 56818 2055.85 609.82 13 . 8.16 56819 2064.02 609.24 14 . 2.98 56820 2066.99 609.34 15 . 6.93 56821 2073.92 609.33 16 . 6.33 56822 2080.25 608.73 17 . 4.61 56823 2084.86 609.05 18 . 8.18 56824 2093.04 609.44 19 GL BOLT LB 2.39 56825 2095.42 609.81 20 TOP BANK 5.75 56826 2101.17 607.88 21 . 6.82 56827 2107.99 606.25 22 WL LB 2.79 56828 2110.78 605.98 23 IN CHANNEL 6.09 56829 2116.87 606.04 24 IN CHANNEL 6.87 56830 2123.73 606.19 25 IN CHANNEL 3.34 56831 2127.08 606.25 26 WL BAR 4.02 56832 2131.10 606.46 27 . 5.53 56833 2136.63 606.52 28 . 4.20 56834 2140.84 606.28 29 WL BAR 3.45 56835 2144.28 605.96 30 IN CHANNEL 5.14 56836 2149.42 605.64 31 IN CHANNEL 4.25 56837 2153.67 605.35 32 IN CHANNEL 3.31 56838 2156.99 605.44 33 IN CHANNEL 3.74 56839 2160.72 605.86 34 TOE RIP-RAP 2.91 56840 2163.63 606.27 35 WL RB 1.94 56841 2165.57 607.50 36 . 1.10 56842 2166.68 608.32 37 . 0.53 56843 2167.20 608.89 38 TOP RIP-RAP 2.54 56844 2169.74 609.20 39 . 2.90 56845 2172.65 610.31 40 GL COR ABUT 1.23 56846 2173.88 610.86 41 . 0.70 56847 2174.58 611.50 42 . 1.35 56848 2175.93 611.90 43 BOLT RB 5.03 56849 2180.96 611.85 44 TOP BALLAST 6.72 56850 2187.69 611.93 45 C/L RAILROAD END KETTLE RIVER X/S 57 PROJ#9510F080 SEPT 19 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 57848 0.00 616.43 1 DUMMY 2000.00 57849 2000.00 616.43 2 STEEP RISE BYND 6.41 57850 2006.41 612.56 3 TOE EDGE ROAD 4.69 57851 2011.11 611.80 4 TOP EDGE ROAD 4.54 57852 2015.65 610.83 5 TOE 4.90 57853 2020.55 610.54 6 TOP 1.67 57854 2022.22 610.24 7 TOP CUT 2.04 57855 2024.27 609.24 8 TOE OLD CHANNEL 2.32 57856 2026.59 608.91 9 C/L 2.08 57857 2028.67 609.00 10 TOE 2.16 57858 2030.83 609.40 11 TOP CHAN 7.74 57859 2038.56 609.59 12 . 8.99 57860 2047.55 609.38 13 BOLT LB 1.36 57861 2048.91 609.29 14 . 0.99 57862 2049.90 609.00 15 . 2.71 57863 2052.61 609.30 16 . 8.25 57864 2060.86 609.21 17 . 3.39 57865 2064.25 608.94 18 . 6.67 57866 2070.92 609.04 19 . 5.16 57867 2076.08 609.36 20 . 9.17 57868 2085.25 609.41 21 . 10.33 57869 2095.58 609.19 22 SPIKE LB 1.25 57870 2096.83 608.95 23 TOP BANK 1.62 57871 2098.44 608.41 24 . 3.18 57872 2101.63 608.11 25 EDGE BAR 2.92 57873 2104.54 607.60 26 . 12.30 57874 2116.85 607.54 27 WL LB 4.06 57875 2120.91 607.42 28 IN CHANNEL 6.61 57876 2127.51 607.31 29 IN CHANNEL 6.43 57877 2133.94 607.33 30 IN CHANNEL 5.34 57878 2139.28 607.36 31 IN CHANNEL 7.63 57879 2146.90 607.35 32 IN CHANNEL 7.35 57880 2154.26 607.32 33 IN CHANNEL 5.00 57881 2159.25 607.24 34 IN CHANNEL 4.04 57882 2163.29 607.40 35 IN CHANNEL 2.52 57883 2165.81 607.53 36 WL RB 2.32 57884 2168.13 607.68 37 . 8.48 57885 2176.61 608.19 38 . 2.99 57886 2179.60 608.62 39 TOP BAR 5.26 57887 2184.86 608.58 40 . 12.11 57888 2196.97 607.90 41 . 0.92 57889 2197.89 608.03 42 EDGE BAR TOE CUT 1.12 57890 2199.01 609.70 43 TOP CUT 1.00 57891 2200.01 609.93 44 TOP BANK 2.13 57892 2202.14 609.99 45 EDGE PATH 10.98 57893 2213.12 609.78 46 . 3.99 57894 2217.11 609.78 47 . 5.25 57895 2222.37 609.15 48 . 3.87 57896 2226.23 609.21 49 . 1.55 57897 2227.78 609.90 50 . 0.78 57898 2228.56 610.00 51 BOLT RB 6.47 57899 2235.03 610.20 52 FLT 18M-CL ROAD END KETTLE RIVER X/S 58 PROJ#9510F080 SEPT 19 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 58803 0.00 614.36 1 DUMMY 2000.00 58804 2000.00 614.36 2 STEEP RISE BYND 6.22 58805 2006.22 610.92 3 TOE BANK 3.30 58806 2009.52 610.21 4 . 3.57 58807 2013.09 610.00 5 . 1.40 58808 2014.49 610.35 6 . 2.29 58809 2016.78 610.31 7 . 1.25 58810 2018.03 610.63 8 . 5.43 58811 2023.46 610.90 9 . 3.20 58812 2026.66 610.65 10 . 4.70 58813 2031.36 610.96 11 . 5.74 58814 2037.09 610.66 12 . 2.19 58815 2039.29 610.03 13 . 1.43 58816 2040.72 610.06 14 . 4.03 58817 2044.74 610.45 15 . 2.21 58818 2046.95 610.34 16 . 5.86 58819 2052.81 610.76 17 . 10.47 58820 2063.28 610.97 18 BOLT LB 3.10 58821 2066.38 610.50 19 . 3.55 58822 2069.93 610.79 20 TOP CUT 1.19 58823 2071.13 610.14 21 TOE 3.34 58824 2074.47 608.80 22 . 2.24 58825 2076.71 608.48 23 . 5.37 58826 2082.08 608.61 24 EDGE BAR 6.34 58827 2088.42 608.63 25 . 8.76 58828 2097.17 608.43 26 . 8.23 58829 2105.40 608.26 27 WL LB 3.07 58830 2108.47 608.08 28 IN CHANNEL 5.34 58831 2113.81 607.90 29 IN CHANNEL 4.60 58832 2118.41 607.75 30 IN CHANNEL 4.48 58833 2122.89 607.60 31 IN CHANNEL 3.53 58834 2126.41 607.65 32 IN CHANNEL 3.85 58835 2130.27 607.63 33 IN CHANNEL 3.97 58836 2134.23 607.79 34 IN CHANNEL 3.31 58837 2137.55 608.04 35 IN CHANNEL 1.52 58838 2139.07 608.24 36 WL RB 1.19 58839 2140.26 608.51 37 TOE CUT 1.16 58840 2141.42 610.18 38 TOP CUT 1.92 58841 2143.34 610.97 39 . 1.40 58842 2144.74 611.16 40 TOP BANK 3.67 58843 2148.41 611.19 41 SPK-CL PATH 11.25 58844 2159.66 611.25 42 BOLT RB 12.09 58845 2171.75 611.26 43 EDGE CMPSTE38 10.19 58846 2181.94 611.22 44 EDGE CMPSTE38 10.85 58847 2192.79 610.86 45 . 3.45 58848 2196.24 610.82 46 EDGE RD-FLAT END KETTLE RIVER X/S 59 PROJ#9510F080 SEPT 18 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 59804 0.00 614.95 1 DUMMY 2000.00 59803 2000.00 614.95 2 ON SLOPE 4.91 59802 2004.91 611.10 3 TOE 0.59 59801 2005.50 610.97 4 BOLT LB 0.97 59800 2006.47 610.38 5 . 1.86 59799 2008.33 609.68 6 . 2.22 59798 2010.55 609.21 7 . 2.12 59797 2012.67 608.95 8 WL LB 1.17 59796 2013.85 608.73 9 IN CHANNEL 3.94 59795 2017.79 608.49 10 IN CHANNEL 3.96 59794 2021.75 608.46 11 IN CHANNEL 4.65 59793 2026.40 608.38 12 IN CHANNEL 2.62 59792 2029.01 608.44 13 IN CHANNEL 4.96 59791 2033.97 608.57 14 IN CHANNEL 3.18 59790 2037.15 608.59 15 IN CHANNEL 5.56 59789 2042.71 608.79 16 IN CHANNEL 3.28 59788 2045.99 608.96 17 WL RB 9.97 59787 2055.96 609.41 18 . 10.47 59786 2066.43 609.91 19 TOP BAR 2.95 59785 2069.37 609.65 20 TOE CUT 1.98 59784 2071.35 610.52 21 TOP CUT 2.92 59783 2074.27 610.93 22 TOP BANK 3.27 59782 2077.54 611.09 23 . 12.41 59781 2089.95 610.76 24 . 13.45 59780 2103.40 610.66 25 . 9.36 59779 2112.76 610.95 26 TOP BANK 0.64 59778 2113.40 610.49 27 . 0.70 59777 2114.11 610.05 28 TOE CUT 4.05 59776 2118.16 609.41 29 . 4.77 59775 2122.93 609.32 30 . 2.90 59774 2125.83 609.21 31 THALWEG 3.39 59773 2129.22 609.74 32 TOE DRY BACKCHAN 0.45 59772 2129.67 610.73 33 TOP CUT 1.21 59771 2130.88 611.40 34 TOP BANK 3.31 59770 2134.19 611.42 35 . 1.89 59769 2136.08 611.15 36 C/L PATH 9.46 59768 2145.54 611.29 37 . 2.92 59767 2148.46 610.81 38 . 6.70 59766 2155.16 610.81 39 TOE 4.89 59765 2160.05 612.36 40 TOP 1.99 59764 2162.04 612.59 41 BOLT RB 9.64 59763 2171.67 612.85 42 EDGE BUSH 25.00 59762 2196.67 612.99 43 FL RR RW 7.02 59761 2203.70 612.71 44 TOP 2.99 59760 2206.69 612.29 45 TOE 4.75 59759 2211.44 613.25 46 TOP BALLAST 3.88 59758 2215.32 613.16 47 TOP BALLAST END KETTLE RIVER X/S 59.1 PROJ#9510F080 SEPT 18 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 59717 0.00 613.51 1 DUMMY 2000.00 59718 2000.00 613.51 2 FLAT BEYOND 28.97 59719 2028.97 613.38 3 . 8.78 59720 2037.75 613.29 4 . 7.70 59721 2045.45 612.88 5 . 9.41 59722 2054.86 613.07 6 BOLT LB 10.25 59723 2065.11 613.21 7 . 16.08 59724 2081.19 612.60 8 TOP BANK 2.35 59725 2083.55 611.68 9 TOE BANK 3.23 59726 2086.78 611.27 10 TOP CUT 5.99 59727 2092.77 610.03 11 TOE 7.59 59728 2100.36 609.70 12 . 5.52 59729 2105.87 609.25 13 WL LB 4.28 59730 2110.16 608.05 14 IN CHANNEL 1.06 59731 2111.22 607.82 15 IN CHANNEL 5.95 59732 2117.17 607.65 16 MIDPT*EST-1.6 6.08 59733 2123.25 607.90 17 IN CHANNEL 2.94 59734 2126.19 608.27 18 IN CHANNEL 2.57 59735 2128.76 608.68 19 IN CHANNEL 3.47 59736 2132.23 608.97 20 IN CHANNEL 2.77 59737 2135.00 609.20 21 WL RB 1.22 59738 2136.21 609.40 22 SPIKE-BAR 7.46 59739 2143.67 610.04 23 TOP BAR 8.86 59740 2152.53 609.65 24 EDGE BAR 1.17 59741 2153.70 610.07 25 . 1.13 59742 2154.82 610.47 26 TOP CUT 3.39 59743 2158.21 611.11 27 TRASHLINE 2.26 59744 2160.48 611.45 28 TOP BANK 16.46 59745 2176.93 611.89 29 . 10.70 59746 2187.64 611.97 30 EDGE ROAD/HWY 4.18 59747 2191.81 612.14 31 EDGE ROAD/HWY 3.14 59748 2194.95 613.13 32 TOP 3.66 59749 2198.61 613.46 33 BOLT RB 15.38 59750 2213.99 613.95 34 FENCELINE 1.73 59751 2215.72 614.43 35 . 8.01 59752 2223.74 614.17 36 . 1.00 59753 2224.74 613.81 37 . 1.76 59754 2226.50 613.88 38 EDGE BALLST 2.40 59755 2228.90 613.90 39 EDGE BALLST 2.21 59756 2231.11 613.87 40 . 2.91 59757 2234.02 614.46 41 SLOW RISE BEYOND END KETTLE RIVER X/S 60 PROJ#9510F080 SEPT 18 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 60685 0.00 613.41 1 DUMMY 2000.00 60686 2000.00 613.41 2 FLAT BEYOND 16.08 60687 2016.08 613.82 3 . 4.03 60688 2020.11 613.34 4 . 24.31 60689 2044.42 613.63 5 . 8.09 60690 2052.51 613.78 6 BOLT LB 12.50 60691 2065.01 613.86 7 . 4.83 60692 2069.84 613.45 8 TOP BANK 12.92 60693 2082.76 611.86 9 TOP CUT 1.47 60694 2084.24 611.54 10 . 2.75 60695 2086.99 610.78 11 EDGE BAR 3.94 60696 2090.93 610.47 12 . 3.08 60697 2094.02 610.47 13 . 3.16 60698 2097.18 610.37 14 WL LB 2.41 60699 2099.59 610.21 15 IN CHANNEL 4.90 60700 2104.49 610.07 16 IN CHANNEL 7.95 60701 2112.44 610.05 17 IN CHANNEL 7.46 60702 2119.90 609.97 18 IN CHANNEL 8.05 60703 2127.95 609.87 19 IN CHANNEL 7.46 60704 2135.41 609.89 20 IN CHANNEL 7.59 60705 2143.00 609.82 21 IN CHANNEL 4.96 60706 2147.96 609.98 22 IN CHANNEL 5.64 60707 2153.60 609.94 23 IN CHANNEL 3.71 60708 2157.31 610.14 24 IN CHANNEL 3.28 60709 2160.59 610.02 25 IN CHANNEL 1.28 60710 2161.87 610.35 26 WL RB 2.80 60711 2164.67 611.52 27 TTOE BALLAST 1.33 60712 2166.00 612.98 28 . 2.95 60713 2168.95 614.60 29 TOP BALLAST 1.47 60714 2170.42 614.88 30 EDGE RR 3.48 60715 2173.90 615.04 31 BOLT RB 1.81 60716 2175.71 615.40 32 TOE BANK 3.30 60717 2179.01 617.73 33 ON SLOPE END KETTLE RIVER X/S 61 PROJ#9510F080 SEPT 18 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 61650 0.00 614.75 1 DUMMY 2000.00 61651 2000.00 614.75 2 SLOW RISE BEYOND 12.36 61652 2012.36 613.26 3 . 8.76 61653 2021.11 613.00 4 . 10.14 61654 2031.25 613.61 5 BOLT LB 14.47 61655 2045.73 613.05 6 TOP BANK 2.57 61656 2048.29 612.53 7 TOP CUT 0.15 61657 2048.44 612.21 8 TOE CUT 1.51 61658 2049.95 611.43 9 TOE 1.86 61659 2051.81 611.51 10 EDGE BAR 4.62 61660 2056.43 611.35 11 . 2.86 61661 2059.30 611.10 12 WL LB 1.11 61662 2060.41 610.92 13 IN CHANNEL 5.32 61663 2065.74 610.68 14 IN CHANNEL 5.46 61664 2071.20 610.53 15 IN CHANNEL 5.71 61665 2076.91 610.46 16 IN CHANNEL 5.19 61666 2082.10 610.39 17 IN CHANNEL 4.80 61667 2086.91 610.39 18 IN CHANNEL 5.77 61668 2092.67 610.42 19 IN CHANNEL 3.80 61669 2096.48 610.37 20 IN CHANNEL 5.37 61670 2101.85 610.44 21 IN CHANNEL 4.06 61671 2105.91 610.55 22 IN CHANNEL 2.70 61672 2108.61 610.77 23 IN CHANNEL 1.58 61673 2110.19 611.10 24 WL RB 1.00 61674 2111.19 611.39 25 TOP BAR 0.85 61675 2112.03 611.84 26 TOE CUT 0.87 61676 2112.91 612.66 27 TOP CUT 3.15 61677 2116.06 613.89 28 TOE BALLST 0.71 61678 2116.77 614.81 29 FL RR RW 2.76 61679 2119.53 616.63 30 . 1.94 61680 2121.47 617.43 31 TOP BALLAST 0.44 61681 2121.92 617.44 32 BOLT RB 3.68 61682 2125.59 617.40 33 TOP BALLAST 2.26 61683 2127.86 617.43 34 TOE BANK 1.34 61684 2129.20 617.85 35 . 8.04 61685 2137.24 623.92 36 FL RR RW END KETTLE RIVER X/S 62 PROJ#9510F080 SEPT 18 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 62619 0.00 618.63 1 DUMMY 2000.00 62620 2000.00 618.63 2 STEEP RISE BYND 3.80 62621 2003.80 615.54 3 BOLT LB 2.37 62622 2006.17 614.20 4 TOE SLQPE 1.72 62623 2007.90 614.06 5 TOP CUT 0.18 62624 2008.08 613.56 6 . 1.14 62625 2009.22 612.99 7 TOE CUT 4.56 62626 2013.78 611.30 8 WL BCHAN LB 0.77 62627 2014.55 611.18 9 IN CHANNEL 3.23 62628 2017.78 611.17 10 IN CHANNEL 5.86 62629 2023.63 610.61 11 IN CHANNEL 4.25 62630 2027.88 610.81 12 IN CHANNEL 2.33 62631 2030.21 610.98 13 IN CHANNEL 2.21 62632 2032.42 611.31 14 WL BAR 4.21 62633 2036.63 611.55 15 TOP BAR 4.67 62634 2041.31 611.55 16 . 5.04 62635 2046.35 611.50 17 SPK-BAR 1.38 62636 2047.72 611.49 18 WL BAR 3.16 62637 2050.88 611.41 19 IN CHANNEL 6.61 62638 2057.49 611.25 20 IN CHANNEL 5.34 62639 2062.83 611.17 21 IN CHANNEL 5.42 62640 2068.25 611.07 22 IN CHANNEL 4.72 62641 2072.97 611.36 23 IN CHANNEL 2.73 62642 2075.70 611.49 24 WL RB 4.59 62643 2080.29 613.16 25 NATURAL BNDRY 2.80 62644 2083.09 614.05 26 TOE CUT 1.09 62645 2084.18 614.90 27 TOP CUT 1.93 62646 2086.11 615.17 28 BOLT RB 1.23 62647 2087.34 615.42 29 FENCELINE 7.82 62648 2095.16 615.90 30 IN FIELD 20.02 62649 2115.19 616.45 31 IN FIELD 21.15 62650 2136.34 619.62 32 FLAT BEYOND END KETTLE RIVER X/S 63 PROJ#9510F080 SEPT 18 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 63620 0.00 617.55 1 DUMMY 2000.00 63619 2000.00 617.55 2 STEEP RISE BYND 4.74 63618 2004.74 614.95 3 TOE 3.04 63617 2007.78 614.65 4 TOP BANK 2.61 63616 2010.39 613.97 5 TOE BANK 2.57 63615 2012.95 614.63 6 TOP 5.74 63614 2018.69 614.82 7 . 7.20 63613 2025.89 615.21 8 BOLT LB 7.46 63612 2033.35 615.14 9 TOP BANK 1.60 63611 2034.95 614.35 10 TOE BANK 6.90 63610 2041.84 613.72 11 . 8.37 63609 2050.22 613.65 12 . 8.54 63608 2058.76 613.26 13 . 6.49 63607 2065.25 613.01 14 WL LB 4.05 63606 2069.30 612.84 15 WET BAR 6.72 63605 2076.02 612.80 16 WET BAR 6.87 63604 2082.88 612.66 17 WET BAR 4.72 63603 2087.60 612.48 18 WL LB WETBAR 2.89 63602 2090.49 612.37 19 IN CHANNEL 5.00 63601 2095.49 612.15 20 IN CHANNEL 5.32 63600 2100.81 612.33 21 IN CHANNEL 4.24 63599 2105.05 612.41 22 IN CHANNEL 2.35 63598 2107.40 612.57 23 WL RB 0.80 63597 2108.21 612.79 24 . 1.07 63596 2109.28 612.98 25 TOE CUT 0.35 63595 2109.63 613.29 26 S 0.61 63594 2110.24 613.66 27 . 0.73 63593 2110.97 614.43 28 TOP CUT 1.67 63592 2112.65 615.06 29 . 0.71 63591 2113.35 615.51 30 . 1.60 63590 2114.95 616.27 31 . 1.47 63589 2116.42 617.05 32 TOP BANK 0.54 63588 2116.96 617.18 33 . 0.62 63587 2117.58 617.54 34 FENCELINE 0.81 63586 2118.39 617.65 35 BOLT RB 3.70 63585 2122.09 617.57 36 . 7.93 63584 2130.01 617.51 37 IN FIELD END KETTLE RIVER X/S 64 PROJ#9510F080 SEPT 18 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 64484 0.00 628.98 1 DUMMY 2000.00 64483 2000.00 628.98 2 SLOW RISE BEYOND 16.90 64482 2016.90 628.82 3 EDGE BUSH 8.41 64481 2025.31 629.06 4 BOLT LB 1.96 64480 2027.27 628.94 5 TOP BANK 7.58 64479 2034.85 623.62 6 ON SLOPE 9.49 64478 2044.34 616.41 7 . 5.36 64477 2049.70 614.42 8 WL LB 1.55 64476 2051.25 614.11 9 IN CHANNEL 4.41 64475 2055.66 613.18 10 IN CHANNEL 1.77 64474 2057.43 613.17 11 IN CHANNEL 1.47 64473 2058.90 613.28 12 IN CHANNEL 2.50 64472 2061.40 613.35 13 IN CHANNEL 2.87 64471 2064.26 613.47 14 IN CHANNEL 3.50 64470 2067.76 613.58 15 IN CHANNEL 6.30 64469 2074.06 613.99 16 IN CHANNEL 4.35 64468 2078.42 614.42 17 WL RB 4.79 64467 2083.20 614.68 18 . 6.85 64466 2090.05 614.85 19 . 3.61 64465 2093.65 614.66 20 . 2.53 64464 2096.19 614.88 21 . 3.25 64463 2099.44 615.06 22 . 3.73 64462 2103.17 615.54 23 . 4.62 64461 2107.79 615.42 24 . 2.63 64460 2110.42 614.92 25 . 1.37 64459 2111.79 615.10 26 TOE CUT 2.02 64458 2113.81 616.37 27 TOP CUT MAIN 9.91 64457 2123.72 616.28 28 . 11.02 64456 2134.74 616.58 29 TOP ISLE 2.76 64455 2137.50 615.93 30 . 3.75 64454 2141.26 615.57 31 . 5.86 64453 2147.12 615.63 32 TOP BACKCHANNEL 1.19 64452 2148.31 615.22 33 TOE 2.23 64451 2150.54 614.77 34 . 2.59 64450 2153.13 615.09 35 . 3.48 64449 2156.61 614.86 36 . 4.96 64448 2161.58 614.76 37 . 1.65 64447 2163.23 614.76 38 . 2.93 64446 2166.16 615.06 39 TOE 0.81 64445 2166.97 615.38 40 TOP BACKCHANNEL 3.11 64444 2170.08 615.78 41 . 2.13 64443 2172.21 616.46 42 . 2.29 64442 2174.50 616.44 43 . 1.97 64441 2176.47 617.07 44 TOP 1.54 64440 2178.01 617.06 45 FENCELINE 3.53 64439 2181.54 617.30 46 GL BOLT RB 2.32 64438 2183.86 617.28 47 EDGE FIELD 4.66 64437 2188.52 617.65 48 . 11.18 64436 2199.70 618.07 49 . 41.98 64435 2241.69 617.80 50 FLAT BEYOND END KETTLE RIVER X/S 65 PROJ#9510F080 SEPT 18 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 65496 0.00 619.92 1 DUMMY 2000.00 65497 2000.00 619.92 2 SLOW RISE BEYOND 10.86 65498 2010.86 619.78 3 . 21.59 65499 2032.45 618.30 4 BOLT LB 7.47 65500 2039.92 617.40 5 . 4.93 65501 2044.85 617.59 6 . 6.43 65502 2051.28 617.35 7 TOP BANK 1.84 65503 2053.12 616.82 8 TOP CUT 0.38 65504 2053.51 615.97 9 TOE CUT 0.85 65505 2054.36 615.46 10 WL LB 3.29 65506 2057.64 615.31 11 IN CHANNEL 10.59 65507 2068.23 615.26 12 IN CHANNEL 11.17 65508 2079.40 615.26 13 IN CHANNEL 10.16 65509 2089.56 615.02 14 IN CHANNEL 6.55 65510 2096.11 614.60 15 IN CHANNEL 3.31 65511 2099.42 614.26 16 IN CHANNEL 7.30 65512 2106.72 614.01 17 MIDPT EST-1.45 8.33 65513 2115.05 614.09 18 IN CHANNEL 1.72 65514 2116.77 614.28 19 IN CHANNEL 2.43 65515 2119.20 614.41 20 IN CHANNEL 2.39 65516 2121.60 614.48 21 IN CHANNEL 2.26 65517 2123.86 614.52 22 IN CHANNEL 2.53 65518 2126.39 614.78 23 IN CHANNEL 2.22 65519 2128.61 614.96 24 IN CHANNEL 2.07 65520 2130.68 615.46 25 WL RB 0.49 65521 2131.18 615.63 26 TOE BANK 0.68 65522 2131.86 615.96 27 TOE CUT 0.28 65523 2132.13 616.28 28 TOP CUT 0.86 65524 2132.99 616.79 29 . 0.98 65525 2133.97 617.28 30 . 0.91 65526 2134.89 618.44 31 TOP BANK 0.60 65527 2135.49 618.71 32 FL RR RW 1.69 65528 2137.17 619.18 33 . 1.12 65529 2138.29 619.48 34 TOE RR 2.22 65530 2140.51 620.69 35 TOP BALLAST 0.91 65531 2141.42 620.92 36 GL BOLT RB 3.66 65532 2145.08 621.15 37 TOP BALLAST 1.52 65533 2146.60 621.05 38 TOE BANK 2.22 65534 2148.83 622.21 39 ON SLOPE END KETTLE RIVER X/S 66 PROJ#9510F080 SEPT 16 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 66451 0.00 622.61 1 DUMMY 2000.00 66452 2000.00 622.61 2 SLOW RISE BEYOND 19.97 66453 2019.97 622.27 3 . 11.34 66454 2031.31 622.17 4 BOLT LB 2.68 66455 2033.99 621.80 5 . 1.19 66456 2035.19 621.35 6 TOP BANK 1.16 66457 2036.35 620.17 7 . 1.88 66458 2038.23 619.07 8 . 0.75 66459 2038.98 618.90 9 TOP CUT 4.31 66460 2043.29 616.24 10 TOE 0.45 66461 2043.74 616.13 11 WL LB 4.20 66462 2047.94 616.02 12 IN CHANNEL 5.41 66463 2053.36 615.69 13 IN CHANNEL 1.88 66464 2055.23 615.86 14 IN CHANNEL 5.39 66465 2060.63 615.81 15 IN CHANNEL 5.01 66466 2065.64 615.78 16 IN CHANNEL 4.66 66467 2070.30 615.78 17 IN CHANNEL 4.69 66468 2074.99 615.85 18 IN CHANNEL 4.76 66469 2079.75 615.89 19 IN CHANNEL 4.62 66470 2084.37 615.97 20 IN CHANNEL 4.04 66471 2088.40 616.12 21 WL RB 6.45 66472 2094.86 616.11 22 . 4.17 66473 2099.02 616.31 23 EDGE BAR 0.77 66474 2099.80 616.63 24 NATURAL BNDRY 5.06 66475 2104.86 617.14 25 TOE CUT 0.35 66476 2105.21 618.79 26 TOP CUT 4.60 66477 2109.81 619.38 27 . 5.35 66478 2115.16 620.79 28 FENCELINE 8.03 66479 2123.20 621.98 29 BOLT RB 16.67 66480 2139.86 622.76 30 EDGE FIELD 25.14 66481 2165.00 623.04 31 . 31.93 66482 2196.93 622.83 32 . 22.42 66483 2219.34 622.40 33 . 8.92 66484 2228.27 622.20 34 TOP DITCH 4.23 66485 2232.49 620.80 35 TOE 3.60 66486 2236.09 621.30 36 . 1.72 66487 2237.81 622.01 37 TOP DITCH 0.76 66488 2238.57 622.21 38 TOE RR 2.70 66489 2241.27 623.30 39 TOP BALLAST 0.79 66490 2242.06 623.41 40 SPK RAILROAD 3.19 66491 2245.25 623.39 41 TOP BALLAST 1.63 66492 2246.88 622.93 42 . 2.91 66493 2249.80 621.74 43 TOE RR 2.73 66494 2252.52 621.55 44 . 5.61 66495 2258.13 622.11 45 TOE ROCK 8.15 66496 2266.28 625.76 46 STEEP RISE BYND END KETTLE RIVER X/S 67 PROJ#9510F080 SEPT 16 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 67452 0.00 621.70 1 DUMMY 2000.00 67451 2000.00 621.70 2 SAME RISE BEYOND 10.20 67450 2010.20 620.05 3 . 7.96 67449 2018.16 619.11 4 . 7.79 67448 2025.95 619.77 5 . 4.91 67447 2030.86 619.65 6 BOLT LB 3.40 67446 2034.26 619.96 7 TOP CUT 1.98 67445 2036.24 618.60 8 TOE CUT 6.61 67444 2042.85 617.33 9 . 3.79 67443 2046.64 616.85 10 . 3.58 67442 2050.22 616.78 11 WL LB 5.42 67441 2055.64 616.62 12 IN CHANNEL 6.62 67440 2062.27 616.42 13 IN CHANNEL 5.68 67439 2067.95 616.24 14 IN CHANNEL 4.55 67438 2072.50 616.10 15 IN CHANNEL 3.21 67437 2075.71 615.97 16 IN CHANNEL 4.29 67436 2079.99 616.27 17 IN CHANNEL 4.17 67435 2084.17 616.46 18 IN CHANNEL 2.05 67434 2086.22 616.76 19 WL RB 0.81 67433 2087.03 616.82 20 SPK 44 0.91 67432 2087.94 616.84 21 TOE 0.61 67431 2088.55 617.32 22 . 1.51 67430 2090.06 617.98 23 . 2.37 67429 2092.43 618.46 24 TOE CUT 1.20 67428 2093.63 619.64 25 TOP CUT 0.72 67427 2094.35 619.80 26 ON SLOPE 3.32 67426 2097.67 621.81 27 ON SLOPE 2.24 67425 2099.91 624.00 28 TOP BANK 1.12 67424 2101.03 624.04 29 GL BOLT RB 0.86 67423 2101.89 624.06 30 NE COR 9.11 67422 2111.00 624.21 31 NW COR GAR 9.20 67421 2120.20 624.21 32 . 15.71 67420 2135.91 623.73 33 EDGE DWZ 6.91 67419 2142.82 623.47 34 . 7.68 67418 2150.50 623.20 35 FENCELINE 16.27 67417 2166.76 624.11 36 . 24.70 67416 2191.46 623.81 37 . 9.23 67415 2200.69 624.25 38 . 23.62 67414 2224.31 624.99 39 . 3.63 67413 2227.94 625.45 40 FL RR RW 13.49 67412 2241.44 625.55 41 EDGE RR 2.71 67411 2244.15 625.58 42 SPK RR 1.53 67410 2245.68 625.63 43 EDGE RR END KETTLE RIVER X/S 68 PROJ#9510F080 SEPT 16 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 68409 0.00 624.28 1 DUMMY 2000.00 68408 2000.00 624.28 2 STEEP RISE BYND 4.03 68407 2004.03 621.45 3 BOLT LB 2.73 68406 2006.76 620.34 4 TOP CUT 0.93 68405 2007.69 619.33 5 TOE SLOPE 2.47 68404 2010.16 618.76 6 . 5.16 68403 2015.32 618.16 7 . 4.14 68402 2019.46 617.95 8 WL LB 6.78 68401 2026.24 617.72 9 IN CHANNEL 6.15 68400 2032.38 617.58 10 IN CHANNEL 2.11 68399 2034.49 617.38 11 IN CHANNEL 4.20 68398 2038.69 617.02 12 IN CHANNEL 3.05 68397 2041.74 616.83 13 IN CHANNEL 2.71 68396 2044.46 616.84 14 IN CHANNEL 2.88 68395 2047.34 616.77 15 IN CHANNEL 2.76 68394 2050.10 616.91 16 IN CHANNEL 3.67 68393 2053.77 617.53 17 IN CHANNEL 2.71 68392 2056.48 617.93 18 WL RB 5.06 68391 2061.54 618.55 19 . 2.70 68390 2064.23 619.20 20 . 4.08 68389 2068.31 620.58 21 TOP CUT 2.28 68388 2070.60 620.41 22 . 2.96 68387 2073.56 620.20 23 GL BOLT RB 4.47 68386 2078.03 620.12 24 . 5.60 68385 2083.64 620.26 25 . 10.80 68384 2094.43 620.18 26 . 3.07 68383 2097.51 620.06 27 . 2.58 68382 2100.08 619.94 28 . 1.18 68381 2101.26 620.16 29 . 0.83 68380 2102.09 620.27 30 TOP 2.03 68379 2104.12 619.97 31 CL DTCH 1.71 68378 2105.83 620.60 32 TOP DTCH 3.45 68377 2109.28 620.80 33 . 4.20 68376 2113.48 620.80 34 TOP CHAN 2.14 68375 2115.62 619.80 35 TOE 2.11 68374 2117.72 619.60 36 . 2.52 68373 2120.25 619.90 37 . 3.44 68372 2123.69 620.22 38 TOE 1.62 68371 2125.31 620.86 39 TOP DRY CHAN 2.07 68370 2127.38 620.81 40 TOP BANK 1.41 68369 2128.80 620.40 41 . 3.97 68368 2132.77 618.69 42 TOE SLOPE-SWMP 5.77 68367 2138.54 618.54 43 . 7.29 68366 2145.83 618.51 44 . 6.27 68365 2152.10 618.50 45 . 3.69 68364 2155.79 618.74 46 EDGE SWAMP 3.49 68363 2159.27 619.46 47 . 5.93 68362 2165.21 620.12 48 . 10.90 68361 2176.11 620.28 49 . 11.63 68360 2187.73 620.87 50 . 14.17 68359 2201.90 621.37 51 . 16.70 68358 2218.60 621.84 52 . 13.54 68357 2232.13 622.31 53 BOLT RB 3.50 68356 2235.63 623.16 54 . 2.89 68355 2238.52 623.76 55 . 3.23 68354 2241.74 623.86 56 TOE 1.12 68353 2242.86 624.30 57 TOP BALLAST 3.75 68352 2246.61 624.40 58 EDGE RR 2.60 68351 2249.21 624.41 59 EDGE RR 4.95 68350 2254.16 624.61 60 SLOW RISE BEYOND END KETTLE RIVER X/S 69 PROJ#9510F080 SEPT 16 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 69893 0.00 627.91 1 DUMMY 2000.00 69892 2000.00 627.91 2 SLOW RISE BEYOND 18.83 69891 2018.83 627.34 3 . 18.72 69890 2037.55 627.00 4 BOLT LB 1.64 69889 2039.19 626.81 5 TOP 9.55 69888 2048.74 622.32 6 TOE SLOPE 3.51 69887 2052.25 621.80 7 . 5.58 69886 2057.83 621.55 8 . 2.49 69885 2060.31 621.05 9 . 9.27 69884 2069.58 620.88 10 . 4.21 69883 2073.80 620.99 11 TOE 1.27 69882 2075.06 621.63 12 TOP 2.39 69881 2077.45 621.63 13 SPIKE 4.98 69880 2082.43 621.64 14 . 4.54 69879 2086.98 621.11 15 TOP BANK 1.01 69878 2087.98 620.93 16 TOP CUT 2.72 69877 2090.71 619.42 17 TOE CUT 0.77 69876 2091.48 619.34 18 WL LB 1.66 69875 2093.14 619.05 19 IN CHANNEL 4.93 69874 2098.07 619.10 20 IN CHANNEL 5.83 69873 2103.89 618.99 21 IN CHANNEL 4.23 69872 2108.12 618.82 22 IN CHANNEL 3.53 69871 2111.65 618.60 23 IN CHANNEL 5.04 69870 2116.69 618.61 24 IN CHANNEL 4.72 69869 2121.42 618.63 25 IN CHANNEL 6.95 69868 2128.36 618.75 26 IN CHANNEL 3.86 69867 2132.22 618.97 27 IN CHANNEL 5.63 69866 2137.84 619.25 28 IN CHANNEL 2.21 69865 2140.06 619.35 29 WL RB 3.95 69864 2144.01 619.63 30 TOE CUT 0.52 69863 2144.53 620.12 31 TOP CUT 3.61 69862 2148.14 620.99 32 TOP BANK 3.40 69861 2151.54 621.00 33 . 4.35 69860 2155.89 621.00 34 . 3.22 69859 2159.11 620.63 35 . 2.40 69858 2161.51 621.09 36 . 5.44 69857 2166.95 621.21 37 . 3.67 69856 2170.62 620.86 38 . 2.50 69855 2173.12 621.05 39 . 2.90 69854 2176.02 620.78 40 . 3.65 69853 2179.67 621.01 41 . 10.79 69852 2190.46 620.89 42 . 1.77 69851 2192.23 620.17 43 CL DRY CHANNEL 1.41 69850 2193.64 620.83 44 . 0.04 69849 2193.68 620.83 45 . 5.38 69848 2199.06 621.01 46 TOP BANK 2.91 69847 2201.97 619.38 47 TOE BANK 1.06 69846 2203.03 619.26 48 . 2.54 69845 2205.57 619.22 49 WL BACKCHANNEL 1.99 69844 2207.56 619.10 50 IN CHANNEL 3.41 69843 2210.97 618.93 51 IN CHANNEL 3.80 69842 2214.77 618.79 52 IN CHANNEL 3.79 69841 2218.56 619.03 53 IN CHANNEL 3.46 69840 2222.02 619.20 54 WL BACKCHANNEL 5.30 69839 2227.32 619.47 55 TOP BAR 5.47 69838 2232.79 619.44 56 . 0.82 69837 2233.61 619.66 57 TOE CUT 1.03 69836 2234.64 620.74 58 TOP CUT 6.92 69835 2241.56 620.89 59 TOE BANK 5.57 69834 2247.13 623.96 60 TOP BANK 5.34 69833 2252.47 624.12 61 FL RR RW 4.72 69832 2257.19 623.98 62 BOLT RB 1.44 69831 2258.64 623.82 63 TOE RR 1.65 69830 2260.29 624.46 64 . 5.32 69829 2265.60 625.30 65 TOP RR 4.42 69828 2270.02 625.28 66 TOP RR 2.27 69827 2272.29 624.92 67 FLAT 50M-TOE END KETTLE RIVER X/S 70 PROJ#9510F080 SEPT 16 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 70766 0.00 627.06 1 DUMMY 2000.00 70767 2000.00 627.06 2 SLOW RISE BEYOND 7.72 70768 2007.72 626.09 3 . 10.55 70769 2018.27 624.89 4 TOP 4.38 70770 2022.64 623.12 5 . 4.82 70771 2027.47 622.23 6 TOE BANK 13.11 70772 2040.58 621.81 7 . 8.75 70773 2049.34 621.34 8 . 3.47 70774 2052.81 621.02 9 . 4.62 70775 2057.43 621.32 10 . 9.32 70776 2066.74 621.54 11 . 13.40 70777 2080.14 621.68 12 . 6.52 70778 2086.66 621.94 13 . 8.02 70779 2094.68 621.94 14 . 7.01 70780 2101.69 621.25 15 . 3.00 70781 2104.69 621.60 16 . 4.67 70782 2109.35 621.09 17 . 2.74 70783 2112.10 621.45 18 BOLT LB 2.18 70784 2114.28 621.31 19 . 3.68 70785 2117.96 621.64 20 . 4.08 70786 2122.04 621.64 21 TOP CHANNEL 0.83 70787 2122.87 621.56 22 TOP CUT 1.99 70788 2124.86 620.77 23 TOE EDGE BAR 7.65 70789 2132.52 620.35 24 . 1.83 70790 2134.35 619.83 25 . 4.39 70791 2138.74 619.84 26 . 2.91 70792 2141.65 619.57 27 WL BACKCHANNEL 1.80 70793 2143.45 619.45 28 IN CHANNEL 2.99 70794 2146.44 619.32 29 IN CHANNEL 4.66 70795 2151.09 619.28 30 IN CHANNEL 3.27 70796 2154.36 619.40 31 IN CHANNEL 4.99 70797 2159.35 619.56 32 WL BACKCHANNEL 3.00 70798 2162.34 619.73 33 TOP BAR 6.97 70799 2169.32 620.27 34 . 5.58 70800 2174.90 620.84 35 TOP BAR 10.37 70801 2185.28 620.91 36 ON BAR 9.85 70802 2195.13 620.56 37 . 8.00 70803 2203.13 620.32 38 TOP BAR 4.92 70804 2208.04 620.02 39 . 4.58 70805 2212.62 619.69 40 WL LB 4.05 70806 2216.68 619.49 41 IN CHANNEL 4.50 70807 2221.18 619.06 42 IN CHANNEL 3.76 70808 2224.94 618.68 43 IN CHANNEL 2.80 70809 2227.74 618.61 44 IN CHANNEL 2.77 70810 2230.52 618.67 45 IN CHANNEL 1.92 70811 2232.44 618.86 46 IN CHANNEL 2.23 70812 2234.67 619.17 47 IN CHANNEL 1.44 70813 2236.11 619.42 48 IN CHANNEL 1.14 70814 2237.25 619.73 49 WL RB 1.46 70815 2238.71 620.26 50 . 1.40 70816 2240.11 620.81 51 . 1.56 70817 2241.67 621.66 52 TOE CUT 0.00 70818 2241.67 622.19 53 TOP BANK 1.11 70819 2242.78 622.44 54 . 4.78 70820 2247.56 622.41 55 TOE RR 2.62 70821 2250.18 623.69 56 TOP RR 0.77 70822 2250.95 623.75 57 GL BOLT RB 2.84 70823 2253.80 623.96 58 TOP RR 1.17 70824 2254.97 623.86 59 . 1.15 70825 2256.12 624.32 60 TOE ROCK FACE 0.16 70826 2256.28 626.02 61 STEEP RISE BYND END KETTLE RIVER X/S 71 PROJ#9510F080 SEPT 15 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 71767 0.00 631.94 1 DUMMY 2000.00 71766 2000.00 631.94 2 STEEP RISE BYND 6.53 71765 2006.53 629.67 3 . 6.52 71764 2013.04 628.84 4 . 4.37 71763 2017.42 627.90 5 BOLT LB 1.11 71762 2018.53 627.88 6 . 1.93 71761 2020.46 627.22 7 TOP BANK 5.34 71760 2025.80 623.27 8 TOE SLOPE 3.02 71759 2028.82 622.82 9 TOP CUT 1.56 71758 2030.38 620.92 10 TOE CUT 2.02 71757 2032.40 620.83 11 . 3.77 71756 2036.17 621.16 12 TOP BAR 7.00 71755 2043.18 621.40 13 TOP BAR 6.06 71754 2049.24 621.38 14 TOP BAR 8.16 71753 2057.40 621.14 15 WL LB 6.75 71752 2064.15 620.89 16 IN CHANNEL 5.56 71751 2069.72 620.69 17 IN CHANNEL 4.95 71750 2074.67 620.51 18 IN CHANNEL 4.35 71749 2079.02 620.50 19 IN CHANNEL 3.68 71748 2082.69 620.55 20 IN CHANNEL 4.14 71747 2086.83 620.62 21 IN CHANNEL 5.54 71746 2092.37 620.75 22 IN CHANNEL 5.42 71745 2097.79 620.90 23 IN CHANNEL 3.26 71744 2101.05 621.13 24 WL RB 1.87 71743 2102.93 621.25 25 TOE 1.27 71742 2104.20 621.61 26 TOE 0.15 71741 2104.34 621.84 27 TOP CUT 2.37 71740 2106.71 622.99 28 TOP BANK 2.82 71739 2109.54 623.31 29 BOLT RB 4.52 71738 2114.05 623.37 30 END ROAD 12.93 71737 2126.99 623.70 31 EDGE ROAD/HWY 11.27 71736 2138.25 623.69 32 FL FLT BEYOND END KETTLE RIVER X/S 72 PROJ#9510F080 SEPT 15 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 72736 0.00 625.24 1 DUMMY 2000.00 72735 2000.00 625.24 2 STEEP RISE BYND 3.81 72734 2003.81 623.43 3 BOLT LB 2.48 72733 2006.29 623.12 4 TOP 0.55 72732 2006.84 622.49 5 TOE CUT 0.66 72731 2007.50 622.21 6 NATURAL BOUNDARY 1.47 72730 2008.97 621.46 7 . 0.92 72729 2009.88 621.08 8 WL LB 0.70 72728 2010.58 620.79 9 IN CHANNEL 1.50 72727 2012.08 620.50 10 IN CHANNEL 1.83 72726 2013.91 620.37 11 IN CHANNEL 1.41 72725 2015.32 619.24 12 TOE CHANNEL 12.77 72724 2028.09 617.31 13 EST IN CHANNEL 10.43 72723 2038.52 620.31 14 IN CHANNEL 0.22 72722 2038.73 620.33 15 IN CHANNEL 1.45 72721 2040.19 620.46 16 IN CHANNEL 2.18 72720 2042.36 620.74 17 IN CHANNEL 1.38 72719 2043.74 621.13 18 WL RB 3.03 72718 2046.77 622.15 19 NATURAL BNDRY 1.89 72717 2048.66 623.29 20 TOP BANK 2.02 72716 2050.67 623.29 21 BOLT MID 2.29 72715 2052.96 623.10 22 TOP BANK 2.19 72714 2055.15 621.70 23 TOE BANK 2.93 72713 2058.08 621.67 24 . 1.87 72712 2059.95 621.57 25 WL LB 1.90 72711 2061.85 621.42 26 IN CHANNEL 3.79 72710 2065.64 621.34 27 IN CHANNEL 4.34 72709 2069.99 621.46 28 IN CHANNEL 5.59 72708 2075.57 621.49 29 IN CHANNEL 4.93 72707 2080.50 621.36 30 IN CHANNEL 3.33 72706 2083.83 621.36 31 IN CHANNEL 0.82 72705 2084.65 621.60 32 WL RB 1.03 72704 2085.68 621.90 33 TOE 0.12 72703 2085.80 622.54 34 TOP CHANNEL 1.39 72702 2087.19 623.58 35 TOP BANK 0.59 72701 2087.78 623.68 36 FENCELINE 7.02 72700 2094.80 624.47 37 . 8.18 72699 2102.98 624.18 38 C/L PATH 9.50 72698 2112.48 624.26 39 BOLT RB 5.82 72697 2118.30 624.10 40 TOP 5.63 72696 2123.93 623.08 41 CL CHANNEL 2.79 72695 2126.72 623.75 42 TOP DRY CHANNEL 10.53 72694 2137.25 623.77 43 . 4.90 72693 2142.15 624.44 44 EDGE BUSH 13.88 72692 2156.03 624.44 45 . 7.54 72691 2163.58 624.30 46 . 10.75 72690 2174.33 624.04 47 EDGE BUSH 8.76 72689 2183.09 623.32 48 . 7.71 72688 2190.80 623.76 49 TOE BANK 5.01 72687 2195.80 625.73 50 . 5.88 72686 2201.68 627.05 51 TOP FLT BEYOND END KETTLE RIVER X/S 73 PROJ#9510F080 SEPT 30 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 73776 0.00 630.27 1 DUMMY 2000.00 73775 2000.00 630.27 2 ON SLP STEEP 16.84 73774 2016.84 625.18 3 TOE SLOPE 14.18 73773 2031.02 624.04 4 . 5.95 73772 2036.97 624.77 5 . 5.47 73771 2042.43 625.10 6 . 9.47 73770 2051.91 624.81 7 . 3.84 73769 2055.74 625.19 8 BOLT LB 1.93 73768 2057.67 624.76 9 . 2.70 73767 2060.37 625.02 10 TOP CHANNEL 1.07 73766 2061.45 624.20 11 TO 0.86 73765 2062.31 624.20 12 TOE CHANNEL 0.65 73764 2062.96 623.08 13 TOP SMALL CHAN 2.63 73763 2065.59 623.15 14 TO 3.36 73762 2068.94 622.25 15 TOE EDGE BAR 4.39 73761 2073.34 622.19 16 TOP BAR 7.33 73760 2080.67 621.81 17 . 7.51 73759 2088.18 621.32 18 WL LB 5.04 73758 2093.22 620.85 19 W 4.55 73757 2097.77 620.57 20 W 4.63 73756 2102.41 619.93 21 W 3.89 73755 2106.30 619.81 22 MIDPT*1.5 3.85 73754 2110.15 620.04 23 W 2.60 73753 2112.76 620.49 24 TOE CHANNEL 2.92 73752 2115.68 621.31 25 WL RB 2.74 73751 2118.42 622.31 26 . 1.30 73750 2119.72 622.91 27 TOE CUT 0.14 73749 2119.86 623.49 28 TOP BANK 1.94 73748 2121.80 623.49 29 . 1.77 73747 2123.57 623.32 30 . 6.08 73746 2129.65 623.29 31 SPIKE 2.62 73745 2132.27 623.33 32 . 2.41 73744 2134.68 623.52 33 . 2.96 73743 2137.64 623.37 34 EDGE CLEAR 3.26 73742 2140.91 623.64 35 . 6.33 73741 2147.24 623.41 36 . 2.03 73740 2149.26 623.56 37 . 9.16 73739 2158.42 623.36 38 . 1.97 73738 2160.40 623.03 39 . 5.89 73737 2166.29 622.97 40 . 1.92 73736 2168.21 623.18 41 . 10.68 73735 2178.89 623.15 42 BOLT RB 9.06 73734 2187.94 623.16 43 . 3.50 73733 2191.44 622.97 44 . 4.25 73732 2195.70 623.15 45 . 5.42 73731 2201.12 623.42 46 . 5.37 73730 2206.49 623.29 47 . 2.61 73729 2209.10 623.58 48 . 4.13 73728 2213.23 623.28 49 . 5.56 73727 2218.79 623.41 50 ROLLING END KETTLE RIVER X/S 74 PROJ#9510F080 SEPT 30 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 74727 0.00 630.25 1 DUMMY 2000.00 74726 2000.00 630.25 2 RISE BEYOND 4.01 74725 2004.01 629.66 3 TOP 1.41 74724 2005.42 628.97 4 BOLT LB 6.73 74723 2012.15 624.44 5 TOE SLOPE 1.61 74722 2013.76 624.23 6 TOP BANK 1.48 74721 2015.24 623.78 7 TOP CUT 0.40 74720 2015.64 622.61 8 TOE CUT 0.68 74719 2016.33 622.41 9 . 1.83 74718 2018.16 622.21 10 WL LB 0.59 74717 2018.75 622.05 11 SPIKE 0.70 74716 2019.45 621.90 12 . 3.11 74715 2022.57 621.78 13 . 4.90 74714 2027.46 621.63 14 . 4.69 74713 2032.15 621.71 15 . 4.84 74712 2036.99 621.74 16 . 6.62 74711 2043.61 621.98 17 . 4.54 74710 2048.15 622.01 18 . 4.89 74709 2053.04 621.76 19 . 4.25 74708 2057.29 621.91 20 . 2.13 74707 2059.42 622.21 21 WL RB 4.09 74706 2063.51 622.66 22 . 2.25 74705 2065.76 622.43 23 . 1.28 74704 2067.04 622.53 24 . 1.98 74703 2069.02 623.19 25 . 2.81 74702 2071.83 623.49 26 TOP 3.07 74701 2074.90 623.40 27 EDGE BAR 1.73 74700 2076.63 623.52 28 TOE 2.47 74699 2079.10 624.14 29 TOE BANK 1.51 74698 2080.61 624.13 30 FENCELINE 1.23 74697 2081.85 624.06 31 BOLT RB 1.38 74696 2083.23 624.00 32 EDGE 2.22 74695 2085.45 624.00 33 EDGE ROAD 0.84 74694 2086.30 623.76 34 . 4.55 74693 2090.85 623.41 35 . 1.33 74692 2092.17 623.21 36 . 2.56 74691 2094.74 623.63 37 . 8.00 74690 2102.74 623.70 38 . 5.32 74689 2108.06 623.31 39 . 10.74 74688 2118.80 624.32 40 . 11.88 74687 2130.68 624.51 41 . 14.65 74686 2145.33 624.52 42 . 12.07 74685 2157.41 623.72 43 SLOW DOWN BEYOND END KETTLE RIVER X/S 75 PROJ#9510F080 SEPT 30 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 75648 0.00 633.55 1 DUMMY 2000.00 75649 2000.00 633.55 2 STEEP RISE BYND 9.02 75650 2009.02 631.98 3 TOP CUT 3.75 75651 2012.77 628.87 4 TOE 0.41 75652 2013.18 628.81 5 BOLT LB 2.24 75653 2015.43 628.80 6 EDGE FIRE ROAD 1.08 75654 2016.50 629.01 7 TOP 2.35 75655 2018.85 627.08 8 . 2.24 75656 2021.09 624.71 9 . 1.88 75657 2022.97 624.02 10 TOE SLOPE 3.76 75658 2026.73 623.67 11 . 3.79 75659 2030.52 623.23 12 . 1.07 75660 2031.59 622.91 13 WL LB 1.95 75661 2033.54 622.25 14 . 2.12 75662 2035.66 621.34 15 . 0.88 75663 2036.54 620.91 16 MIDPT -2.0 2.97 75664 2039.52 620.91 17 MIDPT -2.0 7.49 75665 2047.01 621.61 18 W 1.83 75666 2048.84 621.99 19 W 1.95 75667 2050.79 622.43 20 W 1.16 75668 2051.95 622.71 21 W 1.17 75669 2053.12 622.92 22 WL RB 3.29 75670 2056.41 623.17 23 . 7.50 75671 2063.91 623.42 24 TOE CUT 1.26 75672 2065.17 624.01 25 . 0.66 75673 2065.83 624.96 26 TOP CUT 5.52 75674 2071.35 624.98 27 . 1.90 75675 2073.25 624.76 28 SPIKE 3.50 75676 2076.75 624.91 29 . 9.13 75677 2085.88 625.24 30 . 4.82 75678 2090.70 625.15 31 BOLT RB 2.01 75679 2092.71 625.19 32 FENCELINE 3.42 75680 2096.14 625.33 33 . 11.16 75681 2107.30 625.33 34 . 3.60 75682 2110.89 625.07 35 . 4.38 75683 2115.27 625.37 36 . 14.79 75684 2130.06 625.50 37 FIELD FLAT BYD END KETTLE RIVER X/S 76 PROJ#9510F080 SEPT 30 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 76599 0.00 625.82 1 DUMMY 2000.00 76600 2000.00 625.82 2 FLAT BEYOND 14.78 76601 2014.78 625.50 3 BOLT LB 16.70 76602 2031.48 625.44 4 . 7.30 76603 2038.78 625.39 5 TOP BANK 2.40 76604 2041.18 624.73 6 TOE BANK 3.80 76605 2044.98 625.15 7 TOP BANK 3.68 76606 2048.66 624.75 8 . 3.20 76607 2051.86 623.30 9 TOE 5.62 76608 2057.48 623.16 10 WL 2.84 76609 2060.32 622.57 11 . 3.18 76610 2063.50 622.56 12 . 2.98 76611 2066.48 622.71 13 . 2.76 76612 2069.24 622.98 14 . 1.72 76613 2070.96 623.18 15 WL TOE 2.99 76614 2073.95 625.03 16 TOE CUT 0.26 76615 2074.21 625.92 17 TOP BANK 4.32 76616 2078.53 625.19 18 . 8.91 76617 2087.44 625.10 19 . 4.08 76618 2091.52 625.66 20 . 11.56 76619 2103.08 625.64 21 . 11.78 76620 2114.86 625.38 22 . 9.83 76621 2124.69 625.33 23 . 7.86 76622 2132.55 625.38 24 . 4.18 76623 2136.73 625.19 25 . 1.79 76624 2138.52 625.48 26 . 2.68 76625 2141.20 625.48 27 TOP BANK 1.49 76626 2142.69 624.31 28 TOE 4.55 76627 2147.24 624.38 29 TOP BAR 9.67 76628 2156.91 623.96 30 . 8.91 76629 2165.82 623.73 31 . 7.62 76630 2173.44 622.94 32 WL LB 4.73 76631 2178.17 622.51 33 W 1.79 76632 2179.96 622.35 34 W 3.77 76633 2183.73 622.00 35 W 1.28 76634 2185.02 621.94 36 W 3.38 76635 2188.40 622.28 37 W 4.01 76636 2192.40 622.93 38 WL RB 4.25 76637 2196.65 623.71 39 TOE 0.44 76638 2197.10 624.56 40 . 0.69 76639 2197.79 624.52 41 TOE CUT 0.33 76640 2198.12 625.65 42 TOP BANK 4.11 76641 2202.22 625.67 43 . 10.42 76642 2212.64 625.40 44 GL BOLT RB 2.14 76643 2214.78 625.59 45 EDGE FIELD 25.50 76644 2240.28 625.18 46 CL FIELD ROAD 15.70 76645 2255.98 624.90 47 . 5.76 76646 2261.74 625.11 48 . 9.01 76647 2270.75 625.62 49 . 14.97 76648 2285.72 625.64 50 FLAT BEYOND END KETTLE RIVER X/S 77 PROJ#9510F080 SEPT 30 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 77516 0.00 626.23 1 DUMMY 2000.00 77517 2000.00 626.23 2 ROLLIN 4.31 77518 2004.31 625.97 3 . 5.48 77519 2009.79 626.20 4 . 4.17 77520 2013.96 626.08 5 BOLT LB 4.74 77521 2018.70 625.81 6 TOP OLD DRYCHAN 1.19 77522 2019.89 624.80 7 CL 1.90 77523 2021.79 625.11 8 . 1.86 77524 2023.65 625.65 9 TOP 2.17 77525 2025.82 625.65 10 . 0.91 77526 2026.73 626.02 11 . 5.46 77527 2032.19 625.99 12 . 1.47 77528 2033.66 625.47 13 . 2.39 77529 2036.05 625.55 14 . 1.63 77530 2037.68 625.96 15 . 9.55 77531 2047.23 625.74 16 . 6.12 77532 2053.35 625.97 17 . 2.29 77533 2055.64 625.75 18 TOP OLD CHANNEL 1.01 77534 2056.65 625.28 19 . 2.28 77535 2058.93 624.73 20 CL DRY CHANNEL 3.06 77536 2062.00 625.67 21 TOP 15.43 77537 2077.42 625.58 22 . 14.13 77538 2091.56 625.62 23 2.32 77539 2093.87 625.31 24 TOP BANK 3.13 77540 2097.00 624.55 25 TOP CUT 1.19 77541 2098.20 623.89 26 TOE CUT 5.32 77542 2103.52 623.54 27 WL BACKCHANNEL 3.27 77543 2106.79 622.91 28 . 2.87 77544 2109.66 622.77 29 . 2.28 77545 2111.94 622.78 30 . 2.88 77546 2114.82 622.85 31 . 3.24 77547 2118.06 623.07 32 . 1.72 77548 2119.78 623.35 33 . 1.15 77549 2120.92 623.56 34 WL BACKCHANNEL 1.82 77550 2122.74 624.00 35 BAR 0.90 77551 2123.64 624.22 36 TOE CUT 0.55 77552 2124.19 625.50 37 TOP 11.19 77553 2135.39 625.67 38 . 7.78 77554 2143.16 625.83 39 . 7.87 77555 2151.04 625.31 40 . 2.00 77556 2153.04 625.18 41 . 1.94 77557 2154.98 625.56 42 . 5.85 77558 2160.83 625.17 43 . 3.54 77559 2164.37 625.94 44 . 9.30 77560 2173.68 625.43 45 . 3.45 77561 2177.12 625.87 46 . 2.18 77562 2179.30 625.65 47 . 3.45 77563 2182.75 626.05 48 . 19.68 77564 2202.43 625.52 49 . 10.11 77565 2212.55 625.30 50 . 2.23 77566 2214.77 625.68 51 . 3.59 77567 2218.36 625.73 52 . 14.28 77568 2232.64 625.71 53 . 8.89 77569 2241.53 625.23 54 . 3.41 77570 2244.94 625.90 55 . 4.62 77571 2249.56 625.91 56 . 2.59 77572 2252.15 625.51 57 . 1.50 77573 2253.65 625.65 58 . 9.17 77574 2262.82 625.54 59 . 7.98 77575 2270.80 624.76 60 . 2.41 77576 2273.21 624.44 61 . 9.34 77577 2282.54 624.00 62 . 9.63 77578 2292.18 623.55 63 WL LB 2.77 77579 2294.95 623.19 64 . 3.14 77580 2298.08 622.31 65 2.41 77581 2300.50 621.65 66 MIDPT -1.9 2.83 77582 2303.33 621.86 67 W168 0.79 77583 2304.12 622.16 68 W138 1.67 77584 2305.80 622.54 69 W100 0.65 77585 2306.45 623.55 70 WL RB 1.36 77586 2307.81 624.33 71 ON RIP RAP 1.88 77587 2309.69 626.38 72 TOP RIP-RAP 1.99 77588 2311.68 626.41 73 GL BOLT RB 5.80 77589 2317.48 626.66 74 EDGE ACCESS RD 2.25 77590 2319.72 626.16 75 . 1.52 77591 2321.24 625.76 76 TOE HWY 4.13 77592 2325.37 627.42 77 TOP 1.39 77593 2326.76 627.50 78 EDGE PAVEMENT 5.84 77594 2332.59 627.52 79 C/L ROA 5.65 77595 2338.24 627.54 80 EDGE PAVEMENT 1.03 77596 2339.27 627.50 81 . 1.69 77597 2340.96 626.93 82 . 2.55 77598 2343.52 626.79 83 TOE SLOPE 3.96 77599 2347.48 628.67 84 STEEP RISE BYND END KETTLE RIVER X/S 78 PROJ#9510F080 OCT. 02 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 78458 0.00 626.04 1 DUMMY 2000.00 78459 2000.00 626.04 2 ROLLING 2.44 78460 2002.44 626.20 3 . 5.53 78461 2007.97 626.26 4 BOLT LB 11.42 78462 2019.39 626.06 5 . 9.53 78463 2028.92 626.16 6 . 4.30 78464 2033.22 626.29 7 TOP BANK 0.52 78465 2033.74 625.58 8 . 0.58 78466 2034.32 625.45 9 . 0.58 78467 2034.90 624.60 10 TOE BANK 1.14 78468 2036.04 624.18 11 . 1.69 78469 2037.73 623.95 12 WL LB 5.37 78470 2043.10 623.68 13 . 3.00 78471 2046.10 623.37 14 . 2.50 78472 2048.60 623.37 15 . 4.26 78473 2052.86 623.69 16 . 5.06 78474 2057.92 623.96 17 WL RB 9.84 78475 2067.76 624.29 18 . 10.61 78476 2078.37 624.63 19 BAR 5.77 78477 2084.14 624.80 20 . 1.86 78478 2086.00 625.13 21 . 1.05 78479 2087.05 625.17 22 . 2.89 78480 2089.94 625.67 23 . 5.17 78481 2095.11 625.96 24 TOP BAR 6.39 78482 2101.50 625.86 25 . 4.21 78483 2105.71 625.09 26 . 2.33 78484 2108.04 625.29 27 . 1.15 78485 2109.20 625.67 28 . 3.19 78486 2112.39 625.61 29 . 2.79 78487 2115.17 625.24 30 . 4.96 78488 2120.14 625.37 31 TOP DRY CHANNEL 2.48 78489 2122.62 624.61 32 . 2.50 78490 2125.12 624.34 33 . 3.04 78491 2128.16 624.09 34 . 2.93 78492 2131.09 624.64 35 . 0.64 78493 2131.73 625.15 36 TOE CUT 0.83 78494 2132.56 626.23 37 TOP BANK 3.14 78495 2135.70 626.38 38 . 8.45 78496 2144.15 625.93 39 . 1.33 78497 2145.48 626.13 40 . 7.63 78498 2153.11 625.85 41 . 2.11 78499 2155.22 625.39 42 . 4.86 78500 2160.08 624.88 43 . 4.09 78501 2164.17 625.06 44 . 2.39 78502 2166.56 625.29 45 . 2.32 78503 2168.88 625.51 46 TOP CUT 1.34 78504 2170.22 625.90 47 TOP BANK 2.79 78505 2173.01 626.14 48 BOLT RB 6.50 78506 2179.51 625.64 49 . 4.79 78507 2184.30 625.58 50 . 4.70 78508 2189.00 625.94 51 . 11.43 78509 2200.43 625.90 52 SPIKE 13.15 78510 2213.58 625.99 53 . 14.65 78511 2228.23 626.33 54 . 16.68 78512 2244.92 626.36 55 . 3.98 78513 2248.90 626.05 56 . 4.39 78514 2253.29 625.47 57 TOE 7.77 78515 2261.06 625.74 58 TOP 19.12 78516 2280.18 625.90 59 FLAT BEYOND END KETTLE RIVER X/S 79 PROJ#9510F080 OCT. 02 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 79424 0.00 634.09 1 DUMMY 2000.00 79425 2000.00 634.09 2 VERT RISE 7.63 79426 2007.63 627.22 3 TOE ROCK SLOPE 1.62 79427 2009.25 627.29 4 . 1.26 79428 2010.51 627.40 5 BOLT LB 3.74 79429 2014.25 627.49 6 TOP BANK 0.27 79430 2014.52 626.85 7 TOE CUT 2.08 79431 2016.60 625.54 8 TOE CUT 3.24 79432 2019.84 625.27 9 . 4.55 79433 2024.39 625.55 10 TOP GRAVEL BAR 2.78 79434 2027.18 625.50 11 . 3.16 79435 2030.34 625.31 12 WL LB 3.45 79436 2033.79 625.12 13 W0200 6.41 79437 2040.20 624.90 14 W0410 4.99 79438 2045.19 624.45 15 W0870 2.75 79439 2047.94 624.30 16 W1010 2.41 79440 2050.35 624.14 17 W1180 1.18 79441 2051.53 624.06 18 W1260 2.20 79442 2053.73 624.12 19 W1200 4.83 79443 2058.56 624.24 20 TOE CHANNEL 3.73 79444 2062.29 624.56 21 W0760 2.78 79445 2065.07 625.11 22 W0210 1.06 79446 2066.13 625.31 23 WL RB 0.82 79447 2066.95 625.50 24 . 1.30 79448 2068.25 625.51 25 TOE BANK 1.31 79449 2069.56 626.46 26 TOP CUT 0.14 79450 2069.70 626.85 27 TOP BANK 4.63 79451 2074.33 627.04 28 . 1.41 79452 2075.74 627.53 29 FIELD 2.28 79453 2078.02 627.49 30 GL BOLT RB 7.15 79454 2085.17 627.36 31 . 2.54 79455 2087.70 627.02 32 . 8.64 79456 2096.35 626.85 33 . 17.68 79457 2114.03 627.02 34 . 14.99 79458 2129.03 627.06 35 FLAT BEYOND END KETTLE RIVER X/S 80 PROJ#9510F080 OCT. 02 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 80382 0.00 630.98 1 DUMMY 2000.00 80383 2000.00 630.98 2 STEEP RISE BYND 5.47 80384 2005.47 627.96 3 TOE SLOPE 3.69 80385 2009.16 627.99 4 EDGE ROAD 2.21 80386 2011.37 627.96 5 BOLT LB 1.79 80387 2013.16 628.07 6 EDGE ROAD 0.97 80388 2014.13 628.55 7 TOP SPOIL 1.40 80389 2015.53 628.07 8 TOE SPOIL 9.79 80390 2025.32 628.13 9 TOP BANK 3.02 80391 2028.34 627.41 10 TOP CUT 0.59 80392 2028.93 626.59 11 TOE CUT 2.49 80393 2031.41 625.83 12 WL LB 4.25 80394 2035.66 625.33 13 . 2.05 80395 2037.71 625.17 14 . 3.25 80396 2040.96 624.94 15 . 3.23 80397 2044.20 624.73 16 . 0.57 80398 2044.76 624.64 17 . 4.12 80399 2048.88 624.86 18 . 2.46 80400 2051.34 624.95 19 . 3.83 80401 2055.16 625.18 20 . 2.96 80402 2058.12 625.31 21 . 4.81 80403 2062.93 625.54 22 . 4.84 80404 2067.77 625.57 23 . 6.73 80405 2074.50 625.58 24 . 0.57 80406 2075.07 625.83 25 WL RB 1.78 80407 2076.85 625.94 26 TOE BANK 5.61 80408 2082.46 627.59 27 TOP CUT 0.71 80409 2083.17 628.27 28 TOP BANK 7.72 80410 2090.89 627.66 29 . 4.32 80411 2095.21 628.03 30 . 8.57 80412 2103.79 627.84 31 GL BOLT RB 13.78 80413 2117.57 627.83 32 . 8.31 80414 2125.88 627.32 33 . 9.35 80415 2135.23 627.62 34 . 16.90 80416 2152.13 627.43 35 . 4.29 80417 2156.42 626.89 36 . 4.20 80418 2160.62 626.95 37 . 2.50 80419 2163.12 627.47 38 . 5.13 80420 2168.25 627.45 39 . 2.47 80421 2170.72 626.72 40 . 3.74 80422 2174.46 627.22 41 . 2.24 80423 2176.70 627.96 42 . 12.43 80424 2189.12 627.95 43 FLAT BEYOND END KETTLE RIVER X/S 81 PROJ#9510F080 OCT. 02 1995 STATIONS DISTANCE CHAINAGE ELEV NO. NAME OR REMARKS 81349 0.00 637.30 1 DUMMY 2000.00 81350 2000.00 637.30 2 STEEP RISE BYND 2.52 81351 2002.52 635.89 3 EDGE ROAD/HWY 3.10 81352 2005.62 635.65 4 EDGE ROAD/HWY 2.88 81353 2008.51 634.75 5 . 1.90 81354 2010.40 634.07 6 EDGE ROAD/HWY 2.69 81355 2013.09 633.97 7 BOLT LB 0.57 81356 2013.67 634.09 8 EDGE ROAD/HWY 2.80 81357 2016.46 633.24 9 TOP BANK 3.29 81358 2019.76 630.97 10 . 1.60 81359 2021.36 629.05 11 . 1.12 81360 2022.48 627.50 12 TOE BANK 3.46 81361 2025.94 626.49 13 WL LB 1.58 81362 2027.53 626.04 14 . 3.64 81363 2031.16 626.00 15 . 4.03 81364 2035.19 625.92 16 . 3.91 81365 2039.10 625.79 17 . 3.08 81366 2042.18 625.73 18 . 3.00 81367 2045.17 625.74 19 . 3.49 81368 2048.66 625.84 20 . 4.27 81369 2052.93 625.88 21 . 3.66 81370 2056.59 627.31 22 . 1.73 81371 2058.32 627.44 23 . 1.53 81372 2059.85 627.69 24 . 0.93 81373 2060.78 627.86 25 WL RB TOE 1.04 81374 2061.81 628.44 26 . 0.91 81375 2062.73 628.96 27 TOP BANK TOE CUT 1.25 81376 2063.97 628.84 28 TOP CUT 3.38 81377 2067.36 629.09 29 SPIKE 4.35 81378 2071.70 628.91 30 FENCELINE 5.75 81379 2077.45 628.77 31 BOLT RB 3.31 81380 2080.76 628.69 32 . 3.41 81381 2084.17 629.35 33 . 14.56 81382 2098.74 629.12 34 FLAT BEYOND END