NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 17     KOOTENAY RIVER     PROJECT 68-SR-01     OCT 1968
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      534.42      0    DUMMY
          2000.00
19961                 2000.00      534.42      1    1968 0+00 X/S 17
             4.43
19960                 2004.43      534.88      2    FIELD           17
            15.71
19959                 2020.13      535.28      3    FIELD           17
            11.88
19958                 2032.01      535.80      4    FIELD           17
             8.89
19957                 2040.90      536.40      5    FIELD           17
             3.51
19956                 2044.41      536.90      6    TOE             17
             2.91
19955                 2047.31      537.61      7    ON SLOPE        17
             4.21
19954                 2051.52      538.44      8    CREST           17
             2.73
19953                 2054.25      538.62      9    MON 398 LB(GONE)17
             1.83
19952                 2056.08      538.62     10    CREST           17
             2.11
19951                 2058.18      537.38     11    ON  SLOPE       17
             2.73
19950                 2060.92      536.91     12    TOE DYKE        17
             5.15
19949                 2066.07      536.53     13    TOP BANK        17
             2.61
19948                 2068.68      534.19     14    .               17
             2.61
19947                 2071.28      532.15     15    .               17
             0.91
19946                 2072.20      531.85     16    .               17
             1.52
19945                 2073.72      531.33     17    .               17
             1.52
19944                 2075.24      530.78     18    .               17
             1.52
19943                 2076.77      529.83     19    .               17
             1.52
19942                 2078.29      528.95     20    .               17
             1.08
19939                 2079.37      527.21     21    A2 ADJ          17
            11.89
19938                 2091.26      521.48     22    .               17
             2.48
19937                 2093.74      520.90     23    BP 36.9         17
            13.66
19936                 2107.40      514.69     24    BP 57.3         17
             4.96
19935                 2112.35      512.95     25    SOUNDER MISS73EL17
X/S 17     KOOTENAY RIVER     PROJECT 68-SR-01     OCT 1968
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
            11.83
19934                 2124.18      512.19     26    SOUNDER MISS73EL17
            12.80
19933                 2136.98      512.95     27    SOUNDER MISS73EL17
             3.50
19932                 2140.48      513.80     28    BP 60.0         17
             8.19
19931                 2148.67      515.51     29    .               17
             3.62
19930                 2152.29      515.54     30    BP 54.5         17
             7.25
19929                 2159.55      516.45     31    .               17
            10.54
19928                 2170.09      518.07     32    .               17
            14.84
19927                 2184.92      520.63     33    .               17
            10.21
19926                 2195.13      522.46     34    .               17
             9.44
19925                 2204.57      524.96     35    .               17
             7.89
19924                 2212.47      528.07     36    .               17
             0.78
19923                 2213.25      528.65     37    BP 11.5         17
             1.21
19922                 2214.46      529.13     38    BP  9.9         17
             0.68
19921                 2215.14      529.16     39    .               17
             1.02
19920                 2216.16      529.07     40    .               17
             1.52
19919                 2217.69      529.44     41    .               17
             1.52
19918                 2219.21      530.17     42    .               17
             1.52
19917                 2220.74      531.11     43    .               17
             1.52
19916                 2222.26      531.85     44    .               17
             0.97
19915                 2223.23      532.15     45    .               17
             3.47
19914                 2226.71      535.39     46    .               17
             0.17
19913                 2226.88      537.05     47    TOP RB          17
             2.91
19912                 2229.79      536.86     48    .               17
             1.84
19911                 2231.63      536.81     49    .               17
             0.31
19910                 2231.94      536.50     50    .               17
             2.72
X/S 17     KOOTENAY RIVER     PROJECT 68-SR-01     OCT 1968
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
19909                 2234.66      536.46     51    .               17
             0.93
19908                 2235.59      536.72     52    .               17
             3.77
19907                 2239.36      537.75     53    .               17
             2.55
19906                 2241.91      538.49     54    CREST           17
             1.52
19905                 2243.44      538.49     55    MON 397 RB      17
             1.52
19904                 2244.96      538.49     56    CREST           17
             0.66
19903                 2245.62      538.25     57    .               17
             6.26
19902                 2251.88      535.79     58    TOE DYKE        17
             5.44
19901                 2257.32      535.30     59    FIELD LEVEL     17
 
JOIN  19961-19901  S 43d41'13" E  257.32
