NOTE:
	    
This information is considered historical as it represents channel 
conditions and configuration at the time of the  survey only.  User 
must accept responsibility of ensuring  that the accuracy  and 
completeness of  provided data is suitable for the needs of the 
project or study.   It is provided "as is" without warranty of any 
kind,  whether express or implied.  Under  no  circumstances will the 
Government of British Columbia be liable  to any person or business 
entity for any   direct,  indirect, special, incidental, consequential, 
or other  damages based on any use of this information.

X/S 20     KOOTENAY RIVER     PROJECT 68-SR-01     OCT 1968
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
                         0.00      532.56      0    DUMMY
          2000.00
 2445                 2000.00      532.56      1    1997 0+00 X/S 20  
           101.66
20249                 2101.66      537.88      2    MON 404 LB      20
             3.50
20248                 2105.17      537.32      3    ON SLOPE        20
             6.24
20247                 2111.41      536.53      4    TOP LB          20
             1.67
20246                 2113.08      534.41      5    .               20
             1.83
20245                 2114.90      533.96      6    .               20
             3.19
20244                 2118.10      532.23      7    EDGE WATER      20
             0.05
20243                 2118.15      532.15      8    WL LB           20
             1.13
20242                 2119.28      532.09      9    .               20
             1.52
20241                 2120.80      532.00     10    .               20
             1.52
20240                 2122.33      531.63     11    .               20
             1.52
20239                 2123.85      531.08     12    .               20
             3.46
20238                 2127.31      530.38     13    .               20
             9.41
20237                 2136.71      524.99     14    .               20
            16.84
20236                 2153.55      516.45     15    .               20
             9.59
20235                 2163.14      508.38     16    BP 78.0         20
             4.30
20234                 2167.44      508.16     17    .               20
             3.74
20233                 2171.18      503.96     18    BP 92.5         20
             4.99
20232                 2176.17      503.80     19    BP 93.          20
             9.95
20231                 2186.12      503.50     20    .               20
             8.84
20230                 2194.95      504.02     21    .               20
             8.84
20229                 2203.79      504.60     22    .               20
             8.93
20228                 2212.72      505.85     23    .               20
             4.67
20227                 2217.39      505.94     24    BP 86.0 W       20
             5.82
20226                 2223.21      508.99     25    .               20
X/S 20     KOOTENAY RIVER     PROJECT 68-SR-01     OCT 1968
 
POINT    DISTANCE    CHAINAGE   ELEVATION    NO.    REMARKS
 
            16.86
20225                 2240.08      511.27     26    .               20
             9.72
20224                 2249.79      512.58     27    .               20
             9.23
20223                 2259.02      518.71     28    .               20
             8.85
20222                 2267.87      524.23     29    .               20
             6.16
20221                 2274.03      526.91     30    .               20
             2.31
20220                 2276.34      528.74     31    .               20
             1.31
20219                 2277.65      529.07     32    .               20
             1.52
20218                 2279.17      529.86     33    .               20
             1.52
20217                 2280.70      531.08     34    .               20
             1.52
20216                 2282.22      532.03     35    .               20
             0.92
20215                 2283.14      532.09     36    EDGE WATER      20
             0.15
20214                 2283.29      532.15     37    WL RB           20
             2.22
20213                 2285.50      534.07     38    .               20
             2.12
20212                 2287.62      536.12     39    TOP BANK        20
             9.89
20211                 2297.51      534.65     40    TOE RIDGE       20
            11.39
20210                 2308.90      534.06     41    .               20
            24.45
20209                 2333.35      534.24     42    .               20
            11.66
20208                 2345.02      535.21     43    .               20
             9.61
20207                 2354.63      536.25     44    TOE DYKE        20
             2.76
20206                 2357.39      536.60     45    ON SLOPE        20
             5.95
20205                 2363.34      538.27     46    TOP             20
             1.92
20204                 2365.26      538.27     47    MON 403 RB      20
             2.44
20203                 2367.70      538.27     48    TOP SHOULDER    20
             4.96
20202                 2372.65      536.30     49    TOE DYKE        20
             7.84
20201                 2380.49      536.13     50    FIELD LEVEL     20
 
JOIN  2445-20201  N 52d12'14" E  380.49
